f. a. s. t. f actory a uthorized s ervice t echnician james e. bowie, jr., ph.d., p.e. february,...
TRANSCRIPT
F. A. S. T.FACTORY AUTHORIZED SERVICE
TECHNICIAN
James E. Bowie, Jr., Ph.D., P.E. February, 2011
Delivering
Experience,
Quality and
Service since
1934.
FAST PROGRAM OBJECTIVE
S
The objective is for our representatives to have the capability of generating authorized personnel without input from the factory.
The expectation is that our representatives will have control of the timing and organization of the training making it more accessible and economical.
FAST PROGRAM
WATER KING’S
ROLE
Water King will provide
training materials,
approval of the applications and
review of the programs.
FAST PROGRAM
GETTING STARTED
To initiate the program we need a cadre of Authorized individuals that can then serve as trainers and mentors to aspiring water technicians.
1. One study unit (with an exam), to include completing the required reading list.
2. One unit of hands on training work, may include a combination of videos and a walk through with a FAST. May be substituted by equivalent, verifiable field service work on current model valves. (Discuss substitution with Ray)
3. Participation in a Water King start up with an FAST.
4. Participation in a Water King service call with an FAST.
5. Letter of recommendation by a FAST.6. Two personal references.7. Personal resume.
FAST PROGRAM REQUIREM
ENTS
Water King Task Master III (TM III)
DesignManufacturingService
1/23/2011 INNOVATIONS 6
DESIGN – Task Master III
Mechanical simplicity
One moving part - the piston
1/23/2011 INNOVATIONS 7
Over molded Dual-Lobe Seals
DESIGN – Task Master III
Fully Controlled with Modern Electronics
1/23/2011 INNOVATIONS 8
DESIGN – Task Master III
Optical Sensors guide piston into position
Accurate and Repeatable
No micro-switches
No positioning cams
No wear parts
No calibration1/23/2011 INNOVATIONS 9
DESIGN – Task Master III
Elegant design
1/23/2011 INNOVATIONS 10
DESIGN – Task Master IIIFlow Diagram
1/23/2011 INNOVATIONS 11
OUT IN
POSITION 4FAST RINSE & REFILL
RiserPort
Tank TopPort
OUT IN
POSITION 3BRINE & SLOW RINSE
RiserPort
Tank TopPort
OUT IN
POSITION 2BACKWASH
RiserPort
Tank TopPort
OUT IN
POSITION 1SERVICE
RiserPort
Tank TopPort
DESIGN – Task Master III
Internal brine injector
1/23/2011 INNOVATIONS 12
DESIGN – Task Master III
RemovableNEMA 4 / IP65 control enclosure
NEMA 4 flexible plastic conduit for shut off kits
You can squirt it with a water hose
1/23/2011 INNOVATIONS 13
DESIGN – Task Master III
Corrosion Resistant
All metal contact parts are Austenitic Passivated 316 Stainless Steel
High Temperature – 180˚ F
1/23/2011 INNOVATIONS 14
DESIGN – Task Master IIICorrosion ResistantGaskets and O-rings are EDPM
1/23/2011 INNOVATIONS 15
Cork Gaskets for tank adaptor for low temperature non corrosive applications
DESIGN – Task Master IIICorrosion ResistantPlastic end caps are Noryl
1/23/2011 INNOVATIONS 16
DESIGN – Task Master III
Zero lead. Stainless steel contains no lead.
No brass fittings in contact with the water.
Both no lead and low lead brass have some lead content.
1/23/2011 INNOVATIONS 17
Tank adaptor is also Austenitic Passivated 316 Stainless Steel
DESIGN – Task Master III
Broad application
Very broad range of systems use exactly the same valve and control system.
RF 50 to MF 120012ӯ to 48ӯ
1/23/2011 INNOVATIONS 18
1/23/2011 INNOVATIONS 19
Simple one piece piston
Over molded Dual-Lobe Seals
Can be efficiently replaced
Simple one piece piston
Over molded Dual-Lobe Seals
Can be efficiently replaced
SERVICE – Task Master III
1/23/2011 INNOVATIONS 20
Electronics are Plug and PlayElectronics are Plug and Play
SERVICE – Task Master III
1/23/2011 INNOVATIONS 21
Only seven partsOnly seven parts
SERVICE – Task Master III
1/23/2011 INNOVATIONS 22
Valves are serialized
Factory will know exact configuration of valve as originally manufactured
Valves are serialized
Factory will know exact configuration of valve as originally manufactured
SERVICE – Task Master III
1/23/2011 INNOVATIONS 23
Valve is not heavy or dangerous to work on
Shipping weight is only 25 lbs
Valve is not heavy or dangerous to work on
Shipping weight is only 25 lbs
SERVICE – Task Master III
1/23/2011 INNOVATIONS 24
Programming is user friendly and efficient
Push button manual regeneration
Push button step through on cycles
Programming is user friendly and efficient
Push button manual regeneration
Push button step through on cycles
SERVICE – Task Master III
1/23/2011 INNOVATIONS 25
Valves made in our shop with “our own two hands”
Joe, Jason and Hector assemble and test the valves
Ray keeps the test machine functioning
Jim stays out of the way
Valves made in our shop with “our own two hands”
Joe, Jason and Hector assemble and test the valves
Ray keeps the test machine functioning
Jim stays out of the way
MANUFACTURING – Task Master III
1/23/2011 INNOVATIONS 26
Rigorous quality control on all components
Every valve individually tested
100% testing
Rigorous quality control on all components
Every valve individually tested
100% testing
MANUFACTURING – Task Master III
1/23/2011 INNOVATIONS 27
MANUFACTURING – Task Master IIIAmerican Machining
Machining quality is critical to this product
1/23/2011 INNOVATIONS 28
MANUFACTURING – Task Master III
We are the beneficiaries of a multi million dollar development effort by GE Osmonics.
This product was designed to be the best, most modern, most reliable on the market.
Water King Task Master III (TM III)
Click image to viewTM-III programming demonstration
1/23/2011 INNOVATIONS 29
Water King – Task Master III -Advantage
1/23/2011 INNOVATIONS 30
QUESTIONS?
1/23/2011 INNOVATIONS 31