Facilities Engineering
- Field Development ConceptBy
AP Dr Razali Hamzah
-
8/2/2019 Facilities Engineering - Field Development Concept
2/22
3/22/2012 APDrRazaliHamzah 2
Facilities EngineeringField Development Concept
Contents1. Types of Platformsa. Fixed Platformsb. Manned / Unmanned
c. Mother / Satellite Platformsd. Platforms for Marginal Fields Development.2. Facilities Requirementsa. Production Facilityb. Well Testing Facilityc. Water Handling Facilityd.
Power Generatione. Accommodation/Living Quartersf. IOR/EOR Water Injection / Gas Injection3. Floating Facilitiesa. FPSOb. FSO4. Underwater Facilities
a. Wellheads & Production5. Integrated Development & Production System
6. Q & A
-
8/2/2019 Facilities Engineering - Field Development Concept
3/22
3/22/2012 APDrRazaliHamzah 3
Facilities EngineeringField Development Concept
1. Types of Platforms
a. Fixed Platforms
Definition:A fixed platform is a structurethat is used to support productionfacilities and/or other equipment(offshore) for a long time. It may be
piled or tied up to the ground /seabedor simply placed onsite due to itsgravity.
A fixed platform may be removed
when it has served its purposes or leftin-situ after specific make-safe worksbeen done.
-
8/2/2019 Facilities Engineering - Field Development Concept
4/22
3/22/2012 APDrRazaliHamzah 4
Facilities EngineeringField Development Concept
1. Types of Platforms
a. Fixed Platforms
i). A Steel Platform
iii). A Steel Jacket
ii). A TLP
iv). A Concrete Gravity
-
8/2/2019 Facilities Engineering - Field Development Concept
5/22
3/22/2012 APDrRazaliHamzah 5
Facilities EngineeringField Development Concept
1. Types of Platforms
b. Manned / UnmannedDefinitions: A platform that usually occupiedby working personnel 24 hours and thereforeprovides accommodations / living quartersfor them is called manned platform. Living
quarters are normally located on a motherplatform or a dedicated LQ-platform.Unmanned platforms are those did notprovide living quarters for its workingpersonnel and workers come and go on
daily basis or on required basis only. Itsometimes provides a shed or a dog housefor protection from bad weather only.
-
8/2/2019 Facilities Engineering - Field Development Concept
6/22
3/22/2012 APDrRazaliHamzah 6
Facilities EngineeringField Development Concept
1. Types of Platforms
c. Mother / Satellite PlatformsDefinitions:A mother platform is themain platform that provides all themain facilities e.g. Production
facilities, LQ, Power Generation etc.to the adjacent smaller platforms in afield that requires more than oneplatforms to fully develop andproduced. These smaller platforms
only housed the wellheads for theproduction wells and test separatorsfor well testing purposes are calledthe Satellite platforms.
-
8/2/2019 Facilities Engineering - Field Development Concept
7/22
3/22/2012 APDrRazaliHamzah 7
Facilities EngineeringField Development Concept
1. Types of Platforms
d. Platforms for Marginal Fields.Definition:Marginal fields are fieldswhose reserves are small andrequired minimum facilities for
their development in order forthem to be commercially viable.They cannot used the traditionalmega facilities & infrastructuresbecause of the huge cost thatmakes the development andproduction unprofitable.
-
8/2/2019 Facilities Engineering - Field Development Concept
8/22
-
8/2/2019 Facilities Engineering - Field Development Concept
9/22
3/22/2012 APDrRazaliHamzah 9
Facilities EngineeringField Development Concept
2. Facilities Requirements
a. Production Facility
Consists of,i. Production manifolds.
ii. Piping.
iii. Separators.
iv. Strainers / Scrubbers.v. Heat Exchangers (Heaters / Coolers).
vi. Control Valves.
vii. Pumps.
viii. Instrumentation & Control.ix. Water Treating facility.
x. Gas handling facility
-
8/2/2019 Facilities Engineering - Field Development Concept
10/22
3/22/2012 APDrRazaliHamzah 10
Facilities EngineeringField Development Concept
2. Facilities Requirement
b. Well Testing Facility
On each major platform there is also awell testing facility normally called testseparator. It is functioning as anormal separator that separates
water/oil/gas but has meteringsystems to measure the amount ofwater, oil, and gas individually. Thistest separator can be selectively tied
in to the producing well for testing andmonitoring its productionperformance. Connection is donethrough the production manifolds.
-
8/2/2019 Facilities Engineering - Field Development Concept
11/22
3/22/2012 APDrRazaliHamzah 11
Facilities EngineeringField Development Concept
2. Facilities Requirements
c. Water Treating Facility
The effluent water (produced togetherwith the hydrocarbon) need to beremoved as early as possible when itcomes to surface to avoid corrosion
and worst, reducing the capacity ofthe production facility. The water,before it can be thrown out to sea hasto meet certain specification normally
between 15mg/l 50mg/l (even lowerif onshore), depending on specificlocation offshore.
-
8/2/2019 Facilities Engineering - Field Development Concept
12/22
3/22/2012 APDrRazaliHamzah 12
Facilities EngineeringField Development Concept
2. Facilities Requirements
c. Water Treating Facility
Method Equipment type Approx. Min. Drop SizeRemoval
Gravity Separation Skimmer Tank & Vessels
API Separator, Disposal Piles
Skim Piles
100 150 Microns
Plate Coalescence Parallel Plate Interceptors
Corrugated Plate Interceptors
Cross-flow Separators
Mixed-flow Separators
30 50 Microns
Enhanced Coalescence Precipitators, Filter / Coalescers
Free-Flow Turbulent Coalescers
10 15 Microns
Gas Flotation Dissolved Gas, Hydraulic andMechanical Dispersed Gas
15 20 Microns
Enhanced Gravity Separation Hydrocyclones, Centrifuges 5 15 Microns
Filtration Multi-media Membrane 1+ Micron
-
8/2/2019 Facilities Engineering - Field Development Concept
13/22
3/22/2012 APDrRazaliHamzah 13
Facilities EngineeringField Development Concept
2. Facilities Requirements
d. Power Generation
Electrical Power generation isalso a consideration for offshoreplatforms. Electrical power is
required for lighting, to power firewater pumps, control systemsand many other equipment.Power can be derived by using
gas turbine hence the gasproduced after being conditionedcan be utilized if required.
-
8/2/2019 Facilities Engineering - Field Development Concept
14/22
3/22/2012 APDrRazaliHamzah 14
Facilities EngineeringField Development Concept
2. Facilities Requirementse. Accommodation/Living QuartersFor offshore platforms LQs is one importantconsideration in determining the facilitiesrequired for efficient and safe operations ofthe oil/gas production systems. Althoughthere is an additional capital cost to beincurred for LQs requirement, the resultant
operating costs (inclusive logistics) could besaved depending on the distance andnumber of people to man the platforms forsafe and continuous operations at any onetime during the fields life. A dedicatedaccommodation can help boost up theperformance of the important platformpersonnel esp. the operators andtechnicians. Food and beds are provided forthem free of charge.
-
8/2/2019 Facilities Engineering - Field Development Concept
15/22
3/22/2012 APDrRazaliHamzah 15
Facilities EngineeringField Development Concept
2. Facilities Requirements
e. Accommodation/Living Quarters
Typical LQ capacity for Malaysianoffshore operations are between 80120 man LQs.
During peak activities e.g. duringDrilling campaign additional spacemay be required to house theessential personnel. These may be
provided by the drilling rig contractoror by hiring an accommodation bargeetc.
-
8/2/2019 Facilities Engineering - Field Development Concept
16/22
3/22/2012 APDrRazaliHamzah 16
Facilities EngineeringField Development Concept
2. Facilities Requirementsf. IOR/EOR Water Injection / Gas
InjectionWater Injection facility consists ofPumping and water purifying andtreatment units.
Gas Injection facility consists of gasconditioning/treating and gascompression units.
Space must be provided on theplatform when these equipment arerequired.
-
8/2/2019 Facilities Engineering - Field Development Concept
17/22
3/22/2012 APDrRazaliHamzah 17
Facilities EngineeringField Development Concept
3. Floating Facilities
a. FPSO
(Floating production, storage andoffloading) is a ship like vessel that isused to receive life crude oil (or partlylife) for further stabilization /
separation, then provide space forstorage until a cargo ship comes toreceive the stabilized crude for export.FPSO has the facility to pump and
transfer (offload) the crude oil into thecargo ship. An FPSO is usuallyanchored within a producing field bySBM / SALM system.
-
8/2/2019 Facilities Engineering - Field Development Concept
18/22
3/22/2012 APDrRazaliHamzah 18
Facilities EngineeringField Development Concept
3. Floating Facilitiesb. FSO
(Floating storage and offloading) isalso a ship like vessel but onlyreceives a stabilized crude oil that hasbeen processed at a platform. Itfunctions entirely as storage and off
loading facility. It is also anchoredclosed to the producing platforms(within an oil field) by a SBM / SALMsystem.
All crude is transferred to the FPSO/FSO from the production platforms viaa sub-sea pipeline.
-
8/2/2019 Facilities Engineering - Field Development Concept
19/22
3/22/2012 APDrRazaliHamzah 19
Facilities EngineeringField Development Concept
4. Underwater Facilities
a. Wellheads & Production
Sometimes it is uneconomical to haveplatforms offshore to produce oil/gas atremote fields having small reserves. Toexploit such a field individual well is drilled
and completed underwater. Specialwellheads are used for such wells and aprotection templates are used to protect thewellheads form anchors dropped or draggedfrom ships. The production are then hooked
up to the nearby platforms via a sub-seapipeline. This type of facilities are commonfor deep sea productions.
-
8/2/2019 Facilities Engineering - Field Development Concept
20/22
3/22/2012 APDrRazaliHamzah 20
Facilities EngineeringField Development Concept
5. Integrated Development &
Production System
This is a platform complex housingthe required facilities for the oil/gasproduction. The production
(wellheads), separations,Compression, Pumping, PowerGeneration, Flare boom and LQsmay be housed on a single
platform (huge) or a few individualsmaller platforms but linked bybridges.
-
8/2/2019 Facilities Engineering - Field Development Concept
21/22
3/22/2012 APDrRazaliHamzah 21
Facilities EngineeringField Development Concept
Facilities Engineering Introduction
-
8/2/2019 Facilities Engineering - Field Development Concept
22/22
3/22/2012 APDrRazaliHamzah 22
Facilities Engineering - Introduction