eyre peninsula local government region

6
ISSUES FROM THE WEST

Upload: sheng

Post on 22-Feb-2016

28 views

Category:

Documents


0 download

DESCRIPTION

ISSUES FROM THE WEST. EYRE PENINSULA LOCAL GOVERNMENT REGION. Issue 1Rail Interface. Managing heavy vehicles on unsealed networks. Route Assessor Issues and UniSA course . Interim Operation of S 5(1)(1b) – Native vegetation clearances for road safety. . - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: EYRE PENINSULA LOCAL GOVERNMENT REGION

ISSUES FROM THE WEST

Page 2: EYRE PENINSULA LOCAL GOVERNMENT REGION

Issue 1 Rail Interface

Page 3: EYRE PENINSULA LOCAL GOVERNMENT REGION

Managing heavy vehicles on unsealed networks

Page 4: EYRE PENINSULA LOCAL GOVERNMENT REGION

Route Assessor Issues and UniSA course.

Page 5: EYRE PENINSULA LOCAL GOVERNMENT REGION

Interim Operation of S 5(1)(1b) – Native vegetation clearances for road safety.

Page 6: EYRE PENINSULA LOCAL GOVERNMENT REGION

One System and cultural change for Works teams.