28
f Facilities Engineering Services Section David Nevin Fermilab March 16, 2004

Upload: others

Post on 29-Feb-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

f

Facilities Engineering Services Section

David NevinFermilab

March 16, 2004

Page 2: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

f

Better known as

FESS

Page 3: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

March 16-18,2004 3

f

Tevatron Operations Review

F stands for facilities

• Provide robustness (capacity and reliability) to the many utilities across the site

• Maintain the fire protection and detection systems across the site

• Provide preventive and corrective maintenance to buildings and utilities across the site

• 24 hours a day, 7 days a week

Page 4: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

March 16-18,2004 4

f

Tevatron Operations Review

E stands for engineering

• Provide various engineering disciplines to plan and design conventional construction of buildings and infrastructure from a life cycle sustainable design perspective

• Coordinate engineering activities contracted out to A&E firms

• Task manage or construction coordinate civil construction projects for our customers

Page 5: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

March 16-18,2004 5

f

Tevatron Operations Review

S stands for services

• Maintain real property assets including grounds

• Provide building condition assessments• Provide janitorial services across the site • Maintain the tall grass prairie and buffalo herd• Provide T&M contractors for small projects• Act as lead with municipality interfaces

Page 6: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

March 16-18,2004 6

f

Tevatron Operations Review

The second S stands for section

• We are one of four sections within the Lab

Page 7: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

March 16-18,2004 7

f

Tevatron Operations Review

Facilities Engineering Services Section

MISSION STATEMENT

To establish and maintain a dependable base from which particle physics and other

Fermilab programs can be safely accomplished without interruption

Page 8: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

March 16-18,2004 8

f

Tevatron Operations Review

Plant

• Fermi site contains 6800 acres• 343 buildings (2,287,245 square feet)• 109 trailers (91,186 square feet)• Electric system – power received at 345kV from utility grid at 2

primary substations, 280 secondary substations, 115 miles of cable (100 miles underground)

• Natural gas system – 14 miles of underground piping• Pond water system – 16 ponds with return and supply channels• Industrial cooling water – 21 miles of piping• Sanitary system – 11 miles of sewer collection piping• Domestic water system – 4 wells, treatment and distribution

piping

Page 9: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

March 16-18,2004 9

f

Tevatron Operations Review

FESS Charter (responsibilities)

• Provide capacity for Fermilab’s scientific mission

• Maximize infrastructure reliability• Lead the laboratory infrastructure

recapitalization program• Inspect condition of DOE assets• Provide a work environment that is

environmentally sound and aesthetically pleasing

Page 10: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

March 16-18,2004 10

f

Tevatron Operations Review

Functional Overview

Engineering GroupOperations GroupServices Group

Infrastructure Mgmt Group

Page 11: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

March 16-18,2004 11

f

Tevatron Operations Review

FESS Engineering Group

• Provide facilities in support of the research mission that are functional, economical, efficient, reliable and inspiring– Conceptual to final design

• New facilities and infrastructure• Modifications to existing facilities and

infrastructure– Construction Management– Project Management– Project Documentation (as built)

Page 12: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

March 16-18,2004 12

f

Tevatron Operations Review

How Do We Accomplish This?

• By maintaining an in-house team of professionals with a combined breadth of expertise to fulfill our mission

• By providing timely, state-of-the-art solutions to engineering challenges

• By augmenting our staff using consultants on an as needed basis

• By implementing construction safety and construction quality management

Page 13: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

March 16-18,2004 13

f

Tevatron Operations Review

FESS Operations Group

• Provides predictable capacity and up-time using preventive, predictive and corrective maintenance technologies

• Develops and implements an annual maintenance plan matching growing requirements with available resources

• Manages year round 24 hour maintenance and operational coverage of the site infrastructure

Page 14: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

March 16-18,2004 14

f

Tevatron Operations Review

How do we accomplish this?

• By developing, supporting and managing an effective multi-shift team of professional crafts people

• By implementing proven technologies such as: – Predictive Maintenance– Preventive Maintenance– Reliability Centered Maintenance

• By optimizing resources– People, tools and equipment

Page 15: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

March 16-18,2004 15

f

Tevatron Operations Review

FESS Services Group

• Provide on going up-keep of the roads, grounds and parking areas

• Maintain and enhance natural laboratory property

• Support FESS computing needs• Buffalo herd management• Provide office design services• Wilson Hall building management

Page 16: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

March 16-18,2004 16

f

Tevatron Operations Review

How do we accomplish this?

• By providing efficient, cost effective and environmentally responsible solutions to roads and grounds issues

• By developing and managing a performance based custodial contract incorporating recycling

• By providing computing expertise to support various functions

Page 17: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

March 16-18,2004 17

f

Tevatron Operations Review

FESS Infrastructure Management

Develop and execute strategies which increase the reliability and robustness of Fermilab’s infrastructure systems to strengthen the base from which existing and future laboratory objectives can be accomplished.

Page 18: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

March 16-18,2004 18

f

Tevatron Operations Review

How do we accomplish this?

• Real Property Asset Management– FIMS, CAS, TYSP, IFI budget and reporting

• Third party investment vehicles • By coordinating contracted T&M services and

making them available to Div. and Sec.• Energy and utility management

Page 19: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

March 16-18,2004 19

f

Tevatron Operations Review

FESS FY04 Budget

SWF M&S Total

Actual 10,965.7 5,490.3 16,456.0

Inventory (Spares) 150.0 150.0

Chargebacks -1,966.0 -1,966.0

Cap. Equipment 175.0 175.0

Total Budgeted 8,999.7 5,815.3 14,815.0

Page 20: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

March 16-18,2004 20

f

Tevatron Operations Review

Manpower Distribution

FACILITIES ENG. SERVICES SECTION Staff levels (FTE's)

FY04Admin &

ManagementComputer

ProfessionalsEngineering Physicists Engineers Scientists

Other Technical Support

Clerical & Secretarial Drafters

Service Workers

Skilled Trades Technicians TOTAL

TOTAL (all Indirect) 19.0 3.0 0.0 28.0 0.0 13.4 13.0 2.0 3.0 52.1 5.0 138.5

Weekly / HourlyMonthly

Page 21: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

March 16-18,2004 21

f

Tevatron Operations Review

Key Issues

• Infrastructure funding • Proposed performance measures• Resources gap

– We can be successful if funding is adequate and we can retain our key people

• Keep staff trained to match activities– We have a solid Continuous Improvement Program

Page 22: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

March 16-18,2004 22

f

Tevatron Operations Review

Infrastructure Risks (mitigated)

• Third Party Financing– Central Utility Building electrical and mechanical

rebuild – Majority of “critical” electrical feeders – CDF to D0 utility corridor (ICW, DWS, gas and

sanitary) • NuMI water reuse (pond water supply)• Transformer repair and duct bank replacement• One “critical” 345 kV pole replacement

Page 23: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

March 16-18,2004 23

f

Tevatron Operations Review

Feeder Fault History

0

5

10

15

20

25

1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004YTD

Feed

er F

aults

(#)

0

5

10

15

20

25

All FaultsCable Faults (Splices)

Page 24: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

March 16-18,2004 24

f

Tevatron Operations Review

Infrastructure Risks (foreseen)

• 345 kV wood power poles• 13.8kV electrical high voltage system• ICW underground piping and reservoir supply• DWS supply and distribution piping• South Batavia Dam impact on make-up water

Page 25: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

March 16-18,2004 25

f

Tevatron Operations Review

Tracking Progress and Metrics

Self Assessments:

• Daily meeting with FESS leadership• Weekly meetings with Divs. and Secs.• Weekly meeting with Directorate• Monthly FESS group briefings (metrics)• Performance goals and evaluations• Multiple operational metrics

Page 26: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

March 16-18,2004 26

f

Tevatron Operations Review

Integrated Safety Management

• New employee orientation program• Work activity assessments and walkthrough• Job planning and hazard analysis• No Maintenance Zones• Investigation incidents and near misses• Periodic safety meetings involving all staff• Committee membership and participation

Page 27: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

March 16-18,2004 27

f

Tevatron Operations Review

Communication

• Monthly Operations meeting with Accel. Div.• Monthly LAM• Monthly Group Managers meetings• Weekly AD scheduling meetings• NuMI PMG• Customer feedback• Daily face to face and e-mail

Page 28: Facilities Engineering Services Section - fnal.gov · from which particle physics and other Fermilab programs can be safely accomplished without interruption. ... – Project Management

March 16-18,2004 28

f

Tevatron Operations Review

FESS Vision

“World Class” Facilities and Infrastructure

for“World Class”

Physics