f01h200a installation pocket guide(02)
TRANSCRIPT
-
7/31/2019 F01H200A Installation Pocket Guide(02)
1/24
Contents
1 Precautions ..............................................................................................................................................2
2 Tools for Installation .............................................................................................................................3
3 Outline and Structure.............................................................................................................................4
4 Installing the Lifting eyes.....................................................................................................................5
5 Adjust the Position of the MDF (optional)........................................................................................6
6 Installing the Cabinet on a Concrete Pedestal (reshell)..................................................................7
6.1 Plan Space for the cabinet..............................................................................................................................................7
6.2 Constructing the concrete pedestal................................................................................................................................8
6.3 Installing the Cabinet Base Frame.................................................................................................................................9
6.4 Installing the Passive Cabinet......................................................................................................................................106.5 Fixing the CCC rack(optional).....................................................................................................................................11
6.6 Installing the Active Cabinet.......................................................................................................................................12
6.7 Installing the Waterproof Module................................................................................................................................13
7 Routing Cables .....................................................................................................................................14
7.1 Connecting AC Power Cables and Ground Cable.......................................................................................................14
7.2 Connecting Subscriber Cables.....................................................................................................................................15
7.3 Connecting Optical Cable and Optical Fibers..............................................................................................................16
8 Installing the accessories of the Passive Cabinet...........................................................................17
8.1 Installing the Maintenance Socket...............................................................................................................................17
8.2 Installing the Maintenance Illuminator........................................................................................................................18
8.3 Installing the Door Status Sensor.................................................................................................................................19
9 Installing Batteries................................................................................................................................20
10 Checking the Cabinet Installation ..................................................................................................21
11 PoweringOn the Device....................................................................................................................22
12 Sealing the Cabinet.............................................................................................................................23
13 MDF Label............................................................................................................................................24
1
-
7/31/2019 F01H200A Installation Pocket Guide(02)
2/24
Precautions
NOTE
This document aims to provide simple and distinctive guidelines for hardware installation.
This document does not describe operations for the pre-delivery installation of the internal cables and so on. Instead, this document
describers only the operations for on-site installation.
Electrostatic Discharge
Before touching the device, or holding the boards and IC chips, wear the ESD gloves or the ESD wrist strap to prevent the
electrostatic discharge of the human body from damaging the sensitive components. Ensure that the other end of the ESD
wrist strap is well grounded.
Bundling cables
The distance between cable ties or fiber binding straps inside the cabinet should be within 250 mm. (For subscriber
cablethe distance is 200 mm. )
Affixing labels / tags
l After routing the cable, affix the label or fasten the tag to the cable, and 20 mm away from the connector.
l After the label for the signal cable is affixed to the signal cable, the rectangular text area of the label should face
rightwards or downwards.
l After the identification plate for the power cable is affixed to the power cable, the text area of the plate should face
rightwards or downwards. Ensure that the side affixed with the label faces outwards.
Using the desiccant
After removing the packing case of the cabinet on the site, take out the desiccant packages from the corresponding paperbag (Note: Do not tear the own packages of the desiccant). Then, put the desiccant packages at proper places of the cabinet.
After powering on the cabinet, the desiccant packages must be removed and disposed of as an industrial waste.
2 Copyright Huawei Technologies Co., Ltd. 2011. All rights reserved.
-
7/31/2019 F01H200A Installation Pocket Guide(02)
3/24
Tools for Installation
Before you begin, get the following tools ready.
Tape measure Philips screwdriver Flathead screwdriver
Adjustable wrench Socket wrench Percussion drill
Claw hammer Diagonal pliers Hydraulic crimper
Cable cutter Network cable crimping pliers Wire stripper
ESD wrist strap Wire cutter Multimeter
Rubber hammer
3
-
7/31/2019 F01H200A Installation Pocket Guide(02)
4/24
Outline and Structure
4
-
7/31/2019 F01H200A Installation Pocket Guide(02)
5/24
Installing the Lifting eyes
5
-
7/31/2019 F01H200A Installation Pocket Guide(02)
6/24
Adjust the Position of the MDF (optional)
6
-
7/31/2019 F01H200A Installation Pocket Guide(02)
7/24
Installing the Cabinet on a Concrete Pedestal (reshell)
6.1 Plan Space for the cabinet
7
-
7/31/2019 F01H200A Installation Pocket Guide(02)
8/24
Installing the Cabinet on a Concrete Pedestal (reshell)
6.2 Constructing the concrete pedestal
8
-
7/31/2019 F01H200A Installation Pocket Guide(02)
9/24
Installing the Cabinet on a Concrete Pedestal (reshell)
6.3 Installing the Cabinet Base Frame
9
-
7/31/2019 F01H200A Installation Pocket Guide(02)
10/24
Installing the Cabinet on a Concrete Pedestal (reshell)
6.4 Installing the Passive Cabinet
10
-
7/31/2019 F01H200A Installation Pocket Guide(02)
11/24
Installing the Cabinet on a Concrete Pedestal (reshell)
6.5 Fixing the CCC rack(optional)
11
-
7/31/2019 F01H200A Installation Pocket Guide(02)
12/24
Installing the Cabinet on a Concrete Pedestal (reshell)
6.6 Installing the Active Cabinet
12
-
7/31/2019 F01H200A Installation Pocket Guide(02)
13/24
Installing the Cabinet on a Concrete Pedestal (reshell)
6.7 Installing the Waterproof Module
13
-
7/31/2019 F01H200A Installation Pocket Guide(02)
14/24
Routing Cables
7.1 Connecting AC Power Cables and Ground Cable
14
-
7/31/2019 F01H200A Installation Pocket Guide(02)
15/24
Routing Cables
7.2 Connecting Subscriber Cables
15
-
7/31/2019 F01H200A Installation Pocket Guide(02)
16/24
Routing Cables
7.3 Connecting Optical Cable and Optical Fibers
16
-
7/31/2019 F01H200A Installation Pocket Guide(02)
17/24
Installing the accessories of the Passive Cabinet
8.1 Installing the Maintenance Socket
17
-
7/31/2019 F01H200A Installation Pocket Guide(02)
18/24
Installing the accessories of the Passive Cabinet
8.2 Installing the Maintenance Illuminator
18
-
7/31/2019 F01H200A Installation Pocket Guide(02)
19/24
Installing the accessories of the Passive Cabinet
8.3 Installing the Door Status Sensor
19
-
7/31/2019 F01H200A Installation Pocket Guide(02)
20/24
Installing Batteries
20
-
7/31/2019 F01H200A Installation Pocket Guide(02)
21/24
Checking the Cabinet Installation
No. Requirement Method
1 The cabinet components are installed correctly. The cabinet door shall have no distortion.
The boards can be plugged and unplugged without difficulty. Installation of self-made
components shall comply with the requirements.
Observe and try out
2 The cabinet is installed correctly without flake-off or damage. Observe
3 The cabinet is installed reliably, satisfying the quakeproof requirements in the project
file.
Observe
4 The cabinet installation site complies with the project file. Observe the
installation site
5 All cable apertures are sealed well, including apertures for power cables, ground cable,
optical cable, and external subscriber cables.
Observe
6 The external positive lead and positive lead of battery are correctly and reliably
connected to the power system.
Test with a
multimeter
7 The protective covers on the battery terminals are intact. Observe
8 None of the cables has damage, fracture, or joint on the cable. Observe
9 The power cable and ground cable adopt a whole segment of copper core. The cable has
no joint in the middle or scratch on the skin.
Observe
10 The cross sectional area of the power cable and that of the ground cable comply with the
project file, satisfying the power distribution requirements of the cabinet.
Observe
11 Optical fiber headers and board optical ports to be used are protected with protective
caps. If necessary, clean them in compliance with Huawei regulations.
Observe
12 Cables outside the cabinet are buried underground if possible. If they are routed through
the cabling rack, the lightning proof measures shall be adopted.
Observe
21
-
7/31/2019 F01H200A Installation Pocket Guide(02)
22/24
Powering On the Device
22
-
7/31/2019 F01H200A Installation Pocket Guide(02)
23/24
Sealing the Cabinet
23
-
7/31/2019 F01H200A Installation Pocket Guide(02)
24/24
MDF Label