2
Ichthys is a 40 year project
Document No:
Revision No:
•Semi-submersible central processing facility (CPF)
will be one of the biggest of its type ever built.
•FPSO designed to hold more than1 million barrels
of high value condensate
•885km pipeline to Darwin NT
•Two LNG trains - 8.4 Mt/a
•LPG and condensate plants
3
The CPF is one of the largest in the world
4
The FPSO is 333 metres long
5 5
The expected data volumes are huge
TAGS 550,000
DOCUMENTS 280,000
DRAWINGS 600,000
DATA FIELDS 242,355,000
6
Our starting point
7 7
Unstructured
information -
significant effort
to load and will
delay start up
Traditional
approach
Earlier access to
information to
allow time to
format
information
Require
incremental
handover
More rigour in
the format and
content of
information
handed over
Specify the
target
information
systems
information
requirements
Improved control
over the input
format giving
greater
consistency
Provide
templates
and seed files
Application of
proven
approaches to
data take-on
Use a DMC
with tools and
techniques
We recognised the value of Engineering Information
Document No:
Revision No:
8
What now?
Acquire IM resources
Deploy our Data
Management Contractor
Ensure our requirements
are in the EPC contracts
Communicate the
requirement to project
teams, EPCs and
suppliers
9
Information integration in Operations
10
Thank you