7/30/2019 F-Liquid Penetran Exam Report - Copy
1/24
Client : PT.KRAKATAU STEEL
Project Title : ZERO REFORMER
Name of Equipment : 60" REG -24-1P1
and Identification No. : 60" (BRANCH) : 2 JOINT
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Penetrant
LIQUID PENETRANT EXAMINATION REPORT
Removal
Penetrant Time Minutes
60" REG-24"-1P1
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report - Copy
2/24
Client : PT.KRAKATAU STEEL
Project Title : ZERO REFORMER
Name of Equipment : 36"- REG -02-1P1and Identification No. : 36" (BRANCH) : 4 J OINT
Applicable code
Stage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Penetrant
Penetrant Time Minutes
Removal
LIQUID PENETRANT EXAMINATION REPORT
36" REG-24"-1P1
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report - Copy
3/24
Client : PT.KRAKATAU STEEL
Project Title : ZERO REFORMER
Name of Equipment 20" REG 11-1P1-OGand Identification No. : 20" ( BRANCH ) : 5 JOINT
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Removal
LIQUID PENETRANT EXAMINATION REPORT
Penetrant
Penetrant Time Minutes
24" REG-24"-1P1
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report - Copy
4/24
Client : PT.KRAKATAU STEEL
Project Title : ZERO REFORMER
Name of Equipment : 6" NG 8010 NEW PIPE
and Identification No. : 6" BRANCH (6 JOINT)
Applicable code
Stage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Removal
LIQUID PENETRANT EXAMINATION REPORT
Penetrant
Penetrant Time Minutes
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying Penetrants
Dry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report - Copy
5/24
Client : PT.KRAKATAU STEEL
Project Title : ZERO REFORMER
Name of Equipment 11/2 -IA & 6"
and Identification No. : 11/2 & 6" 3 JOINT BRANCH
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Penetrant Time Minutes
Removal
LIQUID PENETRANT EXAMINATION REPORT
Penetrant
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report - Copy
6/24
Client : PT.KRAKATAU STEEL
Project Title : ZERO REFORMER
Name of Equipment : 10" ECW 8032-01
and Identification No. : 10" (BRANCH) : 4 JOINT
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
ACC
PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Penetrant
Penetrant Time Minutes
Removal
LIQUID PENETRANT EXAMINATION REPORT
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report - Copy
7/24
Client : PT.KRAKATAU STEEL
Project Title : ZERO REFORMER
Name of Equipment : 60" Treansfer line
and Identification No. : 60"X6" ( Branch ) 2 JOINT
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
ACC
PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Removal
LIQUID PENETRANT EXAMINATION REPORT
Penetrant
Penetrant Time Minutes
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report - Copy
8/24
Client : PT.KRAKATAU STEEL
Project Title : ZERO REFORMER
Name of Equipment 72" JOINT DUMMYTO TRANSFERLINE
and Identification No. : 72" & 3" (branch) 6 joint
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
Porosity
PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
LIQUID PENETRANT EXAMINATION REPORT
Removal
Penetrant
Penetrant Time Minutes
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report - Copy
9/24
Client : PT.KRAKATAU STEEL
Project Title : ZERO REFORMER
Name of Equipment 6" Netrogen launch Transferline
and Identification No. : 6" & 3" (branch) 6 joint
Applicable code Stage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
Acc
PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Removal
LIQUID PENETRANT EXAMINATION REPORT
Penetrant
Penetrant Time Minutes
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report - Copy
10/24
Client : PT.KRAKATAU STEEL
Project Title : ZERO REFORMER
Name of Equipment 6" NG-8010-1P4 LINE NEW PIPE
and Identification No. : 6" (branch) 4joint
Applicable code Stage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
LIQUID PENETRANT EXAMINATION REPORT
Removal
Penetrant
Penetrant Time Minutes
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report - Copy
11/24
Client : PT.KRAKATAU STEEL
Project Title : ZERO REFORMER
Name of Equipment 6" NG-8010-1P4 LINE NEW PIPE
and Identification No. : 6" (branch) 4 joint
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
LIQUID PENETRANT EXAMINATION REPORT
Removal
Penetrant
Penetrant Time Minutes
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report - Copy
12/24
Client : PT.KRAKATAU STEEL
Project Title : ZERO REFORMER
Name of Equipment 2" NG 8037-1P2
and Identification No. : 6" & 2" (branch) 1 joint
Applicable code
Stage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
LIQUID PENETRANT EXAMINATION REPORT
Removal
Penetrant
Penetrant Time Minutes
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report - Copy
13/24
Client : PT.KRAKATAU STEEL
Project Title : ZERO REFORMER
Name of Equipment 6" Netrogen
and Identification No. : 6" & 3" (branch) 6 joint
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
POROSITY
PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
LIQUID PENETRANT EXAMINATION REPORT
Removal
Penetrant
Penetrant Time Minutes
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report - Copy
14/24
Client : PT.KRAKATAU STEEL
Project Title : ZERO REFORMER
Name of Equipment 3" IG -SA-" Netrogen launch Transferline
and Identification No. : 3" (branch) 6 joint
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
LIQUID PENETRANT EXAMINATION REPORT
Removal
Penetrant
Penetrant Time Minutes
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report - Copy
15/24
Client : PT.KRAKATAU STEEL
Project Title : ZERO REFORMER
Name of Equipment 6" Netrogen launch Transferline
and Identification No. : 6" & 3" (branch) 6 joint
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
LIQUID PENETRANT EXAMINATION REPORT
Removal
Penetrant
Penetrant Time Minutes
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report - Copy
16/24
Client :
Project Title :
Name of Equipment 8" COW-041 1S1
and Identification No. : 8" (branch) 6 joint
Applicable code
Stage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
LIQUID PENETRANT EXAMINATION REPORT
Removal
Penetrant
Penetrant Time Minutes
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report - Copy
17/24
Client : PT.KRAKATAU STEEL
Project Title : ZERO REFORMER
Name of Equipment 6" Netrogen launch Transferline
and Identification No. : 6" & 3" (branch) 6 joint
Applicable code Stage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
LIQUID PENETRANT EXAMINATION REPORT
Removal
Penetrant
Penetrant Time Minutes
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report - Copy
18/24
Client : PT.KRAKATAU STEEL
Project Title : ZERO REFORMER
Name of Equipment 6" Netrogen launch Transferline
and Identification No. : 6" & 3" (branch) 6 joint
Applicable code Stage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
LIQUID PENETRANT EXAMINATION REPORT
Removal
Penetrant
Penetrant Time Minutes
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report - Copy
19/24
Client : PT.KRAKATAU STEEL
Project Title : ZERO REFORMER
Name of Equipment 6" Netrogen launch Transferline
and Identification No. : 6" & 3" (branch) 6 joint
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
LIQUID PENETRANT EXAMINATION REPORT
Removal
Penetrant
Penetrant Time Minutes
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report - Copy
20/24
Client : PT.KRAKATAU STEEL
Project Title : ZERO REFORMER
Name of Equipment 16" PCW- 8009-W02
and Identification No. : 16" (branch) 2 joint
Applicable code
Stage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
LIQUID PENETRANT EXAMINATION REPORT
Removal
Penetrant
Penetrant Time Minutes
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report - Copy
21/24
Client : PT.KRAKATAU STEEL
Project Title : ZERO REFORMER
Name of Equipment 24"- MPS,24" 1P1
and Identification No. : 24" (BLIND ) 6 joint
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
ACC
PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
LIQUID PENETRANT EXAMINATION REPORT
Removal
Penetrant
Penetrant Time Minutes
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report - Copy
22/24
Client : PT.KRAKATAU STEEL
Project Title : ZERO REFORMER
Name of Equipment 16" PCW-8009-W02
and Identification No. : 16" (branch) 2joint
Applicable code
Stage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
ACC
PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
LIQUID PENETRANT EXAMINATION REPORT
Removal
Penetrant
Penetrant Time Minutes
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report - Copy
23/24
Client : PT.KRAKATAU STEEL
Project Title : ZERO REFORMER
Name of Equipment 6" Netrogen launch Transferline
and Identification No. : 6" & 3" (branch) 6 joint
Applicable codeStage of Examiniation
Material
Surface Preparation
15'
Developing
Location Examined
Judgement Attachment Report
ACC
PREPARED BY, INSTRUCTED BY, ACKNOWLEDGED BY
PT. KRAKATAU ENGINEERING PT. KRAKATAU STEEL
Removal
LIQUID PENETRANT EXAMINATION REPORT
Penetrant
Penetrant Time Minutes
As Welded
After P.W.H.T.
After Hydro. Test
Others
grinding Machine
Satisfactory
Unsatisfactory
Others
Temperature
Type
Application
Color Contrast
Brushing
Fluorescent
Spraying
Solven-Removeable Penetrants
Water-Washable Penetrants
Post-Emulsifying PenetrantsDry Developer
Wet Developer
-
7/30/2019 F-Liquid Penetran Exam Report - Copy
24/24
Project Title ZERO REFORMER Project No.:
Client PT.KRAKATAU ENGINEERING Report No.:
Name of Equipment PIPING Date :
1 60" REG-24-IPI 60 2 120
2 36" REG-02-1P1 36 4 144
3 24" MPS-24" REG-69-1P1 24 14 336
4 20" REG- 11-1P1 28" OG 20 4 80
5 6" NG8010-1P4 NEW LINE PIPE 6 14 84
6 16" PCW-8009 W02 16 2 32
7 12" ECW-8031 12 2 24
8 10" ECW-8032-W01 10" -PCW 10 2 20
9 6" COW-041-1S1 6" SW99-W01 6 4 24
10 2" IG 8037-IP2 2 1 2
11 3" IG,3-SA ECW 3 6 18
12 2" MPS-41-1S1-2"DM8007-W01 2 18 36
13 11/2"-1A 6" SW-99 W01 1.5 3 4.5
14 72" TRANSFER LINE 71 1 71
15 6" BRANCH TRANSFER LINE 6 6 36
16 3" BRANCH TRANSFER LNE 3 6 18
89 1049.5
note :1 WAKTU 52 Hour price /hour Total
2 MAN FOWER
a Level 2 4 52 35,000.0Rp 7,280,000.0Rp
b Level 1 4 52 25,000.0Rp 5,200,000.0Rp
c Helper 5 52 15,000.0Rp 3,900,000.0Rp
3 MATERIAL
a Liquit Penetrant 15 Cans 150,000.0Rp 2,250,000.0Rp
b Liquit Depelover 20 Cans 150,000.0Rp 3,000,000.0Rp
c Liquit Cleaner 55 Cans 150,000.0Rp 8,250,000.0Rp
d Wire brush 3 ls 50,000.0Rp 150,000.0Rp
e Majun 10 kg 10,000.0Rp 100,000.0Rp
30,130,000.0Rp
PREPARED BY, CHECKED BY, APPROVED BY,
DIA
INCH
WELDED
BRANCH
QTY DIA
INCH
LIQUID PENETRANT EXAMINATION REPORT
ACCEPTEDDEFECTNO LINE NOMERQTY
JOINT