faa controller pilot data link communications program atn ‘99 london, england james h. williams...

29
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999

Upload: britton-matthews

Post on 18-Dec-2015

222 views

Category:

Documents


0 download

TRANSCRIPT

FAA Controller Pilot Data Link Communications ProgramATN ‘99

London, England

James H. WilliamsSeptember 22, 1999

Overview

• Why CPDLC?

• Data Link Issues Team• FAA JRC Investment Issues

• Build I / IA Summaries• CPDLC Integration• Integrated Schedule (Build I / ATN)• Human Factors

Why Controller PilotData Link Communications?

• Controller Pilot Data Link Communications (CPDLC) will provide data communications for Air Traffic Control (ATC) operations to supplement the existing air-to-ground (A/G) voice communications and support improvements in airspace use and capacity.

• CPDLC will:– Provide for a more dynamic and efficient A/G information

exchange mechanism– Provide an additional means of communication between pilots

and controllers– Reduce congestion on the voice channels which limits ATC

effectiveness thereby reducing delays– Reduce operational errors resulting from misunderstood

instructions and read-back errors

John KernData Link Issues Team

• Created by Jane Garvey’s NAS Modernization Task Force

• Objective: To develop a Federal Aviation Administration (FAA)/Industry plan for Aeronautical Data Link (ADL) evolution and implementation path with En Route CPDLC being the first project selected for review.

FAA / IndustryConsensus Plan

• The consensus reached uses the following phased approach for developing and implementing ICAO’s standard En Route Aeronautical Telecommunication Network (ATN) compliant data link services:

• Build I (domestic CPDLC)• Four ATN compliant operational services• Use VHF Digital Link Mode 2 (VDL-2) as A/G Sub-

network

• Build IA (enhanced domestic CPDLC)• Increases ATN compliant services • Use VDL-2 as A/G Sub-network

FAA / IndustryConsensus Plan (Continued)

• Build II (domestic/international CPDLC)• Increases ATN compliant services (more complex

3-4D messages and downlinks)• Use VDL-2 as A/G Sub-network

• Build III• ATN message set• Integration with Decision Support Systems• Use Next Generation Air/Ground Communications

(NEXCOM) as A/G Sub-network

En Route Controller Pilot Data Link Communications Implementation Path

CPDLC IICPDLC I/IA

2001 2002 2003 2004 2005 2006 2011 +2007 -10

AvionicsCPDLC III

CPDLC I

CPDLC IA

CPDLC II

Keysite

KeysiteNational

Deployment

NationalDeployment

Ground

CPDLC IIIKeysite

Note: CPDLC II and CPDLC III are not baselined

NEXCOM Analog Voice NEXCOM Digital Voice

A/GSubnetwork NEXCOM Digital DataVDL-2

FAA Investment Decision

• FAA Investment Decision on 10/30/98 – En Route CPDLC Build I (key site only)– En Route CPDLC Build IA (national deployment)

• Additional Investment Decisions required prior to beginning Builds II & III

En Route Controller Pilot Data Link Communications Build I Summary

• Single-site deployment– Key Site: Miami Air Route Traffic Control Center

(ARTCC)– Keysite Initial Operational Capability (IOC): 6/02

• Provides 4 operational services– Transfer of Communication– Initial Contact– Altimeter Setting– Informational Free text menu capability built by

supervisor inputs• Uses VDL-2 as A/G subnetwork• Includes Human Factors demonstration at

FAA Tech Center by 12/00• American Airlines will be the launch airline

En Route Controller Pilot Data Link Communications Build IA Summary

• National deployment to all 20 domestic ARTCCs

• Key site IOC: 6/03 Miami– National deployment– Begin installation: 1/04– Complete installation: 12/04

• Increase the message set to accommodate assignment of speeds, headings, altitudes as well as a route clearance function

• A capability to handle pilot-initiated altitude requests

• Uses VDL-2 as A/G Sub-network

• Anticipate widespread industry participation

Who Owns What

VDL-2 GroundStations

VDL-2 CPDLC I

DLAP

HOST Router

DSR

NADIN II(PSN)

NAS LANHID

CMA

FAA En Route CPDLC Ground System

A/G ATNRouter

G/G ATNRouterG/G ATN

Router

Display CMU/ATSU(ATN compliant)

VDR Multi-ModeTransceivers

VDL-2 GroundStations

Display CMU/ATSU(ATN compliant)

VDR Multi-ModeTransceivers

VDL-2 CPDLC I

DLAP

HOST Router

DSR

NADIN II(PSN)

NAS LANHID

CMA

FAA En Route CPDLC Ground System

A/G ATNRouter

G/G ATNRouterG/G ATN

Router

Who Owns What

VDL-2 GroundStations

Display CMU/ATSU(ATN compliant)

VDR Multi-ModeTransceivers

VDL-2 CPDLC I

DLAP

HOST Router

DSR

NADIN II(PSN)

NAS LANHID

CMA

FAA En Route CPDLC Ground System

A/G ATNRouter

G/G ATNRouterG/G ATN

Router

Who Owns What

VDL-2 GroundStations

Display CMU/ATSU(ATN compliant)

VDR Multi-ModeTransceivers

VDL-2 CPDLC I

DLAP

HOST Router

DSRTelecommunications

Network Planning and Engineering Division

AOP-400

NADIN II(PSN)

NAS LANHID

CMA

FAA En Route CPDLC Ground System

A/G ATNRouter

G/G ATNRouterG/G ATN

Router

Who Owns What

VDL-2 GroundStations

Display CMU/ATSU(ATN compliant)

VDR Multi-ModeTransceivers

VDL-2 CPDLC I

DLAP

HOST Router

DSRTelecommunications

Network Planning and Engineering Division

AOP-400

NADIN II(PSN)

NAS LANHID

CMA

FAA En Route CPDLC Ground System

A/G ATNRouter

G/G ATNRouter

Telecommunications Support and International Communications Division

AOP-600

G/G ATNRouter

Who Owns What

VDL-2 GroundStations

Display CMU/ATSU(ATN compliant)

VDR Multi-ModeTransceivers

VDL-2 CPDLC I

DLAP

HOST Router

DSRTelecommunications

Network Planning and Engineering Division

AOP-400

NADIN II(PSN)

NAS LANHID

CMA

FAA En Route CPDLC Ground System

A/G ATNRouter

G/G ATNRouter

Telecommunications Support and International Communications Division

AOP-600

G/G ATNRouter

Aeronautical Data Link Product TeamAND-370

Who Owns What

VDL-2 GroundStations

Display CMU/ATSU(ATN compliant)

VDR Multi-ModeTransceivers

VDL-2 CPDLC I

En Route IPTAUA-200

DLAP

HOST Router

DSRTelecommunications

Network Planning and Engineering Division

AOP-400

NADIN II(PSN)

NAS LANHID

CMA

FAA En Route CPDLC Ground System

A/G ATNRouter

G/G ATNRouter

Telecommunications Support and International Communications Division

AOP-600

G/G ATNRouter

Aeronautical Data Link Product TeamAND-370

Who Owns What

What is Changing

VDL-2 GroundStations

DisplayCMU/ATSU

ATN compliant

VDRTransceiver

Service ProviderDLAP

HOST Router

DSR

NADIN II(PSN)

NAS LANHID

CMA

NSM

New & ModifiedSoftware

NewHW & SW

NewHW & SW

FAA En Route CPDLC I&IA Ground System

A/G ATNRouter

G/G ATNRouter

G/G ATNRouter

NewEquipment

SoftwareChanges

Software Changes, Keyboard & Site Adaptation Changes

ATN NetworkManager

NewEquipment

Where Located

VDL-2 GroundStations

Display CMU/ATSU(ATN compliant)

VDR Multi-ModeTransceivers

VDL-2 CPDLC I

DLAP

HOST Router

DSR

NADIN II(PSN)

NAS LANHID

CMA

FAA En Route CPDLC Ground System

A/G ATNRouter

G/G ATNRouterG/G ATN

Router

Miami Airspace

VDL-2 GroundStations

Display CMU/ATSU(ATN compliant)

VDR Multi-ModeTransceivers

VDL-2 CPDLC I

DLAP

HOST Router

DSR

NADIN II(PSN)

NAS LANHID

CMA

FAA En Route CPDLC Ground System

A/G ATNRouter

G/G ATNRouterG/G ATN

Router

Where Located

767 AircraftMiami Airspace

VDL-2 GroundStations

Display CMU/ATSU(ATN compliant)

VDR Multi-ModeTransceivers

VDL-2 CPDLC I

DLAP

HOST Router

DSR

NADIN II(PSN)

NAS LANHID

CMA

FAA En Route CPDLC Ground System

A/G ATNRouter

G/G ATNRouterG/G ATN

Router

Where Located

767 AircraftMiami Airspace

Atlanta NNCCSalt Lake City NNCC

VDL-2 GroundStations

Display CMU/ATSU(ATN compliant)

VDR Multi-ModeTransceivers

VDL-2 CPDLC I

DLAP

HOST Router

DSR

NADIN II(PSN)

NAS LANHID

CMA

FAA En Route CPDLC Ground System

A/G ATNRouter

G/G ATNRouterG/G ATN

Router

Where Located

767 AircraftMiami Airspace

Miami ARTCC

Atlanta NNCCSalt Lake City NNCC

VDL-2 GroundStations

Display CMU/ATSU(ATN compliant)

VDR Multi-ModeTransceivers

VDL-2 CPDLC I

DLAP

HOST Router

DSR

NADIN II(PSN)

NAS LANHID

CMALocation

TBD

FAA En Route CPDLC Ground System

A/G ATNRouter

G/G ATNRouterG/G ATN

Router

Where Located

Data Link Integrated Schedule Development (Build I/ATN)

• Major players have worked together to develop an Integrated Schedule

ARINC AMERICANATNSIFAA

CSC ACI

OtherContractors

Boeing

RockwellCollins

OtherContractors

OtherContractors

• Major Data Link Partners– American Airlines– FAA– ARINC– ATN Systems Inc (ATNSI)/

Aeronautical Communications International (ACI)

Human Factors

• Demonstrated limited CPDLC capability on DSR platform• Ground Human Factors Studies

– Initial CPDLC I study completed 3/99– CPDLC IA Procedures and Training Evaluation scheduled for

9/99• Flight Deck Human Factor Activities

– Initial CPDLC Flight Deck Configuration Study completed 3/99– Flight Deck CPDLC IA Training and Procedures Evaluation

scheduled for 10/99• Conduct Controller/Pilot/System Interaction Test in 3/00• Conduct CPDLC end-to-end human factors

demonstration at FAA Technical Center by 12/00

Questions?

CPDLC I messages

Contact/Monitor/Surveillance Requests(uplink)

CONTACT (unit name) (frequency) MONITOR (unit name) (frequency)

Report/Confirmation Requests (uplink) CONFIRM ASSIGNED LEVELAir Traffic Advisories (uplink) (facility designation) ALTIMETER (altimeter)

CHECK STUCK MICROPHONE (frequency)System Management Messages (uplink) ERROR (error information)

NEXT DATA AUTHORITY (facility) SERVICE UNAVAILABLE LOGICAL ACKNOWLEDGEMENT USE OF LOGICAL ACKNOWLEDGEMENT PROHIBITED

Additional Messages (uplink) (free text) X4Responses (downlink) WILCO

UNABLE STANDBY ROGER AFFIRM NEGATIVE

Reports (downlink) ASSIGNED LEVEL (level)System Management Messages(downlink)

ERROR (error information) NOT CURRENT DATA AUTHORITY CURRENT DATA AUTHORITY NOT AUTHORIZED NEXT DATA AUTHORITY LOGICAL ACKNOWLEDGEMENT

CPDLC IA additional messages

Responses/acknowledgements (uplink) UNABLESTANDBYROGER

Vertical Clearances(uplink) MAINTAIN (level)CLIMB TO level)DESCEND TO (level)

Route Modifications (uplink) PROCEED DIRECT TO (position)CLEARED (route clearance)FLY HEADING (degrees)

Speed Changes (uplink) MAINTAIN (speed)MAINTAIN (speed) OR GREATERMAINTAIN (speed) OR LESS

Contact/Monitor/Surveillance Requests (uplink) UnchangedReport/Confirmation Requests (uplink) Adds STATE PREFERRED LEVELAir Traffic Advisories (uplink) UnchangedSystem Management Messages (uplink) UnchangedAdditional Messages (uplink) Adds “THEN” to link messagesResponses (downlink) UnchangedVertical Requests (downlink) REQUEST (level)Reports (downlink) Adds PREFERRED LEVEL (level)System Management Messages (downlink) Unchanged

The following are messages not included in the CPDLC I/IA Requirements Document:

Crossing Constraints (Uplink) CROSS [position] AT [level]Crossing Constraints (Uplink) CROSS [position] AT AND MAINTAIN [level] AT [speed]

Build I - Major Milestones

• American Airlines– Red Label Avionics Available - 3/01– Certification and Operational Approval Complete - 11/01– Initial Operational Capability - 12/01

• FAA– Host Software Integration - 1/01– Integration Testing - 7/01– Initial Operational Capability - 6/02

• ARINC– VDL Mode 2/ATN Development and Test Complete - 4/01 – VDL Mode 2/ATN Deployed in Miami - 3/02

• ATNSI/ACI– Delivery of ATNSI software - 2/00