exterior restoration and rehabilitation of thompson hall presented by: university of new hampshire...
TRANSCRIPT
Exterior Restoration and Rehabilitation of Thompson Hall
Presented By:
University of New Hampshire
Goody Clancy
Shawmut Design and Construction
Today’s Agenda
• Team Introductions
• Project Description
• Pre-construction / Construction Schedule
• Preliminary Logistics
• Occupant Concerns / UNH Department Concerns
and Issues / Fire, Police and Life Safety
University of New Hampshire
Thompson Hall Project Team
Brenda Whitmore, Project Manager
Douglas Bencks, University Architect
Paul Chamberlin, Executive Director, Facilities Design and
Construction
Goody Clancy
Thompson Hall Project Team
• Jean Carroon, Principal
• Lisa Howe, Project Manager
• Beth Sitterly, Architectural Conservator
• John Wathne, Principal
(Structures North Consulting Engineers, Inc.)
Project Description
Shawmut Design and Construction
Thompson Hall Project Team
Lee Dellicker, Vice President/Partner
Carl Jay, Director of Historic Preservation
Ryan Lynch, Project Manager
Dave Hayden, Site Superintendent
Steve Kanavich, Senior Estimator
Tim Leblanc, Director of Safety
Occupied Renovation Philosophy
Shawmut Design and Construction brings a very different attitude
to managing construction within occupied environments. We
consider ourselves guests in your institution and instill
this sense of respect with every subcontractor and individual
worker on site. We firmly believe that what goes on “outside
the construction fence” is just as important as the actual
construction process. We have developed a job site culture with
our superintendents and subcontractors that every person needs to
demonstrate the highest level of sensitivity to the
operational environments .
Project Schedule
• June 2004 – August 2004: Design Development
• August 2004 – October 2004: Final Design
• November 2004 – March 2005: Final Planning
and Subcontractor Procurement
• March 2005 – December 2005: Construction
Preliminary Logistics
• Project Safety
• Subcontractor I.D. Program
• Site Signage
• Communication Methods
Guard Shack
Covered Walkway
Gate
Tree Protection
Emergency Meeting Location
Dumpster
Gate
2 nd Staging Area
Dimond Library
Murkland
Emergency egress routes-
Maintain clear access at
all times
TO BE APPROVEDTO BE APPROVED
Staging with cover to maintain walk way at
porte cochere
“By acceptance of the Contractor Badge, all personnel have acknowledged the worker decorum policy set forth for this project along with the requirements detailed in the General Requirements
Rider of all subcontracts. If any worker fails to adhere to these policies or behaves inappropriately while on the University of
New Hampshire’s campus, We Reserve The Right to remove any worker from the project.”
Subcontractor I.D. Program
Site Signage
Construction
Vehicles
ONLY
Construction
Deliveries
NEXT GATE
HARD HAT AREA
Authorized Personnel
ONLY
Communication
Questions?
Thank You!