BASELINE RD

_ __,'-- L

Baseline Rd

Baseline Rd

Construction Projects

Construction Impact Areas

Type fn Ongoing IZZI Upcoming 0 Intermittent

Vl

;;;

0 125 250 500

<-:,"'-

I:>

,-,t::-,,,

750 1,000

Feet

BUILD Boulder �

I .) ��---re;;;,,- ---

ts:

----

-....:c..i._ ____ _,, BASELINERD Baseline Rd

�I: I

BASELINE RD Baseline Rd

l I

Baseline Rd

(� ________ __,)

u m 0 [IJ 0

m 0 [ill 0

mn

� 0

�---J L==-� �=\..---� �□--��-�Y-\V( -L Uc= --

□ ,1)

Baseline Rd

Baseline Rd BASELINE RD

BASELINE RO

<o/

Planning Design & Construction UNIVERSITY OF COLORADO BOULDER

Campus Construction Map November 2021

2 <( OJ s:j"

0) ,-C\I 0

,­,­....... ,­,-

w z 0 �I

z 0 0 en' 0 ::>

jaimeray18
Sticky Note

November 2021 UCB Cone ZonesMap Code Project Name Schedule Impact Notes Project No. Project Manager

AJ-01 KOBL Steam Tunnel LATE 2021 Steam work in Tunnel Andy Jordan

AJ-04 EKELEY TO EDUCATION & HELLEMS

APRIL - AUGUST 2021 Plant CHW distribution extension from north side of ECKLEY for service to CP008789 (KG-01) and continuing west to intercept the existing CHW distribution lines from the dead chiller in the bunker that serves ECONOMICS & MCOL. The Hellems crawlspace requires hazardous material remediation prior to construction. The revised target is to Bid in July 2021 for a Fall 2021 delivery.

CP272255 Andy Jordan

BM-08 30TH & COLORADO - UNDERPASS UTILITY RELOCATION

SPRING - SUMMER 2021 Contractor Mobilization week of 3-1-21 including site fencing, staging set up, and potholing. Construction activity beginning on March 8th. March activities include utility relocates and Wellman Ditch work.

CP288773 (Location 2)

Brian Moffitt

COB-01 30TH & COLORADO - UNDERPASS CONSTRUCTION

EARLY MAR 2021 – FALL 2022 City of Boulder project. City utility relocations completed. Underpass construction begins in March 2021; expected to require 18 months to complete. Please contact Jenny Godwin [email protected] or Jason Fell [email protected] for additional information. City of Boulder Cone Zones https://bouldercolorado.gov/transportation/list-of-cone-zone-projects

City of Boulder

City of Boulder Contacts - Jenny Godwin, Jason Fell

COB-02 COLORADO/REGENT INTERSECTION

MARCH - AUGUST 2021 City of Boulder project. The City of Boulder will be completing intersection and roadway improvements along the south side Colorado Ave. from the west of Regent to 28th Street, and some work along the east side of Regent. Work will maintain through traffic, but require lane closures.

City of Boulder City of Boulder/ Richelle Riley

CS-05 ECNW-ECNT Renovations (aka NWNT)

April 2021 - July 2022 A 10' to 20' area around the north and east elevations of NW and the NT loading dock and freight elevator will be closed for the duration of the project. Please be aware, the drivelane leading to lot 444 is shared with the project, so be ready for construction traffic. As part of this Summer and Fall work, parking lots 439, 447, 450, and 454 will be closed from May to late, 2021. Outside of ths time, Campus traffic lanes around the project area will largely be maintained.

UCB000277 Christopher Sachs

FM-01 EAST CAMPUS CONSTRUCTION STAGING

ONGOING East Campus Construction Staging Area Various FacMan

JG-01 CAMP - CONCRETE REPAIRS FALL-WINTER 2021 Deferred maintenance concrete crack filling and minor concrete repairs throughout main campus; work to be completed by FacMan Shops staff; minor pedestrian impacts.

UCB000081 Jessica Gammey Gardner

JG-03 SITE-Asphalt Repairs 2021 October 2021 WARD DR paver replacement: Winter 2021. Lot 360 24 hour closure, Spring/Early Summer 2022. Transportation Maintenance building parking lot patch Complete. 18th St bust stop patches: Complete, Farrand Loop striping: Oct 2021

UCB00275 Jessica Gammey Gardner

November 2021 UCB Cone ZonesMap Code Project Name Schedule Impact Notes Project No. Project Manager

JG-04 SITE-Concrete Sealing, Grinding-Leveling

CONCRETE LIFTING: COMPLETE. GRINDING: 11/22-24/21 SEALING: Winter 21-22

sketch/impacts sent to Britton UCB000273 Jessica Gammey Gardner

JG-28 SEEC DRIVE REMOVE & REPLACE COMPLETE COMPLETE UCB000228 Jessica Gammey Gardner

JG-29 IMIG Bus Staging Pothole repair COMPLETE COMPLETE UCB00275 Jessica Gammey Gardner

JG-30 RAMY-Underpass Waterproofing Winter-Spring 2022 The underpass at RAMY will be closed to N/S traffic for concrete/waterproofing replacement. Construction will be phased to allow for entry/exit

UCB000321 Jessica Gammey Gardner

JK-04 UMC - ROOF REPAIR TENTATIVE DEC 2021 Staging will be bike storage are at NW corner of UMC. Duration three weeks. Bidding early June. Construction schedule TBD, depending on material availability and insurance.

CP314205 John Krueger

JK-05 STRNSE - AT&T MACRO SITE TBD Crane will be needed in loading dock area. UCB000175 John Krueger

KG-01 EDUC FIRE SPRINKLER / HVAC UPGRADE (CM)

NOVEMBER 2020 - NOVEMBER 2021

Lot 209 between MCOL and EDUC will be closed and used for staging starting December 1 and running thru November 2021. Emergency access will be available for Police and Fire; all other access requires 72 hours notice.

CP008789 Keith Gardner

PML-04 MULTI-BRKT CKRL-Steam Line Repair

August - October 2021 Poss before move-in, may be after. Sidewalk will be blocked during construction

UCB000390 Patricia McNally-Leef

RD-08 RESEARCH PARK WATER SYSTEM Spring 2022 Research Park Water Valves, various locations throughout the Research Park, working on right of way permits with city but having trouble. May need to wait until agreement is signed with the city for the water system.

CP289593 Richard Dencklau

RD-11 TRUMBO Fountain Work to be completed this Winter Trumbo courtyard will be impacted UCB000027 Richard Dencklau