F A C T S A N D F I G U R E S 2 0 1 6
Highlights 2016
Our mission is to viably ensure energy transportation and distribution via electricity and natural gas networks at transparent rates in the Grand Duchy of Luxembourg.
This role is executed equally with respect to all suppliers and by respecting the company’s public service and environmental protection obligations.
The works to dismantle the old gas
holder built in 1967 and situated at the
Creos site in Hollerich lasted over three
months.
As part of the work in preparation
for the construction of its new
headquarters in Merl, Creos transplanted
15 large trees.
Creos is proud to be associated with
the Luxembourg Science Center,
a recognised private initiative “of national
interest” that will open its doors
in 2017.
Since May, the new site
in Contern has been housing the skills centre for smart
metering.
1 July 2016 will be remembered as an important date in the history of the
electrification of the Grand Duchy with
the installation of the first smart meters
known as “Smarty”.
DISMANTLING OF THE CITY
OF LUXEMBOURG’S GAS HOLDER
TRANSPLANTATION OF TREES
PARTNERSHIP WITH THE LUXEMBOURG SCIENCE CENTER
RELOCATION OF METERING SERVICES
LAUNCH OF THE SMART METERS
Mission
Values
Commitment
Quality
Safety
Innovation
Shareholder structure
Shareholder structure of Creos Luxembourg S.A. as at 31.12.2016
Encevo S.A. 75.43 %
City of Luxembourg 20.00 %
State of the Grand Duchy of Luxembourg 2.28 %
Fédération des Installateurs en Equipements Sanitaires et Climatiques (Federation of Sanitary and Air-Conditioning Equipment Fitters) 0.10 %
42 Luxembourg municipal authorities 2.13 %
Creos Luxembourg S.A. (own shares) 0.05 %
Total 100.00 %
Financial results
(under Lux GAAP) 2016
Net turnover (M€) 258.0
EBITDA (M€) 137.5
EBIT (M€) 64.4
Profit for the financial year (M€) 57.3
In July, Creos launches its smartphone
application available from the App Store
and Google Play.
The new 65/20 kV shielded substation
will be used to ensure the supply of electricity to the southern districts
of Luxembourg City and the Ban
de Gasperich.
In November, the Belgian and German markets
were coupled through the
commissioning of a phase shifting
transformer at the Schifflange
substation.
In the coming years, Creos will install
750 charging stations that will be known
as “Chargy”.
The construction of the new
interchange on the A4 motorway forced
Creos to divert a pipeline on a 3,500 metres stretch and
replace a gas station.
SMARTPHONE APPLICATION
INAUGURATION OF THE ECCO SUBSTATION
PST IN SCHIFFLANGE
ELECTROMOBILITY SYSTEM CHARGY
UNVEILED
DIVERSION OF THE PONTPIERRE
PIPELINE
Flebour
Bascharage
Sotel
Roost
Blooren
Berchem
Heisdorf
Bertrange
Schifflange
2 x 220 kV connection with Germany (Bauler)
2 x 220 kV connection with Germany(Treves and Quint)
Connection with Belgium via the Sotel network
Oxylux
A
A
A
A
AA
CC
B
Electricity
Length of the grid
3,511.3 kmMedium-voltage lines585.0 kmHigh-voltage lines
9,702.5 km
5,606.2 kmLow-voltage lines
Total
220 kV - network
65 kV - network
Substation 220/65/20 kV
Substation 220/20 kV
Substation 220 kV
265,000 customers
Electricity flow
5,048.2 GWh
Electricity network peak
795 MW
Transformer substations
2,633
Réseau de transport Creos
Communes desservies en gaz naturel par Creos
Sudgaz, Ville de Dudelange
Communes non desservies en gaz naturel
RÉSEAU DE TRANSPORT CREOS – GAZ NATUREL
Belgiumentry
Belgiumentry
Franceentry
Germanyentry
Bettendorf
Schengen
DiekirchErpel-dange
Ettelbruck
Schieren
Feulen
Mertzig
Bissen
Grosbous
Mersch
Wiltz
Lintgen
Kehlen
Niederanven
Biwer
Greven-macher
Mertert
Luxembourg
Mamer
Steinfort
Hobscheid
Mondorf-les-Bains
Bous
Remich
Contern
Esch-sur-Sûre
Colmar-Berg
Lorentzweiler
Steinsel
Kopstal
Koerich
Strassen
Bertrange
Sand-weiler
LeudelangeHesperange
Schuttrange
Wald-bredimus
Betzdorf
Winseler
Dalheim
Frisange
Walfer-dange
Weiler-la-Tour
Dudelange
Esch/Alzette
Pétange
Clervaux
Echternach
Creos transmission grid
Municipalities supplied with natural gas by Creos
Sudgaz, City of Dudelange
Municipalities not supplied with natural gas
45,000 customers
Pressure- reduction
substations
63
Length of the grid
2,059.3 kmTotal
281.8 km
1,777.5 km
Gas
Transmission network
Distribution network
Gas network peak
204,780 Nm3/h
Volume transported
9,165 GWh
Creos Luxembourg S.A.