Page 1: FEB 2006 as reported by Mark Dye. P6001A P6001B P6003A N East firewater pond West firewater pond P6003B P6002B P6002A East isolation gate West isolation

FEB 2006

as reported by Mark Dye

Page 2: FEB 2006 as reported by Mark Dye. P6001A P6001B P6003A N East firewater pond West firewater pond P6003B P6002B P6002A East isolation gate West isolation

P6001AP6001B

P6003A

N

East firewater

pond

West firewater

pond

P6003B

P6002B P6002A

East isolation

gate

West isolation

gate

Pump house layout

Page 3: FEB 2006 as reported by Mark Dye. P6001A P6001B P6003A N East firewater pond West firewater pond P6003B P6002B P6002A East isolation gate West isolation

Unpacking P6001A

Page 4: FEB 2006 as reported by Mark Dye. P6001A P6001B P6003A N East firewater pond West firewater pond P6003B P6002B P6002A East isolation gate West isolation
Page 5: FEB 2006 as reported by Mark Dye. P6001A P6001B P6003A N East firewater pond West firewater pond P6003B P6002B P6002A East isolation gate West isolation

This is the pumps hydraulic end

With the pump submerged, the water flows up through the shaft housing

Page 6: FEB 2006 as reported by Mark Dye. P6001A P6001B P6003A N East firewater pond West firewater pond P6003B P6002B P6002A East isolation gate West isolation

The business end!

Page 7: FEB 2006 as reported by Mark Dye. P6001A P6001B P6003A N East firewater pond West firewater pond P6003B P6002B P6002A East isolation gate West isolation

The pump and first pipe spool being lowered into the well…

Page 8: FEB 2006 as reported by Mark Dye. P6001A P6001B P6003A N East firewater pond West firewater pond P6003B P6002B P6002A East isolation gate West isolation

…into the icy water below

Page 9: FEB 2006 as reported by Mark Dye. P6001A P6001B P6003A N East firewater pond West firewater pond P6003B P6002B P6002A East isolation gate West isolation

Looking down through the spool to the pump top below

Page 10: FEB 2006 as reported by Mark Dye. P6001A P6001B P6003A N East firewater pond West firewater pond P6003B P6002B P6002A East isolation gate West isolation

A shaft bearing is installed between each pipe spool and clamped between the flanges

The bearing is water lubricated and made of PTFE

Page 11: FEB 2006 as reported by Mark Dye. P6001A P6001B P6003A N East firewater pond West firewater pond P6003B P6002B P6002A East isolation gate West isolation

The shaft joining piece has a left hand thread!

The next pipe spool is lowered into position

Page 12: FEB 2006 as reported by Mark Dye. P6001A P6001B P6003A N East firewater pond West firewater pond P6003B P6002B P6002A East isolation gate West isolation

Jointing compound

Page 13: FEB 2006 as reported by Mark Dye. P6001A P6001B P6003A N East firewater pond West firewater pond P6003B P6002B P6002A East isolation gate West isolation

The flanges are bolted together,

then torqued down to 175 ft-lbs.

The support is opened,and the pump is lowered.

Page 14: FEB 2006 as reported by Mark Dye. P6001A P6001B P6003A N East firewater pond West firewater pond P6003B P6002B P6002A East isolation gate West isolation

With all the parts assembled we have…The pump at approx 2.5 metres

Three spools at 1.7 metres each

One spool at 1 metre

Giving a total of

8.6 metres

Now we need the stuffing box assembly

Page 15: FEB 2006 as reported by Mark Dye. P6001A P6001B P6003A N East firewater pond West firewater pond P6003B P6002B P6002A East isolation gate West isolation

The stuffing box assembly is unpacked,

And the top bearing assembly removed.

Page 16: FEB 2006 as reported by Mark Dye. P6001A P6001B P6003A N East firewater pond West firewater pond P6003B P6002B P6002A East isolation gate West isolation

The top bearing assembly is keyed to the shaft because it also contains a ratchet device to prevent back turning of the shaft.

Page 17: FEB 2006 as reported by Mark Dye. P6001A P6001B P6003A N East firewater pond West firewater pond P6003B P6002B P6002A East isolation gate West isolation

STEADY AS SHE GOES!!!

Page 18: FEB 2006 as reported by Mark Dye. P6001A P6001B P6003A N East firewater pond West firewater pond P6003B P6002B P6002A East isolation gate West isolation

Thread the shaft through and line up the spool bolts.

The whole assembly now needs to be lifted to remove the spool support. The combined weight is now 3.7 tonnes.

Page 19: FEB 2006 as reported by Mark Dye. P6001A P6001B P6003A N East firewater pond West firewater pond P6003B P6002B P6002A East isolation gate West isolation

The top bearing is re-installed and

keyed to the shaft.

Page 20: FEB 2006 as reported by Mark Dye. P6001A P6001B P6003A N East firewater pond West firewater pond P6003B P6002B P6002A East isolation gate West isolation

The coupling housing and motor stand installed.

The coolingwater supply,

…and return, and constant level oiler is fitted.

Page 21: FEB 2006 as reported by Mark Dye. P6001A P6001B P6003A N East firewater pond West firewater pond P6003B P6002B P6002A East isolation gate West isolation

10kv Electric motor installed

Page 22: FEB 2006 as reported by Mark Dye. P6001A P6001B P6003A N East firewater pond West firewater pond P6003B P6002B P6002A East isolation gate West isolation

PUMP SPECIFICATIONS

Pump speed 1480rpmTest pressure 33bargRated flow 240 l/s (864t/hr)Head 158.4 mtrs. (15 barg)

Page 23: FEB 2006 as reported by Mark Dye. P6001A P6001B P6003A N East firewater pond West firewater pond P6003B P6002B P6002A East isolation gate West isolation

The jockey pump is exactly the same as the main pumps,

…only in miniature!

Page 24: FEB 2006 as reported by Mark Dye. P6001A P6001B P6003A N East firewater pond West firewater pond P6003B P6002B P6002A East isolation gate West isolation

The pump had it’s first test run…

…flushing firemains into the night!