fall 2013 release webinar
DESCRIPTION
Watch the recording here: http://www.arenasolutions.com/support/fall-13-webinar/ Arena pioneered cloud PLM applications. The company’s products, including BOMControl, PartsList and PDXViewer, enable engineering and manufacturing teams and their extended supply chains to speed prototyping, reduce scrap, and streamline supply chain management. Arena cloud PLM applications simplify bill of materials and change management for companies of all sizes, and offer the right balance of flexibility and control at every point in the product lifecycle—from prototype to full-scale production.TRANSCRIPT
FALL 2013 RELEASESEPTEMBER 25, 2013
Steve Chalgren, VP Product Management & Strategy
Kathy Davies, Product Manager
Paul Welch, Product Manager
Roy Stafford, Product Manager
AGENDA
• Introductions• Fall 2013 Product Previews
API Supply Chain Exchange Project Collaboration Demand Analysis
• How to get more information• Questions
FALL 2013 PRODUCTS
• API
• Supply Chain Exchange
• Project Management
• Cost Analysis
APPLICATION PROGRAMMING INTERFACE (API)
WHAT DOES IT DO?
Provides the ability to develop lightweight and flexible programmatic integrations
Arena Confidential
Samples:• ERP Integration
• Cost Data• Inventory Data
• CRM Integration• SKU’s automatically added to PLM
• CAD Integration• Custom integrations• Add functionality to existing integrations
WHY SHOULD YOU CARE
• Eliminates the manual ‘push’ of data amongst systems
Business Impact: TTM, Product Quality
• Improved organizational communication, collaboration, etc.
Business Impact: TTM
Leverage Your PLM Investment!
SUPPLY CHAIN EXCHANGE
Technical
ARCHITECTURE
• RESTful (REpresentational State Transfer)
• Authentication: session ID
• Protocol: Secure, encrypted https protocol
• Data Transport: JSON (JavaScript Object Notation)
Arena Confidential
SUPPORTED CAPABILITY
• Secure Authentication
• Items – Specs, BOM, Sourcing, Files, etc. Read Create Modify Delete
• Additional Arena objects in future releases
Arena Confidential
EXAMPLE – CREATE AN ITEM
Arena Confidential
url
Authentication
Data
Request
WANT MORE?
October 1st, 2013:
Supply Chain Exchange
SUPPLY CHAIN EXCHANGE
• Multi-tiered supplier collaboration
• Invite unlimited suppliers to view, approve and comment on build packages
• Low cost, low overhead approach to supplier collaboration
OEM
Other Suppliers
Contract Manufacturer
SupplierA
SupplierC
SupplierB
SupplierD
SupplierE
WHY SHOULD YOU CARE
• Ground Breaking - Easily involve your Supplier’s Supplier…End Tier
Business Impact: Competitive advantage to
include your entire supply chain
• More Timely Decision Making – all the way to the manuf. Floor
Business Impact: Less scrap & rework
• Better feedback from Supply Chain
Business Impact: DFM, Fewer Errors
affecting TTM, Product Cost & Quality
OEM
Other Suppliers
Contract Manufacturer
SupplierA
SupplierC
SupplierB
SupplierD
SupplierE
Leverage Your PLM Investment!
SAMPLE USE CASES
Arena Confidential
OEM
Other Suppliers
Contract Manufacturer
SupplierA
SupplierC
SupplierB
SupplierD
SupplierE
• Procurement for quoting
Send a build package
Receive a quote
• Collaborate with CM during NPI
DFM, DFQ
• Many OEMs include CM in change
Approval on ECOs
Implementation tracking
SUPPLY CHAIN EXCHANGE
Demonstration
WANT MORE?
October 2nd, 2013:
PROJECT MANAGEMENT
PROJECT MANAGEMENT
• High level project management in the context of the product record
• Collaborate globally with easy to use projects:
Use projects for new product introductions
Detailed manufacturing and engineering efforts
Targeted quality initiatives
• See real time product record information in the context of your schedule for accurate assessment of project progress
• Evaluate metrics for projects across your workspace with comprehensive reporting to maximize company efficiency.
Arena Confidential
WHY SHOULD YOU CARE
• Gives Mgmt Team the information necessary to make better strategic decisions
Business Impact: Invest in appropriate projects early, kill those that
are not
• Better visibility into Project Status’s for everybody involved – not just PMs
Business Impact: Affects TTM – projects completed on-time, on-
budget
• Less time in administrative tasks: meetings (CCBs), emails, chasing information, etc.
Business Impact: Affects TTM – projects completed on-time, on-
budget
Leverage Your PLM Investment!
SUPPLY CHAIN EXCHANGE
Demonstration
WANT MORE?
October 8th, 2013:
COST ANALYSIS
CUSTOMER PROBLEM
• No easy way to do forecast based planning
• Export BOM data from Arena – AML, cost
• Spend many hours in Excel doing merge and rollup across multiple BOMs
• Results in: Poor visibility into material requirements
Disadvantage when negotiating component prices
Contract Manufacturer often has a better picture on volume
Money left on the table
Arena Confidential
COST ANALYSIS
• Enter a forecast against multiple product BOMs
• Calculate total demand for required materials
• Aggregates across multiple products or product lines
• Include cost and sourcing information from Arena
Arena Confidential
=Total Materials Demand
Forecast Qty.
Product BOM
Product BOM +n
WHY SHOULD YOU CARE
• Reduction in Direct Material Spend
Business Impact: Product Cost reduction and MBO incentives realized!
• You’re living in Excel for forecasting
Business Impact: Significant reduction in manual effort to build and maintain
Future forecasting: Better predictability for negotiating future demand
• Take control back from your CM!
Business Impact: Affects Product Costs
Leverage Your PLM Investment!
SUPPLY CHAIN EXCHANGE
Demonstration
TYPICAL USE-CASE
Arena Confidential
Product 1
Forecast
Product 3Product 2
Period Q1 Q2 Q3 Q4
Product 1 100,000 100,000 150,000 200,000
Product 2 50,000 80,000 100,000 120,000
Product 3 80,000 120,000 150,000 200,000
CALCULATE TOTAL MATERIAL DEMAND
Arena Confidential
Qty. 4 Qty. 2 Qty. 1
Total Demand for Capacitor P/N 1001
Product 1 Product 3Product 2
Capacitor P/N 1001
Qty 4* Forecast Qty 2 * Forecast
Qty 1 * Forecast
++
=
Total 3.45M Pieces Required
Qty used per assembly
WANT MORE?
October 2nd, 2013:
UPCOMING ACTIVITIES
• Training:
• Topic Specific Webinars: October 1st: API
October 2nd: Supply Chain Exchange & Cost Analysis
October 8th: Project Management
www.arenasolutions.com
866.937.1438
THANK YOU