  • 7/30/2019 F-Liquid Penetran Exam Report - Copy

    1/24

    Client : PT.KRAKATAU STEEL

    Project Title : ZERO REFORMER

    Name of Equipment : 60" REG -24-1P1

    and Identification No. : 60" (BRANCH) : 2 JOINT

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Penetrant

    LIQUID PENETRANT EXAMINATION REPORT

    Removal

    Penetrant Time Minutes

    60" REG-24"-1P1

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report - Copy

    2/24

    Client : PT.KRAKATAU STEEL

    Project Title : ZERO REFORMER

    Name of Equipment : 36"- REG -02-1P1and Identification No. : 36" (BRANCH) : 4 J OINT

    Applicable code

    Stage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Penetrant

    Penetrant Time Minutes

    Removal

    LIQUID PENETRANT EXAMINATION REPORT

    36" REG-24"-1P1

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report - Copy

    3/24

    Client : PT.KRAKATAU STEEL

    Project Title : ZERO REFORMER

    Name of Equipment 20" REG 11-1P1-OGand Identification No. : 20" ( BRANCH ) : 5 JOINT

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Removal

    LIQUID PENETRANT EXAMINATION REPORT

    Penetrant

    Penetrant Time Minutes

    24" REG-24"-1P1

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report - Copy

    4/24

    Client : PT.KRAKATAU STEEL

    Project Title : ZERO REFORMER

    Name of Equipment : 6" NG 8010 NEW PIPE

    and Identification No. : 6" BRANCH (6 JOINT)

    Applicable code

    Stage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Removal

    LIQUID PENETRANT EXAMINATION REPORT

    Penetrant

    Penetrant Time Minutes

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying Penetrants

    Dry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report - Copy

    5/24

    Client : PT.KRAKATAU STEEL

    Project Title : ZERO REFORMER

    Name of Equipment 11/2 -IA & 6"

    and Identification No. : 11/2 & 6" 3 JOINT BRANCH

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Penetrant Time Minutes

    Removal

    LIQUID PENETRANT EXAMINATION REPORT

    Penetrant

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report - Copy

    6/24

    Client : PT.KRAKATAU STEEL

    Project Title : ZERO REFORMER

    Name of Equipment : 10" ECW 8032-01

    and Identification No. : 10" (BRANCH) : 4 JOINT

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    ACC

    PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Penetrant

    Penetrant Time Minutes

    Removal

    LIQUID PENETRANT EXAMINATION REPORT

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report - Copy

    7/24

    Client : PT.KRAKATAU STEEL

    Project Title : ZERO REFORMER

    Name of Equipment : 60" Treansfer line

    and Identification No. : 60"X6" ( Branch ) 2 JOINT

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    ACC

    PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Removal

    LIQUID PENETRANT EXAMINATION REPORT

    Penetrant

    Penetrant Time Minutes

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report - Copy

    8/24

    Client : PT.KRAKATAU STEEL

    Project Title : ZERO REFORMER

    Name of Equipment 72" JOINT DUMMYTO TRANSFERLINE

    and Identification No. : 72" & 3" (branch) 6 joint

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    Porosity

    PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    LIQUID PENETRANT EXAMINATION REPORT

    Removal

    Penetrant

    Penetrant Time Minutes

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report - Copy

    9/24

    Client : PT.KRAKATAU STEEL

    Project Title : ZERO REFORMER

    Name of Equipment 6" Netrogen launch Transferline

    and Identification No. : 6" & 3" (branch) 6 joint

    Applicable code Stage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    Acc

    PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Removal

    LIQUID PENETRANT EXAMINATION REPORT

    Penetrant

    Penetrant Time Minutes

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report - Copy

    10/24

    Client : PT.KRAKATAU STEEL

    Project Title : ZERO REFORMER

    Name of Equipment 6" NG-8010-1P4 LINE NEW PIPE

    and Identification No. : 6" (branch) 4joint

    Applicable code Stage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    LIQUID PENETRANT EXAMINATION REPORT

    Removal

    Penetrant

    Penetrant Time Minutes

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report - Copy

    11/24

    Client : PT.KRAKATAU STEEL

    Project Title : ZERO REFORMER

    Name of Equipment 6" NG-8010-1P4 LINE NEW PIPE

    and Identification No. : 6" (branch) 4 joint

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    LIQUID PENETRANT EXAMINATION REPORT

    Removal

    Penetrant

    Penetrant Time Minutes

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report - Copy

    12/24

    Client : PT.KRAKATAU STEEL

    Project Title : ZERO REFORMER

    Name of Equipment 2" NG 8037-1P2

    and Identification No. : 6" & 2" (branch) 1 joint

    Applicable code

    Stage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    LIQUID PENETRANT EXAMINATION REPORT

    Removal

    Penetrant

    Penetrant Time Minutes

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report - Copy

    13/24

    Client : PT.KRAKATAU STEEL

    Project Title : ZERO REFORMER

    Name of Equipment 6" Netrogen

    and Identification No. : 6" & 3" (branch) 6 joint

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    POROSITY

    PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    LIQUID PENETRANT EXAMINATION REPORT

    Removal

    Penetrant

    Penetrant Time Minutes

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report - Copy

    14/24

    Client : PT.KRAKATAU STEEL

    Project Title : ZERO REFORMER

    Name of Equipment 3" IG -SA-" Netrogen launch Transferline

    and Identification No. : 3" (branch) 6 joint

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    LIQUID PENETRANT EXAMINATION REPORT

    Removal

    Penetrant

    Penetrant Time Minutes

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report - Copy

    15/24

    Client : PT.KRAKATAU STEEL

    Project Title : ZERO REFORMER

    Name of Equipment 6" Netrogen launch Transferline

    and Identification No. : 6" & 3" (branch) 6 joint

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    LIQUID PENETRANT EXAMINATION REPORT

    Removal

    Penetrant

    Penetrant Time Minutes

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report - Copy

    16/24

    Client :

    Project Title :

    Name of Equipment 8" COW-041 1S1

    and Identification No. : 8" (branch) 6 joint

    Applicable code

    Stage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    LIQUID PENETRANT EXAMINATION REPORT

    Removal

    Penetrant

    Penetrant Time Minutes

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report - Copy

    17/24

    Client : PT.KRAKATAU STEEL

    Project Title : ZERO REFORMER

    Name of Equipment 6" Netrogen launch Transferline

    and Identification No. : 6" & 3" (branch) 6 joint

    Applicable code Stage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    LIQUID PENETRANT EXAMINATION REPORT

    Removal

    Penetrant

    Penetrant Time Minutes

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report - Copy

    18/24

    Client : PT.KRAKATAU STEEL

    Project Title : ZERO REFORMER

    Name of Equipment 6" Netrogen launch Transferline

    and Identification No. : 6" & 3" (branch) 6 joint

    Applicable code Stage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    LIQUID PENETRANT EXAMINATION REPORT

    Removal

    Penetrant

    Penetrant Time Minutes

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report - Copy

    19/24

    Client : PT.KRAKATAU STEEL

    Project Title : ZERO REFORMER

    Name of Equipment 6" Netrogen launch Transferline

    and Identification No. : 6" & 3" (branch) 6 joint

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    LIQUID PENETRANT EXAMINATION REPORT

    Removal

    Penetrant

    Penetrant Time Minutes

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report - Copy

    20/24

    Client : PT.KRAKATAU STEEL

    Project Title : ZERO REFORMER

    Name of Equipment 16" PCW- 8009-W02

    and Identification No. : 16" (branch) 2 joint

    Applicable code

    Stage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    LIQUID PENETRANT EXAMINATION REPORT

    Removal

    Penetrant

    Penetrant Time Minutes

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report - Copy

    21/24

    Client : PT.KRAKATAU STEEL

    Project Title : ZERO REFORMER

    Name of Equipment 24"- MPS,24" 1P1

    and Identification No. : 24" (BLIND ) 6 joint

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    ACC

    PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    LIQUID PENETRANT EXAMINATION REPORT

    Removal

    Penetrant

    Penetrant Time Minutes

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report - Copy

    22/24

    Client : PT.KRAKATAU STEEL

    Project Title : ZERO REFORMER

    Name of Equipment 16" PCW-8009-W02

    and Identification No. : 16" (branch) 2joint

    Applicable code

    Stage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    ACC

    PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    LIQUID PENETRANT EXAMINATION REPORT

    Removal

    Penetrant

    Penetrant Time Minutes

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report - Copy

    23/24

    Client : PT.KRAKATAU STEEL

    Project Title : ZERO REFORMER

    Name of Equipment 6" Netrogen launch Transferline

    and Identification No. : 6" & 3" (branch) 6 joint

    Applicable codeStage of Examiniation

    Material

    Surface Preparation

    15'

    Developing

    Location Examined

    Judgement Attachment Report

    ACC

    PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY

    PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL

    Removal

    LIQUID PENETRANT EXAMINATION REPORT

    Penetrant

    Penetrant Time Minutes

    As Welded

    After P.W.H.T.

    After Hydro. Test

    Others

    grinding Machine

    Satisfactory

    Unsatisfactory

    Others

    Temperature

    Type

    Application

    Color Contrast

    Brushing

    Fluorescent

    Spraying

    Solven-Removeable Penetrants

    Water-Washable Penetrants

    Post-Emulsifying PenetrantsDry Developer

    Wet Developer

  • 7/30/2019 F-Liquid Penetran Exam Report - Copy

    24/24

    Project Title ZERO REFORMER Project No.:

    Client PT.KRAKATAU ENGINEERING Report No.:

    Name of Equipment PIPING Date :

    1 60" REG-24-IPI 60 2 120

    2 36" REG-02-1P1 36 4 144

    3 24" MPS-24" REG-69-1P1 24 14 336

    4 20" REG- 11-1P1 28" OG 20 4 80

    5 6" NG8010-1P4 NEW LINE PIPE 6 14 84

    6 16" PCW-8009 W02 16 2 32

    7 12" ECW-8031 12 2 24

    8 10" ECW-8032-W01 10" -PCW 10 2 20

    9 6" COW-041-1S1 6" SW99-W01 6 4 24

    10 2" IG 8037-IP2 2 1 2

    11 3" IG,3-SA ECW 3 6 18

    12 2" MPS-41-1S1-2"DM8007-W01 2 18 36

    13 11/2"-1A 6" SW-99 W01 1.5 3 4.5

    14 72" TRANSFER LINE 71 1 71

    15 6" BRANCH TRANSFER LINE 6 6 36

    16 3" BRANCH TRANSFER LNE 3 6 18

    89 1049.5

    note :1 WAKTU 52 Hour price /hour Total

    2 MAN FOWER

    a Level 2 4 52 35,000.0Rp 7,280,000.0Rp

    b Level 1 4 52 25,000.0Rp 5,200,000.0Rp

    c Helper 5 52 15,000.0Rp 3,900,000.0Rp

    3 MATERIAL

    a Liquit Penetrant 15 Cans 150,000.0Rp 2,250,000.0Rp

    b Liquit Depelover 20 Cans 150,000.0Rp 3,000,000.0Rp

    c Liquit Cleaner 55 Cans 150,000.0Rp 8,250,000.0Rp

    d Wire brush 3 ls 50,000.0Rp 150,000.0Rp

    e Majun 10 kg 10,000.0Rp 100,000.0Rp

    30,130,000.0Rp

    PREPARED BY, CHECKED BY, APPROVED BY,

    DIA

    INCH

    WELDED

    BRANCH

    QTY DIA

    INCH

    LIQUID PENETRANT EXAMINATION REPORT

    ACCEPTEDDEFECTNO LINE NOMERQTY

    JOINT