farmers market plan-the corridor - 11-03-2011

88
Dave Albersman 612-349-2778 Ma rk Oya as 612-338-0330 Bruce Lam brecht 612-349-2775 Connecting Regi onal Sport s and Entertainm ent Through Transit

Upload: cory-merrifield

Post on 06-Apr-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 1/88

Dave Albersman 612-349-2778 Mark Oyaas 612-338-0330 Bruce Lambrecht 612-349-2775

Connecting Regional Sports and Entertainment Through Transit

Page 2: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 2/88

 Connecting Regional Sports and Entertainment Through Transit 

November 3, 2011

The Honorable Mark DaytonGovernor of Minnesota

130 State Capitol75 Rev. Dr. Martin Luther King Jr. Blvd.

St. Paul, MN 55155

Dear Governor Dayton:

For more than a year a group of interested citizens has been crafting and refining an urban revitalization plan thatincludes a new downtown Minneapolis site for the Vikings stadium, a redevelopment plan for the Metrodome, anexciting vision for what could be on the site of the current building, as well as a proposal for a new structure for financing and operating the region’s sports and entertainment facilities. The Stadium-related events of this past weekalone are ample evidence that we don’t have a system in place to make these important infrastructure decisions; we

have merely established a 55-year-long pattern of bad behavior. This submission is made in hopes that our State’sleaders will fill the void created by the collapse of the proposed funding formulas with a new framework thatrecognizes the potential power of a billion dollar stadium investment and harnesses that power to maximize publicbenefit.

We call our efforts “The Corridor” [www.corridormn.com]. This refers to a concept which leverages current andplanned fixed rail transit to connect the region’s major sports and convention facilities. It speaks to the synergies of asports and entertainment district in Minneapolis utilizing all of the transportation and transit infrastructure the public

has already paid for. From this perspective the plan is a roadmap for recruiting large scale sporting events likesoccer’s Gold Cup or the Pan Am Games. If properly managed a legitimate bid for the Olympics could be in reach.

On a macro level this proposal provides a means to come to grips with the ongoing crisis management thatcontinually clouds efforts to enhance the State’s sports infrastructure. We turn to the Metropolitan AirportsCommission (MAC) as an inspiring model for managing critical public assets and submit the MetropolitanEntertainment Commission (MEC) for your consideration. It is time to get the house in order. Between now and theregularly-scheduled legislative session it would be possible to convene a group of qualified and engaged citizens toform the MEC. They could consider governance, operations and financing options. Additionally this group could act

as an arbiter for site selection.

A MEC offers the opportunity to capture and consolidate the multiplicity of taxes and related publicly-generatedrevenues that could amount to $300 million which could be used toward immediate stadium needs. When combinedwith team owner contributions and other private sector support we submit that it is possible that the State contributionmay be a manageable $200 million. Our assumptions have been vetted by finance professionals from both the publicand pri ate sectors b t the need the scr tin that onl State re en e officials can appl

Page 3: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 3/88

cc: Rep. Kurt Zellers, Speaker of the House Sen. Amy Koch, Senate Majority Leader Rep. Paul Thissen, Minority Leader Sen. Thomas M. Bakk, Minority Leader 

Rep. Morrie Lanning (author) Sen. Julie Rosen (author)

Addresses:

Rep. Kurt Zellers (R) (District 32B)Speaker of the House463 State Office Building

100 Rev. Dr. Martin Luther King Jr. Blvd.Saint Paul, Minnesota 55155

Rep. Paul Thissen (DFL) (District 63A)House Minority Leader 267 State Office Building100 Rev. Dr. Martin Luther King Jr. Blvd.Saint Paul, Minnesota 55155

Rep. Morrie Lanning379 State Office Building100 Rev. Dr. Martin Luther King Jr. Blvd.Saint Paul, Minnesota 55155

Sen. Amy KochSenate Majority Leader 75 Rev. Dr. Martin Luther King Jr. Blvd.Capitol Building, Room 208St. Paul, MN 55155-1606

Senator Thomas M. BakkSenate Minority Leader 100 Rev. Dr. Martin Luther King Jr. Blvd.

State Office Building, Room 147St. Paul, MN 55155-1206

Sen. Julie Rosen75 Rev. Dr. Martin Luther King Jr. Blvd.Capitol Building, Room 322St P l MN55155 1606

Page 4: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 4/88

Billion Dollar Investment

Maximize Public Benefit

Page 5: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 5/88

Target Field RevisitedThe “Corridor”

Why Farmer’s Market?

MetrodomeMedical Campus

The “MEC” (Metropolitan Entertainment Commission)

Page 6: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 6/88

“Site too small and next to garbage burner” 

Page 7: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 7/88

Rapid Park ‐ 1999Rapid Park ‐ 1999

Page 8: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 8/88

Twins Ballpark (Rendering by Albersman & Armstrong, Ltd. –2000)

Page 9: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 9/88

Twins Ballpark (Rendering by Albersman & Armstrong, Ltd. –2000)

Page 10: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 10/88

The “Sports Corridor” – 2002 Rendering by Duncan Malloch

Page 11: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 11/88

Page 12: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 12/88

Connecting Regional Sports and Entertainment Through Transit

Page 13: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 13/88

?Arden

Hi l ls

Saint

Paul

Minneapol is

Mal l of  Amer i ca

Si te

Page 14: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 14/88

?Arden

Hi l ls

Minneapol is

Mal l of  Amer i ca

Si te

MSP Air por t

Saint

Paul

Page 15: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 15/88

?Arden

Hi l ls

Minneapol is

Mal l of  Amer i ca

Si te

MSP Air por t

Saint

Paul

Vikings Stadium

Target Field

Target Center

Block EConvention Center

HCMC

MOA Field

U of M Hospital

U of M Sports

Xcel & RiverCentre

Union Depot

Page 16: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 16/88

Downtown East / North Loop Master Plan

Adopted October 2003

Page 17: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 17/88

Downtown East

Sports &Entertainment

ALBERSMANARMSTRONGALBERSMANARMSTRONG

Page 18: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 18/88

Why Far m er ’s Mar ket ?

Page 19: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 19/88

Farmer’s Market Site Location

34 Acres34 Acres

ALBERSMANARMSTRONGALBERSMANARMSTRONG

Page 20: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 20/88

MetrodomeSite Location

22 Acres22 Acres

ALBERSMANARMSTRONGALBERSMANARMSTRONG

Page 21: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 21/88

Issues:

Rail, Bus and Bike

Parking / Roadway AccessSkyway System

Bars and Restaurants

Redevelopment NeedHighest and Best Use

Land Value

Interim Location

Land Assembly

Page 22: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 22/88

Page 23: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 23/88

Rail, Bus and Bike

Existing Metro BusTransit StationsExisting Metro BusTransit Stations

Hiawatha LRTCentral Corridor LRTSouthwest LRTBottineau LRTNorthStar Rail

Bike TrailInterchange StationMTC Bus Stations

ALBERSMANARMSTRONGALBERSMANARMSTRONG

Page 24: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 24/88

Issues:

Rail, Bus and Bike

Parking / Roadway AccessSkyway System

Bars and Restaurants

Redevelopment NeedHighest and Best Use

Land Value

Interim Location

Land Assembly

Farmer’sMarket Site MetrodomeSite

+ -

Page 25: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 25/88

Farmer’s Market Site –Parking

Source: City of 

 Minneapolis,

 and

 aerial

 survey

 using

 Google

 Earth

 Pro

SITE

ALBERSMANARMSTRONGALBERSMANARMSTRONG

Page 26: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 26/88

Page 27: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 27/88

Page 28: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 28/88

Page 29: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 29/88

MetrodomeSite – Parking

Source: City of 

 Minneapolis,

 and

 aerial

 survey

 using

 Google

 Earth

 Pro

SITE

ALBERSMANARMSTRONGALBERSMANARMSTRONG

Page 30: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 30/88

MetrodomeSite – Parking

Garage Parking: 5,600 (44%)Surface Parking: 7,000 (56%)

Total Parking: 12,600 (100%)

Source: City of 

 Minneapolis,

 and

 aerial

 survey

 using

 Google

 Earth

 Pro

Stadium

Footprint

ALBERSMANARMSTRONGALBERSMANARMSTRONG

Page 31: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 31/88

MetrodomeSite – Parking

 Average Walking

Distance = 3.6 Blocks

Stadium

Footprint

ALBERSMANARMSTRONGALBERSMANARMSTRONG

Page 32: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 32/88

Page 33: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 33/88

Page 34: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 34/88

Farmer’s Market Site –Skyway System

ALBERSMANARMSTRONGALBERSMANARMSTRONG

Page 35: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 35/88

Page 36: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 36/88

Issues:

Rail, Bus and Bike

Parking / Roadway Access

Skyway System

Bars and Restaurants

Redevelopment NeedHighest and Best Use

Land Value

Interim LocationLand Assembly

Farmer’sMarket Site MetrodomeSite

+ -

+ -+ -

Page 37: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 37/88

Page 38: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 38/88

MetrodomeSite –Bars and Restaurants

ALBERSMANARMSTRONGALBERSMANARMSTRONG

Page 39: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 39/88

Issues:

Rail, Bus and Bike

Parking / Roadway Access

Skyway System

Bars and Restaurants

Redevelopment NeedHighest and Best Use

Land Value

Interim LocationLand Assembly

Farmer’sMarket Site MetrodomeSite

+ -

+ -+ -

+ -

Page 40: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 40/88

Farmer’s Market Site –Redevelopment Need

Page 41: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 41/88

MetrodomeSite –Redevelopment Need

M t d Sit R d l t N d

Page 42: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 42/88

MetrodomeSite –Redevelopment Need

I

Page 43: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 43/88

Issues:

Rail, Bus and Bike

Parking / Roadway Access

Skyway System

Bars and Restaurants

Redevelopment NeedHighest and Best Use

Land Value

Interim LocationLand Assembly

Farmer’sMarket Site MetrodomeSite

+ -

+ -+ -

+ -

+ -

F ’ M k t Sit Hi h t dB t U

Page 44: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 44/88

Farmer’s Market Site –Highest and Best Use

Metrodome SiteMetrodome Site

Farmer’s Market SiteFarmer’s Market Site

ALBERSMANARMSTRONGALBERSMANARMSTRONG

F ’ M k t Sit Hi h t dB t U

Page 45: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 45/88

Farmer’s Market Site –Highest and Best Use

CentralBusinessDistrict

CentralBusinessDistrict

ElliotNeighborhood

ElliotNeighborhood

MedicalMedical

North Loop &Warehouse

North Loop &Warehouse

SportsSports

RestaurantsTheaters

RestaurantsTheaters

Mill CityDistrictMill CityDistrict

University

West

University

West

ALBERSMANARMSTRONGALBERSMANARMSTRONG

Farmer’sMarket Site Highest andBest Use

Page 46: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 46/88

Farmer’s Market Site –Highest and Best Use

Housing, Medicaland Educational

Housing, Medicaland Educational

Sports andEntertainmentSports andEntertainment

ALBERSMANARMSTRONGALBERSMANARMSTRONG

CBDCBD

Issues:

Page 47: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 47/88

Issues:

Rail, Bus and Bike

Parking / Roadway Access

Skyway System

Bars and Restaurants

Redevelopment NeedHighest and Best Use

Land Value

Interim LocationLand Assembly

Farmer’sMarket Site MetrodomeSite

+ -

+ -+ -

+ -

+ -+ -

Cit y of Mpls Land Cost Analys is :

Page 48: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 48/88

Cit y of Mpls Land Cost Analys is :

Farmer’s Market Site Metrodome SiteLow Estimate High Estimate Low Estimate High Estimate

Infrastructure: $69 Million $181 Million $30 Million $70 Million

PropertyAcquisition: $47 Million $47 Million $0 $0

Demolition: $3 Million $4 Million $3 Million $4 Million

Totals: $119 Million $232 Million $33 Million $74 Million

Difference: $86 Million $158 Millionmore than more than

Metrodome Metrodome

Source: Jim Nelson of  Eberhardt Advisory

Land Valuat ion Com par ison:

Page 49: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 49/88

Land Valuat ion Com par ison:

Farmer’s Market Site Metrodome SiteValue/S.F. 1 Value Value/S.F. 1 Value

Assessed

Market Value: $14.84 $16,160,000 $32.58

 $35,480,000

Recent Sales: $17.25  $18,785,000 No Recent Sales 3

100% CostPremium: 2 $29.68 $32,320,000 $65.16 $70,960,000

Source: Hennepin County Assessor’s Office1 Based on 25 Acres2 100% increase over assessors market value.3 Option in 2001 of  bare land for $48.sq.ft.

Issues:

Page 50: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 50/88

Issues:

Rail, Bus and Bike

Parking / Roadway Access

Skyway System

Bars and Restaurants

Redevelopment NeedHighest and Best Use

Land Value

Interim LocationLand Assembly

Farmer’sMarket Site MetrodomeSite

+ -

+ -+ -

+ -

+ -+ -

+ -

InterimLocation (est $15million/year)

Page 51: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 51/88

Interim Location (est. $15 million/year)

Issues:

Page 52: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 52/88

Issues:

Rail, Bus and Bike

Parking / Roadway Access

Skyway System

Bars and Restaurants

Redevelopment NeedHighest and Best Use

Land Value

Interim LocationLand Assembly

Farmer’sMarket Site MetrodomeSite

+ -

+ -+ -

+ -

+ -+ -

+ -

+ -

LandAssembly - Metrodome

Page 53: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 53/88

Land Assembly Metrodome

22 Acres22 Acres

ALBERSMANARMSTRONGALBERSMANARMSTRONG

LandAssembly–Farmer’sMarket

Page 54: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 54/88

Land Assembly Farmers Market

34 Acres34 Acres

ALBERSMANARMSTRONGALBERSMANARMSTRONG

Issues:

Page 55: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 55/88

Rail, Bus and Bike

Parking / Roadway Access

Skyway System

Bars and Restaurants

Redevelopment NeedHighest and Best Use

Land Value

Interim LocationLand Assembly

Farmer’sMarket Site MetrodomeSite

+ -

+ -+ -

+ -

+ -+ -

+ -

+ -

? +

Summary :

Page 56: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 56/88

Selecting the best location is more important than

simple implementation

A good location with flaws can be fixed, a flawlessplan in a bad location cannot

The stadium on the Metrodomesite is not compatiblewith current emerging development

Farmer’s Market site would give much needed boost tothis area of North Minneapolis

Page 57: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 57/88

Downtown East

Sports &

Entertainment

ALBERSMANARMSTRONGALBERSMANARMSTRONG

Site

Page 58: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 58/88

ALBERSMANARMSTRONGALBERSMANARMSTRONG

Ste

Vikings Stadium Concept

Page 59: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 59/88

EnergyResource

Center

FootballFootball

BaseballBaseball

BasketballBasketball

Future LRT Extension

LRTStation

Theater,

Entertainment

Theater,

Entertainment

FarmersMarket

Tailgating,Railgating,

Trailgating

TheInterchange

Station

ALBERSMANARMSTRONGALBERSMANARMSTRONG

Connection

Connection

4,600

Stalls

1,600Stalls

1,500Stalls

1,600 Stalls

550 Stalls

370Stalls

Twins Plaza

g p

1,150Stalls

Connection

Vikings Stadium Concept

Page 60: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 60/88

EnergyResource

Center

FootballFootball

BaseballBaseball

BasketballBasketball

Future LRT Extension

LRTStation

Theater,

Entertainment

Theater,

Entertainment

FarmersMarket

Tailgating,Railgating,

Trailgating

TheInterchange

Station

ALBERSMANARMSTRONGALBERSMANARMSTRONG

Connection

Connection

4,600

Stalls

1,600Stalls

1,500Stalls

1,600 Stalls

550 Stalls

Twins Plaza

g p

Connection

FutureDevelopment

FutureDevelopment

FutureDevelopment

FutureDevelopment

Vikings Stadium Concept

Page 61: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 61/88

FootballFootball

BaseballBaseball

BasketballBasketball

Future LRT Extension

LRTStation

Theater,

Entertainment

Theater,

Entertainment

FarmersMarket

Tailgating,Railgating,

Trailgating

TheInterchange

Station

ALBERSMANARMSTRONGALBERSMANARMSTRONG

Connection

Connection

4,600

Stalls

1,600Stalls

1,500Stalls

1,600 Stalls

300 Stalls

Twins Plaza

g p

Connection

FutureDevelopment

FutureDevelopment

FutureDevelopment

FutureDevelopment

Vikings Stadium Concept

Page 62: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 62/88

ALBERSMAN

ARMSTRONG

ALBERSMAN

ARMSTRONG

g p

Vikings Stadium Concept

Page 63: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 63/88

ALBERSMAN

ARMSTRONG

ALBERSMAN

ARMSTRONG

Vikings Stadium Concept

Page 64: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 64/88

ALBERSMAN

ARMSTRONG

ALBERSMAN

ARMSTRONG

Vikings Stadium Concept

Page 65: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 65/88

ALBERSMAN

ARMSTRONG

ALBERSMAN

ARMSTRONG

Page 66: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 66/88

Metrodome Medical Campus

Downtown East / North Loop Master PlanAdoptedOctober2003

Page 67: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 67/88

Adopted October 2003

Downtown East / North Loop Master PlanAdoptedOctober2003

Page 68: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 68/88

Adopted October 2003

MetrodomeMedical Campus

Page 69: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 69/88

U of M Medical School

Mayo Satellite

Specialty Clinics

U of M Ambulatory CareMedical Device Incubator 

HCMC

Housing

Metrodomere-use illustration

Met rodomeSi te

HCMC

LRT

Stat ion

Why the MetrodomeMedical Campus ?

Page 70: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 70/88

Proximity to the U of M

Parking Potential

Access to Transit

Identity OpportunityMedical Synergies

Roadway Access

Compatible with

Metrodomere-use illustration

Met rodomeSi te

HCMC

LRT

Stat ion

Emerging Development

Why Not?

Page 71: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 71/88

The Stadium Problem

Page 72: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 72/88

The Current System is Broken and Dysfunctional:

Competition between government jurisdictions

Lack of coordinated planning

Financial burden not fairly shared

Finances difficult to understand

Duplicative facilities and management

Site selection based on crisis management

Public benefit not maximized

Page 73: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 73/88

The MEC“Metropolitan Entertainment Commission”

A New Model for Development,Ownership and Management of Sports,

Entertainment and Exhibition Facilities

Issues

Page 74: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 74/88

Billion Dollar Investment

Maximize Public Benefit Utilize existing freeway and major arterial systems

Capitalize on existing and planned transit

Maximize existing parking infrastructure/investment

Access to jobs

Strengthen urban core

Create sports and entertainment synergies

Create operational & management efficiencies

Should accomplish more than just a stadium

Fix ing the Problem…

Page 75: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 75/88

(Metropolitan Airports Commission)

The MAC Model

The MAC Model (Metropolitan Airports Commission)

Page 76: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 76/88

Operates and Manages:

Minneapolis/Saint Paul International Airport

Saint Paul Downtown Holman Field Flying Cloud Airport

Crystal Airport

AirlakeAirport

Lake Elmo Airport

Anoka County – Blaine Airport

The MAC Model Versus

Page 77: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 77/88

Similarities:

Large publicly-owned facilities

Multiple large tenants (e.g. Twins & Vikings / Delta & Sun Country)

Multiple revenue streams

Capital & ongoing financing needs

Recognized public benefit

Spor ts & Entertainment Facilit ies

The MAC Model Versus

Page 78: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 78/88

Differences:

Compensatory – landside and terminalrevenue flows to MAC

Single management

Oversight by statewide representation

Capital cost recovery based on user fees

Accountable to legislature

Residual – revenue flows toteam owners

Multiple owners/management authorities

Regional and local oversight

Capital cost recovery based on taxes

Accountable to local sponsors

Metropolitan Airports Commission Sports & Ent. Facilities

Spor ts & Entertainment Facilit ies

The MAC Model (Metropolitan Airports Commission)

Page 79: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 79/88

Summary:

User fees based budget

Taxing authority (not used since late 1960’s) Oversight by benefitting jurisdiction

Professional management

Accountable to legislature

Staggered terms provide political stability

Bonding authority

Power of eminent domain

The MEC Model (Metropolitan Entertainment Commission)

Page 80: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 80/88

Summary:

User fees based budget

Taxing authority (not used since late 1960’s) Oversight by benefitting jurisdiction

Professional management

Accountable to legislature

Staggered terms provide political stability

Bonding authority

Power of eminent domain

The Met ropolitan Enter tainment

Page 81: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 81/88

MEC Phase I:

Target Center 

Target Field

Minneapolis Convention Center 

Mall of America Field (Metrodome)

Commission (MEC)

MEC Phase II:

Xcel Center 

RiverCentre

Midway Stadium

Potent ial Financ ing Plan – Phase I

Page 82: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 82/88

Metropolitan Entertainment Commission (MEC):

Lead with Private Money

Team owners

Corporate investment

Maximize Unencumbered Existing Revenue Streams

Capture TAD garage revenues

Refinance Minneapolis Convention Center  Sell MetrodomeDevelopment rights

Refinance Target Field

Sell naming rights / sponsorships

Realize Management Efficiencies

Finish with new public money

Example Financing Plan – Phase I

Page 83: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 83/88

Lead with Private Money: $ 520 MFinish with Public Money: $ 480 M

Total: $ 1 Billion

(Estimates Only)

Page 84: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 84/88

Example Financing Plan – Phase I(Estimates Only)

Page 85: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 85/88

Finish with Public Money:Reduce Bureaucracy $ 20 M1

TAD Garages $ 50 M2

Convention Center $ 50 M3

HC Twins Bonds $100 M4

Twins/VikesEnt. Tax $ 50 M5

Sale of Metrodome $ 30 M6

Add’l Public Contribution $180 M7

Total: $480 M

( y)

1. Reduced admin. expenses bonded over 30 years.2. Assumes all net revenues after 5pm weekdays and weekends from events.3. Assumes refinance of current taxes used for Convention Center. Extend and refinance of debt., Assumes 3% food

and liquor, 0.5% sales tax already in place and extended.4. Assumes use of excess revenue already being collected for Twins games, 0.15% sales tax.5. Assumes 3% entertainment tax already in place for Twins games as well as 3% Vikings entertainment tax.6. From published reports.7. Gaming, bonding, legacy funds or foundations.

Why MEC? (Metropolitan Entertainment Commission)

Page 86: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 86/88

Eliminate duplicative bureaucracies

Take politics out of the planning process

Broader representation by benefiting jurisdictions Establish ongoing funding

Reduce leverage of team owner 

Transparency

Maximize public benefit

Next Steps

Page 87: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 87/88

Extend Vikings Lease for One Year 

Create MEC Task Force:

Governance

Financing

Operations

Site selection

Lead with Private Sector Investment

Prepare for Legislative Session

Page 88: Farmers Market Plan-The Corridor - 11-03-2011

8/3/2019 Farmers Market Plan-The Corridor - 11-03-2011

http://slidepdf.com/reader/full/farmers-market-plan-the-corridor-11-03-2011 88/88