Page 1: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

Federal-Aid Highway Program Funding

“Strategic Use of Flexibility”

June 13, 2008

Ron Rigney, P.E. & P.L.S.Director

Division of Program Management

Page 2: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

The federal-aid highway program funding is in accordance with the current federal transportation act, “Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU).”

Page 3: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

Legislative approval by Congress for SAFETEA-LU was signed into law by President Bush on August 10, 2005.

Normally, a transportation act covers a period of six years, but SAFETEA-LU only covers five years – FY 2005 through FY 2009.

With SAFETEA-LU scheduled to expire at the end of FY 2009 (October 1, 2009), preliminary work has already begun on the next transportation act.

Page 4: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

House of Representatives Senate

Any Differences?

President

Start Over

Conference Committee

Conference Bill

Floor Action

Surface Transportation

Act

Public Hearings

Subcommittee Bill

Committee Bill

House Bill

Public Hearings

Subcommittee Bill

Committee Bill

Senate Bill

Override Veto?

No Yes

Veto Approval

Yes No

CongressionalProcedures

Page 5: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

Kentucky Statewide Transportation Improvement Program

(STIP)&

Federal Discretionary Funding Programs

Page 6: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

KYTC projects that are funded through the federal transportation funding (FD52) programs must come through an “Enacted Highway Plan (SYP),” however, federal regulations require that KYTC prepare and submit to FHWA and FTA a Statewide Transportation Improvement Program (STIP).

Page 7: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

The STIP identifies the transportation programs and projects within Kentucky that will utilize federal funding. The STIP is prepared in the summer of even number years and includes highway, public transit, aviation, transportation enhancement, Safe Routes to School and recreational trail projects. Each of the programs contains a listing of scheduled projects and scheduled costs for the next four Federal Fiscal Years. The scheduled costs of the projects listed in the STIP must be fiscally constrained.

We will start preparing the 2008 STIP when we have the 2008 Enacted Highway Plan.

Page 8: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

The Division of Program Management is responsible for monitoring the approved STIP and verifying that funding requests for proposed projects are identified within the STIP.

Page 9: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

In addition to the STIP requirements, federal funded projects located within the nine Metropolitan Planning Organizations (MPO) areas must be identified within their MPO Transportation Improvement Program (TIP) before project funding can be authorized. If a project is not identified within the MPO TIP, KYTC must request the MPO to amend their TIP to include the project, and this process may take several months to complete.

•KIPDA Jefferson, Bullitt, Oldham Counties, KY Clark, Floyd Counties, IN

•OKI Boone, Kenton, Campbell Counties, KY Butler, Clermont, Hamilton, Warren Counties, OH Deerborn County, IN

•FIVCO Boyd and Greenup Counties, KY

•EUTS Henderson County, KY

•GRADD Daviess County, KY

•BRADD Warren County, KY

•LTADD Hardin County, KY

•CMCRPC Christian County, KY

•LFUCG Fayette and Jessamine Counties, KY

MPO Areas

Page 10: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

EUTSEvansville Urban

Transportation Study

GRADDGreen River

Area Development District

LTADDLincoln Trail

Area Development District

KIPDAKentuckiana Regional Planning

and Development Agency

OKIOhio-Kentucky-Indiana

Regional Council of GovernmentsLFUCG

Lexington-FayetteUrban County Government

FIVCOFive Counties

Area DevelopmentDistrict

CMCRPCClarksville-Montgomery CountyRegional Planning Commission

BRADDBowling Green

Area Development District

MPO AREAS

Page 11: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

Tracking Federal-Aid Highway Program

Funding

Page 12: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

In tracking the Federal-Aid Highway Program funding, we normally break down the federal-aid into the following three (3) general types of funds:

•Formula Funds

•Non-Formula Funds

•Discretionary Funds

Page 13: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

“Formula Funds” - the distribution of federal funds using a formula provided in law and the distribution of funds is called apportionments. The “Formula Funds” apportionments are broken down into various federal funding categories, such as the following core programs: Interstate Maintenance (IM), National Highway (NH), Bridge (BR), Congestion Mitigation (CM), Safety (SAF), and Surface Transportation (STP).

The Bridge, Safety, and Surface Transportation core programs are broken down into additional various funding categories, and each category has different eligibility requirements.

Page 14: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

“Non-Formula Funds” - the distribution of federal funds through allocations as earmarked within the Transportation Act as defined by Congress (High Priority Projects), Equity Bonus, and Appalachian Development Highway System (APD) funding.

The eligibility of “Non-Formula Funds” is determined by the type of funds. The High Priority Projects (HPP) project funding is only eligible for the specific projects as defined by Congress. The Appalachian Development Highway System (APD) funding is only eligible for projects associated with the completion of the APD system in Kentucky, which is limited to the US 460 coordinator in Pike County and US 119 in Letcher County. The Equity Bonus funding has the flexibility that it can be used on any federal project, but we use the Equity Bonus to cover projects that would normally fall under the STP funded projects.

Page 15: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

Discretionary Funds - yearly allocations of federal funds through the various federal discretionary programs, such as Interstate Maintenance, Ferry Boats, Public Lands Highways, Scenic Byways, Transportation and Community and System Preservation Program. Projects receiving yearly federal Discretionary funding is normally announced by Congress, and the discretionary funding is only eligible for the specified project as defined by Congress.

Page 16: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

Federal-aid Highway Program “Funding Terms”

Page 17: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

“Authorization Act” is the Congressional legislation that establishes or continues Federal programs or agencies and establishes an upper limit on the amount of funds for the program(s). The current Transportation Act, SAFETEA-LU, is for the federal-aid highway program.

“Appropriations Act” is the Congressional legislation that makes federal funds available for expenditure with specific limitations as to the amount, purpose, and duration. For the federal-aid highway program, the appropriations act specifies amounts of funds that Congress will make available for the fiscal year to liquate obligations.

“Apportionments” distribution of federal funds using a formula provided in law and the distribution of funds is called apportionments.

“Allocations” are the distribution of federal funds through allocations as earmarked within the Transportation Act as defined by Congress (High Priority Projects), Equity Bonus, Appalachian Development Highway System (APD), and yearly Discretionary funding allocations earmarked by Congress or FHWA.

“Project Agreement” is the federal-aid highway programming document (PR-1) outlining the location of the project, the phase of the project, the project scope, type of work, type and amount of federal funds, and state matching funds, which is signed by KYTC and FHWA. The FHWA approval date is the official date that state expenditures are eligible for reimbursement with federal funds.

Page 18: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

“Obligation” is the term used for the federal government’s legal commitment (promise) to reimburse the state for the federal share of a project’s eligible costs.

“Obligation Authority” is the total amount of funds that may be obligated in a fiscal year.

“Obligation Limitation” is a restriction or ceiling on the amount of federal funds that may be obligated during a specified time period.

The obligation authority or obligation limitation does not change the distribution of apportionments or allocations of federal funds; it controls the amount or rate at which the funds may be obligated. In order to obligate federal-aid funding, you must have available the corresponding amount of funding apportionments/allocations and you must have available the corresponding amount of obligation authority.

Normally, each year the total federal apportionments and allocations are greater than the obligation authority. At the end of the federal fiscal year, the remaining apportionment/allocation amounts are carried forward into the next fiscal year. However, yearly obligation authority made available for the “Formula Funds” must be obligated during the fiscal year, or the state loses the remaining available obligation authority associated with the “Formula Funds.” The obligation authority for the “Non-Formula” and “Discretionary” funding can be carried forward into the next fiscal year.

Page 19: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

DateFHWA

Notice No.

Kentucky Rescission

Amount

National Total Rescissions

Amount

Percentage of KY Rescission/National Total Rescissions

September 24, 2002 4510-481 $5,254,868 $320,000,000 1.64%

June 10, 2003 4510-508 $4,139,369 $250,000,000 1.66%

February 20, 2004 4510-515 $3,440,783 $207,000,000 1.66%

January 25, 2005 4510-540 $19,938,177 $1,261,277,000 1.58%

December 28, 2005 4510-578 $31,511,454 $1,999,999,000 1.58%

March 21, 2006 4510-588 $18,010,022 $1,143,000,000 1.58%

July 5, 2006 4510-606 $11,066,985 $702,362,500 1.58%

March 19, 2007 4510-643 $55,213,815 $3,471,582,000 1.59%

June 20, 2007 4510-647 $13,853,179 $871,022,000 1.59%

March 4, 2008 4510.673 $49,444,690 $3,150,000,000 1.57%

TOTAL   $211,873,342 $13,376,242,500 1.58%

“Rescissions” are when unused balances of previous apportionments or allocations are cancelled through legislative actions of Congress. The designated rescission amount reduces available funding apportionments or available funding allocations, and normally does not reduce obligation authority.

Page 20: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

“End of Year Redistribution of Additional Obligation Authority”

In late July or early August of each year, FHWA submits an official notice to each state requesting the state to prepare a request for “End of Year Redistribution of Additional Obligation Authority” for federal-aid highway “Formula Funding.”

However, before you can request additional obligation authority, first you must prove that you can use the current remaining obligation authority.

Second you must prove that you have projects available so you can obligate the federal funds before the end of the federal fiscal year (October 1).

And, third you must have available funding apportionments within the category of “Formula Funds” that you want to obligate, if provided additional obligation authority through the redistribution of additional obligation authority process.

Page 21: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

FISCAL YEAR

ADDITIONAL OBLIGATION

AUTHORITY RECEIVED

KENTUCKYPERCENT OF

TOTAL

TOTAL ADDITIONAL OBLIGATION AUTHORITY AVAILABLE NATIONWIDE

2007 19,029,829 1.56% 1,223,675,007

2006 33,905,399 1.63% 2,076,788,143

2005 17,434,289 1.49% 1,167,701,604

2004 14,032,625 1.44% 973,838,857

2003 6,471,721 1.50% 432,391,111

2002 7,584,664 1.53% 495,383,586

TOTALS 98,458,527 1.55% 6,369,778,308

End of Fiscal Year Redistribution of Obligation AuthorityFY 2002 thru FY 2007

Page 22: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

Often times you will hear us refer to programming the federal funds as “Advance Construction (AC).”

The federal “Advance Construction” process provides states the ability to request and receive approval from FHWA to conduct designated project activities in advance of having to use current apportionments and obligation authority of federal-aid highway funds, and that expenditures associated with the designated project activities will be eligible for federal reimbursement when the advance construction amount is converted using available apportionment and obligation authority of federal-aid funds.

“Advance Construction” is like using the state’s federal-aid funding credit card, and project expenditures will be paid with state funds and reimbursement of expenditures will not be requested until federal-aid funding apportionments and obligation authority is available to convert the advance construction amount.

Page 23: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

The 2000 General Assembly changed the funding authorization process to allow the Cabinet to authorize funding based on projected expenditures. Going from an authorization base to an expenditure base required the Cabinet to develop a “Cash Management Balance” process and model. The Cash Management Balance process and model is used to determine the bottom line cash balance to cover current fixed cost items, current expenditures of currently authorized projects, current modifications to existing projects, and proposed new funding requests.

STA

TE“F

I XED

COST”

BUD

GETIT

EM

S

STATEROA

D

FUNDREVEN

UE

$$

$$

6

YP

“S

P”

PR

OJ

EC

TS

FOR FEDE R

ALP

RO

JECT

S

STATE MATCH

ING

FU

NDS F

ED

ER

AL

HI G

HW

AYT

RUS T

FU

ND

E

RV

EN

UE

ST

OK Y

T C

$$

$$

$

FHHES

APD

IM

STP

NH TE

CM

AQ

BR ID

GE

KYD

HPP

RRS

RRP

6YP

NON 6YRBUDGET

FEDERALPROGRAMS

SLO,SLX,SNK

STATE FUNDS

“FIXED COST” ITEMS:* DEBT SERVICE

* MAINTENANCE

* RESURFACING

* VEHICLE REGULATION

* HIGHWAY OPERATION

* CAPITAL CONSTRUCTION

* JUDGEMENTS & OTHER

* SECRETARY’S CONTINGENCY

* STATE POLICE & OTHER AGENCIES

* GENERAL ADMIN. & SUPPORT

* REVENUE SHARING

Page 24: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

2008 Recommended Highway Program Anticipated Funding Levels

FED-AID INTERSTATE MAINTENANCE

FEDERAL SAFETY PROGRAM FUNDS

FED-AID SURFACE TRANSPORTATION

PROGRAM (Includes Trans. Enhancement and Metro-specific funding categories

FED-AID NATIONAL HIGHWAY SYSTEM

FEDERAL HIGH PRIORITY PROJECTS

(1)

(2)

(3)

(4)

(5)

FED-AID BRIDGE REPLACEMENT

FEDERAL FOREST HIGHWAY FUNDS

STATE CONSTRUCTION FUNDS EXPECTED

TO BE AVAILABLE FOR OBLIGATION ("SP")

FEDERAL APPALACHIAN HIGHWAYS FUNDS

FED-AID CONGESTION MITIGATION

(6)

(7)

(8)

(9)

(10)

TOTAL ESTIMATED 2008 HIGHWAY PROGRAM = $4.8 BILLIONNOTE: FEDERAL-AID FUNDING LEVELS INCLUDE ANY PLANNED STATE MATCHING FUNDS.

$76,800,000

(10)

$512,400,000

(9)$852,000,00

0(8)

$3,000,000

(7)$441,100,00

0(6)$138,800,00

0(5)

$841,000,000

(4)

$1,049,400,000(3)

$143,100,000(2)

$728,500,000(1)

FEDERAL & STATE HIGHWAY FUNDING LEVELS AVAILABLE FOR OBLIGATION FROM 2009 THRU 2014(As estimated by the Kentucky Transportation Cabinet)

Federal

State & Local Match

State Projects “SP”

Page 25: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

Funding Category FY-2009 FY-2010 FY-2011 FY-2012 FY-2013 FY-2014

2009-2014TOTAL

FUNDINGAppalachian Development (APD)* 85.4 85.4 85.4 85.4 85.4 85.4 512.4Bridge Replacement On-System (BRO)** 45.9 48.2 48.2 48.2 48.2 48.2 286.9Bridge Replacement On/Off (BRX)** 14.1 14.8 14.8 14.8 14.8 14.8 88.1Bridge Replacement Off (BRZ)** 10.6 11.1 11.1 11.1 11.1 11.1 66.1Congestion Mitigation (CMAQ)** 12.3 12.9 12.9 12.9 12.9 12.9 76.8Forest Highways (FH) 0.5 0.5 0.5 0.5 0.5 0.5 3.0Interstate Maintenance (IM)** 116.5 122.4 122.4 122.4 122.4 122.4 728.5National Highways (NH)** 134.5 141.3 141.3 141.3 141.3 141.3 841.0Rail Protect. Devices (RRP) 1.8 1.8 1.8 1.8 1.8 1.8 10.8Rail Separation (RRS) 1.8 1.8 1.8 1.8 1.8 1.8 10.8Hazard Elimination (HES) 19.5 20.4 20.4 20.4 20.4 20.4 121.5STP-Henderson (SHN) 0.4 0.4 0.4 0.4 0.4 0.4 2.4STP-Louisville (SLO) 13.1 13.8 13.8 13.8 13.8 13.8 82.1STP-Lexington (SLX) 4.5 4.7 4.7 4.7 4.7 4.7 28.0STP-Northern Kentucky (SNK) 4.9 5.1 5.1 5.1 5.1 5.1 30.4Surface Transportation (STP)*** 132.0 138.6 138.6 138.6 138.6 138.6 825.0Transportation Enhancement (TE) 13.0 13.7 13.7 13.7 13.7 13.7 81.5High Priority Projects (HPP) 54.7 40.5 39.5 4.1 0.0 0.0 138.8Kentucky Appropriations Earmarks (KYD) 0.0 0.0 0.0 0.0 0.0 0.0 0.0Subtotal Federal Program $665.5 $677.4 $676.4 $641.0 $636.9 $636.9 $3,934.1

*Includes 20% state match**Reflects 2% takedown for SPR; toll credits for match***Reflects 2% takedown for SPR; 10% set aside for TE Program

Page 26: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

FUNCTIONALCLASS NO. FUNCTIONAL CLASS MILES

01 RURAL INTERSTATE 1,25602 RURAL PRINCIPLE ARTERIAL 3,55106 RURAL MINOR ARTERIAL 1,75607 RURAL MAJOR COLLECTOR 6,20708 RURAL MINOR COLLECTOR 8,96709 RURAL LOCAL 5,468TOTAL 27,205

FUNCTIONALCLASS NO. FUNCTIONAL CLASS MILES

11 URBAN INTERSTATE 67112 URBAN FREEWAYS & EXPRESSWAYS 18514 URBAN PRINCIPLE ARTERIAL 1,10216 URBAN MINOR ARTERIAL STREET 1,10717 URBAN COLLECTOR STREET 98119 URBAN LOCAL 151TOTAL 4,197

Eligible for Federal-Aid Highway funds

Page 27: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

Appalachian Development (APD) Funds

Eligibility - The funds may be used for the construction, reconstruction, or improvement of highways on the designated 3,090 miles of the Appalachian Development Highway System (ADHS).

Page 28: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

Highway Bridge Program (HBP) Funds

Formerly the Highway Bridge Replacement and Rehabilitation Program (HBRRP), includes Bridge Replacement On-System (BRO), Bridge Replacement On/Off-System (BRX), and Bridge Replacement Off- System (BRZ).

Eligibility - HBP funds may be used for:-The total replacement of a structurally deficient or functionally obsolete highway bridge on any public road with a new facility constructed in the same general traffic corridor,-The rehabilitation that is required to restore the structural integrity of a bridge on any public road, as well as the rehabilitation work necessary to correct major safety (functional) defects,-The replacement of ferryboat operations in existence on January 1, 1984, the replacement of bridges destroyed before 1965, low-water crossings, and bridges made obsolete by Corps of Engineers (COE) flood control or channelization projects and not rebuilt with COE funds, and-Bridge painting, seismic retrofitting, systematic preventative maintenance, calcium magnesium acetate applications, sodium acetate/formate, or other environmentally acceptable, minimally corrosive anti-icing and deicing compositions or installing scour countermeasures.

Deficient highway bridges eligible for replacement or rehabilitation must be over waterways, other topographical barriers, other highways, or railroads. The condition of bridges may also be improved through systematic preventative maintenance.

Page 29: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

Congestion Mitigation and Air Quality Improvement Program (CMAQ) Funds

Eligible projects/programs include:-transportation activities in an approved State Implementation Plan,-transportation control measures to assist areas designated as nonattainment under the Clean Air Act Amendments (CAAA) of 1990,-pedestrian/bicycles off-road or on-road facilities including modification of existing public walkways to comply with the Americans with Disabilities Act,-ISTEA management and monitoring systems,-traffic management/monitoring/congestion relief strategies,-transit (new system/service expansion or operations),-alternative fuel projects (including vehicle refueling infrastructure, clean fuel fleet programs and conversions),-public/private partnerships and initiatives,-inspection and maintenance (I/M) programs,-intermodal freight, and -telecommunications.

Page 30: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

Congestion Mitigation and Air Quality Improvement Program (CMAQ) Funds continued

Eligible projects/programs also include:-travel demand management,-project development activities for new services and programs with air quality benefits,-public education and outreach activities,-rideshare programs,-establishing/contracting with transportation management associations (TMAs),-fare/fee subsidy programs (operating subsidies have a 3-year limit),-diesel retrofits,-truck-stop electrification-experimental pilot projects/innovative financing, and-other transportation projects with air quality benefits.

Ineligible projects include:-Construction of projects which add new capacity for single-occupancy vehicles.

Page 31: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

Public Lands Highways (PLHD) and Forest Highways (FH) Funds

Eligibility - Public lands highways (PLHD and FH) funds shall be used to pay the cost of:-Transportation planning, research, and engineering and construction of, highways, roads, parkways, and transit facilities located on public lands, national parks, and Indian reservations;-Operation and maintenance of transit facilities located on public lands, national parks, and Indian reservations. Under the provisions of 23 U.S.C. 202(b)(5) public lands highways (PLHD and FH) shall be available for any eligible transportation project that is within or adjacent to, or that provides access to, the areas served by a forest highway or public lands highway;-Transportation planning for tourism and recreational travel including the National Forest Scenic Byways Program, Bureau of Land Management Back Country Byways Program, National Trail System Program, and other similar Federal programs that benefit recreational development.-Adjacent vehicular parking areas.-Interpretive signage.-Acquisition of necessary scenic easements and scenic or historic sites.-Provision for pedestrians and bicycles.-Construction and reconstruction of roadside rest areas including sanitary and water facilities. -Other appropriate public road facilities such as visitor centers as determined by the Secretary.

Page 32: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

Interstate Maintenance (IM) Funds

Types of work eligible for IM funding include:-Projects for resurfacing, restoration, rehabilitation, and reconstruction;-Projects for the reconstruction or new construction of bridges, interchanges, and over crossings along existing Interstate routes, including the acquisition of right-of-way where necessary;-Capital costs for operational, safety, traffic management, or intelligent transportation systems (ITS) improvements (operating costs are not eligible for IM funds); and-Projects for preventive maintenance.

Under the provisions of 23 U.S.C. 119(d), construction of new travel lanes, other than high occupancy vehicle (HOV) or auxiliary lanes, is not eligible for IM funding.

Page 33: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

National Highway (NH) Funds

Eligibility - Funds apportioned to a State for the NHS may be obligated for:-Construction, reconstruction, resurfacing, restoration, and rehabilitation of segments of the NHS;-Operational improvements for segments of the NHS;-Construction of, and operational improvements for, a Federal-aid highway not on the NHS, and construction of a transit project eligible for assistance under chapter 53 of title 49 if (a) such highway or transit project is in the same corridor as, and in proximity to, a fully access-controlled NHS highway, (b) the construction or improvements will improve the level of service on the fully access-controlled NHS highway and improve regional travel, and (c) theconstruction or improvements are more cost-effective than improvements on the fully access controlled NHS highway would be to provide the same benefits;-Highway safety improvements for segments of the NHS;-Transportation planning in accordance with 23 U.S.C. 134 and 135;-Highway research and planning in accordance with chapter 5 of title 23;-Highway-related technology transfer activities; and-Capital and operating costs for traffic monitoring, management, and control facilities and programs.

Page 34: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

National Highway (NH) Funds continued

Other types of work eligible for NH funding include:-Fringe and corridor parking facilities;-Carpool and vanpool projects;-Bicycle transportation and pedestrian walkways in accordance with 23 U.S.C. 217;-Development, establishment, & implementation of management systems under 23 U.S.C. 303;-In accordance with all applicable Federal law (including regulations), participation in natural habitat and wetland mitigation efforts related to projects funded under this title, which may include participation in natural habitat and wetland mitigation banks, contributions to statewide and regional efforts to conserve, restore, enhance, and create natural habitats and wetland, and development of statewide and regional natural habitat and wetland conservation and mitigation plans, including any such banks, efforts, and plans authorized under the Water ResourcesDevelopment Act of 1990 (Public Law 101-640) (including crediting provisions).-Publicly-owned intracity or intercity bus terminals;-Infrastructure-based intelligent transportation systems capital improvements;-Environmental restoration and pollution abatement in accordance with 23 U.S.C. 328; and-Control of noxious weeds and aquatic noxious weeds and establishment of native species in accordance with 23 U.S.C. 329.

Page 35: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

Elimination of Hazards at Railway-Highway Crossings Funds

includes Railway-Highway Protective Devices (RRP) and Railway Highway Crossing Hazard Elimination (RRS)

Eligibility: All at-grade public crossing safety improvement projects meeting the eligibility description in 23 U.S.C. §130 are eligible for funding, including, but not limited to, the installation of protective devices, the elimination of hazards, and grade crossing separation including the separation or protection of grades at crossings, the reconstruction of existing railroad grade crossing structures, and the relocation of highways to eliminate grade crossings.

Page 36: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

Hazard Elimination (HES) Funds

Eligibility: Each State shall conduct and systematically maintain an engineering survey of all public roads to identify hazardous locations, sections, and elements, including roadside obstacles and unmarked or poorly marked roads, which may constitute a danger to motorists, bicyclists, and pedestrians, assign priorities for the correction of such locations, sections, and elements, and establish and implement a schedule of projects for their improvement.

Funds authorized to carry out this section shall be available for expenditure on—(1) any public road;(2) any public surface transportation facility or any publicly owned bicycle or pedestrian pathway or trail; or(3) any traffic calming measure.

Page 37: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

Surface Transportation (STP) Funds

Projects eligible for STP funds include the following:(1) Construction, reconstruction, rehabilitation, resurfacing, restoration, and operational improvements for highways (including Interstate highways) and bridges (including bridges on public roads of all functional classifications), including any such construction or reconstruction necessary to accommodate other transportation modes, and including the seismic retrofit and painting of and application of calcium magnesium acetate, sodium acetate/formate, or other environmentally acceptable, minimally corrosive anti-icing and de-icing compositions on bridges and approaches thereto and other elevated structures, mitigation of damage to wildlife, habitat, and ecosystems caused by a transportation project funded under this title.(2) Capital costs for transit projects eligible for assistance under chapter 53 of title 49, including vehicles and facilities, whether publicly or privately owned, that are used to provide intercity passenger service by bus.(3) Carpool projects, fringe and corridor parking facilities and programs, bicycle transportation and pedestrian walkways in accordance with section 217, and the modification of public sidewalks to comply with the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.).(4) Highway and transit safety infrastructure improvements and programs, hazard eliminations, projects to mitigate hazards caused by wildlife, and railway-highway grade crossings.(5) Highway and transit research and development and technology transfer programs.(6) Capital and operating costs for traffic monitoring, management, and control facilities and programs, including advanced truck stop electrification systems.

Page 38: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

Surface Transportation (STP) Funds continued

Other projects eligible for STP funds include the following:(7) Surface transportation planning programs.(8) Transportation enhancement activities.(9) Transportation control measures listed in section 108(f)(1)(A) (other than clause (xvi)) of the Clean Air Act (42 U.S.C. 7408(f)(1)(A)).(10) Development and establishment of management systems under section 303.(11) In accordance with all applicable Federal law and regulations, participation in natural habitat and wetlands mitigation efforts related to projects funded under this title, which may include participation in natural habitat and wetlands mitigation banks; contributions to statewide and regional efforts to conserve, restore, enhance, and create natural habitats and wetlands; and development of statewide and regional natural habitat and wetlands conservation and mitigation plans, including any such banks, efforts, and plans authorized pursuant to the Water Resources Development Act of 1990 (including crediting provisions). (12) Projects relating to intersections that-- (A) have disproportionately high accident rates; (B) have high levels of congestion, as evidenced by--(i) interrupted traffic flow at the intersection; and (ii) a level of service rating that is not better than ``F'' during peak travel hours, calculated in accordance with the Highway Capacity Manual issued by the Transportation Research Board; and (C) are located on a Federal-aid highway.

Page 39: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

Surface Transportation (STP) Funds continued

Other projects eligible for STP funds include the following:(13) Infrastructure-based intelligent transportation systems capital improvements.(14) Environmental restoration and pollution abatement in accordance with section 328. (15) Control of noxious weeds and aquatic noxious weeds and establishment of native species in accordance with section 329.

Location of Projects--surface transportation program projects may not be undertaken on roads functionally classified as local or rural minor collectors, unless the projects are:-bridges on all public roads of all functional classifications,-any such construction or reconstruction necessary to accommodate other transportation modes, -the seismic retrofit and painting of and application of calcium magnesium acetate, sodium acetate/formate, or other environmentally -acceptable, minimally corrosive anti-icing and de-icing compositions on bridges and approaches and other elevated structures,-mitigation of damage to wildlife, habitat, and ecosystems caused by a transportation project funded under with STP funds,-such roads on a Federal-aid highway system on January 1, 1991, and-approved by the Secretary.

Page 40: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

Surface Transportation (STP) Funds Allocated to Henderson (SHN), Lexington (SLX), Louisville (SLO), and Northern Kentucky (SNK)

Eligibility- STP funds suballocated for urbanized areas with over 200,000 population may be used for any of the eligible STP purposes.

Fund Distribution Method: 62.5 percent of the remaining STP funds, after the seta-side for transportation enhancement activities, apportioned to a State is divided between urbanized areas over 200,000 and the remaining areas of the State in proportion to their relative share of the State's population. Funds for urbanized areas over 200,000 population are further suballocated to such areas based on each area's share of population in areas over 200,000 population in the State.

Page 41: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

Transportation Enhancement (TE) Funds

Eligibility - The term "transportation enhancement activity" means, with respect to any project or the area to be served by the project, any of the following activities as the activities relate to surface transportation:

A. Provision of facilities for pedestrians and bicycles.B. Provision of safety and educational activities for pedestrians and bicyclists.C. Acquisition of scenic easements and scenic or historic sites (including historic battlefields).D. Scenic or historic highway programs (including the provision of tourist and welcome center facilities).E. Landscaping and other scenic beautification.F. Historic preservation.G. Rehabilitation and operation of historic transportation buildings, structures, or facilities (including historic railroad facilities and canals).H. Preservation of abandoned railway corridors (including the conversion and use of the corridors for pedestrian or bicycle trails).I. Inventory, control, and removal of outdoor advertising.J. Archaeological planning and research.

Page 42: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

Transportation Enhancement (TE) Funds continued

Eligibility continued -

K. Environmental mitigation—i. to address water pollution due to highway runoff; or,ii. reduce vehicle-caused wildlife mortality while maintaining habitat connectivity.L. Establishment of transportation museums.Each State administers its own program and develops its own procedures to solicit and select projects for funding.

Fund Distribution Method: TE funds are 10 percent of STP Apportionments, plus 10 percent of Equity Bonus programmatically distributed to the STP. The amount set aside after FY 2005 must be at least the amount set aside in FY 2005 (SAFETEA-LU Section 1113(c)).

Page 43: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

High Priority Projects (HPP) FundsFunds are eligible for projects as defined by Congress.

Kentucky Appropriations Earmarks (KYD) Funds

Yearly allocations of federal funds are through the various federal discretionary programs, such as Interstate Maintenance, Ferry Boats, Public Lands Highway, Scenic Byways, Transportation and Community and System Preservation Program.

Eligibility- Projects receiving yearly federal Discretionary funding is normally announced by Congress, and the discretionary funding is only eligible for the specified project as defined by Congress.

Page 44: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

The federal-aid highway program is not a grant program.

The federal-aid highway program is a reimbursement program, which means project expenditures must be paid first with state funds, and then the state sends requests to FHWA for reimbursement of eligible costs.

Page 45: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

KYTC submits a weekly federal billing to FHWA requesting reimbursement of federal funds, and the turn-around time to receive reimbursement runs 6 to 10 days.

Page 46: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

“Explanation of Item Number Series”

“Explanation of Item Number Series”

0 - 99 … Interstate Construction (Non-Pavement Rehab)100 - 899 … Non-Interstate Reconstruction, Construction,

New Route, etc 900 - 999 … HES Projects1000 - 1999 … Federal Bridge Replacement Program

2000 - 2999 ... Pavement Rehabilitation (Interstate, Parkways or Primary Routes)

3000 - 3999 ... Transportation Enhancement Projects4000 - 4299 ... County Bridge Replacement Program (State Funds)4300 - 4999 ... Guardrail Replacement Program (State Funds)5000 - 5999 ... Rockfall and Landslide Repairs6000 - 6999 ... Open7000 - 7999 ... 1998 SYP General Assembly Added Projects8000 - 8099 ... 2000 SYP General Assembly Added Projects

8300 - 8999 ... 2006 SYP General Assembly Added Projects

8100 - 8199 ... 2002 SYP General Assembly Added Projects

9000 - Above ... Open

8200 - 8299 ... 2004 SYP General Assembly Added Projects

Page 47: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

The Division of Program Management is responsible for preparing the programming documents for authorization of federal funding for the Preliminary Engineering (PE) and Environmental, Design, Right-of-Way, Utility, and Construction phases of KYTC projects.

Page 48: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

The Division of Program Management prepares the project authorization document (TC10) and prints the unsigned TC10 to route for approval signatures.

Page 49: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

In addition to the TC10, the projected expenditures and required cash flow for each funding request is entered into the KYTC “Cash Management Balance” model to determine if cash is available to cover the projected expenditures.

Page 50: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

The Division of Program Management routes the unsigned TC10 and “Cash Management Balance” sheet through the Preauthorization Review Team (Pre-ART) Committee for their review and recommendation to the Authorization Review Team (ART) Committee for funding approval signatures.

Page 51: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

Upon receiving the approved signed TC10, if the TC10 is for federal funding, the Division of Program Management then begins the process to prepare the federal funding programming document (PR1) to be submitted to FHWA.

Page 52: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

Please keep in mind that the federal PR1 document approved and signed by FHWA serves as the project agreement between KYTC and FHWA that the corresponding project phase activities are eligible for reimbursement of federal funds in accordance with federal funding regulations.

Page 53: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

The FHWA approval date is the beginning date that project expenditures are eligible for reimbursement, and any project expenditures occurring prior to the approval date on the PR1 are not eligible for reimbursement of federal funds.

Page 54: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

The Division of Program Management has developed reports and electronic processes to assist the project manager and management staff to track the current status of projects and current status of funding for each phase of the SYP projects.

•Federal-Aid Weekly Balance Sheet

•Monthly Status Report

•Project Managers Toolbox on the KYTC DOT Intranet website on the Division of Program Management’s homepage

Page 55: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management
Page 56: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

“Explanation of Item Number Series”

“Explanation of Item Number Series”

0 - 99 … Interstate Construction (Non-Pavement Rehab)100 - 899 … Non-Interstate Reconstruction, Construction,

New Route, etc 900 - 999 … HES Projects1000 - 1999 … Federal Bridge Replacement Program

2000 - 2999 ... Pavement Rehabilitation (Interstate, Parkways or Primary Routes)

3000 - 3999 ... Transportation Enhancement Projects4000 - 4299 ... County Bridge Replacement Program (State Funds)4300 - 4999 ... Guardrail Replacement Program (State Funds)5000 - 5999 ... Rockfall and Landslide Repairs6000 - 6999 ... Open7000 - 7999 ... 1998 SYP General Assembly Added Projects8000 - 8099 ... 2000 SYP General Assembly Added Projects

8300 - 8999 ... 2006 SYP General Assembly Added Projects

8100 - 8199 ... 2002 SYP General Assembly Added Projects

9000 - Above ... Open

8200 - 8299 ... 2004 SYP General Assembly Added Projects

Page 57: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management
Page 58: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

LABEL ITEM DESCRIPTION OF ITEM

COUNTY The name of the Kentucky county where the project is located. The Status Report is sorted by county name.

YEAR OF SIX-YEAR HIGHWAY PLAN The year that the identified project first entered into the Six-Year Highway Plan.

KYTC IDENTIFICATION NUMBER The District Number and Item Number of the identified project. Please refer to Explanation of Item Number Series for further explanation.

PARENT NUMBER The year of SYP and KYTC Identification Number that the identified project was broken out of.

ROUTE The route prefix and route number where the project is located. For new routes, the route may be blank.

LENGTH Length of the project in miles, unless otherwise noted.DESCRIPTION A brief description and scope of the identified project, including

beginning and ending termini of project limits.MILEPOINTS The beginning milepoint(s) and ending milepoint(s) of the project

along the identified route(s).SCOPE Type of project work to be performed.PRECON FLAG Is identified as either "A" = Active Preconstruction Project or with an

"I" = Inactive Preconstruction projectPROJECT CONSTRUCTION NUMBER (PCN) KYTC Construction Contract Identification Number. This number

only appears for projects that have been let to construction, and is used in checking the status of current construction status of awarded construction phase.

AUTHORIZATION NUMBER KYTC project authorization identification number for MARS accounting information.

ENVIRONMENTAL REQUEST The type of the environmental activities and document underway or approved for the identified project.

ENVIRONMENTAL EXPIRATION DATE The expiration date of the approved environmental document. R/W SCHEDULED COMPLETION The scheduled completion date of right-of-way plans for the

identified project.LETTING STATUS The current letting status of the identified project. LETTING DATE The anticipated scheduled letting date, that is subject to change

depending upon numerous factors such as Environmental, Permits, Right-of-Way, Utility Relocations, Construction Plans, and available funding.

DESIGN BY The name of the Design Consultant or the KYTC Department conducting the project design activities.

KEY TO INTERPRETING INFORMATION PRESENTEDFY 2007- FY 2012 STATUS REPORT

Page 59: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

KEY TO INTERPRETING INFORMATION PRESENTEDFY 2007- FY 2012 STATUS REPORT

LABEL ITEM2004 HIGHWAY PLAN

FUNDING

PHASE

YEAR(Under the Label "2006 Highway Plan")

AMOUNT

PRECON DATA BASE

YEAR(Under the Label "Precon Data Base")

AMOUNT

STAGE

AUTH AMOUNT

OVERRUN/(UNDERRUN)

The current status of project funding. Estimated: The total funding for the phase has not been authorized. Authorized: The project funding has been authorized for the corresponding phase.Awarded: The corresponding construction phase has been let to construction and the construction contract awarded to contractor.Sent to FHWA: The federal programming document has been sent to FHWA requesting approval of federal participation for reimbursement to KYTC the federal share of the identified phase cost.Non-Six-Year: The corresponding phase is not scheduled in the Six-Year Highway Plan, but the corresponding amount is the estimated cost of the phase.Not Required: The corresponding phase is not required as originally anticipated.Reestimated: The identified phase and cost in the Six-Year Highway Plan has been moved or combined into another project.Pending: The request for funding has been submitted and KYTC authorization of funding is pending.

The amount of authorized funding for the corresponding phase.

The amount of authorized funding overrunning the original estimated Six-Year Highway Plan scheduled cost, or the amount underrunning the original estimated Six-Year Highway Plan scheduled cost.

DESCRIPTION OF ITEMThe identification of the current Six-Year Highway Plan.

The type of funds to be utilized for the identified project.

P = Preliminary Engineering and Early Public CoordinationD = Design phaseR = Right-of-way phaseU = Utility relocation phaseC = Construction phase

The fiscal year in which the identified phase activity is scheduled to be funded and should commence. Example: FY 2005 begins July 1, 2004 and ends June 30, 2005 for state funded projects, and for federal funded projects, FY 2005 begins October 1, 2004 and ends September 30, 2005.

The estimated cost of each identified phase and total cost of all identified phases.

The current project schedule and estimated cost.

The current fiscal year in which the identified phase activity is scheduled to be funded and should commence, based upon current status of project activities.

The current estimated cost of each identified phase and total cost of all identified phases based upon current status and requirement of project activities.

Page 60: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

Note: The Federal Funding Program is a reimbursement program. Thus, State Funds are used first to cover the costs, and then KYTC sends weekly invoices to FHWA for reimbursement of the federal share of the costs. The normal turn around time is approximately a 7 to ten days.

KEY TO INTERPRETING INFORMATION PRESENTEDFY 2007- FY 2012 STATUS REPORT

FUND CODE TYPE OF FUNDING

APD Federal Appalachian Development

BRA Federal Bridge Acceleration Funds (Demo)

BRO Federal Bridge Replacement on Federal System

BRX Federal Bridge Replacement on or off Federal System

BRZ Federal Bridge Replacement off Federal System

CM Federal Congestion Mitigation

FH Federal Forest Highway

GAR Garvee Bond Debt Service FD53

HES Federal Safety Hazard Elimination

HPP Federal High Priority Projects Defined by Congress

IM Federal Interstate Maintenance

JM1 Garvee Bonds I-65 Rehabilitation

JM2 Garvee Bonds I-75 Rehabilitation

JM3 Garvee Bonds I-64 Rehabilitation

KYD Kentucky Federal Discretionary Funding Defined by Congress

NH Federal National Highway System

RRP Federal Safety Railroad Protection

RRS Federal Safety Railroad Separation

SAF Federal Safety Funds

SHN Federal Surface Transportation Dedicated to Henderson

SLO Federal Surface Transportation Dedicated to Louisville

SLX Federal Surface Transportation Dedicated to Lexington

SNK Federal Surface Transportation Dedicated to Northern Kentucky

SP State Project funding

STP Federal Surface Transportation; Any Area

TE Federal Transportation Enhancement

Page 61: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management
Page 62: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

Overview of KYTC “Project Managers

Toolbox”

Page 63: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

1. Go to KYTC Internet home page2. In the address bar highlight the address and type DOT3. You will access the KYTC IntraNet home page, and under the

“Resources” block select “Program Management”4. This will take you to the Division of Program Management

home page, and then select “Toolbox”5. This will take you to the “Project Managers Toolbox”

application

The following instructions are for accessing the KYTC Project Managers Toolbox:

Page 64: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

The following applications are available in the Project Managers Toolbox:

• SYP Project Information Center - Access budget information by entering the PCN number, the TC-10 number, or the SYP Item number• Non-SYP Project Information Center - Access budget information by entering the TC-10 number• Pending, Pending - Access a list of funding requests that are waiting on TC-10s to be prepared• Pending - Access a list of funding requests where the TC-10s have been prepared but not

approved• Active SYP Projects - Access information by selecting a county. A county map appears that

identifies current active SYP projects within the corresponding county. Click on a yellow, orange, or blue box to access the current status information for the project and to “Zoom To” the project location on aerial photos

• Active Construction - Access a listing of active construction projects by county, and click on the PCN number to access the current status of each project

• TC-10 Viewer (PAS) - Access an electronic copy of a TC-10 by several means, including TC-10 number, SYP item number, county, and funding program code

• Unscheduled Project Info - Access the Division of Planning’s “Unscheduled Projects Information” data system by entering the KYTC district, county, project description, route number, and/or SYP item number

• Select SYP Project Information - Access awarded SYP projects or initial R/W phase funding authorizations

• Miscellaneous - Several informational type items are available for downloading electronic files or printing hard copies

Page 65: Federal-Aid Highway Program Funding “Strategic Use of Flexibility” June 13, 2008 Ron Rigney, P.E. & P.L.S. Director Division of Program Management

THANK YOU.