facility: south texas project, units 1 and 2 (stp)

6
_. . LICENSEE: HOUSTON LIGHTING AND POWER COMPANY (HL&P), et al. May 8 1996 0 f FACILITY: South Texas Project, Units 1 and 2 (STP) SUBJECT: SUMMARY OF APRIL 25, 1996, MEETING ON GRADED QUALITY ASSURANCE On April 25, 1996, the NRC staff met briifly with the licensee to discuss the schedular aspects of the licensee's March 28, 1996, submittal on their revised Operations Quality Assurance Plan (0QAP). Meeting attendees are listed in Attachment 1. A handout provided by the licensee is Attachment 2. The March 28, 1996, revision to tho 0QAP incorporates the licensee's methodology for implementation of STP's' Graded Quality Assurance (GQA) Program. The specific purpose of this meeting between the licensee and the staff was to discuss the future milestones and schedules of the licensee's program so the staff could determine which portions of the program the staff wanted to observe. The licensee invited the staff to attend the GQA working group (for final approval) and/or the expert panel meetings for both the essential cooling water and reactor makeup water systems (these are the first two systems the licensee plans to focus on). These meetings are scheduled for May and July of 1996, respectively (see Attachment 2). The staff indicated that it would consider the offer and get back to the licensee. The staff said that during these future interactions it will focus its review in areas such as how the GQA process ensures defense in depth, how the deterministic and probabilistic considerations are combined, how the total impact on risk is evaluated, and the guidance / criteria for the expert panel. The staff also said that it wants to see the licensee's corrective action program during one of the site visits, since the licensee's corrective action program provides feedback to the risk-ranking process. ORIGINAL SIGNED BY: Thomas W. Alexion, Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499 Attachments: 1. List of Meeting Attendees 2. Meeting Handout , | -cc w/atts: See next page i NBC HLE CEN1B COPY | DISTRIBUTION: See next page | g Document Name: ST042996.MTS ( OFC PM:PD4 d BC:HQMk BC:SPN/)/7 NAME TAlexico:h SBlach EBdch[ DATE I/2 96 f/1-/96 f/%/d6 / COPY [YES)NO dE'$/N0 YES/N0 | " 0FFICIAL RECORD COPY j , i ' ' 9605140056 960500 PDR ADOCK 05000498 Yl P PDR I k .

Upload: others

Post on 19-Feb-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

_.

.

LICENSEE: HOUSTON LIGHTING AND POWER COMPANY (HL&P), et al. May 8 19960f

FACILITY: South Texas Project, Units 1 and 2 (STP)

SUBJECT: SUMMARY OF APRIL 25, 1996, MEETING ON GRADED QUALITY ASSURANCE

On April 25, 1996, the NRC staff met briifly with the licensee to discuss theschedular aspects of the licensee's March 28, 1996, submittal on their revisedOperations Quality Assurance Plan (0QAP). Meeting attendees are listed inAttachment 1. A handout provided by the licensee is Attachment 2.

The March 28, 1996, revision to tho 0QAP incorporates the licensee'smethodology for implementation of STP's' Graded Quality Assurance (GQA)Program. The specific purpose of this meeting between the licensee and thestaff was to discuss the future milestones and schedules of the licensee'sprogram so the staff could determine which portions of the program the staffwanted to observe.

The licensee invited the staff to attend the GQA working group (for finalapproval) and/or the expert panel meetings for both the essential coolingwater and reactor makeup water systems (these are the first two systems thelicensee plans to focus on). These meetings are scheduled for May and July of1996, respectively (see Attachment 2). The staff indicated that it wouldconsider the offer and get back to the licensee.

The staff said that during these future interactions it will focus its reviewin areas such as how the GQA process ensures defense in depth, how thedeterministic and probabilistic considerations are combined, how the totalimpact on risk is evaluated, and the guidance / criteria for the expert panel.The staff also said that it wants to see the licensee's corrective actionprogram during one of the site visits, since the licensee's corrective actionprogram provides feedback to the risk-ranking process.

ORIGINAL SIGNED BY:Thomas W. Alexion, Project ManagerProject Directorate IV-1Division of Reactor Projects III/IVOffice of Nuclear Reactor Regulation

Docket Nos. 50-498 and 50-499

Attachments: 1. List of Meeting Attendees2. Meeting Handout

,

|-cc w/atts: See next page i

NBC HLE CEN1B COPY |DISTRIBUTION: See next page

|g

Document Name: ST042996.MTS (

OFC PM:PD4 d BC:HQMk BC:SPN/)/7NAME TAlexico:h SBlach EBdch[DATE I/2 96 f/1-/96 f/%/d6/COPY [YES)NO dE'$/N0 YES/N0 |

" 0FFICIAL RECORD COPY j,

i'

'

9605140056 960500PDR ADOCK 05000498 YlP PDR I

k.

- . . - - - - __ _ . . - - _ . . .

'

.

-4l

! 0"STR::BU""0N: -

W Mesi Jii' ei(s/stfis)PUBLIC

PD4-1 r/f (w/atts)JDyer, RIV (w/atts)ACRS

! OGC|

| NWRussell/FMiraglia

| RZimermanJRoe<

EAdensam (EGAl)WBecknerTAlexionPNoonanEJordanSBlackEButcherNRC Particip:ntsJMitchell, 0-17 G21

i

,

!

1|

|

t

I.

|

i l.

! !;

_ _ .._. . . _ _

i

.i

*2A ttg

i i e '

UNITED STATES3 ,j NUCLEAR REGULATORY COMMISSION*, WASHINGTON. D.C. 3056 4 091.

***** May 8, 1996

; LICENSEE: HOUSTON LIGHTING AND POWER COMPANY (HL&P), et al.,

4 FACILITY: South Texas Project, Ur ts 1 and 2 (STP)i

i

j SUBJECT: SUMARY OF' APRIL 25, 1996, MEETING ON GRADED QUALITY ASSURANCE

:

| On April 25, 1996, the NRC staff met briefly with the licensee to discuss theschedular aspects of the licensee's March 28, 1996, submittal on their revisedOperations Quality Assurance Plan (0QAP). Meeting attendees are listed inAttachment 1. A handout provided by the licensee is Attachment 2.

The March 28, 1996, revision to the 0QAP incorporates the licensee's;

: methodology for implementation of STP's Graded Quality Assurance (GQA)! Program. The specific purpose of this meeting between the licensee and the

staff was to discuss the future milestones and schedules of the licensee'sprogram so the staff could determine which portions of the program the staff,

; wanted to ob w s.

The licensee invited the staff to attend the GQA working group (for finalapproval) and/or the expert panel meetings for both the essential cooling4

water and reactor makeup water systems (these are the first two systems the !.licensee plans to focus en). These meetings are scheduled for May and July of1996, respectively (see Attachment 2). The staff indicated that it would

; consider the offer and get back to the licensee.

The staff said that during these future irteractions it will f m s its reviewin areas such as how the GQA process ennres defense in depth, hor thedeterministic and probabilistic considerations are combined, how the totalimpact on risk is evaluated, and the guidance / criteria for the expert panel.The staff also said that it wants to see the licensee's corrective actionprogram during one of the site visits, since the licensee's corrective actionprogram provides feedback to tne risk-ranking process.

IfhMF d?U.

Thomas W. Alexion, Proje t ManagerProject Directorate IV-1Division of Reactor Projects III/IVOffice of Nuclear Reactor Regulation

Docket Nos. 50-498 and 50-499

Attachments: 1. List of Mee'.ing Attendees2. Meeting Handout

cc w/atts: See next page

I

.- . _ _ _ _____ - ___ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

1

|MEETING BETWEEN HL&P AND NRC ON GRADED OUALITY ASSURANCEREGARDING FUTURE INTERACTIONS. MILESTONES AND SCHEDULES

APRIL 25. 1996

| 8121 QIS.anization|

L. Martin HL&PM. McBurnett HL&PT. Alexion. NRCL. Campbell NRCS. Dinsmore NRCR. Gramm NRC,

| W. Haass NRC' J. Peralta NRC

M. Rubin NRC

|

|t

!

|

|

2

i

i

I

l|

|

|

.

f

a

Attachment 1'

i

):

!!<

_ _ _ _ _ . _ _ _ _

|

'1

Houston Lighting & Power Company South Texas, Units 1 & 2,

|

cc:,

Mr. David P. Loveless Jack R. Newman, Esq.| Senior Resident Inspector Morgan, Lewis & Bockius| U.S. Nuclear Regulatory Commission. 1800 M Street, N.W.

P. O. Box 910 Washington, DC 20036-5869Bay City, TX 77414

Mr. Lawrence E. MartinMr. J. C. Lanier/M. B. Lee General Manager, Nuclear Assurance Licensing

( City of Austin Houston Lighting and Power CompanyElectric Utility Department P. O. Box 289721 Barton Springs Road Wadsworth, TX 77483Austin, TX 78704

Rufus S. ScottMr. M. T. Hardt Associate General CounselMr. W. C. Gunt Houston Lighting and Power CompanyCentral Public Service Board P. O. Box 61867P. O. Box 1771 Houston, TX 77208

| San Antonio, TX 78296Joseph R. Egan, Esq.

Mr. G. E. Vaughn/C. A. Johnson Egan & Associates, P.C.| Central Power and Light Company 2300 N Street, N.W.

P. O. Box 289 Washington, DC 20037Mail Code: N5012Wadsworth, TX 74483 Office of the Governor

ATTN: Andy Beratt, DirectorINPO Environmental PalfcyRecords Center P. O. Box 12428700 Galleria Parkway Austin, TX 78711Atlanta, GA 30339-306.4

Arthur C. Tate, DirectorRegional Administrator, Region IV Division of Compliance & InspectionU.S. Nuclear Regulatory Commission Bureau of Radiation Control611 Ryan Plaza Drive, Suite 1000 Texas Department of HealthArlington, TX 76011 1100 West 49th Street

Austin, TX 78756Mr. Joseph M. Hendrie50 Be11 port Lane J. W. BeckBellport,.NY 11713 Little Harbor Consultants, Inc.

44 Nichols RoadJudge, Matagorda County Cohasset, MA 02025-1166Matagorda Count, Courthouse

! 1700 Seventh Street

|Bay City, TX 77414 |

l

i Mr. William T. Cottle{ Group Vice President Nuclear! Houston Lighting & Power Companyi South Texas Project Electric] Generating Station

' P. O. Box 289) Wadsworth, TX 77483: i

) l

1

i

]e

i \

__. _ . _ _ _ _ _ _ _ _ _ . _ - - _ - _ - _ - - - _ _ _ . - - _ _ . _ _ _ _ _ _ _ _ _ _ _ _

23APR96 Schedule for Grtded Quality Assurance Working Group~

1

C:\SPDATA\GOA-0304.SCHFEBFNARY MARCH APRtl MAYi i ?JNEi

i JULY AUGUSTi

b Ok KlCKOFF ME5 TING' *

,

INDENTIFY PREUMWARY GOA REOD FIELDS & DEV PLAN

| o' modPSA THEORY AND APPUCATION TRANWG E '

| | | | | o'm o4mDELPHI DETERM. MEmODOLOGY TRANWG | *

| | | | | bo4m 5OA TRAINtNG ON GOA REOMNTS, OO AP AND STP IMPL METH E '

| | | | | | | b_CFF SITE BRAINTSTORMING SESSION -PROCESSES AND METH E =

D G G ESS AND METH M .

i i i i i | i__GOAWG MEETNG - REVIEW SYS SELECTICW CRITERIA AND SELECT 2 PILOT SYS 5

| | | | | | | | | | o$n osaDEV PRESENTATION & COLLATE DATA FOR GOAWG REV OF THE 1ST F1 LOT SYS M

WG MEETWG & PE M , DISCUSSION, RE M FOR IST SYSTE |

LLLJS_LJ DA SELLg'snoosne| | | |: I i o

OOAWG MEETING FOR FINAL APPROVAL OF 1ST SYS E

SUBurr GOA SYS BASIS DOC F A EX RT PA LA |

| 1. i | 1 - -DEV PRESENT ATIONS & COLLATE DATA FOR GOAWG REVIEW OF 2ND PILOT SYS M

I S/S|"*GO4 uE NG & Rn u REvi .D , ReCOu FOR

| | | | | | | | |omo*

7ns; ENTER RECOM*AENDATIONS INTO GOAB DATABASE - FINAL REVIEW

| | | | 1 |-

om,omT*

GOAWG MEETING FOR FINAL APPROVAL OF 2ND SYS |'

| | | | | | ! om2am2'

'

EVAL REOD RESOURCES AND DEV FULL IMPLEMTATION SCH |

| | | | | | | omao7m*

PRESENT GOA SYS BASIS DOC FOR FINAL EXPERT PANEL APP |

GENE TE CTS F MENTATION RECOMM P

:

:

:

____-____________ _____ - __ - _ _ _ _ _ _ _ _ _ _ _ _ _ __ -_ _ ___ ___ __ _ _ _ _ _ _ _ _. -