fall 2013 release webinar

33
FALL 2013 RELEASE SEPTEMBER 25, 2013 Steve Chalgren, VP Product Management & Strategy Kathy Davies, Product Manager Paul Welch, Product Manager Roy Stafford, Product Manager

Upload: arena-plm

Post on 22-Jun-2015

113 views

Category:

Technology


0 download

DESCRIPTION

Watch the recording here: http://www.arenasolutions.com/support/fall-13-webinar/ Arena pioneered cloud PLM applications. The company’s products, including BOMControl, PartsList and PDXViewer, enable engineering and manufacturing teams and their extended supply chains to speed prototyping, reduce scrap, and streamline supply chain management. Arena cloud PLM applications simplify bill of materials and change management for companies of all sizes, and offer the right balance of flexibility and control at every point in the product lifecycle—from prototype to full-scale production.

TRANSCRIPT

Page 1: Fall 2013 release webinar

FALL 2013 RELEASESEPTEMBER 25, 2013

Steve Chalgren, VP Product Management & Strategy

Kathy Davies, Product Manager

Paul Welch, Product Manager

Roy Stafford, Product Manager

Page 2: Fall 2013 release webinar

AGENDA

• Introductions• Fall 2013 Product Previews

API Supply Chain Exchange Project Collaboration Demand Analysis

• How to get more information• Questions

Page 3: Fall 2013 release webinar

FALL 2013 PRODUCTS

• API

• Supply Chain Exchange

• Project Management

• Cost Analysis

Page 4: Fall 2013 release webinar

APPLICATION PROGRAMMING INTERFACE (API)

Page 5: Fall 2013 release webinar

WHAT DOES IT DO?

Provides the ability to develop lightweight and flexible programmatic integrations

Arena Confidential

Samples:• ERP Integration

• Cost Data• Inventory Data

• CRM Integration• SKU’s automatically added to PLM

• CAD Integration• Custom integrations• Add functionality to existing integrations

Page 6: Fall 2013 release webinar

WHY SHOULD YOU CARE

• Eliminates the manual ‘push’ of data amongst systems

Business Impact: TTM, Product Quality

• Improved organizational communication, collaboration, etc.

Business Impact: TTM

Leverage Your PLM Investment!

Page 7: Fall 2013 release webinar

SUPPLY CHAIN EXCHANGE

Technical

Page 8: Fall 2013 release webinar

ARCHITECTURE

• RESTful (REpresentational State Transfer)

• Authentication: session ID

• Protocol: Secure, encrypted https protocol

• Data Transport: JSON (JavaScript Object Notation)

Arena Confidential

Page 9: Fall 2013 release webinar

SUPPORTED CAPABILITY

• Secure Authentication

• Items – Specs, BOM, Sourcing, Files, etc. Read Create Modify Delete

• Additional Arena objects in future releases

Arena Confidential

Page 10: Fall 2013 release webinar

EXAMPLE – CREATE AN ITEM

Arena Confidential

url

Authentication

Data

Request

Page 11: Fall 2013 release webinar

WANT MORE?

October 1st, 2013:

Page 12: Fall 2013 release webinar

Supply Chain Exchange

Page 13: Fall 2013 release webinar

SUPPLY CHAIN EXCHANGE

• Multi-tiered supplier collaboration

• Invite unlimited suppliers to view, approve and comment on build packages

• Low cost, low overhead approach to supplier collaboration

OEM

Other Suppliers

Contract Manufacturer

SupplierA

SupplierC

SupplierB

SupplierD

SupplierE

Page 14: Fall 2013 release webinar

WHY SHOULD YOU CARE

• Ground Breaking - Easily involve your Supplier’s Supplier…End Tier

Business Impact: Competitive advantage to

include your entire supply chain

• More Timely Decision Making – all the way to the manuf. Floor

Business Impact: Less scrap & rework

• Better feedback from Supply Chain

Business Impact: DFM, Fewer Errors

affecting TTM, Product Cost & Quality

OEM

Other Suppliers

Contract Manufacturer

SupplierA

SupplierC

SupplierB

SupplierD

SupplierE

Leverage Your PLM Investment!

Page 15: Fall 2013 release webinar

SAMPLE USE CASES

Arena Confidential

OEM

Other Suppliers

Contract Manufacturer

SupplierA

SupplierC

SupplierB

SupplierD

SupplierE

• Procurement for quoting

Send a build package

Receive a quote

• Collaborate with CM during NPI

DFM, DFQ

• Many OEMs include CM in change

Approval on ECOs

Implementation tracking

Page 16: Fall 2013 release webinar

SUPPLY CHAIN EXCHANGE

Demonstration

Page 17: Fall 2013 release webinar

WANT MORE?

October 2nd, 2013:

Page 18: Fall 2013 release webinar

PROJECT MANAGEMENT

Page 19: Fall 2013 release webinar

PROJECT MANAGEMENT

• High level project management in the context of the product record

• Collaborate globally with easy to use projects:

Use projects for new product introductions

Detailed manufacturing and engineering efforts

Targeted quality initiatives

• See real time product record information in the context of your schedule for accurate assessment of project progress

• Evaluate metrics for projects across your workspace with comprehensive reporting to maximize company efficiency.

Arena Confidential

Page 20: Fall 2013 release webinar

WHY SHOULD YOU CARE

• Gives Mgmt Team the information necessary to make better strategic decisions

Business Impact: Invest in appropriate projects early, kill those that

are not

• Better visibility into Project Status’s for everybody involved – not just PMs

Business Impact: Affects TTM – projects completed on-time, on-

budget

• Less time in administrative tasks: meetings (CCBs), emails, chasing information, etc.

Business Impact: Affects TTM – projects completed on-time, on-

budget

Leverage Your PLM Investment!

Page 21: Fall 2013 release webinar

SUPPLY CHAIN EXCHANGE

Demonstration

Page 22: Fall 2013 release webinar

WANT MORE?

October 8th, 2013:

Page 23: Fall 2013 release webinar

COST ANALYSIS

Page 24: Fall 2013 release webinar

CUSTOMER PROBLEM

• No easy way to do forecast based planning

• Export BOM data from Arena – AML, cost

• Spend many hours in Excel doing merge and rollup across multiple BOMs

• Results in: Poor visibility into material requirements

Disadvantage when negotiating component prices

Contract Manufacturer often has a better picture on volume

Money left on the table

Arena Confidential

Page 25: Fall 2013 release webinar

COST ANALYSIS

• Enter a forecast against multiple product BOMs

• Calculate total demand for required materials

• Aggregates across multiple products or product lines

• Include cost and sourcing information from Arena

Arena Confidential

=Total Materials Demand

Forecast Qty.

Product BOM

Product BOM +n

Page 26: Fall 2013 release webinar

WHY SHOULD YOU CARE

• Reduction in Direct Material Spend

Business Impact: Product Cost reduction and MBO incentives realized!

• You’re living in Excel for forecasting

Business Impact: Significant reduction in manual effort to build and maintain

Future forecasting: Better predictability for negotiating future demand

• Take control back from your CM!

Business Impact: Affects Product Costs

Leverage Your PLM Investment!

Page 27: Fall 2013 release webinar

SUPPLY CHAIN EXCHANGE

Demonstration

Page 28: Fall 2013 release webinar

TYPICAL USE-CASE

Arena Confidential

Product 1

Forecast

Product 3Product 2

Period Q1 Q2 Q3 Q4

Product 1 100,000 100,000 150,000 200,000

Product 2 50,000 80,000 100,000 120,000

Product 3 80,000 120,000 150,000 200,000

Page 29: Fall 2013 release webinar

CALCULATE TOTAL MATERIAL DEMAND

Arena Confidential

Qty. 4 Qty. 2 Qty. 1

Total Demand for Capacitor P/N 1001

Product 1 Product 3Product 2

Capacitor P/N 1001

Qty 4* Forecast Qty 2 * Forecast

Qty 1 * Forecast

++

=

Total 3.45M Pieces Required

Qty used per assembly

Page 30: Fall 2013 release webinar

WANT MORE?

October 2nd, 2013:

Page 31: Fall 2013 release webinar

UPCOMING ACTIVITIES

• Training:

• Topic Specific Webinars: October 1st: API

October 2nd: Supply Chain Exchange & Cost Analysis

October 8th: Project Management

Page 32: Fall 2013 release webinar
Page 33: Fall 2013 release webinar

www.arenasolutions.com

866.937.1438

THANK YOU