Factory line production
Presented By
Skand Kumar 2010BARC038
Shikha Negi 2010BARC049
Nabarun Dutta 2010BARC071
Anil Choudhary 2010BARC080
Content
1…Introduction
2…Areas of factory line production
3…Areas related with Architecture
4…Types
5…Advantage and Disadvantage
6…Case Study
- Literature
- Live
7…Conclusion
What is factory line production?
A factory line production is a set of sequential operations established ina factory whereby materials are put through a refining process to produce an end-product that is suitable for onward consumption; or components are assembled tomake a finished article.
History
It was popularized in the 1910s and 1920s by Henry Ford's Ford Motor Company,
which introduced electric motors to the then-well-known technique of chain or
sequential production.
Areas of factory line(a broad scenario)
Automobiles
Food products
Electronics
Construction
Aeronautics
Printing press…
Areas related with construction
Tiles
Panels
Purlin
False ceiling panels
Window frames
Paver Block
Electric poles
Railway sleepers
Fencing post
Safety Barriers
Metal Shuttering for concrete
Prefabricated concrete segments …
Classification of assembly line by Layout
Process layout(similar activities together)
Product Layout(Straight Line Assembly)
Fixed-position layout(Product Fixed Services Moving)
Cellular Layout( Multiple Small Assembly Line)
Types of assembly line by Layout
Pros and cons
May prove economical in mass production High initial cost
Faster production Reduces employment
Quality Demand is the main factor
Standardization May take time in setup
Chance of error reduced
Less manual labor
Autoclaved Aerated Concrete Block production
Manufacturer-Shandong Dongyue Building Machine Co Ltd., China
Materials weighed and checked for quality
Preparation and storage of raw material
Materials put in conveyer belt for filtering
and quality assurance
Cutting area
1-Carriage box putting main block
over rail cart
2-Main block moving towards cutter
3-Chiselling of main block
Site area: 44750.070 m2
Supplier/ contractor: Larsen and turbo infrastructure
Client: Delhi metro rail corporation limited
Casting and stacking yard at Moti nagar, Delhi
Office Parapet
casting
areaBatching
plant
Stacking
area
Casting
area
Bar binding
area
Fabrication
yard
Bar stacking
area
Cement godown
Water treatment plantQuality
analysis lab
ENTRY
Layout of casting and stacking yard
1. The site has• 3 Production lines• 4 Batching plants • 2 Cement godown• Water treatment plant
2. Design mix is used.3. Treated water is used.4. Concrete testing is done in QA/QC lab.
• Compression test• Impact test• Slump test• Consistency test• Density test
5. M-35 concrete is used.6. Fly ash is used which comes from Dharma
power plant nearby.
Water treatment plant
Batching plant
About Site
Office Parapet
casting
areaBatching
plant
Stacking
area
Casting
area
Bar binding
area
Fabrication
yard
Bar stacking
area
Cement godown
Water treatment plantQuality
analysis lab
ENTRY
Layout of casting and stacking yard
Office Parapet
casting
areaBatching
plant
Stacking
area
Casting
area
Bar binding
area
Fabrication
yard
Bar stacking
area
Cement godown
Water treatment plantQuality
analysis lab
ENTRY
Layout of casting and stacking yard
Office Parapet
casting
areaBatching
plant
Stacking
area
Casting
area
Bar binding
area
Fabrication
yard
Bar stacking
area
Cement godown
Water treatment plantQuality
analysis lab
ENTRY
Layout of casting and stacking yard
Office Parapet
casting
areaBatching
plant
Stacking
area
Casting
area
Bar binding
area
Fabrication
yard
Bar stacking
area
Cement godown
Water treatment plantQuality
analysis lab
ENTRY
Layout of casting and stacking yard
References
http://www.dongyuemachine.com SHANDONG DONGYUE BUILDING MACHINE
http://www.youtube.com/watch?v=C_JjLwPYdhk AAC Blocks production line
L&T Site Visit
Sumit Kumar (Engineer) L&T
Venkata Rao (Project Manager) L&T
A Review of Assembly Line Changes for Lean Manufacturing (IOSR Journal of Mechanical and Civil
Engineering (IOSR-JMCE))