federal and state laws prohibit employment and/or …...federal and state laws prohibit employment...
TRANSCRIPT
Federal and state laws prohibit employment and/or public accommodation discrimination on the basis of age, color, creed, disability, gender identity, national origin, pregnancy, race, religion, sex, sexual orientation or veteran’s status. If you believe you have been discriminated against, please contact the Iowa Civil Rights Commission at 800-457-4416 or Iowa Department of Transportation's affirmative action officer. If you need accommodations because of a disability to access the Iowa Department of Transportation’s services, contact the agency's affirmative action officer at 800-262-0003.
i
Iowa Statewide Transportation Improvement Program
Index
Introduction ......................................................................... i Map - District Planners' Areas of Responsibility Metropolitan Planning Organizations and Regional Planning Affiliations .................................. v Map - Large Urban, Small Urban and Regional Transit Systems................................................................. vi
FHWA and FTA Programs FHWA FTA
Statewide Projects ................................................ 1 ........ 296 Ames MPO (AAMPO) ......................................... 10 ........ 297 Cedar Rapids MPO (Corridor MPO) .................. 16 ....... 300 Council Bluffs MPO (MAPA) ............................. 27 ....... 301 Davenport MPO (Bi-State) ................................. 32 ....... 302 Des Moines MPO (DMAMPO) ........................... 39 ....... 303 Dubuque MPO (DMATS) .................................... 53 ....... 305 Iowa City MPO (MPOJC) .................................... 59 ....... 306 Sioux City MPO (SIMPCO) ................................ 66 ....... 309 Waterloo MPO (INRCOG) .................................. 72 ....... 311 RPA 1 (Upper Explorerland)................................ 79 ....... 314 RPA 2 (NIACOG) ................................................ 90 ....... 316 RPA 3 (NW IA Pl & Dev) ................................... 106 ....... 319 RPA 4 (Siouxland Regional) ................................ 119 ....... 321 RPA 5 (MIDAS) .................................................. 132 ...... 323 RPA 6 (Region 6) ................................................. 143 ....... 325 RPA 7 (IA Northland) .......................................... 157 ....... 326 RPA 8 (ECIA) ...................................................... 171 ....... 328 RPA 9 (Bi-State) .................................................. 182 ....... 330 RPA 10 (ECICOG) .............................................. 188 ........ 334 RPA 11 (CIRTPA) ............................................... 202 ....... 339 RPA 12 (Region XII COG) .................................. 219 ....... 342 RPA 13 (SWIPCO) .............................................. 229 ....... N/A RPA 14 (ATURA)................................................ 240 ........ 344 RPA 15 (Area 15)................................................. 248 ........ 347 RPA 16 (SE IA RPC) ........................................... 259 ........ 349 RPA 17 (Chariton Valley) .................................... 272 ........ 350 RPA 18 (MAPA RPA) ......................................... 286 ........ N/A
The proposed 2021-2024 Iowa Statewide Transportation Improvement Program (STIP) project listing is contained herein. This draft is prepared in accordance with Title 23, United States Code.
The draft STIP has been produced based on the current federal transportation bill, the Fixing America’s Surface Transportation Act (FAST-Act), which was signed into law on December 4, 2015. Under the FAST-Act FHWA federal funding programs include the National Highway Performance Program (NHPP), National Highway Freight Program (NHFP), Surface Transportation Block Grant Program (STBG), Transportation Alternatives Set-Aside (TAP), Congestion Mitigation and Air Quality Improvement Program (CMAQ), Highway Safety Improvement Program (HSIP), Railway-Highway Crossings, and Metropolitan Planning.
The projects identified in the draft STIP document are the result of regional and statewide transportation planning efforts conducted by the Iowa DOT and each of the 27 Metropolitan Planning Organizations (MPO) and Regional Planning Affiliations (RPA) located throughout the state.
Primary system projects are identified and programmed as part of the Iowa Transportation Improvement Program (Five-Year Program) process. The Five-Year Program document is updated and approved annually by the Iowa Transportation Commission (Commission). The Five-Year Program is used to inform Iowans of planned investments in the multimodal transportation system and encompasses investments in aviation, transit, railroads, trails, and highways. A copy of the current Five-Year Program can be found at: https://iowadot.gov/program_management/five-year-program
The Iowa DOT’s programming process is transparent, aligns available tools and plans, and incorporates appropriate and extensive stakeholder input. The major procedural steps include problem statement development, scoping, project advancement, project prioritization, program synthesis, and final programming. It is important to note that this process is also governed by Iowa’s long range transportation planning documents. As such, projects programmed in the Five-Year Program are consistent with Iowa’s long-range State Transportation Plan – Iowa in Motion 2045, and several other planning documents, as discussed below. A copy of the State Transportation Plan can be found at: https://iowadot.gov/iowainmotion/iowa-in-motion-home
ii
The FAST Act continued the provisions for performance-based planning and programming (PBPP) that were established in the prior federal reauthorization act, Moving Ahead for Progress in the 21st Century (MAP-21). The phase-in of federal PBPP requirements is ongoing; specific processes and requirements have moved into implementation and others will continue to do so over the next few years. Iowa in Motion 2045 was adopted prior to initial state performance targets being developed; these targets will be included in the next update of the plan. Currently, statewide targets have been set for federally-required measures in the areas of safety (all roads), pavement condition (Interstate and non-Interstate National Highway System (NHS)), bridge condition (NHS), system reliability (Interstate and non-Interstate NHS), freight movement (Interstate), and transit asset management (small urban and rural transit systems). Additional background on performance measures and targets, links to Iowa DOT performance-based plans, and current Iowa DOT performance targets are available at https://iowadot.gov/systems_planning/planning/federal-performance-management-and-asset-management. Discussion below provides an overview of the various performance-based plans and target-setting processes, and their connection to the investments included in the STIP. Iowa in Motion 2045 established the following vision for Iowa DOT: “A safe and efficient multimodal transportation system that enables the social and economic well-being of all Iowans, provides enhanced access and mobility for people and freight, and accommodates the unique needs of urban and rural areas in an environmentally conscious manner.” The plan focuses on four investment areas, with a heavy emphasis on stewardship:
• Stewardship through maintaining a state of good repair • Modification through rightsizing the system • Optimization through improving operational efficiency and
resiliency • Transformation through increasing mobility and travel choices
Iowa in Motion 2045 includes analysis and strategies for the various modes of transportation in the state. For highways, this includes considerations related to capacity, mobility and safety, freight, condition, operations, and bridges. Pavement and bridge needs are anticipated to be addressed primarily through asset management as described in the Transportation Asset Management Plan (TAMP), which is highlighted below. The STIP helps to address the following identified needs by including investments that implement applicable strategies.
• Capacity needs were identified for three interurban interstate corridors and for several Interstate, NHS, and other State routes in urban areas. Strategies to address these needs include targeting investment toward areas anticipated to become congested by 2045, and considering targeting anticipatory investments at locations with potential congestion issues beyond 2045. Strategies include added capacity and/or operational improvements.
• Mobility and safety, or “Super-2” needs, were identified for five U.S. routes across Iowa, all of which are part of the NHS. Strategies to address these needs include targeting investment toward improvements such as wider paved shoulders, turn lanes, passing lanes, limited access, and geometric improvements. These improvements are largely anticipated to be opportunistic, and are likely to occur at spot locations when other pavement, bridge, or safety issues are being addressed.
• The operations analysis focused on prioritizing interstate corridors from an operations perspective, and implementing appropriate transportation system management and operations (TSMO) strategies on those corridors.
The 2019 Strategic Highway Safety Plan (SHSP) includes engineering strategies to help address issues with lane departure crashes and to improve intersections. These improvements are being implemented as appropriate throughout the State’s highway system. Strategies to help prevent lane departures include the installation of countermeasures such as centerline rumble strips, shoulder/edgeline rumble strips, curve delineation, shoulder treatments, and median cable barriers. Strategies to help improve intersections include implementing innovative improvements such as roundabouts, reduced conflict intersections, diverging diamond interchanges, and offset turn lanes; traffic signal modifications; intersection lighting; and bicycle/pedestrian intersection improvements. The HSIP program of projects included in the draft STIP has been produced based on the strategies contained in the SHSP and the Iowa DOT’s safety performance measure target setting process. Numerous stakeholder groups, including MPOs, participated in the target setting process. Working in partnership with local agencies, investments have been identified and programmed which will construct effective countermeasures to reduce traffic fatalities and serious injuries. Projects chosen for HSIP investment are based on crash history, roadway characteristics, and the existence of an infrastructure countermeasures that
iii
can address the types of crashes present. The Iowa DOT continues to utilize a systemic safety improvement process rather than relying on “hot spot” safety improvements. Pavement and bridge projects on the Interstate System and non-Interstate NHS are determined in alignment with the Transportation Asset Management Plan (TAMP) and the performance target setting process. The TAMP helps connect the vision of Iowa in Motion 2045 with the projects programmed in the Five-Year Program and STIP. The TAMP describes how the existing highway system is managed. Preserving and improving this system is critical for achieving the system vision. The TAMP also connects Iowa in Motion 2045 and system/modal plans to Iowa DOT’s Five-Year Program and the STIP. Iowa in Motion 2045 defines a vision for the transportation system over the next 20 years, while the Five-Year Program and STIP identify specific investments over the next four to five years. The TAMP has a 10-year planning horizon and helps ensure that investments in the Five-Year Program and STIP are consistent with Iowa DOT’s longer-term vision. Pavement and bridge projects are identified and programmed in the STIP in a manner that is consistent with the strategies identified in the TAMP and the target-setting process. Pavement and bridge target setting involved an internal DOT working group and coordination with MPOs and local owners of NHS assets. The methodology used to set targets used current and historical data on condition and funding to forecast future condition. Asset management focuses on performing the right treatment at the right time to optimize investments and outcomes. The TAMP discusses the major investment categories that the Commission allocates funding through. Once the Commission approves the funding for these categories, Iowa DOT recommends the allocation of the funds to specific projects using the processes described in the TAMP. The TAMP includes a 10-year forecast of funding for pavement and bridge stewardship projects, and funding amounts in the STIP generally align with this forecast. The Iowa DOT strives to maintain the bridge inventory in a condition that provides safe and efficient movement of people and freight. Bridges are managed by using a bridge management process with forecasting capabilities to better identify future needs across the entire inventory. The ability to predict bridge needs beyond a short-term time horizon improves the ability to make better decisions today and predict what funding needs are necessary for a stable bridge inventory. Bridge projects are
programmed to help meet the desired program outcomes documented in the TAMP. The Iowa DOT works to provide a safe, serviceable, and sustainable roadway system using its pavement management system. The pavement management system will assist program administrators in the selection of economical options for pavement decisions for the construction, reconstruction, rehabilitation, preservation, and maintenance of pavements. The pavement management system will be used to model and predict future pavements conditions based on various funding levels. This analysis will determine the level of funding to maintain the pavement system in a state of good repair. Pavement projects are programmed to help meet the desired program outcomes documented in the TAMP. Projects focused on improving pavement and bridge condition also often help improve system reliability and freight movement. Additional projects focused specifically on improving these areas of system performance are developed in alignment with the target-setting process for related performance measures, and the freight improvement strategies and freight investment plan included in the State Freight Plan. This plan includes a detailed analysis and prioritization of freight bottlenecks, which are locations that should be considered for further study and possibly for future improvements. A detailed analysis was performed to prioritize the bottlenecks based on their value to the overall system, traffic and infrastructure condition, and travel time performance. The process also involved extensive input from State, MPO, RPA, and industry representatives. State projects identified in the freight investment plan and programmed in the STIP were highly ranked, freight bottlenecks. System reliability and freight target setting involved an internal DOT working group and coordination with MPOs. The methodology used to set targets used current and historical data on condition and funding to forecast future condition. The State Freight Plan identifies several strategies that help direct investments made in the STIP. These include:
• Target investment to address mobility issues that impact freight movements.
• Emphasize the Iowa Multimodal Freight Network and utilize designs that are compatible with significant freight movements.
• Right-size the highway system and apply cost-effective solutions to locations with existing and anticipated issues.
iv
Public transit capital projects included in the STIP align with the transit asset management (TAM) planning and target setting processes undertaken by the Iowa DOT, transit agencies, and MPOs. The Iowa DOT establishes a group TAM plan and group targets for all small urban and rural providers while large urban providers establish their own TAM plans and targets. Investments are made in alignment with TAM plans with the intent of keeping the state’s public transit vehicles and facilities in a state of good repair and meeting transit asset management targets. The Iowa DOT allocates funding for transit rollingstock in accordance with the Public Transit Management System process. In addition, the Iowa DOT awards public transit infrastructure grants in accordance with the project priorities established in Iowa Code chapter 924. Additional state and federal funding sources that can be used by transit agencies for vehicle and facility improvements are outlined in the funding chapter of the Transit Manager’s Handbook. Individual transit agencies determine the use of these sources for capital and operating expenses based on their local needs. Projects included in the STIP, but not located on the primary system, are identified and programmed through Iowa’s regional planning process. The Iowa DOT regional process includes the targeting of federal highway funds directly to 18 RPAs and 9 MPOs. These organizations provide additional inputs to the four-year program by conducting regional transportation planning efforts including the project selection for “targeted” STBG funding. Projects identified by each agency are local priorities and are consistent with each agency’s long-range transportation plan. In addition to the STBG funded projects noted above the STIP also includes county and city bridge projects to be funded with federal aid funding. STBG funds are targeted directly to Iowa’s 99 counties for investment in secondary road bridge infrastructure. The Iowa DOT also operates a city bridge program which makes STBG funding available for investment in municipal bridge projects. City and county bridge projects funded with FHWA funding are included in MPO and RPA TIPs and carried forward to the STIP. A number of additional grant programs are administered by the Iowa DOT which target FHWA funding to locally sponsored projects. Funding available to local sponsors includes CMAQ, NHFP, and Recreational Trail among others. The projects selected for funding as part of these grant programs are programmed in MPO and RPA TIPs and included in the draft STIP.
In February 2018 Iowa’s Transportation Commission approved a Federal Aid Swap policy that allows certain locally sponsored projects to swap federal aid dollars for state Primary Road Funds dollars. Specifically, the Federal Aid Swap policy applies to STBG, bridge, CMAQ, and HSIP funding targeted to locally sponsored projects. Swap funded projects have been included in the STIP document in order to provide a comprehensive listing of transportation improvements funded through the state of Iowa’s federal aid apportionments and Primary Road Funds dollars. Some proposed obligations may be identified under a broader category of statewide improvements that are subject to alternate programming requirements. Examples of statewide programming entries include the DOT’s Railroad Highway program, the Highway Safety Improvement Program Secondary, Emergency Relief projects, and State Planning and Research funding, among others. In addition to the FHWA program of projects outlined above the draft STIP includes all projects for which Federal Transit Administration (FTA) funding may be utilized. The transit portion of the STIP was developed by Iowa’s MPOs and RPAs in cooperation with the state’s large urban, small urban and regional transit systems. This draft STIP will be made available to all Iowans consistent with the Iowa DOT’s public participation plan. Comments received by September 7, 2020, will be considered prior to the STIP submittal to the FHWA/FTA in September 2020. Comments on the draft STIP should be submitted directly to the Iowa DOT Program Management Bureau or Iowa DOT district planners. The draft STIP includes areas of responsibility and contact information for these points of contact. Inclusion of a project in the draft STIP does not guarantee federal-aid eligibility for the project. Eligibility for federal aid will be determined on a case-by-case basis when project authorization is requested from the FHWA or FTA.
temmE
neirB'O yalC otlA olaP
htuomylP atsiV aneuB
llahsraM
noyL nosnikciD
xuoiS
tdlobmuH
radeC
aloecsO
nanahcuB
notgnihsaW
eeL
yrneH
asiuoL
enitacsuM
ttocS
kukoeK
neruB naVsivaD
nosreffeJollepaWeornoM
esoonappA
sacuLekralC
rutaceD
noinU
dloggniRrolyaT
smadAyremogtnoMslliM
eimattawattoP ssaC riadA
nosirraH yblehS
anonoM drofwarC
nobuduA
llorraC eneerG
yrubdooW adI caS
htussoK ogabenniW htroW
kcocnaH odroG orreC
thgirW nilknarF reltuB
nuohlaCretsbeW
notlimaH nidraH
enooB yrotS
eirhtuG sallaD kloP
nosidaM nerraW noiraM
enyaW
aksahaM
keihsewoPrepsaJ awoI nosnhoJ
noskcaJsenoJnniLnotneBamaT
erawaleDkwaH kcalBydnurG
remerB
etteyaF notyalC
dyolF wasakcihC
llehctiM drawoH keihsenniW eekamallA
euqubuD
tnomerF egaP
notnilC
senioM seD
eekorehC
Hector Torres-Cacho205 E. 227th StFairfield, IA 52556641-469-4007Fax: 641-472-3622
Catherine Cutler5455 Kirkwood Blvd. SWCedar Rapids, IA 52404319-364-0235Fax: 319-364-9614
Krista Billhorn428 43rd St. SWMason City, IA 50401641-422-9447Fax: 641-422-9457
Andy Loonan1020 S. Fourth St.Ames, IA 50010515-239-1996Fax: 515-239-1472
Dakin Schultz2800 Gordon DriveP.O. Box 987Sioux City, IA 51102712-274-5837Fax: 712-276-2822
Scott Suhr2210 E. Seventh St.Atlantic, IA 50022712-243-7627Fax: 712-243-6788
District Transportation Planners’ Areas of ResponsibilityMetropolitan Planning Organizations and Regional Planning Affiliations January 2020
Northwest IowaPlanning and Development
Commission
Siouxland RegionalTransportation Planning
Association
MAPA RuralTransportation Planning
Affiliation
Southwest IowaPlanning Council
ATURATransportation Planning
Affiliation
Region XIICouncil of Governments
MIDASCouncil of Governments
North Iowa AreaCouncil of Governments
Central Iowa RegionalTransportation
Planning Alliance
Region 6 Resource Partners
Iowa NorthlandRegional Transportation
Authority
Upper ExplorerlandRegional Planning
Commission
East CentralIntergovernmental
Association
East Central IowaCouncil of Governments
Bi-StateRegional Commission
Southeast IowaRegional
Planning Commission
Area XVRegional
Planning Commission
Chariton ValleyTransportation
Planning Affiliation
Sioux City
Omaha/Council Bluffs
Des Moines
Ames
Iowa City
WaterlooDubuque
Cedar Rapids
Davenport/Rock Island
Transportation Districts
Metropolitan Planning Organizations
Regional Planning Affiliations
23
4
5
6
7
8
9
10
11
12
13 14 1516
17
18
1
satnohacoP
Sam Shea5455 Kirkwood Blvd. SWCedar Rapids, IA 52404319-286-4907Fax: 319-364-9614
23
4 5
61
v
www.masoncity.net/pview.aspx?id=18070&catid=477
www.cityofottumwa.com/departments/transit
www.midascog.net/transit/dart
www.ci.marshalltown.ia.us/static/departments/works/transit.php
www.muscatineiowa.gov/index.aspx?NID=75
www.ci.clinton.ia.us/html/MTA.html
www.burlingtoniowa.org/publicworks/bus.html
www.nwiarides.org/
www.swipco.org
www.riverbendtransit.org
www.region12cog.org/western_iowa_public_transit/public_transit.asp
www.southerniowatrolley.org
www.ridehirta.com
www.simpco.org/srts/
www.midascog.net/transit/region-v
www.r2bus.org
www.1015transit.com
www.region6planning.org
www.seirpc.com/seibus/route.html
www.ecicog.org/ecitransit
www.inrcog.org/rtc.htm
www.rta8.org/
www.neicac.org/transport.html
www.cityofdubuque.org/thejule
www.cyride.com
www.icgov.org/default/?id=1515
www.uiowa.edu/~cambus
www.coralville.org/index.aspx?nid=80
www.cedar-rapids.org/transit/
www.mettransit.orgwww.sioux-city.org/transit
www.ridedart.com
www.bettendorf.org/department/?fDD=22-0
www.yellowandblueforyou.com
www.cityofdavenportiowa.com/department/division.php?structureid=420
13
12
4
3
5
14
2
15
11
10
1
16
9
6
7
8
Iowa's Public Transit System
4 Transit Systems in urbanized areas > 200,000 population8 Transit Systems in urbanized areas 50,000 to 200,000 population7 Transit Systems in small urban areas < 50,000 population16 Regional Transit Systems January 16, 2014
vi
FHWA Programs
0 20
Iowa Department of Transportation
800 Lincoln Way, Ames, IA 50010
Phone: 515-239-1409
STIP Contact: Matthew Chambers, [email protected]
40 80 Miles
r----,
L ___ J Counties
1
RPA 0 / StatewideCMAQ
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
23405
Iowa Department ofTransportation
STP-A-000s()--22-00
Bus Replacement: Large Urban and Rural Areas
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$3,800,000$3,000,000
$3,800,000$3,000,000
$3,800,000$3,000,000
$3,800,000$3,000,000
$15,200,000$12,000,000
25540
Iowa Department ofTransportation
STP-A-000T()--22-00
Iowa Clean Air Attainment Program
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$5,000,000$2,000,000
$2,000,000
$5,000,000$2,000,000
$2,000,000
$5,000,000$2,000,000
$2,000,000
$15,000,000$6,000,000
$6,000,000
ER
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
15055
Iowa Department ofTransportation
ER-000T()--58-00
STATEWIDE: EMERGENCY RELIEF PROGRAMPROJECTS TO BE DETERMINED
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$30,038,009 $30,038,009
2
HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
8109
Iowa Department ofTransportation
HSIP-000T()--2H-00
Statewide Railroad Crossings
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$500,000$450,000
$500,000$450,000
$500,000$450,000
$500,000$450,000
$2,000,000$1,800,000
15169
Iowa Department ofTransportation
HSIP-000T()--2H-00
Statewide safety projects including centerline rumble strips,intersection improvements, and pavement markings
Pave, Traffic Signals, Pavement Markings
TIP Approved TotalFederal Aid
RegionalSwap
$1,250,000$1,125,000
$20,166,000$18,149,400
$25,000,000$22,500,000
$25,000,000$22,500,000
$71,416,000$64,274,400
25371
Iowa Department ofTransportation
HSIP-000T(865)--2H-00
Statewide Interstate Guardrail Repair
Landscaping
TIP Approved TotalFederal Aid
RegionalSwap
$865,000$778,500
$865,000$778,500
$865,000$778,500
$865,000$778,500
$3,460,000$3,114,000
16
Iowa Department ofTransportation
RRP-000T()--48-00
Railroad Highway Crossing and Surface Repair Programs
Pavement Rehab, Railroad Signals
TIP Approved TotalFederal Aid
RegionalSwap
$6,329,257$5,696,331
$6,329,257$5,696,331
$6,329,257$5,696,331
$6,329,257$5,696,331
$25,317,028$22,785,324
MISC
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
13250
Iowa Department ofTransportation
MISC-000T()--XX-00
Allocated Funds: Research, Tech, Min Bus, Seatbelt, UseTax, Inv, NCPD, Etc.
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$2,500,000$2,000,000
$2,500,000$2,000,000
$2,500,000$2,000,000
$2,500,000$2,000,000
$10,000,000$8,000,000
22190
Iowa Department ofTransportation
MISC-000T()--XX-00
State Planning Research and Develompent (SPR). Technology Transfer. DOT Co-op and Intern Program. Management Systems.
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$13,455,283$10,764,227
$13,455,283$10,764,227
$13,455,283$10,764,227
$13,455,283$10,764,227
$53,821,132$43,056,908
3
NHFP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
35743
Iowa Department ofTransportation
INHFP-000S()--2F-00
National Highway Freight Program - Projects to bedetermined
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$20,560,651$16,448,521
$20,560,651$16,448,521
$20,560,651$16,448,521
$61,681,953$49,345,563
37003
Iowa Department ofTransportation
INHFP-000T()--0F-00
Linking Iowa's Freight Transportation System
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$2,284,516$1,827,613
$2,284,516$1,827,613
$2,284,516$1,827,613
$6,853,548$5,482,839
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
16884
Iowa Department ofTransportation
IM-000T()--13-00
STATEWIDE INTERSTATE SIGNING
Traffic Signs
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000$900,000
$1,000,000$900,000
$1,000,000$900,000
$1,000,000$900,000
$4,000,000$3,600,000
16883
Iowa Department ofTransportation
IM-000T()--13-00
STATEWIDE INTERSTATE LIGHTING
Lighting
TIP Approved TotalFederal Aid
RegionalSwap
$500,000$450,000
$500,000$450,000
$500,000$450,000
$500,000$450,000
$2,000,000$1,800,000
4
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38343
Iowa Department ofTransportation
IMN-000T()--0E-00
STATEWIDE INTERSTATE PAVEMENT MAINTENANCE
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$9,500,000 $9,500,000 $9,500,000 $9,500,000 $38,000,000
16885
Iowa Department ofTransportation
NHSN-000T()--2R-00
STATEWIDE INTERSTATE REST AREA MAINTENANCE
Rest Area Improvement
TIP Approved TotalFederal Aid
RegionalSwap
$6,000,000 $6,000,000 $6,000,000 $6,000,000 $24,000,000
8114
Iowa Department ofTransportation
STPN-000S ()--2J-00
Statewide Contract Maintenance
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$35,350,000 $35,350,000 $35,350,000 $35,350,000 $141,400,000
8112
Iowa Department ofTransportation
STPN-000T ()--2J-00
EMERGENCY - CONTINGENCY - U-STEP/C-STEP & TJRESERVE
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$6,000,000 $6,000,000 $6,000,000 $6,000,000 $24,000,000
8113
Iowa Department ofTransportation
STPN-000T()--2J-00
STATEWIDE TRAFFIC CONTROL DEVICES
Traffic Signs
TIP Approved TotalFederal Aid
RegionalSwap
$10,000,000 $10,000,000 $10,000,000 $10,000,000 $40,000,000
14
Iowa Department ofTransportation
STPN-000T()--2J-00
COOPERATIVE CITY/COUNTY/STATE HIGHWAYRESEARCH
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$1,500,000 $1,500,000 $1,500,000 $1,500,000 $6,000,000
45526
Iowa Department ofTransportation
STPN-000T()--2J-00
POST LETTING PROJECT COST
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$20,000 $20,000,000 $20,000,000 $20,000,000 $60,020,000
13428
Iowa Department ofTransportation
STPN-000T()--2J-00
ROADSIDE ENHANCEMENT IMPROVEMENTSSTATEWIDE
Landscaping
TIP Approved TotalFederal Aid
RegionalSwap
$2,500,000 $2,500,000 $2,500,000 $2,500,000 $10,000,000
3
Iowa Department ofTransportation
STPN-000T()--2J-00
MISC CONSULTANT SERVICES -CONSULTING/INSPECTIONS
Outside Services Engineering
TIP Approved TotalFederal Aid
RegionalSwap
$85,000,000 $85,000,000 $85,000,000 $85,000,000 $340,000,000
5
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
33936
Iowa Department ofTransportation
STPN-000T()--2J-00
Americans with Disabilities Act
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$3,000,000 $3,000,000 $3,000,000 $3,000,000 $12,000,000
6
RTP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45524
Iowa Department ofTransportation
NRT-000T(169)--9G-00
FRT Committee Costs for FFY 2021
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$1,250$1,000
$1,250$1,000
45523
Iowa Department ofTransportation
NRT-000T(170)--9G-00
Support for 2021 Bicycle Summit
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$8,000$6,000
$8,000$6,000
38352
Iowa Department ofNatural Resources
NRT-000T(28)--9G-00
Iowa DNR OHV Program - Statewide - Purchase of Mowers
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$74,000$59,000
$74,000$59,000
38353
Iowa Department ofNatural Resources
NRT-000T(29)--9G-00
Iowa DNR OHV Program: Marshall County Nicholson-FordOHV Park: Equipment Maintenance and Storage Building
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$68,000$54,000
$68,000$54,000
38401
Iowa Department ofNatural Resources
NRT-000T(64)--9G-00
Iowa State parks Trail Repair Crew - Geode
Ped/Bike Miscellaneous
TIP Approved
1/22/2031
TotalFederal Aid
RegionalSwap
$37,252$28,252
$37,252$28,252
38403
Iowa Department ofNatural Resources
NRT-000T(66)--9G-00
Iowa State parks Trail Repair Crew - Lake Wapello
Ped/Bike Miscellaneous
TIP Approved
1/23/2031
TotalFederal Aid
RegionalSwap
$30,287$23,287
$30,287$23,287
38404
Iowa Department ofNatural Resources
NRT-000T(67)--9G-00
Iowa State parks Trail Repair Crew - Viking Lake
Ped/Bike Miscellaneous
TIP Approved
1/23/2031
TotalFederal Aid
RegionalSwap
$40,437$30,437
$40,437$30,437
38405
Iowa Department ofNatural Resources
NRT-000T(68)--9G-00
Iowa State parks Trail Repair Crew - Waubonsie
Ped/Bike Miscellaneous
TIP Approved
1/23/2031
TotalFederal Aid
RegionalSwap
$32,876$24,876
$32,876$24,876
39451
Iowa Department ofNatural Resources
NRT-0625()--9G-00
On Snow Grooming Equipment
Ped/Bike Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$280,000$224,000
$280,000$224,000
7
RTP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36644
Iowa Department ofNatural Resources
NRT-0625()--9G-00
Snowmobile Trail Grooming Equipment Purchase
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$300,000$240,000
$300,000$240,000
40058
Iowa Department ofTransportation
NRT-000T()--9G-00
Federal Recreational Trails Program
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$1,718,521$1,374,817
$1,718,521$1,374,817
$1,718,521$1,374,817
$5,155,563$4,124,451
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
8252
Iowa Department ofTransportation
STP-000T()--2C-00
Construction Industry Training Program
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000$800,000
$1,000,000$800,000
$1,000,000$800,000
$1,000,000$800,000
$4,000,000$3,200,000
8119
Iowa Department ofTransportation
STP-000T()--2C-00
PREVOCATIONAL TRAINING AND DBE SUPPORTSERVICES
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$360,000$288,000
$360,000$288,000
$360,000$288,000
$360,000$288,000
$1,440,000$1,152,000
9662
Iowa Department ofTransportation
TAP-R- 000T()--8T-00
SCENIC BYWAYS PROGRAM - PROJECTSDETERMINED LATER
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$500,000$400,000
$500,000$400,000
$500,000$400,000
$500,000$400,000
$2,000,000$1,600,000
13745
Iowa Department ofTransportation
STP-000T()--2C-00
Non-Interstate Pavement Modernization
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$115,000,000$50,000,000
$140,000,000$50,000,000
$145,000,000$50,000,000
$400,000,000$150,000,000
25541
Iowa Department ofTransportation
TAP-R-000T()--8T-00
Statewide Transportation Alternatives Program: Projects tobe Determined
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$1,250,000$1,000,000
$1,250,000$1,000,000
$1,250,000$1,000,000
$3,750,000$3,000,000
8
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45486
Iowa Department ofTransportation
TAP-R-000T(136)--8T-00
Iowa Safe Routes to School Partnership
Ped/Bike Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$251,319$201,055
$251,319$201,055
44754
University ofNorthern Iowa
TAP-R-000T(137)--8T-00
UNI Integrated Roadside Vegetation Management
Landscaping
TIP Approved TotalFederal Aid
RegionalSwap
$676,750$541,400
$676,750$541,400
SWAP-HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39497
Iowa Department ofTransportation
HSIP-SWAP-000T()--SJ-00
Statewide HSIP-SWAP Secondary Program
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$2,000,000
$2,000,000
$2,000,000
$2,000,000
$2,000,000
$2,000,000
$6,000,000
$6,000,000
9
0
Boone
County
Ames Area Metropolitan Planning Organization
515 Clark Avenue, P.O.Box 811, Ames, IA 50010
Phone: 515-239-5165, Fax: 515-239-5142, https://www.cityofames.org
Public Works Director: John Joiner, [email protected]
\
2 4 Miles
Story
County
/
�orts � Commercial
- Interstate
- National Highway System
Enhanced - Primary Roads
General Service - Local Roads
El Basic Service
El Local Service Transit rel Regional
[el Large Urban
rel Small Urban
rel Intercity Bus
C[I Amtrak
I Park & Ride
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] MPO Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
10
11
MPO 22 / AAMPOPL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
34214
MPO 22 / AAMPO
RGPL-PA22(RTP)--PL-85
Trans Planning
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$125,000$100,000
$125,000$100,000
$125,000$100,000
$125,000$100,000
$500,000$400,000
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38031
Iowa Department ofTransportation
BRFN-69()--39-85
US69: GRAND AVE IN AMES 0.1 MI N OF LINCOLN WAY
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$265,000 $265,000
45416
Iowa Department ofTransportation
IMN-35()--0E-85
I-35: US 30 AND CO RD E15 INTERCHANGE RAMPS
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,800,000 $1,800,000
45391
Iowa Department ofTransportation
IMN-35()--0E-85
I-35: US 30 TO CO RD D59 (SB)
TIP Approved TotalFederal Aid
RegionalSwap
$2,400,000 $2,400,000
12
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36918
MPO 22 / AAMPO
RGTR-0155()--ST-85
CyRide: Vehicle Replacement
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$850,000$225,000
$225,000
$850,000$225,000
$225,000
38304
MPO 22 / AAMPO
RGTR-0155()--ST-85
CyRide: Vehicle Replacement
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$850,000$225,000
$225,000
$850,000$225,000
$225,000
37442
MPO 22 / AAMPO
RGTR-0155()--ST-85
CyRide Vehicle Replacement
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$850,000$225,000
$225,000
$850,000$225,000
$225,000
45238
MPO 22 / AAMPO
RGTR-0155()--ST-85
CyRide: Vehicle Replacement
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$850,000$225,000
$225,000
$850,000$225,000
$225,000
13
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38306
Ames
TAP-U-0155()--8I-85
In the city of Ames, On Vet Med Trail, from S Grand AveSouth .53 Miles to S 16th St,
Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$500,000$159,000
$159,000
$500,000$159,000
$159,000
21260
Ames
TAP-U-0155(SE16TH)--8I-85
Skunk River Trail: From SE 16th Street to East Lincoln Way
Ped/Bike Structures, Ped/Bike Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$835,000$240,000
$240,000
$835,000$240,000
$240,000
14983
Ames
TAP-U-0155(SE16th)--8I-85
In the City of Ames, Skunk River Trail: From SE 16th Streetto East Lincoln Way
Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$521,000$160,000
$160,000
$521,000$160,000
$160,000
DOT Note: Project eligible for FHWA TAP funding
19249
Ames
TAP-U-0155()--8I-85
Squaw Creek: From Skunk River to S. Duff Avenue
Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$681,000$159,000
$159,000
$681,000$159,000
$159,000
SWAP-CMAQ
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45239
Ames
ICAAP-SWAP-0155(702)--SH-85
First Phase Deployment Ames Traffic Signal Master Plan
Traffic Signals
TIP Approved TotalFederal Aid
RegionalSwap
$1,470,685
$1,176,548
$1,176,548
$1,470,685
$1,176,548
$1,176,548
14
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36919
Ames
STBG-SWAP-0155()--SG-85
In the city of Ames, On Cherry Avenue, from E Lincoln WaySouth .4 Miles to Southeast 5th Street,
Grade and Pave
TIP Approved TotalFederal Aid
RegionalSwap
$2,400,000
$1,890,000
$1,890,000
$2,400,000
$1,890,000
$1,890,00036927
Ames
STBG-SWAP-0155()--SG-85
In the city of Ames, On East 13th Street, from Duff AvenueEast .4 Miles to Meadowlane Avenue,
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,500,000
$1,600,000
$1,600,000
$2,500,000
$1,600,000
$1,600,00035616
Ames
STBG-SWAP-0155()--SG-85
In the city of Ames, On North Dakota Avenue, from OntarioStreet North 0.17 Miles to Union Pacific Railroad Tracks
Pave
TIP Approved TotalFederal Aid
RegionalSwap
$1,500,000
$900,000
$900,000
$1,500,000
$900,000
$900,00038303
Ames
STBG-SWAP-0155()--SG-85
In the city of Ames, On Stange Rd and 24TH ST, fromBlankenburg Dr North .4 Miles to 24th ST and East .8 Milesto RR,
Grade and Pave
TIP Approved TotalFederal Aid
RegionalSwap
$4,200,000
$1,600,000
$1,600,000
$4,200,000
$1,600,000
$1,600,000
45233
Ames
STBG-SWAP-0155()--SG-85
In the city of Ames, on Lincoln Way, from Dotson Dr to SFranklin Ave
Grade and Pave
TIP Approved TotalFederal Aid
RegionalSwap
$2,400,000
$1,686,000
$1,686,000
$2,400,000
$1,686,000
$1,686,000
15
Corridor Metropolitan Planning Organization
101 First Street SE, Cedar Rapids, IA 52401
Phone: 319-286-5041, Fax: 319-286-5130, www.corridormpo.com
Corridor MPO Manager: Bill Micheel, [email protected] Transportation Planner: Brandon Whyte, [email protected]
Benton
County
l
�l ' �L>'
•
/ ,h
Mar
10
Cedar, .
�orts � Commercial
- Interstate
- National Highway System
El Enhanced - Primary Roads
General Service - Local Roads -+
-Ramps
� -I I 1-t
Fairfax
/
Basic Service
El Local Service Transit rel Regional
-Trails
-+- Railroad
l
Walford l
D;<
N
0 2 4
l
T
8 Miles
Johnson
County
rel Large Urban
rel Small Urban
rel Intercity Bus
C[I Amtrak
I Park & Ride
Rivers
Major Lakes
C] MPO Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
16
17
MPO 23 / CMPOCMAQ
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
6695
Cedar Rapids
STP-A-1187(652)--22-57
In the City of Cedar Rapids, COLLINS RD: C AVEINTERSECTION
Pavement Widening
TIP Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$197,000$157,000
$197,000$157,000
PA Note: FA will be used for advanced right-of-way acquisition.
DOT Note: Total grant amount of $1,400,000. $1,243,078.57 already autnorized.
NHFP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39426
Cedar RapidsAirport Commission
NHFP-CRAC(001)--2F-57
In the City of Cedar Rapids, Air Cargo Logistics Facility atEastern Iowa Airport
Buildings
TIP Approved
11/16/2020
TotalFederal Aid
RegionalSwap
$1,150,000$925,000
$1,150,000$925,000
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37860
Iowa Department ofTransportation
BRF-30()--38-57
US30: CEDAR RIVER 0.5 MI W OF E JCT US 151 (EB)
Bridge Replacement, Traffic Signs
TIP Approved TotalFederal Aid
RegionalSwap
$11,258,000$9,006,400
$11,258,000$9,006,400
38070
Iowa Department ofTransportation
IM-380()--13-57
I-380: TOWER TERRACE INTERCHANGE IN HIAWATHA(STATE SHARE)
Grade and Pave, Bridge Replacement, Traffic Signs
TIP Approved TotalFederal Aid
RegionalSwap
$17,545,000$15,790,500
$17,545,000$15,790,500
PL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
17107
MPO 23 / CMPO
RGPL-PA23()--PL-00
MPO: Planning Funds
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$374,000$299,000
$374,000$299,000
$374,000$299,000
$374,000$299,000
$1,496,000$1,196,000
18
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38106
Iowa Department ofTransportation
IMN-380()--0E-57
I-380: GLASS RD 1.1 MI S OF IA 100 IN CEDAR RAPIDS
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$808,000 $808,000
45288
Iowa Department ofTransportation
NHSN-151()--2R-57
US151: E JCT US 30 TO MT VERNON RD (SB)
Pavement Widening
TIP Approved TotalFederal Aid
RegionalSwap
$600,000 $600,000
45396
Iowa Department ofTransportation
NHSN-151()--2R-57
US151: IA 13 TO IA 1 (VAR LOC)
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,100,000 $2,100,000
39284
Iowa Department ofTransportation
BRFN-30()--39-57
US30: UP RR 1.6 MI W OF E JCT US 218 (WB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,762,000 $1,762,000
39286
Iowa Department ofTransportation
IMN-380()--0E-57
I-380: SB REST AREA 3.0 MI S OF CEDAR RAPIDS
Grade and Pave, Rest Area Improvement
TIP Approved TotalFederal Aid
RegionalSwap
$4,336,000 $1,998,000 $6,334,000
39287
Iowa Department ofTransportation
IMN-380()--0E-57
I-380: CC RR AND ASH PIT 2.9 MI S OF IA 100 IN CEDARRAPIDS (NB & SB)
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$700,000 $700,000
45259
Iowa Department ofTransportation
BRFN-30()--39-57
US30: CIC RR 0.8 MI W OF I-380 IN CEDAR RAPIDS (EB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$800,000 $800,000
45434
Iowa Department ofTransportation
IMN-380()--0E-57
I-380: BLAIRS FERRY RD 0.6 MI N OF IA 100
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,100,000 $1,100,000
45295
Iowa Department ofTransportation
IMN-380()--0E-57
I-380: 27TH AVE 1.7 MI N OF US 30
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$600,000 $600,000
19
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36956
MPO 23 / CMPO
RGTR-PA23()--ST-57
CR Transit Route 5 two Heavy-Duty (35' diesel) BusReplacements
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$1,032,000$825,000
$825,000
$1,032,000$825,000
$825,000
PA Note: Replacing bus numbers 2091 and 2092.
36957
MPO 23 / CMPO
RGTR-PA23()--ST-57
Purchase 1 medium-duty 33' replacement ADA paratransitservice bus.
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$205,000$164,000
$164,000
$205,000$164,000
$164,000
PA Note: Replacing bus numbers 2402
36958
MPO 23 / CMPO
RGTR-PA23()--ST-57
In the City of Marion bus stop improvements located onnon-local roads.
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$394,000$315,000
$315,000
$394,000$315,000
$315,000
38368
Cedar Rapids
TAP-U-1187()--8I-57
On EDGEWOOD RD NE,from the north side of theEdgewood Rd Bridge to the ext.trail aprox 1K' north.
Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$200,000$160,000
$160,000
$200,000$160,000
$160,000
35691
Cedar Rapids
TAP-U-1187(792)--8I-57
Lindale Trl Ext from existing trail along &under Blairs FerryRd. Along abandoned Rail to Council Street NE
Ped/Bike ROW, Ped/Bike Grade & Pave, Ped/BikeStructures
TIP Approved
2/16/2021
TotalFederal Aid
RegionalSwap
$2,183,000$1,663,000
$1,663,000
$2,183,000$1,663,000
$1,663,000
PA Note: Project authorized for $139,000 in STBG, total STBG STIP limit is $1,802,000; project authorized for $261,000 in TAP total STIP limit is $261,000.
DOT Note: Project eligible for FHWA TAP funding
25525
Cedar Rapids
TAP-U-1187(793)--8I-57
In the city of Cedar Rapids, On EDGEWOOD RD NE, fromGlass Rd NE to approx 350' S of Blairs Ferry Rd NE
Ped/Bike Grade & Pave, Ped/Bike Structures
TIP Approved
4/20/2021
TotalFederal Aid
RegionalSwap
$2,240,000$1,792,000
$1,792,000
$2,240,000$1,792,000
$1,792,000
PA Note: Project has $1,317,000 in STBG and $475,000 in STBG-TAP
36995
Cedar Rapids
TAP-U-1187(796)--8I-57
Lindale Trail Ext ph2 from Council St NE along abandonedrailway to 51st St & the CVNT Trail near Hwy 100
Ped/Bike ROW, Ped/Bike Grade & Pave, Ped/BikeMiscellaneous
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$1,190,000$950,000
$950,000
$1,190,000$950,000
$950,000
20
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37075
Cedar Rapids
TAP-U-1187(799)--8I-57
In the city of Cedar Rapids, FromCherryHill Pk,to Sharon Lnalong Gordon Ave,Cherokee Pk to Midway Dr
Ped/Bike ROW, Ped/Bike Grade & Pave
TIP Approved
3/16/2021
TotalFederal Aid
RegionalSwap
$2,200,000$1,440,000
$1,440,000
$2,200,000$1,440,000
$1,440,000
PA Note: Project has $1,275,000 in STBG and $165,000 in TAP.
36965
Cedar Rapids
TAP-U-1187(801)--8I-57
From Midway Dr along Vinton Ditch to E Ave along E Ave toVinton Ditch, to & along F Ave until 13th Street
Ped/Bike Grade & Pave, Ped/Bike Structures
TIP Approved
2/16/2021
TotalFederal Aid
RegionalSwap
$2,052,000$1,634,000
$1,634,000
$2,052,000$1,634,000
$1,634,000
29791
Marion
TAP-U-4775(631)--8I-57
10TH ST, Over Indian Creek, from the to be built TowerTerrace Rd South 2.1 M to Boyson Trail north of 8th Ave.
Ped/Bike Grade & Pave, Ped/Bike Structures,Ped/Bike Development
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$2,643,000$2,070,000
$2,070,000
$2,643,000$2,070,000
$2,070,000
PA Note: Project authorized for $223,479; total STIP limit 2,294,000.
35692
Marion
TAP-U-4775(635)--8I-57
In the city of Marion, 10TH AVE,Construct 10' side paths inROW on N&S sides of street from 35th St to Eagleview Dr
Ped/Bike Grade & Pave
TIP Approved
3/16/2021
TotalFederal Aid
RegionalSwap
$3,537,000$2,830,000
$2,830,000
$3,537,000$2,830,000
$2,830,000
PA Note: Project has $2,583,000 in STBG and $247,000 in TAP.
39556
Marion
TAP-U-4775(638)--8I-57
In the city of Marion, From E side of Indian Creek Bridgeover Marion Bvld E to 7th St
Ped/Bike Grade & Pave, Ped/Bike Structures
TIP Approved
4/20/2021
TotalFederal Aid
RegionalSwap
$1,812,000$1,450,000
$1,450,000
$1,812,000$1,450,000
$1,450,000
39557
Marion
TAP-U-4775(639)--8I-57
From City Limits E under Hwy 100 Bridge over Indian Creekto Grand Ave spur
Ped/Bike ROW, Ped/Bike Grade & Pave, Ped/BikeStructures
TIP Approved
6/15/2021
TotalFederal Aid
RegionalSwap
$1,510,000$1,208,000
$1,208,000
$1,510,000$1,208,000
$1,208,000
36938
Linn CountyConservation Board
TAP-U-C057(141)--8I-57
42nd ST N along Preserve Ln to Rock Island Preservealong abandoned rail aprox 250' E of Cedar River
Ped/Bike ROW, Ped/Bike Grade & Pave, Ped/BikeStructures
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$908,000$726,000
$726,000
$908,000$726,000
$726,000
38373
MPO 23 / CMPO
RGTR-PA23()--ST-57
Purchase 1 medium-duty 33' replacement ADA paratransitservice bus.
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$216,000$172,000
$172,000
$216,000$172,000
$172,000
21
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
PA Note: Replacing bus numbers 2403
38374
MPO 23 / CMPO
RGTR-PA23()--ST-57
CR Transit Route 5 two Heavy-Duty (35' diesel) BusReplacements
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$1,084,000$866,000
$866,000
$1,084,000$866,000
$866,000
PA Note: Replacing bus numbers 2093 and 2094.
38370
Cedar Rapids
TAP-U-1187()--8I-57
In the city of Cedar Rapids, On EDGEWOOD RD BridgeNE, widen existing ped bridge to 8' for trail development.
Ped/Bike Structures
TIP Approved TotalFederal Aid
RegionalSwap
$625,000$500,000
$500,000
$625,000$500,000
$500,000
30992
Cedar Rapids
TAP-U-1187(786)--8I-57
CeMar Cedar Rapids Phase 4-Lindale Connector,MarionCity Limit N to Hwy100 and Lindale Mall Shopping Centers
Ped/Bike ROW, Ped/Bike Grade & Pave, Ped/BikeStructures
TIP Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$1,827,000$1,457,000
$1,457,000
$1,827,000$1,457,000
$1,457,000
39453
Linn CountyConservation Board
TAP-U-C057()--8I-57
Worcester Rd W to 80th St NW, then N until Ellis Rd thenalong Hwy 100 and abandoned rail ROW to Covington Rd
Ped/Bike ROW, Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$875,000$700,000
$700,000
$2,172,000$709,000
$709,000
$3,047,000$1,409,000
$1,409,000
PA Note: Project has $700,000 of TAP in FFY22 for advanced ROW. Project also has $709,000 of STBG in FFY23.
38775
MPO 23 / CMPO
RGTR-PA23()--ST-57
CR Transit Route 5 two Heavy-Duty (35' diesel) BusReplacements
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$1,116,000$893,000
$893,000
$1,116,000$893,000
$893,000
PA Note: Replacing bus numbers 2131 and 2132.
39454
MPO 23 / CMPO
RGTR-PA23()--ST-57
Purchase 1 medium-duty 33' replacement ADA paratransitservice bus.
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$215,000$172,000
$172,000
$215,000$172,000
$172,000
PA Note: Replacing bus numbers 875
39455
Cedar Rapids
TAP-U-1187()--8I-57
In the city of Cedar Rapids, Filling sw gaps b/w O & 16 Ave& add bus pads at stops & 4 benches & 2 shelters
Ped/Bike Grade & Pave, Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$554,000$325,000
$325,000
$554,000$325,000
$325,000
22
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45503
MPO 23 / CMPO
RGTR-PA23()--ST-57
CR Transit Route 5 two Heavy-Duty (35' diesel) BusReplacements
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$1,116,000$893,000
$893,000
$1,116,000$893,000
$893,000
PA Note: Replacing bus numbers 2133 and 2134
45504
MPO 23 / CMPO
RGTR-PA23()--ST-57
Linn County LIFTS Bus 2024
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$215,000$172,000
$172,000
$215,000$172,000
$172,000
PA Note: Replacing bus number 2876
29793
Cedar Rapids
TAP-U-1187()--8I-57
Bowling St from 33rd Ave N to 21st Ave a 10' Trail. From 21st Ave to A Ave on Bowling ST &21st Ave 6' sidewalk &on-st.
Ped/Bike Grade & Pave, Ped/Bike Development
TIP Approved TotalFederal Aid
RegionalSwap
$760,000$608,000
$608,000
$760,000$608,000
$608,000
PA Note: _
DOT Note: Project eligible for FHWA TAP funding
45505
Cedar Rapids
TAP-U-1187()--8I-57
On Cottage Grove Ave SE, from CeMar Trail SE to EastPost Road
Ped/Bike ROW, Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$2,827,000$425,000
$425,000
$2,827,000$425,000
$425,000
39452
Fairfax
TAP-U-2462()--8I-57
On E CEMETERY RD, from Driftwood Ln E to Fairfax CityLimits
Ped/Bike ROW, Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$1,071,000$857,000
$857,000
$1,071,000$857,000
$857,000
45506
Robins
TAP-U-6520()--8I-57
On W MAIN ST, from N. Center Point Rd SE to the CedarValley Nature Trail
Ped/Bike Grading
TIP Approved TotalFederal Aid
RegionalSwap
$825,000$407,000
$407,000
$825,000$407,000
$407,000
23
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38371
Cedar Rapids
TAP-U-1187()--8I-57
W side of WILEY BLVD SW,from 16th Ave to Williams BlvdSW incd all req intersection improvements.
Traffic Signals, Ped/Bike Grade & Pave, Ped/BikeMiscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$1,715,000$1,372,000
$1,372,000
$1,715,000$1,372,000
$1,372,000
PA Note: Project has $227,000 in TAP and $1,145,000 in STBG
36964
Cedar Rapids
TAP-U-1187()--8I-57
F Ave NW from 13th St NW to the Cedar River;Along theRiver N to I Ave NW & S to 1st Ave W
Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$2,262,000$1,800,000
$1,800,000
$2,262,000$1,800,000
$1,800,000
PA Note: Project includes TAP $56K and STBG $1,744K<br/>
DOT Note: Project eligible for FHWA TAP funding
24
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
25545
Cedar Rapids
STBG-SWAP-1187(787)--SG-57
In the City of Cedar Rapids On Tower Terrace Road, fromC Avenue NE to Alburnett Road in Marion
Grade and Pave, Ped/Bike Grade & Pave
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$12,726,000
$8,102,000
$8,102,000
$12,726,000
$8,102,000
$8,102,00025544
Cedar Rapids
STBG-SWAP-1187(803)--SG-57
In the City of Cedar Rapids On Tower Terrace Road NE, atC Avenue NE
Grade and Pave, Traffic Signals
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$655,000
$524,000
$524,000
$3,095,000
$2,476,000
$2,476,000
$3,750,000
$3,000,000
$3,000,000PA Note: $524,000 of SWAP-STBG in FFY21 is for advanced ROW.
34198
Cedar Rapids
STBG-SWAP-1187(807)--SG-57
In the city of Cedar Rapids, On EDGEWOOD RD NE, fromHwy 100 north to Blairs Ferry Rd
Pavement Rehab, Sanitary Sewer, Ped/Bike Paving
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$1,952,000
$925,000
$925,000
$1,952,000
$925,000
$925,00039462
Cedar Rapids
STBG-SWAP-1187(808)--SG-57
Tower Terrace Rd aprx 300' E of Edgewood Rd to aprx1,000' W of Miller Rd & all intersections.
Grade and Pave, Pavement Widening, Ped/Bike Grade& Pave
TIP Approved
7/20/2021
TotalFederal Aid
RegionalSwap
$1,893,000
$1,514,000
$1,514,000
$1,893,000
$1,514,000
$1,514,000
36940
Hiawatha
STBG-SWAP-3432()--SG-57
I-380: TOWER TERRACE INTERCHANGE IN HIAWATHA
Grade and Pave, Bridge Replacement, Ped/Bike Structures
TIP Approved TotalFederal Aid
RegionalSwap
$5,000,000
$4,000,000
$4,000,000
$5,000,000
$4,000,000
$4,000,00039463
Hiawatha
STBG-SWAP-3432(611)--SG-57
Tower Terrace Rd aprx 300' E of N.Center Point Rd to aprx75' E of Goldfinch Ln; roundabout at N.Center Point Rd
Grade and Pave, Pavement Widening, Ped/Bike Grade& Pave
TIP Approved
7/20/2021
TotalFederal Aid
RegionalSwap
$3,727,000
$1,514,000
$1,514,000
$3,727,000
$1,514,000
$1,514,000
38366
Cedar Rapids
STBG-SWAP-1187(804)--SG-57
In the city of Cedar Rapids, Connect 6th ST at B Ave NW toEllis Blvd and E Ave NW.
Grade and Pave, Ped/Bike Grade & Pave
TIP Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$4,690,000
$1,808,000
$1,808,000
$4,690,000
$1,808,000
$1,808,00034199
Cedar Rapids
STBG-SWAP-1187(785)--SG-57
On the proposed Tower Terrace rd, construct TowerTerrace from C Ave to Sumerset Ave
Grade and Pave, Sanitary Sewer, Ped/Bike Grade &Pave
TIP Approved
10/18/2022
TotalFederal Aid
RegionalSwap
$2,303,000
$836,000
$836,000
$2,303,000
$836,000
$836,000
25
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45508
Marion
STBG-SWAP-4775()--SG-57
On 7th Ave, from 12th ST E to 22nd St
Pavement Rehab/Widen, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$5,480,000
$903,000
$903,000
$5,480,000
$903,000
$903,000
26
0
Metropolitan Area Planning Agency
2222 Cuming Street, Omaha, NE 68102
Phone: 402-444-6866, Fax: 402-951-6517, www.mapacog.org
Executive Director: Greg Youell, [email protected]
Transportation and Data Manager: Michael Helgerson, [email protected]
I +-_._-I-
Dodge
County
Saunders
County
8 Miles
Washington
County
Cass
County
Pottawattamie
County
Iowa
Mills
County
�
I
�orts - Interstate
� Commercial - National Highway System
El Enhanced - Primary Roads
El General Service - Local Roads
El Basic Service
El Local Service Transit rel Regional
[el Large Urban
rel Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] MPO Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
27
28
MPO 24 / MAPANHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38153
Iowa Department ofTransportation
IM-80()--13-78
I-80: I-29/80/480 INTERSTATES IN COUNCIL BLUFFS(CBIS) STATE SHARE
Grade and Pave, Bridge Replacement, Traffic Signs
TIP Approved TotalFederal Aid
RegionalSwap
$172,092,000$154,882,800
$138,740,000$124,866,000
$4,183,000$3,764,700
$4,588,000$4,129,200
$319,603,000$287,642,700
PL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
29733
MPO 24 / MAPA
RGPL-PA24()--PL-78
UZA of Pottawattamie County including the City of CouncilBluffs
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$166,000$133,000
$166,000$133,000
$166,000$133,000
$166,000$133,000
$664,000$532,000
29
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38013
Iowa Department ofTransportation
BRFN-275()--39-78
US275: MISSOURI RIVER IN COUNCIL BLUFFS (STATESHARE)
Bridge Cleaning
TIP Approved TotalFederal Aid
RegionalSwap
$57,000 $57,000 $57,000 $57,000 $228,000
38123
Iowa Department ofTransportation
IMN-480()--0E-78
I-480: MISSOURI RIVER IN COUNCIL BLUFFS (STATESHARE)
Bridge Deck Overlay, Bridge Painting, Bridge Cleaning
TIP Approved TotalFederal Aid
RegionalSwap
$1,216,000 $30,000 $2,402,000 $30,000 $3,678,000
38124
Iowa Department ofTransportation
IMN-680()--0E-78
I-680: MISSOURI RIVER IN COUNCIL BLUFFS (EB & WB)(STATE SHARE)
Bridge Cleaning
TIP Approved TotalFederal Aid
RegionalSwap
$48,000 $48,000 $48,000 $48,000 $192,000
38118
Iowa Department ofTransportation
IMN-80()--0E-78
I-80: MISSOURI RIVER IN COUNCIL BLUFFS (EB & WB)(STATE SHARE)
Bridge Cleaning
TIP Approved TotalFederal Aid
RegionalSwap
$42,000 $42,000 $42,000 $42,000 $168,000
45270
Iowa Department ofTransportation
IMN-80()--0E-78
I-80: 24TH ST TO INDIAN CREEK IN COUNCIL BLUFFS
Grading
TIP Approved TotalFederal Aid
RegionalSwap
$1,750,000 $1,750,000
45310
Iowa Department ofTransportation
IMN-680()--0E-78
I-680: AT W JCT I-29 (EB & WB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$2,000,000 $2,000,000
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45410
Iowa Department ofTransportation
STP-92()--2C-78
IA92: HARRY LANGDON BLVD IN COUNCIL BLUFFS TO0.3 MI E OF STATE ORCHARD RD
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,861,000$2,288,800
$2,861,000$2,288,800
30
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
35677
Council Bluffs
TAP-T-1642(681)--8V-78
In the city of Council Bluffs, On Railroad Ave, fromKanesville Blvd N 1.03 Miles to Council Bluffs CorporateLimits
Ped/Bike Grade & Pave
TIP Approved
3/16/2021
TotalFederal Aid
RegionalSwap
$613,000$490,000
$490,000
$613,000$490,000
$490,000
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
35678
Council Bluffs
STBG-SWAP-1642()--SG-78
On Stevens Road, from State Orchard Road to Intersectionwith Norwood Drive
Right of Way, Outside Services Engineering
TIP Approved TotalFederal Aid
RegionalSwap
$310,000
$248,000
$248,000
$1,800,000
$1,440,000
$1,440,000
$2,110,000
$1,688,000
$1,688,00034126
Council Bluffs
STBG-SWAP-1642()--SG-78
In the city of Council Bluffs, On S EXPRESSWAY, from I-80N .7 Miles to 21st Avenue
Pavement Rehab, Sanitary Sewer
TIP Approved TotalFederal Aid
RegionalSwap
$3,260,000
$3,260,000
$3,260,000
$3,260,000
$3,260,000
$3,260,00036984
Council Bluffs
STBG-SWAP-1642()--SG-78
In the city of Council Bluffs, On Hwy 192, from 21st AvenueNorth 1972 Feet to 16th Avenue
Grade and Pave, Sanitary Sewer
TIP Approved TotalFederal Aid
RegionalSwap
$4,313,000
$4,313,000
$4,313,000
$4,313,000
$4,313,000
$4,313,00034125
Council Bluffs
STBG-SWAP-1642()--SG-78
On N 16TH ST, from Avenue G 1 miles to Nash Blvd
Pavement Rehab, Sanitary Sewer
TIP Approved TotalFederal Aid
RegionalSwap
$5,683,000
$4,546,000
$4,546,000
$5,683,000
$4,546,000
$4,546,00025419
Council Bluffs
STBG-SWAP-1642()--SG-78
On W Graham Ave, from High Street to Fairmount Ave
Grade and Pave, Sanitary Sewer
TIP Approved TotalFederal Aid
RegionalSwap
$3,006,000
$2,405,000
$2,405,000
$3,006,000
$2,405,000
$2,405,000
31
6 I
0 2
Bi-State Regional Commission
1504 Third Avenue, Third Floor, Rock Island, IL 61201-8612
Phone: 309-793-6300, Fax: 309-793-6305, www.bistateonline.org
Executive Director: Denise Bulat, [email protected]
Transportation Director: Gena McCullough, [email protected]
Scott
ave
I I
4 8 Miles
Iowa
�-r�
_,., /, ,, 92 �
( ' ,I' -1
■-■
Rock
· · Island67
Oak,Grove
f
Rock Island
County Illinois )
�orts - Interstate
� Commercial - National Highway System
El Enhanced - Primary Roads
El General Service - Local Roads
-Ramps
-Trails
Basic Service
El Local Service Transit
� ......... m,-... �=:
j rel Regional -+- Railroad
Henry
County
[el Large Urban
rel Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
Rivers
Major Lakes
C] MPO Planning Arear--1 L._ _ _J Counties
City Limits
Urban Area
32
33
MPO 25 / BSRCNHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38155
Iowa Department ofTransportation
IM-NHS-74()--03-82
I-74: IN BETTENDORF AND DAVENPORT (CENTRALSECTION) STATE SHARE
Bridge Replacement, Bridge Removal, Landscaping
TIP Approved TotalFederal Aid
RegionalSwap
$69,707,000$59,250,950
$15,561,000$13,226,850
$85,268,000$72,477,800
38167
Iowa Department ofTransportation
IMX-280()--02-82
I-280: MISSISSIPPI RIVER IN DAVENPORT (STATESHARE)
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$17,000,000$15,300,000
$17,000,000$15,300,000
38136
Iowa Department ofTransportation
IMX-280()--02-82
I-280: W OF IA 22 TO MISSISSIPPI RIVER (EB & WB)
Grade and Pave
TIP Approved TotalFederal Aid
RegionalSwap
$4,024,000$3,621,600
$4,024,000$3,621,600
39347
Iowa Department ofTransportation
BRF-461()--38-82
IA461: DUCK CREEK 0.4 MI S OF US 6 IN DAVENPORT(NB)
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$3,768,000$3,014,400
$3,768,000$3,014,400
PL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
16066
MPO 25 / BSRC
RGPL-PA25()--PL-82
Quad Cities Urbanized Area
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$388,660$310,928
$388,660$310,928
$388,660$310,928
$388,660$310,928
$1,554,640$1,243,712
34
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38023
Iowa Department ofTransportation
BRFN-67()--39-82
US67: MISSISSIPPI RIVER IN DAVENPORT (STATESHARE)
Bridge Cleaning
TIP Approved TotalFederal Aid
RegionalSwap
$25,000 $25,000 $25,000 $25,000 $100,000
45258
Iowa Department ofTransportation
IMN-280()--0E-82
I-280: DME RR 9.1 MI S OF I-80
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,250,000 $1,250,000
38135
Iowa Department ofTransportation
IMN-280()--0E-82
I-280: MISSISSIPPI RIVER IN DAVENPORT (STATESHARE)
Bridge Cleaning
TIP Approved TotalFederal Aid
RegionalSwap
$35,000 $35,000 $35,000 $35,000 $140,000
38138
Iowa Department ofTransportation
IMN-280()--0E-82
I-280: MISSISSIPPI RIVER IN DAVENPORT (STATESHARE)
Bridge Painting
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000 $1,000,000
38129
Iowa Department ofTransportation
IMN-74()--0E-82
I-74: MISSISSIPPI RIVER IN BETTENDORF (NB & SB)(STATE SHARE)
Bridge Cleaning
TIP Approved TotalFederal Aid
RegionalSwap
$50,000 $50,000 $50,000 $50,000 $200,000
45269
Iowa Department ofTransportation
IMN-80()--0E-82
I-80: MISSISSIPPI RIVER IN LE CLAIRE (STATE SHARE)
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$125,000 $125,000
38132
Iowa Department ofTransportation
IMN-80()--0E-82
I-80: SW 35TH ST 1.6 MI W OF US 67 IN LE CLAIRE
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$200,000 $200,000
38131
Iowa Department ofTransportation
IMN-80()--0E-82
I-80: MISSISSIPPI RIVER IN LE CLAIRE (STATE SHARE)
Bridge Cleaning
TIP Approved TotalFederal Aid
RegionalSwap
$100,000 $100,000 $100,000 $100,000 $400,000
45278
Iowa Department ofTransportation
NHSN-6()--2R-82
US6: 0.1 MI E OF IA 461 TO W OF ELMORE AVE INDAVENPORT
Culvert Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$173,000 $173,000
35
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38210
Iowa Department ofTransportation
NHSN-67()--2R-82
US67: EAST RIVER ST TO FOREST RD IN DAVENPORT
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$2,374,000 $2,374,000
38021
Iowa Department ofTransportation
BRFN-22()--39-82
IA22: DODGE CREEK 1.1 MI S OF CO RD Y48
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$415,000 $415,000
38020
Iowa Department ofTransportation
BRFN-6()--39-82
US6: I-280 INTERCHANGE IN DAVENPORT
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$1,373,000 $1,373,000
39350
Iowa Department ofTransportation
BRFN-67()--39-82
US67: MISSISSIPPI RIVER IN DAVENPORT (STATESHARE)
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000 $1,000,000
45421
Iowa Department ofTransportation
IMN-74()--0E-82
I-74: I-80 TO 0.6 MI S OF US 6/KIMBERLY RDINTERCHANGE
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$3,190,000 $3,190,000
38024
Iowa Department ofTransportation
BRFN-67()--39-82
US67: MISSISSIPPI RIVER IN DAVENPORT (STATESHARE)
Bridge Painting
TIP Approved TotalFederal Aid
RegionalSwap
$3,000,000 $3,000,000
39349
Iowa Department ofTransportation
NHSN-61()--2R-82
US61: N OF I-80 TO 0.3 MI S OF WAPSIPINICON RIVER
Culvert Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$817,000 $817,000
45432
Iowa Department ofTransportation
BRFN-461()--39-82
IA461: DME RR 1.0 MI E OF IA 22 IN DAVENPORT
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,500,000 $1,500,000
45308
Iowa Department ofTransportation
IMN-280()--0E-82
I-280: I-280 EB OVER I-280 WB AT I-80 INTERCHANGE
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$300,000 $300,000
36
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45304
Iowa Department ofTransportation
IMN-80()--0E-82
I-80: WISCONSIN AVE 1.4 MI W OF IA 130
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$120,000 $120,000
45257
Iowa Department ofTransportation
IMN-80()--0E-82
I-80: UTICA RIDGE RD 3.3 MI E OF US 61
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$280,000 $280,000
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36969
Bettendorf
STP-U-0587(639)--70-82
On FRST GRV DR, from International Dr to Middle Rd
Grade and Pave, Ped/Bike Grade & Pave
TIP Approved
5/18/2021
TotalFederal Aid
RegionalSwap
$6,630,000$5,181,000
$5,181,000
$6,630,000$5,181,000
$5,181,000
38564
Davenport
STP-U-1827(686)--70-82
On 53rd Street, from Eastern Avenue to Elmore Circle S12TT78N RR03
Grade and Pave
TIP Approved
6/15/2021
TotalFederal Aid
RegionalSwap
$5,400,000$3,706,878
$3,706,878
$5,400,000$3,706,878
$3,706,878
39481
Davenport
STP-U-1827()--70-82
In the city of Davenport, On 3rd & 4th St, from Telegraph Rdto Harrison St,
Pave, Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$9,074,235$7,259,388
$7,259,388
$9,074,235$7,259,388
$7,259,388
STBG-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
44724
Davenport
BROS-1827(687)--8J-82
On ELM ST, Over Canadian Pacific RR, from Mound St toEastern Ave S19 T78 R04E
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$2,470,525$1,000,000
$2,470,525$1,000,000
37
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36970
Davenport
TAP-R-1827(688)--8T-82
On BRADY ST FRONTAGE, Over GOOSE CREEK, from59th St to Existing Path on VMP S12 T78 R03E
Ped/Bike Grade & Pave
TIP Approved
7/20/2021
TotalFederal Aid
RegionalSwap
$775,063$530,917
$530,917
$775,063$530,917
$530,917
39480
Eldridge
TAP-T-2290()--8V-82
In the city of Eldridge, On Townsend Farms, from S 5th St.4 Miles to S 1st St
Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$356,000$284,800
$284,800
$356,000$284,800
$284,800
39482
Davenport
TAP-T-1827()--8V-82
On Emies Park Ave & Locust St, from Duck Creek Trail atEmeis Park Ave 1 Miles to Wisconsin Ave,
Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$654,463$522,770
$522,770
$654,463$522,770
$522,770
38
I
0
Dallas
2
I
4
Des Moines Area Metropolitan Planning Organization
420 Watson Powell Jr. Parkway, Suite 200, Des Moines, IA 50309
Phone: 515-334-0075, Fax: 515-334-0098, www.dmampo.org
Executive Director: Todd Ashby, [email protected]
Senior Planner: Sreyoshi Chakraborty, [email protected]
iorts - Interstate
Commercial - National Highway System
(I Enhanced - Primary Roads
(I General Service - Local Roads
(I Basic Service -Ramps
(I Local Service -TrailsTransit
-+- Railroad [el Regional
[el Rivers
Large Urban
[el Major Lakes
_,, ,
, Small Urban
C] MPO Planning Area[el Intercity Bus
r--1
CE! L_ _ _J Counties
Amtrak
I City Limits
Park & Ride Urban Area
39
40
MPO 26 / DMAMPOCHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36680
Polk County
BRS-CHBP-C077(228)--GB-77
On NE 82ND AVE 0.10 miles W of NE 109 St,
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$1,610,060$710,060
$900,000
$900,000
$1,610,060$710,060
$900,000$900,000
CMAQ
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39415
MPO 26 / DMAMPO
STP-A-PA26()--86-77
Dart: Euclid/Douglas Ave Crosstown (Route 50) - Yr 3
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$392,186$313,749
$392,186$313,749
DEMO
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
41343
MPO 26 / DMAMPO
EDP-PA26(001)--7Y-77
On BIRDLAND DR, Over BIRDLAND LAGOON, S35 T79R24
Miscellaneous
TIP Approved
9/21/2021
TotalFederal Aid
RegionalSwap
$31,937,000$25,550,000
$550,000
$31,937,000$25,550,000
$550,000
41
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45371
Iowa Department ofTransportation
NHSX-6()--3H-77
US6: HICKMAN RD TO DOUGLAS AVE IN DES MOINES(STATE SHARE)
Pavement Rehab, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$539,000$431,200
$539,000$431,200
45381
Iowa Department ofTransportation
NHSX-6()--3H-77
US6: NW 128TH ST IN CLIVE (STATE SHARE)
Grade and Pave, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$520,000$416,000
$520,000$416,000
38247
Iowa Department ofTransportation
NHSX-69()--3H-77
US69: I-80 TO SE 33RD ST IN ANKENY
Grade and Pave, Erosion Control, Traffic Signals
TIP Approved TotalFederal Aid
RegionalSwap
$19,901,000$15,920,800
$200,000$160,000
$20,101,000$16,080,800
38005
Iowa Department ofTransportation
BRF-28()--38-77
IA28: RACCOON RIVER 3.7 MI N OF IA 5 (SB)
Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$6,943,000$5,554,400
$6,943,000$5,554,400
39322
Iowa Department ofTransportation
BRF-69()--38-77
US69: FOURMILE CREEK 0.8 MI S OF CO RD F22
Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$6,000$4,800
$1,315,000$1,052,000
$1,321,000$1,056,800
38071
Iowa Department ofTransportation
IM-35()--13-77
I-35: I-80/235 INTERCHANGE NE OF DES MOINES
Grade and Pave, Bridge New, Grading
TIP Approved TotalFederal Aid
RegionalSwap
$2,500,000$2,250,000
$41,558,000$37,402,200
$17,292,000$15,562,800
$61,350,000$55,215,000
39323
Iowa Department ofTransportation
BRF-69()--38-77
US69: FOURMILE CREEK 0.3 MI N OF CO RD F22
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,255,000$1,004,000
$1,255,000$1,004,000
38111
Iowa Department ofTransportation
IM-NHS-35()--03-77
I-35: NE 36TH ST IN ANKENY TO N OF IA 210
Pave, Bridge Replacement, Grading
TIP Approved TotalFederal Aid
RegionalSwap
$30,558,000$25,974,300
$36,190,000$30,761,500
$66,748,000$56,735,800
45342
Iowa Department ofTransportation
IM-NHS-80()--03-25
I-80: W OF GRAND PRAIRIE PKWY TO E OF JORDANCREEK PKWY
Grade and Pave, Bridge Replacement, Traffic Signs
TIP Approved TotalFederal Aid
RegionalSwap
$11,894,000$10,109,900
$12,248,000$10,410,800
$24,142,000$20,520,700
42
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45340
Iowa Department ofTransportation
IM-NHS-80()--03-77
I-80: I-35/235 INTERCHANGE NE OF DES MOINES TOUS 65 (WB)
Bridge Replacement, Grading, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$19,729,000$16,769,650
$19,729,000$16,769,650
45343
Iowa Department ofTransportation
NHSX-141()--3H-77
IA141: NW 121ST ST INTERSECTION INCL LOCAL RDCONNECTIONS
Grade and Pave, Traffic Signs, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$8,275,000$6,620,000
$8,275,000$6,620,000
PL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38361
MPO 26 / DMAMPO
RGPL-PA26()--PL-77
MPO Planning Funding
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$1,131,250$905,000
$1,131,250$905,000
$1,131,250$905,000
$1,131,250$905,000
$4,525,000$3,620,000
43
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45248
Iowa Department ofTransportation
IMN-235()--0E-77
I-235: SW I-35/80 INTERCHANGE TO NE I-35/80INTERCHANGE
Guardrail
TIP Approved TotalFederal Aid
RegionalSwap
$300,000 $300,000
39335
Iowa Department ofTransportation
IMN-235()--0E-77
I-235: SW I-35/80 INTERCHANGE TO NE I-35/80INTERCHANGE
Landscaping
TIP Approved TotalFederal Aid
RegionalSwap
$100,000 $100,000 $100,000 $100,000 $400,000
39326
Iowa Department ofTransportation
IMN-35()--0E-77
I-35: S OF NE 54TH AVE TO 0.5 MI S OF E 1ST ST INANKENY
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$3,935,000 $3,935,000
38152
Iowa Department ofTransportation
IMN-35()--0E-77
I-35: IN ANKENY FROM N OF ORALABOR RD TO NE36TH ST
Erosion Control
TIP Approved TotalFederal Aid
RegionalSwap
$285,000 $285,000
45387
Iowa Department ofTransportation
NHSN-415()--2R-77
IA415: DITCH 0.6 MI S OF I-35/80
TIP Approved TotalFederal Aid
RegionalSwap
$46,000 $46,000
45374
Iowa Department ofTransportation
NHSN-6()--2R-77
US6: IA 28 TO E OF MLK JR PKWY IN DES MOINES
Pavement Rehab, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$1,806,000 $1,806,000
45351
Iowa Department ofTransportation
NHSN-65()--2R-77
US65: IA 163 SB RAMP IN PLEASANT HILL (STATESHARE)
Grade and Pave
TIP Approved TotalFederal Aid
RegionalSwap
$300,000 $300,000
39336
Iowa Department ofTransportation
STPN-415()--2J-77
IA415: CO RD R6F/NW BEAVER DR INTERSECTION(STATE SHARE)
Grade and Pave
TIP Approved TotalFederal Aid
RegionalSwap
$500,000 $500,000
38072
Iowa Department ofTransportation
STPN-80()--2J-77
I-80: DOUGLAS AVE TO E OF 100TH ST
Erosion Control, Traffic Signs
TIP Approved TotalFederal Aid
RegionalSwap
$900,000 $900,000
44
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45247
Iowa Department ofTransportation
IMN-35()--0E-77
I-35: IA 160 INTERCHANGE IN ANKENY NB EXIT RAMP
Traffic Signals
TIP Approved TotalFederal Aid
RegionalSwap
$50,000 $50,000
45249
Iowa Department ofTransportation
IMN-80()--0E-77
I-80: NE I-35/235 INTERCHANGE TO W US 65
Guardrail
TIP Approved TotalFederal Aid
RegionalSwap
$400,000 $400,000
45246
Iowa Department ofTransportation
NHSN-6()--2R-77
US6: HICKMAN RD TO NW 62ND AVE
Traffic Signals
TIP Approved TotalFederal Aid
RegionalSwap
$105,000 $105,000
38206
Iowa Department ofTransportation
NHSN-69()--2R-77
US69: DES MOINES RIVER TO N OF MAURY AVE IN DESMOINES (STATE SHARE)
Pavement Widening, Traffic Signals, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$752,000 $752,000
39327
Iowa Department ofTransportation
BRFN-65()--39-77
US65: SE 64TH AVE 1.0 MI N OF IA 5 (NB & SB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,413,000 $1,413,000
38007
Iowa Department ofTransportation
BRFN-69()--39-77
US69: FOURMILE CREEK 0.1 MI S OF CO RD F22
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,198,000 $1,198,000
39216
Iowa Department ofTransportation
STPN-80()--2J-25
I-80: CO RD R16 TO CO RD R22/UTE AVE
Traffic Signs
TIP Approved TotalFederal Aid
RegionalSwap
$925,000 $925,000
45316
Iowa Department ofTransportation
BRFN-141()--39-77
IA141: IA 44 INTERCHANGE IN GRIMES (EB & WB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,050,000 $1,050,000
45338
Iowa Department ofTransportation
IMN-80()--0E-77
I-80: NW 72ND ST 1.0 MI W OF IA 28 (EB & WB)
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$1,500,000 $1,500,000
45
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45512
MPO 26 / DMAMPO
RGPL-PA26()--ST-00
Pavement data collection
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$300,000$250,000
$250,000
$300,000$250,000
$250,000
27146
MPO 26 / DMAMPO
RGPL-PA26()--ST-77
Transportation Management Association
Miscellaneous, Ped/Bike Miscellaneous, TransitInvestments
TIP Approved TotalFederal Aid
RegionalSwap
$119,000$95,000
$95,000
$119,000$95,000
$95,000
$119,000$95,000
$95,000
$119,000$95,000
$95,000
$476,000$380,000
$380,000
22143
MPO 26 / DMAMPO
RGTR-PA26()--ST-00
DART: Vehicle Purchase
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$1,680,000$1,400,000
$1,400,000
$2,027,200$1,410,200
$1,410,200
$2,038,000$1,400,000
$1,400,000
$1,693,750$1,355,000
$1,355,000
$7,438,950$5,565,200
$5,565,200
35369
Ankeny
TAP-T-0187(640)--8V-77
In the City of Ankeny, High Trestle Trail Extension SEMagazine Road to SE Oralabor Road
Ped/Bike Grade & Pave
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$2,160,000$700,000
$700,000
$2,160,000$700,000
$700,000
PA Note: $100K of STBG Funding, $600K of TAP Funding
27151
Des Moines
TAP-T-1945()--8V-77
In the city of Des Moines, Bill Riley Trail Bridge, OverRaccoon River
Ped/Bike Structures
TIP Approved TotalFederal Aid
RegionalSwap
$425,000$100,000
$100,000
$425,000$100,000
$100,000
35375
Norwalk
TAP-T-5587(604)--8V-91
In the city of Norwalk, a pedestrian bridge over an inlet toLake Colechester on Beardsley Street.
Ped/Bike Grade & Pave
TIP Approved
7/20/2021
TotalFederal Aid
RegionalSwap
$500,000$100,000
$100,000
$500,000$100,000
$100,000
46
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45480
Clive
TAP-T-1425()--8V-25
In City of Clive and Winsor Heights, Clive Aquatic Center,Campbell Park, Colby Park
Ped/Bike Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$120,000$100,000
$100,000
$120,000$100,000
$100,000
25421
Bondurant
TAP-U-0747(609)--8I-77
In the City of Bondurant, Pedestrian/Bicycle Underpass atUS 65 by Oleson Dr north of Grant St
Ped/Bike Miscellaneous
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$3,194,000$1,645,000
$1,029,000
$3,194,000$1,645,000
$1,029,000
DOT Note: This project received a SRTS award of 80,000
36682
Warren County
TAP-U-C091(131)--8I-91
On PALOMINO PKWY, S3 T77 R24
Ped/Bike ROW, Ped/Bike Grade & Pave
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$240,000$192,000
$192,000
$240,000$192,000
$192,000
45483
MPO 26 / DMAMPO
TAP-T-PA26()--8V-77
various locations throughout the metro
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$337,000$200,000
$200,000
$337,000$200,000
$200,000
39392
Ankeny
TAP-T-0187()--8V-77
In the city of Ankeny, Oralabor Trail - SW State StOverpass
Ped/Bike Structures
TIP Approved TotalFederal Aid
RegionalSwap
$1,550,000$735,000
$735,000
$1,550,000$735,000
$735,000
37835
Des Moines
TAP-T-1945()--8V-77
In the city of Des Moines, Carlisle Trail
Ped/Bike Grading, Ped/Bike Paving
TIP Approved TotalFederal Aid
RegionalSwap
$2,500,000$900,000
$900,000
$2,500,000$900,000
$900,000
45481
Des Moines
TAP-T-1945()--8V-77
In City of Des Moines, from W River Dr to 2nd Ave, alongDes Moines River
Ped/Bike Grade & Pave, Ped/Bike Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$1,500,000$435,000
$435,000
$1,500,000$435,000
$435,000
47
SWAP-CMAQ
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37830
Clive
ICAAP-SWAP-1425()--SH-77
In the city of Clive, U.S. Highway 6 & NW 128th StreetIntersection Improvements
Pavement Widening, Traffic Signals
TIP Approved TotalFederal Aid
RegionalSwap
$2,900,635
$700,000
$1,837,635
$2,900,635
$700,000
$1,837,63545484
Waukee
ICAAP-SWAP-8177(626)--SH-25
In City of Waukee, intersection of Ashworth Dr, Warrior Lnand Northview Dr
Pavement Rehab/Widen, Traffic Signs
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$2,077,370
$1,277,370
$2,077,370
$1,277,37037836
Des Moines
STP-A-1945(849)--86-77
In the City of Des Moines, 71 signalized intersections in Nand E Downtown
Traffic Signals
TIP Approved
7/20/2021
TotalFederal Aid
RegionalSwap
$200,000
$160,000
$200,000
$160,000
48
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
35368
Ankeny
STBG-SWAP-0187(643)--SG-77
In the city of Ankeny, On West First Street, from SW ScottStreet to Ankeny Boulevard
Pave
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$6,030,000
$2,530,000
$2,530,000
$6,030,000
$2,530,000
$2,530,00027142
Des Moines
STBG-SWAP-1945(848)--SG-77
In the city of Des Moines, On 2nd Avenue Bridge, Over DesMoines River and Birdland Drive
Bridge Rehabilitation
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$4,000,000
$1,000,000
$2,000,000
$4,000,000
$1,000,000
$2,000,000PA Note: Includes $1,000,000 in SWAP-HBP funding.
27144
Des Moines
STBG-SWAP-1945(852)--SG-77
On Indianola Avenue Reconstruction, from East Army PostRoad to U.S. 69
Pavement Rehab
TIP Approved
12/21/2021
TotalFederal Aid
RegionalSwap
$6,250,000
$3,000,000
$3,000,000
$6,250,000
$3,000,000
$3,000,00036674
Des Moines
STBG-SWAP-1945(853)--SG-77
In the City of Des Moines, Ingersoll Avenue Reconstruction,from Polk Blvd to 42nd St
Pavement Rehab
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$2,750,000
$1,000,000
$1,000,000
$2,750,000
$1,000,000
$1,000,00036681
Urbandale
STBG-SWAP-7875()--SG-25
In the city of Urbandale, 170th Street (Alice's Road):Meredith Drive to Waterford Road
Pavement Rehab, Traffic Signals, Pavement Markings
TIP Approved TotalFederal Aid
RegionalSwap
$7,180,000
$600,000
$600,000
$7,180,000
$600,000
$600,00035377
West Des Moines
STBG-SWAP-8260(651)--SG-77
In the city of West Des Moines, Grand Avenue Widening:from 1st Street to 6th Street
Grade and Pave
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$5,586,550
$3,652,550
$3,652,550
$5,586,550
$3,652,550
$3,652,550PA Note: STBG funding limit: $3,652,550
34816
Polk County
STBG-SWAP-C077(229)--FG-77
On NW 26TH ST, from NW 66 Ave to Hwy 415
Pavement Rehab
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$6,750,000
$1,750,000
$1,750,000
$6,750,000
$1,750,000
$1,750,00036677
MPO 26 / DMAMPO
STBG-SWAP-PA26()--SG-77
Pavement Rehabilitation on US6/Merle Hay Road: HickmanRoad to Douglas Avenue
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$750,000
$250,000
$250,000
$750,000
$250,000
$250,000
49
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36673
Carlisle
STBG-SWAP-1105()--SG-91
In the city of Carlisle, Scotch Ridge Road and Highway 5intersection south approx. 1,250 feet southwest
Pavement Rehab, Traffic Signals
TIP Approved TotalFederal Aid
RegionalSwap
$3,249,000
$1,837,000
$1,837,000
$3,249,000
$1,837,000
$1,837,000PA Note: Joint Project with Warren County, TPMS project number 35771
37834
Des Moines
STBG-SWAP-1945()--SG-77
In the city of Des Moines, Guthrie Avenue ViaductRehabilitation
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$5,000,000
$2,000,000
$2,000,000
$5,000,000
$2,000,000
$2,000,00036675
Des Moines
STBG-SWAP-1945()--SG-77
In the city of Des Moines, Walnut Street BridgeReplacement
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$11,000,000
$3,400,000
$3,400,000
$11,000,000
$3,400,000
$3,400,00037833
Des Moines
STBG-SWAP-1945(855)--SG-77
In the City of Des Moines, Intelligent TransportationSystems Upgrade - Phase 3
Traffic Signals
TIP Approved
8/18/2020
TotalFederal Aid
RegionalSwap
$15,000,000
$500,000
$500,000
$15,000,000
$500,000
$500,00037839
Urbandale
STBG-SWAP-7875()--SG-77
In the city of Urbandale, 128th Street Maintenance, DouglasParkway to Aurora Avenue
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000
$750,000
$750,000
$1,000,000
$750,000
$750,00036679
Polk County
STBG-SWAP-C077(BR3606)--FG-77
On NE FRISK DR, Over Deer Creek N of NE 94 Ave
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$920,000
$543,000
$543,000
$920,000
$543,000
$543,00037444
Polk County
STBG-SWAP-C077(NE 22 ST)--FG-77
On NE 22nd St, from NE 54 Ave 0.5 miles to N of NE 58Ave
Pavement Rehab/Widen
TIP Approved TotalFederal Aid
RegionalSwap
$3,200,000
$1,750,000
$1,750,000
$3,200,000
$1,750,000
$1,750,00037843
MPO 26 / DMAMPO
STBG-SWAP-PA26()--SG-77
In the City of Des Moines, Douglas/Euclid Avenues fromMerle Hay Road east to just west of E. 14th Street
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$5,000,000
$445,000
$445,000
$5,000,000
$445,000
$445,00039390
Ankeny
STBG-SWAP-0187()--SG-77
In the city of Ankeny, On NE Delaware Ave Widening - NE5th to 18th St
Pavement Widening
TIP Approved TotalFederal Aid
RegionalSwap
$11,150,000
$2,000,000
$2,000,000
$11,150,000
$2,000,000
$2,000,000
50
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39435
Des Moines
STBG-SWAP-1945()--SG-29
In the city of Des Moines, Intelligent Transportation SystemPhase 4
Traffic Signals
TIP Approved TotalFederal Aid
RegionalSwap
$12,500,000
$500,000
$500,000
$12,500,000
$500,000
$500,00039461
Johnston
STBG-SWAP-3827()--SG-77
In the city of Johnston, On NW 100thStreet, NW 62nd Ave south to 1000 feet north of the NW 54th Avenue
Grade and Pave
TIP Approved TotalFederal Aid
RegionalSwap
$10,841,000
$750,000
$750,000
$10,841,000
$750,000
$750,000
39397
Norwalk
STBG-SWAP-5587()--SG-91
In the city of Norwalk, On the intersection of Beardley Stand IA 28 (Sunset Dr)
Pavement Rehab/Widen, Traffic Signals
TIP Approved TotalFederal Aid
RegionalSwap
$2,190,000
$700,000
$700,000
$2,190,000
$700,000
$700,00039395
West Des Moines
STBG-SWAP-8260()--SG-77
In the city of West Des Moines, 8th Street Improvementsfrom I-235 South Ramp to Clegg Road
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$5,570,000
$2,000,000
$2,000,000
$5,570,000
$2,000,000
$2,000,00038607
Polk County
STBG-SWAP-C077(BR2444)--SG-77
On NW 86 St, Over LITTLE BEAVER CREEK, 0.50 MI N ofNW 70TH AVE
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,100,000
$600,000
$600,000
$1,100,000
$600,000
$600,00032581
Polk County
STBG-SWAP-C077(BR6680)--SG-77
On NE 50TH AVE, Over MUD CREEK, 0.65 mi E of NE80TH ST
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$650,000
$300,000
$300,000
$650,000
$300,000
$300,00045479
Altoona
STBG-SWAP-0132()--SG-77
On 8TH ST SW, Over NB US 65, S14 T79 R23
Grade and Pave, Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$1,200,000
$1,000,000
$1,000,000
$1,200,000
$1,000,000
$1,000,00045473
Clive
STBG-SWAP-1425()--SG-77
On I 80 W, Over WALNUT CREEK, S32 T79 R25
Pavement Rehab/Widen, Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,200,000
$1,000,000
$1,000,000
$1,200,000
$1,000,000
$1,000,00039393
Des Moines
STBG-SWAP-1945()--SG-77
In the city of Des Moines, SE Connector from 30th St to US65
Pavement Rehab/Widen, Bridge New, Ped/BikeMiscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$13,950,000
$7,600,000
$7,600,000
$13,950,000
$7,600,000
$7,600,000
51
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45476
Des Moines
STBG-SWAP-1945()--SG-77
In the City of Des Moines, citywide ITS upgrade Phase 5
Traffic Signals
TIP Approved TotalFederal Aid
RegionalSwap
$12,500,000
$500,000
$500,000
$12,500,000
$500,000
$500,00045477
Des Moines
STBG-SWAP-1945()--SG-77
On FLEUR DR, Over RACCOON AND RR, S8 T78 R24
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$3,000,000
$1,000,000
$1,000,000
$3,000,000
$1,000,000
$1,000,00045474
Polk City
STBG-SWAP-6170()--SG-77
On E NORTHSIDE DR, Over BIG CREEK, S36 T81 R25
Pavement Rehab/Widen, Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$393,000
$393,000
$393,000
$393,000
$393,000
$393,00045475
Windsor Heights
STBG-SWAP-8477()--SG-77
On UNIVERSITY AVE, Over WALNUT CREEK, S35 T79R25
Pavement Rehab/Widen
TIP Approved TotalFederal Aid
RegionalSwap
$1,200,000
$1,000,000
$1,000,000
$1,200,000
$1,000,000
$1,000,00045478
Polk County
STBG-SWAP-C077()--FG-77
In Polk County, On NE 38TH ST, north of NE 108 Ave
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$525,000
$350,000
$350,000
$525,000
$350,000
$350,00040171
Polk County
STBG-SWAP-C077(BR6333)--FG-77
On NE 108TH ST, Over CAMP CREEK, S26 T79 R22
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$810,000
$600,000
$600,000
$810,000
$600,000
$600,000
52
I
0 1
Dubuque Metro Area Transportation Study
7600 Commerce Park, Dubuque, IA 52002
Phone: 563-556-4166, Fax: 563-556-0348, www.eciatrans.org
Executive Director: Kelley Deutmeyer, [email protected]
Transportation Director: Chandra Ravada, [email protected]
Iowa Dubuque
County
I I
2 4 Miles
Wisconsin
Grant
County
Jo Daviess
County
�orts - Interstate
� Commercial - National Highway System
El Enhanced - Primary Roads
El General Service - Local Roads
El Basic Service
El Local Service Transit [el Regional
[el Large Urban
[el Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] MPO Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
53
54
MPO 27 / DMATSDEMO
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
40123
Dubuque County
HDP-C031(110)--6B-31
Improvements to Northwest Arterial/D10/S John DeereRoad
Grade and Pave, Traffic Signals, Right of Way, OutsideServices Engineering, Ped/Bike Grade & Pave
TIP Approved
7/20/2021
TotalFederal Aid
RegionalSwap
$9,545,023$5,452,023
$9,545,023$5,452,023
PA Note: The project received $5,452,023 of FFY 2019 Better Utilizing Investments to Leverage Development (BUILD) funds.
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38279
Iowa Department ofTransportation
NHSX-3()--3H-31
IA3: 0.7 MI N OF BOY SCOUT RD TO S OF CO RD C9YIN SAGEVILLE
Grade and Pave, Erosion Control, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$303,000$242,400
$19,806,000$15,844,800
$436,000$348,800
$20,545,000$16,436,000
45377
Iowa Department ofTransportation
BRF-61()--38-31
US61: GRANDVIEW AVE 1.2 MI S OF US 20 IN DUBUQUE
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,150,000$920,000
$1,150,000$920,000
PL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
13239
MPO 27 / DMATS
RGPL-PA27()--PL-31
MPO Planning: Transportation Planning in DMATS area
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$136,495$109,196
$133,000$107,000
$133,000$107,000
$133,000$107,000
$535,495$430,196
55
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37926
Iowa Department ofTransportation
BRFN-20()--39-31
US20: MISSISSIPPI RIVER IN DUBUQUE (STATE SHARE)
Bridge Cleaning
TIP Approved TotalFederal Aid
RegionalSwap
$70,000 $70,000 $70,000 $70,000 $280,000
37930
Iowa Department ofTransportation
BRFN-61()--39-31
US61: MISSISSIPPI RIVER IN DUBUQUE (STATE SHARE)
Bridge Cleaning
TIP Approved TotalFederal Aid
RegionalSwap
$20,000 $20,000 $20,000 $20,000 $80,000
37931
Iowa Department ofTransportation
BRFN-61()--39-31
US61: PEOSTA CHANNEL 0.2 MI N OF E 11TH ST INDUBUQUE
Bridge Cleaning
TIP Approved TotalFederal Aid
RegionalSwap
$50,000 $50,000 $50,000 $50,000 $200,000
45430
Iowa Department ofTransportation
NHSN-20()--2R-31
US20: 0.6 MI E OF THE NORTHWEST ARTERIAL INDUBUQUE
Slope Improvement
TIP Approved TotalFederal Aid
RegionalSwap
$50,000 $50,000
45428
Iowa Department ofTransportation
NHSN-61()--2R-31
US61: 0.6 MI N OF US 151
Slope Improvement
TIP Approved TotalFederal Aid
RegionalSwap
$100,000 $100,000
38229
Iowa Department ofTransportation
STPN-52()--2J-31
US52: US 61/US 151 TO US 20 IN DUBUQUE (SWARTERIAL) (STATE SHARE)
Pavement Rehab, Erosion Control
TIP Approved TotalFederal Aid
RegionalSwap
$4,933,000 $4,933,000
38228
Iowa Department ofTransportation
NHSN-20()--2R-31
US20: SWISS VALLEY RD SW OF DUBUQUE
Erosion Control
TIP Approved TotalFederal Aid
RegionalSwap
$428,000 $428,000
39233
Iowa Department ofTransportation
STPN-20()--2J-31
US20: MISSISSIPPI RIVER IN DUBUQUE
Traffic Signs
TIP Approved TotalFederal Aid
RegionalSwap
$200,000 $200,000
39235
Iowa Department ofTransportation
STPN-61()--2J-31
US61: MISSISSIPPI RIVER IN DUBUQUE
Traffic Signs
TIP Approved TotalFederal Aid
RegionalSwap
$200,000 $200,000
56
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45324
Iowa Department ofTransportation
BRFN-20()--39-31
US20: MIDDLE BRANCH CATFISH CREEK & CC RR 0.6MI E OF NW ARTERIAL IN DUBUQUE (EB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$450,000 $450,000
45289
Iowa Department ofTransportation
BRFN-61()--39-31
US61: PEOSTA CHANNEL 0.2 MI N OF E 11TH ST INDUBUQUE
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$14,700,000 $14,700,000
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
33894
Dubuque
HDP-2100(679)--3C-31
SW Arterial corridor between US 20 to US 151/61, US 20(MP 4.4884 to 6.3816) and US 151/61 (MP 186.334 to7.4998).
Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$11,473,436$578,436
$578,436
$11,473,436$578,436
$578,436
36993
MPO 27 / DMATS
RGPL-PA27()--ST-00
In DMATS region
Planning Study
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000$800,000
$800,000
$1,000,000$800,000
$800,000
PA Note: These funds will be used to BUILD Micro simulation model and project implementation for STREETS project,
45236
MPO 27 / DMATS
RGPL-PA27()--ST-31
Transportation Planning
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$18,750$15,000
$15,000
$18,750$15,000
$15,000
$37,500$30,000
$30,000
45237
MPO 27 / DMATS
RGPL-PA27()--ST-31
In the City of Dubuque Study and implement trafficmanagement systems,
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$41,666$33,333
$33,333
$41,666$33,333
$33,333
$41,666$33,333
$33,333
$124,998$99,999
$99,999
57
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38302
Peosta
TAP-R-5957()--8T-31
On Flashing Beacon and Radar Signs, from PeostaCommunity Pkwy to Kalb Ridge St
Miscellaneous
TIP Approved
11/05/2020
TotalFederal Aid
RegionalSwap
$32,000$20,000
$20,000
$32,000$20,000
$20,000
35236
Asbury
TAP-U-0252(604)--8I-31
On Cloie Creek Park Trail, from Burr Oak Dr. to existing trailand from existing trail to Willow Wood Dr.
Ped/Bike Grade & Pave
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$504,000$376,000
$376,000
$504,000$376,000
$376,000
38301
Dubuque
TAP-U-2100()--8I-31
On Bee Branch Creek Trail Project Phase 1,
Grade and Pave
TIP Approved
3/16/2021
TotalFederal Aid
RegionalSwap
$525,000$420,000
$420,000
$525,000$420,000
$420,000
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36994
Dubuque
STBG-SWAP-2100()--SG-31
In the city of Dubuque, On Asbury Rd Improvements, fromSt. Ambrose St. to Carter Rd
Traffic Signals
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$400,000
$400,000
$500,000
$400,000
$400,00036664
Dubuque
STBG-SWAP-2100(687)--SG-31
In the city of Dubuque, On North Cascade Rd, from EdvalLn to US 52 (SW Arterial)
Grade and Pave, Right of Way, Outside ServicesEngineering
TIP Approved
3/16/2021
TotalFederal Aid
RegionalSwap
$1,432,000
$1,432,000
$1,432,000
$1,432,000
$1,432,000
$1,432,000
35228
Dubuque
STBG-SWAP-2100(698)--SG-31
In the city of Dubuque, On University Ave, fromPennsylvania Avenue to Loras Boulevard
Pavement Rehab/Widen
TIP Approved
3/16/2021
TotalFederal Aid
RegionalSwap
$6,000,000
$4,960,000
$4,960,000
$3,250,000
$2,600,000
$2,600,000
$9,250,000
$7,560,000
$7,560,00039422
Asbury
STBG-SWAP-0252()--SG-31
In the city of Asbury, On Hales Mill Road, from AutumnDrive to Asbury Road
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,600,000
$1,000,000
$1,000,000
$1,600,000
$1,000,000
$1,000,00045235
Dubuque
STBG-SWAP-2100()--SG-31
On IA 32 N, Over UNION HOLLOW, from US 20 N 5.15miles to IA 3 S28 T89 R02E
Pave, Outside Services Engineering
TIP Approved TotalFederal Aid
RegionalSwap
$2,625,264
$2,625,264
$2,625,264
$374,156
$374,156
$374,156
$2,999,420
$2,999,420
$2,999,420
58
0
Metropolitan Planning Organization of Johnson County
410 East Washington Street, Iowa City, IA 52240
Phone: 319-356-5230, Fax: 319-356-5217, www.mpojc.org
Executive Director: Kent Ralston, [email protected]
Assistant Transportation Planner: Brad Neumann, [email protected]
Johnson
County
2 4 8 Miles
�orts - Interstate
� Commercial - National Highway System
El Enhanced - Primary Roads
El General Service - Local Roads
Basic Service
El Local Service Transit rel Regional
rel Large Urban
rel Small Urban
rel Intercity Bus
C[I Amtrak
I Park & Ride
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] MPO Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
59
60
MPO 28 / MPOJCCMAQ
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36670
Tiffin
STP-A-7662()--22-52
In the city of Tiffin, On Highway 6 and Park Road,roundabout
Grade and Pave
TIP Approved
2/19/2019
TotalFederal Aid
RegionalSwap
$2,140,320$500,000
$2,140,320$500,000
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38069
Iowa Department ofTransportation
IM-380()--13-52
I-380: W FOREVERGREEN RD INTERCHANGE 2.0 MI NOF I-80 IN TIFFIN (STATE SHARE)
Traffic Signals
TIP Approved TotalFederal Aid
RegionalSwap
$400,000$360,000
$400,000$360,000
38068
Iowa Department ofTransportation
NHS-80()--19-52
I-80: I-380/US 218 INTERCHANGE NEAR IOWA CITY(STATE SHARE)
Grade and Pave, Bridge New, Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$137,755,000$110,204,000
$60,061,000$48,048,800
$14,029,000$11,223,200
$4,629,000$3,703,200
$216,474,000$173,179,200
39270
Iowa Department ofTransportation
NHSX-1()--3H-52
IA1: E BURLINGTON ST TO N GOVERNOR ST IN IOWACITY (SB) STATE SHARE
Grade and Pave
TIP Approved TotalFederal Aid
RegionalSwap
$3,100,000$2,480,000
$3,100,000$2,480,000
45303
Iowa Department ofTransportation
IM-80()--13-52
I-80: 1ST AVE INTERCHANGE IN CORALVILLE (STATESHARE)
Grade and Pave, Bridge Replacement, CulvertReplacement
TIP Approved TotalFederal Aid
RegionalSwap
$23,123,000$20,810,700
$23,123,000$20,810,700
PL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39689
MPO 28 / MPOJC
RGPL-JCCOG(RTP)--PL-52
JCCOG: METROPOLITAN PLANNING PL FUNDS
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$440,000$352,000
$220,000$176,000
$220,000$176,000
$220,000$176,000
$1,100,000$880,000
61
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39272
Iowa Department ofTransportation
IMN-80()--0E-52
I-80: PRAIRIE DU CHIEN RD NE 1.3 MI W OF IA 1
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$320,000 $320,000
62
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
25398
Iowa City
NHSX-001-5(120)--3H-52
In the City of Iowa City, 1: From Capitol St to RiversideDrive
Pavement Rehab/Widen, Ped/Bike Miscellaneous
TIP Approved
12/17/2019
TotalFederal Aid
RegionalSwap
$1,433,120$1,011,000
$1,011,000
$1,433,120$1,011,000
$1,011,000
33922
Iowa City
STP-U-3715(666)--70-52
In the city of Iowa City, On American Legion Road, fromScott Boulevard east 1.1 Miles to Taft Avenue
Grade and Pave
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$9,152,000$3,608,000
$3,608,000
$9,152,000$3,608,000
$3,608,000
PA Note: Project #33923 funding in FYFY20 moved back to FY21.
36668
Iowa City
STP-U-3715(669)--70-52
In the city of Iowa City, On Benton Street, from MormonTrek Boulevard East to Greenwood Drive
Pavement Rehab
TIP Approved
2/16/2021
TotalFederal Aid
RegionalSwap
$2,872,480$1,316,000
$1,316,000
$2,872,480$1,316,000
$1,316,000
38310
North Liberty
STP-U-5557(622)--70-52
In the city of North Liberty, On Ranshaw Way, from ZellerStreet south to Hawkeye Drive
Pavement Rehab/Widen, Lighting, Ped/Bike Structures
TIP Approved
2/16/2021
TotalFederal Aid
RegionalSwap
$6,697,600$2,576,000
$2,576,000
$6,697,600$2,576,000
$2,576,000
DOT Note: Project has been approved for the use of Advance Construction. Reimbursement can begin in FFY 2022.
38309
University Heights
STP-U-7855()--70-52
In the city of University Heights, On Melrose Avenue, fromSunset Street east to east city limits
Pavement Rehab, Lighting, Pavement Markings
TIP Approved TotalFederal Aid
RegionalSwap
$1,518,400$730,000
$730,000
$1,518,400$730,000
$730,000
39151
Coralville
STP-U-1557()--70-52
In the city of Coralville, On 5th St, from just west of 12th Avewest through 20th Ave intersection
Pavement Rehab/Widen, Landscaping, Ped/Bike Paving
TIP Approved TotalFederal Aid
RegionalSwap
$2,971,280$1,650,000
$1,650,000
$2,971,280$1,650,000
$1,650,000
39152
Tiffin
STP-U-7662()--70-52
In the city of Tiffin, On North Park Rd, from Hwy 6 north2,000 Feet
Pavement Rehab/Widen, Ped/Bike Grade & Pave,Ped/Bike Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$5,490,160$1,200,000
$1,200,000
$5,490,160$1,200,000
$1,200,000
45232
Iowa City
STP-U-3715()--70-52
In the City of Iowa City, on Dodge Street, from BurlingtonStreet north to Governor Street.
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$13,780,000$3,750,000
$3,750,000
$13,780,000$3,750,000
$3,750,000
63
STBG-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39434
Iowa City
BRM-3715()--8N-52
In the city of Iowa City, Gilbert Street bridge, Gilbert Streetbridge over RALSTON CREEK.
Bridge Replacement
TIP Approved
6/15/2021
TotalFederal Aid
RegionalSwap
$1,664,000$1,000,000
$1,664,000$1,000,000
35404
Iowa City
BROS-3715(663)--8J-52
In the city of Iowa City, Prentiss Street Bridge, PrentissStreet Bridge over Ralston Creek
Bridge Replacement
TIP Approved
4/21/2020
TotalFederal Aid
RegionalSwap
$1,456,000$820,000
$1,456,000$820,000
39427
Iowa City
BROS-3715(664)--8J-52
In City of Iowa City, 2nd Avenue bridge, 2nd Avenue bridgeover Ralston Creek
Bridge Replacement
TIP Approved
4/20/2021
TotalFederal Aid
RegionalSwap
$577,200$444,000
$577,200$444,000
64
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39149
Iowa City
TAP-T-3715()--8V-52
In the city of Iowa City, On Hwy 6 Trail, from FairmeadowsBlvd east to Heinz Rd
Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$569,920$438,000
$438,000
$569,920$438,000
$438,000
33926
Coralville
TAP-U-1557(646)--8I-52
In the city of Coralville, On Coralville Iowa River Trail, fromRocky Shore Drive northwest .5 Miles to Clear Creek
Ped/Bike Grade & Pave
TIP Approved
8/18/2020
TotalFederal Aid
RegionalSwap
$924,560$613,000
$613,000
$924,560$613,000
$613,000
DOT Note: Project eligible for FHWA TAP funding
33925
Tiffin
TAP-U-7662(614)--8I-52
In the city of Tiffin, On Tiffin Clear Creek trail Phase 6, fromKimberlite Street south .1 Miles to Brown Street
Ped/Bike Grade & Pave
TIP Approved
2/02/2021
TotalFederal Aid
RegionalSwap
$228,800$102,000
$102,000
$228,800$102,000
$102,000
DOT Note: Project eligible for FHWA TAP funding
39150
Coralville
TAP-U-1557()--8I-52
On Clear Creek Trail on east side of Camp Cardinal Blvd,from Hwy 6 south to Tom Harkin Trailhead
Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$501,280$212,519
$212,519
$501,280$212,519
$212,519
45234
North Liberty
TAP-U-5557()--8I-52
In the City of North Liberty, on North Liberty Trail, from northof Abraham Drive, north-northwest to Front Street.
Pave
TIP Approved TotalFederal Aid
RegionalSwap
$1,125,280$648,118
$648,118
$1,125,280$648,118
$648,118
STP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
33923
Iowa City
STP-U-3715(668)--70-52
In the city of Iowa City, On IWV Road, from Hebl Ave east1.5 Miles to Hwy 218
Grade and Pave
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$3,517,280$930,000
$930,000
$3,517,280$930,000
$930,000
PA Note: Awarded $930,000 in STP funds. These funds will be used in the MPOJC eligible segment between Hwy 218 and Hurt Road.
65
South
Dakota
Siouxland Interstate Metropolitan Planning Council
1122 Pierce Street, Sioux City, IA 51105
Phone: 712-279-6286, Fax: 712-279-6920, www.simpco.org
Executive Director: Michelle Bostinelos, [email protected]
Regional Planning Director: Erin Berzina, [email protected]
Plymouth
County
Union
County
Dixon
County
0 2
\
Dakota
County
Nebraska
4 8 Miles
Iowa
Woodbury
County
�orts � Commercial
- Interstate
- National Highway System
Enhanced - Primary Roads
General Service - Local Roads
El Basic Service
El Local Service Transit rel Regional
[el Large Urban
rel Small Urban
rel Intercity Bus
C[I Amtrak
I Park & Ride
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] MPO Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
66
67
MPO 29 / SIMPCONHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45394
Iowa Department ofTransportation
IMX-29()--02-97
I-29: MONONA CO TO S OF SERGEANT BLUFFINTERCHANGE (SB)
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,842,000$2,557,800
$2,842,000$2,557,800
39378
Iowa Department ofTransportation
NHSX-20()--3H-97
US20: US 75/IA 12 IN SIOUX CITY TO LITTLE WHISKEYCR (EB & WB)
Grade and Pave
TIP Approved TotalFederal Aid
RegionalSwap
$12,554,000$10,043,200
$12,554,000$10,043,200
PL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
18694
MPO 29 / SIMPCO
RGPL-PA29(RTP)--PL-97
RGLPL: SIMPCO: MPO Planning
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$270,991$142,228
$270,991$142,228
$270,991$142,228
$270,991$142,228
$1,083,964$568,912
68
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38048
Iowa Department ofTransportation
BRFN-77()--39-97
US77: MISSOURI RIVER IN SIOUX CITY (STATE SHARE)
Bridge Cleaning
TIP Approved TotalFederal Aid
RegionalSwap
$36,000 $36,000 $36,000 $36,000 $144,000
38149
Iowa Department ofTransportation
IMN-129()--0E-97
I-129: MISSOURI RIVER IN SIOUX CITY (STATE SHARE)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$4,970,000 $4,970,000
45323
Iowa Department ofTransportation
IMN-29()--0E-97
I-29: UP RR 1.9 MI S OF US 75 (NB/SB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$540,000 $540,000
45328
Iowa Department ofTransportation
IMN-29()--0E-97
I-29: 8TH ST 2.0 MI S OF US 20 (NB/SB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$480,000 $480,000
38157
Iowa Department ofTransportation
IMN-29()--0E-97
I-29: RECONSTRUCTION IN SIOUX CITY
Erosion Control
TIP Approved TotalFederal Aid
RegionalSwap
$209,000 $209,000
39383
Iowa Department ofTransportation
IMN-29()--0E-97
I-29: I-129 INTERCHANGE IN SIOUX CITY
Lighting
TIP Approved TotalFederal Aid
RegionalSwap
$1,492,000 $1,492,000
39382
Iowa Department ofTransportation
NHSN-20()--2R-97
US20: US 75/IA 12 INTERCHANGE IN SIOUX CITY
Lighting
TIP Approved TotalFederal Aid
RegionalSwap
$302,000 $302,000
38148
Iowa Department ofTransportation
IMN-129()--0E-97
I-129: MISSOURI RIVER IN SIOUX CITY (STATE SHARE)
Bridge Cleaning
TIP Approved TotalFederal Aid
RegionalSwap
$50,000 $50,000 $50,000 $150,000
45302
Iowa Department ofTransportation
BRFN-20()--39-97
US20: PROPOSED RD 0.5 MI W OF IA 12 (EB & WB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$700,000 $700,000
69
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45296
Iowa Department ofTransportation
BRFN-20()--39-97
US20: SERGEANT RD 2.1 MI W OF IA 12 (EB & WB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000 $1,000,000
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36933
Sioux City
TAP-U-7057(700)--8I-97
On Big Sioux/Highway 12 Trail, from Big Sioux River toHighway 12
Ped/Bike Grade & Pave
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$600,000$300,000
$600,000$300,000
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39148
Sergeant Bluff
TAP-R-6890()--8T-97
The Loess Hills Scenic Trail (Phase 1), Sergeant Bluff, fromBarker Park to South Ridge Road
Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$443,025$182,775
$182,775
$360,500$125,000
$125,000
$803,525$307,775
$307,775
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
44954
Woodbury County
BRS-SWAP-C097(E-6)--FF-97
On D 12, Over CREEK, from Barker Avenue E 0.05 miles inSectiion 7 T89N R46W
TIP Approved TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,000
70
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36656
Sergeant Bluff
STBG-SWAP-6890(610)--SG-97
In the city of Sergeant Bluff, On First Street, from Port NealRoad to C Street
Pavement Rehab
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$2,000,000
$1,400,000
$1,400,000
$2,000,000
$1,400,000
$1,400,00036655
Sioux City
STBG-SWAP-7057()--SG-97
In the city of Sioux City, On Stone Park Blvd, from WestClifton St to Idlewood Avenue
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,610,000
$1,288,000
$1,288,000
$1,610,000
$1,288,000
$1,288,00035398
Sioux City
STBG-SWAP-7057(705)--SG-97
In the city of Sioux City, On South Fairmount Street, fromTransit Avenue to Vine Avenue
Pavement Rehab
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$2,756,000
$1,824,000
$1,824,000
$2,756,000
$1,824,000
$1,824,00037828
Sioux City
STBG-SWAP-7057()--SG-97
In the city of Sioux City, On Dodge Ave, from South RustinSt to South Cecelia St
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,300,000
$1,040,000
$1,040,000
$1,300,000
$1,040,000
$1,040,00038311
Sioux City
STBG-SWAP-7057()--SG-97
In the city of Sioux City, On South Cecelia St, from DodgeAve to Morningside Ave
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$850,000
$117,000
$117,000
$850,000
$117,000
$117,00037829
Sioux City
STBG-SWAP-7057()--SG-97
In the city of Sioux City, On Hamilton Blvd, from BuckwalterDrive to Sioux City city limits
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,215,000
$972,000
$972,000
$1,215,000
$972,000
$972,00032763
Woodbury County
STBG-SWAP-C097(K25)--FG-97
On K25, from Relocated Port Neal Road South 1.8 Miles toGelita Plant Entrance, Sec 7 and 18 T87 R47
Pavement Widening, Shoulder Grading, Granular Shoulders
TIP Approved TotalFederal Aid
RegionalSwap
$2,887,000
$2,125,000
$2,125,000
$2,887,000
$2,125,000
$2,125,00038873
Sioux City
STBG-SWAP-7057()--SG-97
In the city of Sioux City, On South Rustin Street, from LeechAvenue to Dodge Avenue
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,759,000
$1,407,000
$1,407,000
$1,759,000
$1,407,000
$1,407,00038874
Sioux City
STBG-SWAP-7057()--SG-97
In the city of Sioux City, On Rebecca Street, from West 16thStreet to Villa Avenue
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,539,000
$1,158,000
$1,158,000
$1,539,000
$1,158,000
$1,158,000
71
Iowa Northland Regional Council of Governments
229 E. Park Ave, Waterloo, IA 50703
Phone: 319-235-0311, Fax: 319-235-2891, www.inrcog.org
Executive Director: Kevin Blanshan, [email protected]
Transportation Planner: Kyle Durant, [email protected]
\l)•-------=1------���t----l
� I� =--1-..,.....--1_57
Grund:yCounty
I I
I I
I I
I I
I
6 Hudson
N I I I
0 1 1 2
l
'I
� Waterl · Elk Run Raymond� L'
-��---�s
@� ®'��------"F'
Black Hawk County
�orts - Interstate
� Commercial - National Highway System
El Enhanced - Primary Roads
El General Service - Local Roads
Local Service Transit [el Regional
[el Large Urban
[el Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] MPO Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
72
73
MPO 30 / INRCOGCHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39400
Waterloo
BRM-CHBP-8155(770)--NB-07
On 11th Street, Over Cedar River, from Black Hawk St NE.03 miles to structure
Bridge Replacement
TIP Approved
5/18/2021
TotalFederal Aid
RegionalSwap
$6,250,000$3,413,750
$2,836,250
$6,250,000$3,413,750
$2,836,25039401
Waterloo
BRM-CHBP-8155(771)--NB-07
On Park Ave, Over Cedar River, from Commercial St NE .1miles to structure
Bridge Replacement
TIP Approved
5/18/2021
TotalFederal Aid
RegionalSwap
$6,250,000$3,413,750
$2,836,250
$6,250,000$3,413,750
$2,836,250
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38218
Iowa Department ofTransportation
NHSX-20()--3H-7
US20: US 63 TO IA 21 IN WATERLOO (EB & WB)
Grade and Pave, Traffic Signs
TIP Approved TotalFederal Aid
RegionalSwap
$16,561,000$13,248,800
$16,561,000$13,248,800
38177
Iowa Department ofTransportation
NHSX-27()--3H-7
IA27: US 20 TO RIDGEWAY AVE IN CEDAR FALLS (NB &SB)
Grade and Pave, Culvert Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$5,324,000$4,259,200
$5,324,000$4,259,200
45382
Iowa Department ofTransportation
NHSX-20()--3H-7
US20: HUDSON RD TO US 63 (EB & WB)
Grade and Pave, Traffic Signs
TIP Approved TotalFederal Aid
RegionalSwap
$16,594,000$13,275,200
$16,594,000$13,275,200
PL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
16106
MPO 30 / INRCOG
RGPL-PA30()--PL-07
Waterloo MPO Planning: PL For Waterloo MPOTransportation Planning
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$239,025$191,220
$239,025$191,220
$239,025$191,220
$239,025$191,220
$956,100$764,880
74
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45254
Iowa Department ofTransportation
BRFN-63()--39-7
US63: CEDAR RIVER 0.2 MI N OF US 218 IN WATERLOO(NB)
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000 $1,000,000
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45454
MPO 30 / INRCOG
RGPL-PA30()--ST-07
MPO-wide Iowa Pavement Management Program data
Outside Services Planning
TIP Approved TotalFederal Aid
RegionalSwap
$78,000$78,000
$78,000
$78,000$78,000
$78,000
37824
Cedar Falls
TAP-U-1185(654)--8I-07
In the city of Cedar Falls, On Union Rd Trail, from W 12th Stsouth 1.0 Miles to W 27th St
Ped/Bike Grade & Pave
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$375,000$300,000
$300,000
$375,000$300,000
$300,000
35359
Waterloo
TAP-U-8155(766)--8I-07
On Shaulis Rd Trail, from Cedar Terrace Dr E 0.7 miles toCedar Valley Nature Trail
Ped/Bike Grade & Pave
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$593,000$474,000
$474,000
$593,000$474,000
$474,000
DOT Note: Project eligible for FHWA TAP funding
45240
MPO 30 / INRCOG
STP-U-PA30()--70-07
NE Industrial Access: NEPA
Outside Services Planning
TIP Approved TotalFederal Aid
RegionalSwap
$625,000$480,000
$480,000
$625,000$480,000
$480,000
75
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39135
Elk Run Heights
TAP-R-2312(604)--8T-07
In the city of Elk Run Heights, On Mayor's Park, west ofMcCoy Rd and south of Lafayette Rd
Ped/Bike Grade & Pave, Ped/Bike Structures,Ped/Bike Miscellaneous
TIP Approved
3/16/2021
TotalFederal Aid
RegionalSwap
$536,000$428,000
$428,000
$536,000$428,000
$428,000
45045
Cedar Falls
TAP-U-1185()--8I-07
On Lake Street Trail, from Central Ave E 0.6 miles toexisting trail
Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$395,000$302,000
$302,000
$395,000$302,000
$302,000
39134
Waterloo
TAP-U-8155(767)--8I-07
In the city of Waterloo, On Park Ave, from Franklin St South0.75 Miles to US 218 SB
Ped/Bike Structures, Ped/Bike Miscellaneous
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$172,000$137,000
$137,000
$172,000$137,000
$137,000
39133
Waterloo
TAP-U-8155(768)--8I-07
On Cedar River Marina Recreational Trail Enhancements,
Outside Services Engineering, Ped/Bike Grade &Pave, Ped/Bike Miscellaneous
TIP Approved
3/16/2021
TotalFederal Aid
RegionalSwap
$574,000$459,000
$459,000
$574,000$459,000
$459,000
39421
Waterloo
TAP-U-8155(774)--8I-07
On US 63, from Parker St S 1.7 miles to Washington St
Landscaping, Ped/Bike Grade & Pave, Ped/BikeMiscellaneous
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$2,069,500$1,587,466
$1,110,528
$2,069,500$1,587,466
$1,110,528
PA Note: $476,938 in old TE funds. Project has both MPO TAP and STBG funds.
DOT Note: Project to be authorized using only Transportation Enhancement funds.
76
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
29681
Cedar Falls
STBG-SWAP-1185(652)--SG-07
In the city of Cedar Falls, On Cedar Heights Dr, fromGreenhill Rd south 0.8 miles to Viking Rd
Pavement Rehab/Widen, Right of Way, Outside ServicesEngineering
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$4,055,000
$2,900,000
$2,900,000
$4,055,000
$2,900,000
$2,900,000
36659
Hudson
STBG-SWAP-3577(608)--SG-07
In the city of Hudson, On Butterfield Rd, from Ranchero Rdnorth 0.5 Miles to 500' S of US-20
Outside Services Engineering
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$131,000
$104,000
$104,000
$131,000
$104,000
$104,00025388
Raymond
STBG-SWAP-6342(601)--SG-07
In the city of Raymond, On Lafayette Rd, from 2750' W ofTaylor Ln east 1.3 Miles to 1065' E of North 3rd St
Grade and Pave, Outside Services Engineering, Ped/BikeGrade & Pave
TIP Approved
2/16/2021
TotalFederal Aid
RegionalSwap
$3,256,000
$1,230,000
$1,230,000
$3,256,000
$1,230,000
$1,230,000
37823
Waterloo
STBG-SWAP-8155(769)--SG-07
Waterloo Adaptive Traffic Signals & Fiber OpticsCommunications: Downtown bound by Walnut, Mullan,Washington, 6th
Traffic Signals, Miscellaneous
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$620,000
$496,000
$496,000
$620,000
$496,000
$496,000
PA Note: PE is allowed by the MPO for this project.
37821
Elk Run Heights
STBG-SWAP-2312()--SG-07
In the city of Elk Run Heights, On Lafayette Rd & GilbertvilleRd, from WCL east and southeast 0.65 miles to Amber Ln
Grade and Pave
TIP Approved TotalFederal Aid
RegionalSwap
$1,897,000
$1,200,000
$1,200,000
$1,897,000
$1,200,000
$1,200,00039136
Waterloo
STBG-SWAP-8155()--SG-07
On Hess Rd, from E Shaulis Rd N 0.4 miles to 500' north ofKOA Dr
Grade and Pave, Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$3,327,000
$2,727,000
$2,727,000
$3,327,000
$2,727,000
$2,727,00039139
Cedar Falls
STBG-SWAP-1185()--SG-07
In the city of Cedar Falls, On Main St, from 6th St South0.75 Miles to Seerley Blvd
Grade and Pave, Right of Way, Outside ServicesEngineering, Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$3,350,000
$1,500,000
$1,500,000
$8,297,000
$1,400,000
$1,400,000
$11,647,000
$2,900,000
$2,900,000
45241
Evansdale
STBG-SWAP-2432()--SG-07
On Lafayette Rd, from Evans Rd E 1.4 miles to ECL
Pavement Rehab, Outside Services Engineering, Ped/BikePaving, Ped/Bike Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$120,000
$102,000
$102,000
$2,500,000
$1,605,000
$1,605,000
$2,620,000
$1,707,000
$1,707,000
77
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39137
Waterloo
STBG-SWAP-8155()--SG-07
On Hess Rd, from 500' N of KOA Dr N 0.45 miles to 960' Nof US 20
Grade and Pave, Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$3,840,000
$1,350,000
$1,350,000
$3,840,000
$1,350,000
$1,350,00039138
MPO 30 / INRCOG
STBG-SWAP-PA30()--SG-07
On IA 58, from US 63 North 4.0 Miles to 0.4 mi S ofRanchero Rd
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$563,000
$450,000
$450,000
$563,000
$450,000
$450,00038335
MPO 30 / INRCOG
STBG-SWAP-PA30()--SG-07
IA 27: US 20 TO RIDGEWAY AVE IN CEDAR FALLS (NB &SB)
Grade and Pave
TIP Approved TotalFederal Aid
RegionalSwap
$625,000
$500,000
$500,000
$625,000
$500,000
$500,000PA Note: MPO contribution to TPMS 38177
78
•
0
RPA 1 - Upper Explorerland Regional Planning Commission
325 Washington Street, Suite A, Decorah, IA 52101
Phone: 563-382-6171, Fax: 563-382-6311, www.uerpc.org
Executive Director: Rachelle Howe, [email protected]
Regional Planner: Aaron Detter, [email protected]
County� 150
____ ..._93_--.. ':J.
20 Miles
�orts � Commercial
El Enhanced
General Service
Basic Service
El Local Service Transit rel Regional
rel Large Urban
rel Small Urban
rel Intercity Bus
C[I Amtrak
I Park & Ride
- Interstate
- National Highway System
- Primary Roads
Local Roads
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] RPA Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
79
80
RPA 1CHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
35080
Allamakee County
BRS-CHBP-C003(63)--GB-03
On B25, Over Cota Creek, S23 T97N R03W
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$700,340$382,340
$318,000
$700,340$382,340
$318,00029473
Howard County
BRS-CHBP-C045(88)--GB-45
On V10, Over Staff Creek
Bridge Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$500,000$273,100
$226,900
$500,000$273,100
$226,900
HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45284
Iowa Department ofTransportation
HSIPX-150()--3L-33
IA150: NCL OF WEST UNION TO WINNESHIEK CO
Pavement Widening
TIP Approved TotalFederal Aid
RegionalSwap
$1,600,000$1,440,000
$1,600,000$1,440,000
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45443
Iowa Department ofTransportation
NHSX-150()--3H-96
IA150: FAYETTE CO TO SCL OF CALMAR
Pavement Widening, Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$5,410,000$4,328,000
$5,410,000$4,328,000
81
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37912
Iowa Department ofTransportation
BRFN-18()--39-22
US18: MISSISSIPPI RIVER IN MARQUETTE (STATESHARE)
Bridge Cleaning
TIP Approved TotalFederal Aid
RegionalSwap
$20,000 $20,000 $20,000 $20,000 $80,000
37934
Iowa Department ofTransportation
BRFN-3()--39-33
IA3: OTTER CREEK 2.4 MI W OF W JCT IA 150
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$107,000 $107,000
38044
Iowa Department ofTransportation
BRFN-52()--39-96
US52: STREAM AND TWIN SPRINGS RD 0.6 MI N OF IA9
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$427,000 $427,000
37878
Iowa Department ofTransportation
BRFN-76()--39-3
IA76: MINERAL CREEK 1.6 MI S OF CO RD A26
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$200,000 $200,000
37876
Iowa Department ofTransportation
BRFN-9()--39-3
IA9: MISSISSIPPI RIVER IN LANSING (STATE SHARE)
Bridge Cleaning
TIP Approved TotalFederal Aid
RegionalSwap
$20,000 $20,000 $20,000 $20,000 $80,000
38045
Iowa Department ofTransportation
BRFN-52()--39-96
US52: UPPER IOWA RIVER 1.8 MI N OF IA 9
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$332,000 $332,000
39202
Iowa Department ofTransportation
BRFN-18()--39-22
US18: STREAM 0.6 MI W OF E JCT US 52
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$2,290,000 $2,290,000
39256
Iowa Department ofTransportation
BRFN-9()--39-45
IA9: CRANE CREEK 1.4 MI W OF CO RD V26
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$287,000 $287,000
39257
Iowa Department ofTransportation
BRFN-9()--39-45
IA9: NORTH BRANCH TURKEY RIVER 4.3 MI E OF US 63
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,019,000 $1,019,000
82
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39255
Iowa Department ofTransportation
BRFN-9()--39-45
IA9: LITTLE WAPSIPINICON RIVER 0.1 MI W OF CO RDV10
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$251,000 $251,000
45329
Iowa Department ofTransportation
BRFN-13()--39-22
IA13: VOLGA RIVER 4.1 MI S OF IA 56
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$800,000 $800,000
45365
Iowa Department ofTransportation
BRFN-93()--39-33
IA93: STREAM 0.7 MI W OF CO RD V68
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$900,000 $900,000
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
20
RPA 1
RGPL-PA01(RTP)--ST-00
UERPC RPA-1 TRANSPORT PLANNING
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$37,500$30,000
$30,000
$37,500$30,000
$30,000
$37,500$30,000
$30,000
$43,750$35,000
$35,000
$156,250$125,000
$125,000
45319
Iowa Department ofTransportation
STP-9()--2C-3
IA9: MISSISSIPPI RIVER BRIDGE IN LANSING (STATESHARE)
Grade and Pave, Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$37,124,000$29,699,200
$37,124,000$29,699,200
83
STBG-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
4811
Fayette County
BROS-C033(77)--8J-33
On 240TH ST, Over Turner Creek, in NW 1/4 S11 T94 R09
Bridge Replacement
TIP Approved
11/19/2019
TotalFederal Aid
RegionalSwap
$560,000$440,000
$560,000$440,000
32136
Winneshiek County
BRS-C096(138)--60-96
On W46, Over YELLOW RIVER, S9 T96 R07
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$500,000$400,000
$500,000$400,000
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
22090
Winneshiek CountyConservation Board
TAP-R-C096()--8T-96
On Dry Run Trail, Over Dry Run Creek, 1/4 mile W of Iowa-9/US-52 intersection
Ped/Bike Structures
TIP Approved TotalFederal Aid
RegionalSwap
$800,000$423,000
$423,000
$800,000$423,000
$423,000
DOT Note: Project eligible for FHWA TAP funding
38348
Winneshiek CountyConservation Board
TAP-R-C096()--8T-96
Trail Bridge (Phase VII) On Dry Run Trail, Over Dry RunCreek
Ped/Bike Structures
TIP Approved TotalFederal Aid
RegionalSwap
$665,000$274,000
$274,000
$665,000$274,000
$274,000
32585
Winneshiek CountyConservation Board
TAP-R-C096()--8T-96
On Trail Bridge, Over Dry Run Creek,
Ped/Bike Structures
TIP Approved
4/20/2021
TotalFederal Aid
RegionalSwap
$320,000$116,000
$116,000
$320,000$116,000
$116,000
DOT Note: Project eligible for FHWA TAP funding
39141
Fayette CountyConservation Board
TAP-R-C033()--8T-33
Backbone Trail extension, from Nims Bridge (current trail)along Great River Road (south side) to Juniper Road
Scenic or Historic Hwy., Ped/Bike Paving, Ped/BikeMiscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$1,735,000$171,000
$171,000
$1,735,000$171,000
$171,000
45492
Clayton CountyConservation Board
TAP-R-C022()--8T-22
On South/East side of Iowa 13, from 250th Street 1 miles toGrape Road
Ped/Bike Paving
TIP Approved TotalFederal Aid
RegionalSwap
$854,233$192,000
$192,000
$854,233$192,000
$192,000
84
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
32108
Clayton County
BHOS-SWAP-C022()--SB-22
On ACORN RD, Over SMALL, in SE S29 T91 R06
Culvert Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00038486
Decorah
BRM-SWAP-1867(616)--SD-96
On POLE LINE RD, Over DRAINAGE, S8 T98 R08
Bridge Replacement
TIP Approved
2/16/2021
TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00035077
Allamakee County
BROS-SWAP-C003(66)--FE-03
On Smithfield Drive, Over YELLOW RIVER, S9 T96N R05W
Bridge Replacement
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$710,000
$710,000
$710,000
$710,00032839
Allamakee County
BROS-SWAP-C003(68)--SE-03
On Livingood Springs Road, Over YELLOW RIVER, S3T96N R06W
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$610,000
$600,000
$610,000
$600,00038821
Fayette County
BROS-SWAP-C033(140)--SE-33
On 120th St, Over UNNAMED CREEK Extending 1,000ftEast and West of the Bridge, S7 TT92N RR10W
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$380,000
$320,000
$380,000
$320,00018433
Fayette County
BROS-SWAP-C033(141)--SE-33
On L AVE, Over VOLGA RIVER, on WLINE S29 T92 R08
Bridge Replacement
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$360,000
$360,000
$360,000
$360,00038820
Fayette County
BROS-SWAP-C033(142)--SE-33
On W55, Over BEAVER CREEK extending 1,000ft Northand South of the Bridge, S24 TT94N RR07W
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$380,000
$320,000
$380,000
$320,00034726
Winneshiek County
BROS-SWAP-C096(150)--SE-96
On SCENIC RIVER RD, Over UPPER IOWA RIVER, fromintersection of Bluffton Rd east 4800 Feet, S25 T99 R09
Bridge Replacement, Grading
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$800,000
$800,000
$800,000
$800,00038664
Fayette County
BRS-SWAP-C033(139)--FF-33
On W14 (R Ave.), Over Volga River, from Hwy 93 South1200 Feet, along WLINE S29 T93 R8
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$510,000
$450,000
$510,000
$450,000
85
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
23616
Winneshiek County
BRS-SWAP-C096(119)--FF-96
W20: Over UPPER IOWA RIVER
Grade and Pave, Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$1,478,000
$650,000
$1,478,000
$650,00037527
Howard County
BHS-SWAP-C045()--FC-45
On A46, Over Crane Creek
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00036406
Allamakee County
BROS-SWAP-C003(29R1)--FE-03
On Ellingson Bridge Drive, Over PATTERSON CREEK,Bridge #29R1, S29 T99N R06W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$510,000
$510,000
$510,000
$510,00029321
Clayton County
BROS-SWAP-C022()--SE-22
On 250TH ST, Over DRY MILL CREEK, in N1/4 S20 T93R04
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,00038649
Howard County
BROS-SWAP-C045()--SE-45
On 25th St, Over Staff Creek
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$495,000
$495,000
$495,000
$495,00038644
Howard County
BROS-SWAP-C045()--SE-45
On Vale Ave, Over Nichols Creek, Immediately West of V58
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00044877
Howard County
BRS-SWAP-C045()--FF-45
On V58, Over Nichols Creek, Approximately 1.4 MilesNorth of A23
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$480,000
$480,000
$480,000
$480,00016792
Clayton County
BHOS-SWAP-C022()--SB-22
On MESQUITE RD, Over PECK CREEK, from Marengo Rdwest 50 Feet to bridge, at Ctr S1 T91 R03
Culvert Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00037764
Allamakee County
BROS-SWAP-C003(14I1)--SE-03
On Picnic Woods Drive, Over TEEPLE CREEK, Bridge#14I1, S14 T97N R06W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$360,000
$350,000
$360,000
$350,000
86
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37763
Allamakee County
BROS-SWAP-C003(18B1)--SE-03
On Suttle Creek Road, Over YELLOW RIVER, Bridge#18B1, S18 T96N R04W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$960,000
$950,000
$960,000
$950,00038651
Howard County
BROS-SWAP-C045()--SE-45
On 135th St, Over South Branch Turkey River
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$540,000
$540,000
$540,000
$540,00018343
Winneshiek County
BROS-SWAP-C096()--SE-96
On Pleasent View Rd., Over Canoe Creek, S33 T99 R7
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,00039034
Clayton County
BROS-SWAP-C022()--SE-22
On 172nd St, Over STREAM, from Eagle Ave W 0.1 milesto the end of the project S9 T94 R5
Bridge Replacement, Grading
TIP Approved TotalFederal Aid
RegionalSwap
$900,000
$900,000
$900,000
$900,00039035
Clayton County
BROS-SWAP-C022()--SE-22
On Coffee Rd, Over PLUM CREEK, S34 T91 R1
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00038653
Howard County
BROS-SWAP-C045()--SE-45
On 180th St, Over Bohemain Creek
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$360,000
$360,000
$360,000
$360,00020251
Winneshiek County
BROS-SWAP-C096()--FE-96
360TH ST: Over Upper Iowa River
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,00039056
Allamakee County
BRS-SWAP-C003(18K3)--FF-03
On X42(Lansing Harpers Road), Over VILLAGE CREEK,Bridge #18K3, S18 T98N R03W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$960,000
$950,000
$960,000
$950,000
87
SWAP-HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37433
Winneshiek County
HSIP-SWAP-C096()--FJ-96
On 175th St and US 52, S26 T97 R09
Lighting
TIP Approved TotalFederal Aid
RegionalSwap
$80,000
$80,000
$80,000
$80,00036004
Winneshiek County
HSIP-SWAP-C096()--FJ-96
On W38 & A26, S6 T99 R07
Lighting
TIP Approved TotalFederal Aid
RegionalSwap
$75,000
$75,000
$75,000
$75,00040119
Winneshiek County
HSIP-SWAP-C096()--SJ-96
Replacement of Chevrons on all paved county roads
Traffic Signs
TIP Approved TotalFederal Aid
RegionalSwap
$275,000
$275,000
$275,000
$275,00036006
Winneshiek County
HSIP-SWAP-C096()--FJ-96
On W46 & Centennial Rd, S30 T97 R07
Lighting
TIP Approved TotalFederal Aid
RegionalSwap
$80,000
$80,000
$80,000
$80,00036009
Winneshiek County
HSIP-SWAP-C096()--FJ-96
On W38 & A38, S35 T99 R08
Lighting
TIP Approved TotalFederal Aid
RegionalSwap
$80,000
$80,000
$80,000
$80,00036011
Winneshiek County
HSIP-SWAP-C096()--FJ-96
On W46 & Sand Rd, S6 T96 R07
Lighting
TIP Approved TotalFederal Aid
RegionalSwap
$80,000
$80,000
$80,000
$80,000
88
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
29492
Allamakee County
STBG-SWAP-C003(67)--FG-03
On A26, from X20 Intersection 6.31 miles to IA 26
Pavement Rehab
TIP Approved
3/16/2021
TotalFederal Aid
RegionalSwap
$4,100,000
$2,800,000
$2,800,000
$4,100,000
$2,800,000
$2,800,00020122
Winneshiek County
STBG-SWAP-C096(153)--SG-96
W20: From Co. Rd A34 to 244th Ave.
Pavement Rehab
TIP Approved
2/16/2021
TotalFederal Aid
RegionalSwap
$3,953,800
$1,853,800
$1,853,800
$3,953,800
$1,853,800
$1,853,80035133
Fayette County
STBG-SWAP-C033(126)--FG-33
On W14 from 150th St to 60th St
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,450,000
$2,100,000
$2,100,000
$2,450,000
$2,100,000
$2,100,00039140
Guttenberg
STBG-SWAP-3167()--SG-22
In the city of Guttenberg, On 5th Street, from Haydn Streetnorth .44 Miles to Kosciusko Street
Pave
TIP Approved TotalFederal Aid
RegionalSwap
$431,000
$344,000
$344,000
$431,000
$344,000
$344,00037450
Howard County
STBG-SWAP-C045()--FG-45
On V10, from Hwy 9 North 9.5 Miles to MN Boarder
Pave
TIP Approved TotalFederal Aid
RegionalSwap
$3,325,000
$2,519,000
$2,519,000
$3,325,000
$2,519,000
$2,519,00037438
Winneshiek County
STBG-SWAP-C096(154)--FG-96
Co. Rd. W14 from Spillville to Fort Atkinson
Grade and Pave, Granular Shoulders
TIP Approved
12/19/2023
TotalFederal Aid
RegionalSwap
$2,200,000
$2,200,000
$2,200,000
$2,200,000
$2,200,000
$2,200,000
89
90
91
RPA 2CHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
34608
Worth County
BROSCHBP-C098(79)--GA-98
On A39, Over STREAM, S8 T98 R21
Bridge Replacement
TIP Approved
2/16/2021
TotalFederal Aid
RegionalSwap
$325,000$177,515
$147,485
$325,000$177,515
$147,48534712
Franklin County
BRS-CHBP-C035(102)--GB-35
On S41, Over DD NO. 6, from 80th Street North 1 Miles to90th Street
Bridge Replacement
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$650,000$355,030
$294,970
$650,000$355,030
$294,9707371
Kossuth County
BRS-CHBP-C055(176)--GB-55
A42: N Line 19, Greenwood Twp.E FORK DES MOINESRIVER
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$518,480$218,480
$300,000
$518,480$218,480
$300,00029446
Kossuth County
BRS-CHBP-C055(791290)--GB-55
On B14, Over E FORK DES MOINES RIVER, near NE S12T97 R29, Burt Township
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$518,480$218,480
$300,000
$518,480$218,480
$300,00037681
Mitchell County
BRS-CHBP-C066(78)--GB-66
On S70, Over ROCK CREEK, S8 T98 R18
Bridge Replacement
TIP Approved
2/16/2021
TotalFederal Aid
RegionalSwap
$350,000$191,170
$158,830
$350,000$191,170
$158,830
HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45398
Iowa Department ofTransportation
HSIPX-18()--3L-34
US18: E OF CEDAR RIVER RR IN CHARLES CITY TOLITTLE CEDAR RIVER (STATE SHARE)
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,517,000$2,265,300
$2,517,000$2,265,300
92
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37902
Iowa Department ofTransportation
BRF-65()--38-17
US65: E BRANCH BEAVERDAM CREEK 0.7 MI S OF CORD B60
Bridge Replacement, Wetland Mitigation, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$1,748,000$1,398,400
$1,748,000$1,398,400
38231
Iowa Department ofTransportation
NHSX-18()--3H-34
US18: US 218/IA 27 INTERSECTION IN FLOYD
Grade and Pave, Bridge New, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000$800,000
$20,846,000$16,676,800
$436,000$348,800
$22,282,000$17,825,600
45339
Iowa Department ofTransportation
NHSX-65()--3H-17
US65: 0.1 MI S OF 27TH ST SW TO 6TH ST S IN MASONCITY
Grade and Pave, Traffic Signals, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$14,828,000$11,862,400
$14,828,000$11,862,400
93
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37901
Iowa Department ofTransportation
BRFN-65()--39-17
US65: WINNEBAGO RIVER 0.1 MI N OF S JCT CO RDB20 (NB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$283,000 $283,000
45281
Iowa Department ofTransportation
IMN-35()--0E-35
I-35: DRAINAGE DITCH #29 1.3 MI N OF CO RD C70 (SB)
TIP Approved TotalFederal Aid
RegionalSwap
$18,000 $18,000
39388
Iowa Department ofTransportation
IMN-35()--0E-98
I-35: 1.0 MI N OF IA 9 TO MINNESOTA
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,542,000 $1,542,000
45375
Iowa Department ofTransportation
NHSN-18()--2R-34
US18: IA 14 TO E OF CEDAR RIVER RR IN CHARLESCITY (STATE SHARE)
Pavement Rehab, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$2,829,000 $2,829,000
45348
Iowa Department ofTransportation
NHSN-18()--2R-34
US18: DITCH NEAR CHICKASAW CO LINE
Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$58,000 $58,000
45372
Iowa Department ofTransportation
STPN-218()--2J-34
US218: MONTGOMERY ST IN FLOYD TO CEDAR RIVERRR
Pavement Rehab, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$670,000 $670,000
45420
Iowa Department ofTransportation
STPN-69()--2J-95
US69: N 9TH AVE IN LAKE MILLS TO MINNESOTA
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,460,000 $1,460,000
45405
Iowa Department ofTransportation
STPN-9()--2J-98
IA9: 1ST ST IN FERTILE TO I-35
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,748,000 $1,748,000
37904
Iowa Department ofTransportation
BRFN-122()--39-17
IA122: WILLOW CREEK 4.4 MI E OF I-35 (WB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$260,000 $260,000
94
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37965
Iowa Department ofTransportation
BRFN-169()--39-55
US169: BLACK CAT CREEK 4.2 MI N OF US 18
Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$1,928,000 $1,928,000
37937
Iowa Department ofTransportation
BRFN-65()--39-35
US65: BAILEY CREEK 0.8 MI S OF S JCT CO RD C13
Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$2,110,000 $2,110,000
39387
Iowa Department ofTransportation
BRFN-9()--39-98
IA9: BEAVER CREEK 0.5 MI W OF CO RD S18
Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$10,000 $902,000 $912,000
38052
Iowa Department ofTransportation
BRFN-9()--39-98
IA9: I-35 INTERCHANGE
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$927,000 $927,000
38053
Iowa Department ofTransportation
BRFN-9()--39-98
IA9: STREAM 1.3 MI E OF US 65
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$295,000 $295,000
39197
Iowa Department ofTransportation
IMN-35()--0E-17
I-35: 1.0 MI N OF CO RD B35 TO 1.0 MI N OF IA 9
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,001,000 $1,001,000
39278
Iowa Department ofTransportation
BRFN-15()--39-55
IA15: LOTTS CREEK 6.3 MI S OF CO RD A42
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000 $500,000
39194
Iowa Department ofTransportation
BRFN-18()--39-17
US18: UP RR 1.5 MI W OF US 65 (WB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$631,000 $631,000
39195
Iowa Department ofTransportation
BRFN-18()--39-17
US18: TRAIL 5.2 MI E OF E JCT I-35 (EB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$550,000 $550,000
95
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39237
Iowa Department ofTransportation
BRFN-3()--39-35
IA3: SQUAW CREEK 0.6 MI E OF US 65 IN HAMPTON
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$321,000 $321,000
39199
Iowa Department ofTransportation
BRFN-65()--39-17
US65: CALAMUS CREEK 1.8 MI N OF IA 122 IN MASONCITY
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$300,000 $300,000
39298
Iowa Department ofTransportation
BRFN-9()--39-66
IA9: LITTLE CEDAR RIVER 4.0 MI E OF E JCT US 218
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$400,000 $400,000
39302
Iowa Department ofTransportation
BRFN-9()--39-66
IA9: WAPSIPINICON RIVER 1.5 MI E OF E JCT CO RDT62
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$264,000 $264,000
39299
Iowa Department ofTransportation
BRFN-9()--39-66
IA9: SOAP CREEK 6.1 MI E OF E JCT US 218
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$238,000 $238,000
39301
Iowa Department ofTransportation
BRFN-9()--39-66
IA9: CEDAR RIVER 2.0 MI W OF W JCT US 218
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$410,000 $410,000
39300
Iowa Department ofTransportation
BRFN-9()--39-66
IA9: ROCK CREEK 5.8 MI W OF W JCT US 218
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$225,000 $225,000
39386
Iowa Department ofTransportation
BRFN-9()--39-98
IA9: WILLOW CREEK 0.4 MI W OF I-35
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$200,000 $200,000
39198
Iowa Department ofTransportation
IMN-35()--0E-17
I-35: FRANKLIN CO TO 1.0 MI N OF CO RD B35
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,773,000 $1,773,000
96
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39376
Iowa Department ofTransportation
STPN-9()--2J-95
IA9: N US 69 INTERSECTION NEAR LELAND
Traffic Signs
TIP Approved TotalFederal Aid
RegionalSwap
$40,000 $40,000
45355
Iowa Department ofTransportation
BRFN-122()--39-17
IA122: WILLOW CREEK 4.4 MI E OF I-35 (EB)
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$900,000 $900,000
45367
Iowa Department ofTransportation
BRFN-14()--39-34
IA14: FLOOD CREEK 3.6 MI S OF CO RD B45
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,300,000 $1,300,000
45268
Iowa Department ofTransportation
BRFN-18()--39-41
US18: DITCH 2.8 MI E OF CO RD R35
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$692,000 $692,000
45251
Iowa Department ofTransportation
BRFN-18()--39-41
US18: W BRANCH IOWA RIVER 0.8 MI E OF CO RD R35
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$715,000 $715,000
45301
Iowa Department ofTransportation
BRFN-218()--39-34
US218: CEDAR RIVER 0.2 MI S OF CO RD B33
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$850,000 $850,000
45330
Iowa Department ofTransportation
BRFN-69()--39-95
US69: PIKE RUN CREEK 0.5 MI N OF N JCT IA 9
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$450,000 $450,000
45433
Iowa Department ofTransportation
IMN-35()--0E-17
I-35: MAIN ST 0.4 MI S OF N JCT US 18 IN CLEAR LAKE(NB & SB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,400,000 $1,400,000
45300
Iowa Department ofTransportation
IMN-35()--0E-17
I-35: IMRL RR 0.2 MI S OF N JCT US 18 IN CLEAR LAKE(NB & SB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,200,000 $1,200,000
97
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45334
Iowa Department ofTransportation
IMN-35()--0E-17
I-35: 4TH AVE S 0.6 MI S OF N JCT US 18 IN CLEARLAKE (NB & SB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,100,000 $1,100,000
45332
Iowa Department ofTransportation
IMN-35()--0E-17
I-35: AT N JCT US 18 IN CLEAR LAKE (NB & SB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,400,000 $1,400,000
45400
Iowa Department ofTransportation
IMN-35()--0E-35
I-35: CO RD C47 TO CERRO GORDO CO
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,860,000 $1,860,000
RTP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38360
Franklin CountyConservation Board
NRT-C035()--9G-00
On 2ND ST NE, Over SQUAW CREEK, S28 T92 R20
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$250,000$200,000
$250,000$200,000
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
73
RPA 2
RGPL-PA02(RTP)--ST-00
NIACOG: RPA 2 TRANSPORTATION PLANNING
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$30,000$25,000
$25,000
$70,000$56,000
$56,000
$70,000$56,000
$56,000
$70,000$56,000
$56,000
$240,000$193,000
$193,000
98
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38325
Garner
TAP-R-2837(605)--8T-41
On Trail, from Country Club Drive W 2450 miles to StateStreet then south across HWY 18.
Ped/Bike Grade & Pave
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$316,000$200,000
$200,000
$316,000$200,000
$200,000
39414
Cerro GordoCountyConservation Board
TAP-R-C017()--8T-17
On Prairie Land Trail, from s33 sw 2 Miles to Gravel Road,
Ped/Bike Grading
TIP Approved TotalFederal Aid
RegionalSwap
$264,000$211,000
$211,000
$264,000$211,000
$211,000
45229
Ventura
TAP-R-7967()--8T-17
In Ventura, trail adjacent to lake Street from Macintosh Parkto Venetian Village Bridge
Ped/Bike Development
TIP Approved TotalFederal Aid
RegionalSwap
$613,432$339,000
$339,000
$613,432$339,000
$339,000
99
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39449
Plymouth
BROS-SWAP-6142(601)--SE-17
In the city of Plymouth, On Main Street Bridge Replacement
Bridge Replacement
TIP Approved
2/16/2021
TotalFederal Aid
RegionalSwap
$580,000
$464,000
$580,000
$464,00038737
Franklin County
BROS-SWAP-6940(602)--FE-35
On South Lincoln Street (S43), Over BAILEYE CREEK, S9T93 R20
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000
$800,000
$1,000,000
$800,00032747
Floyd County
BROS-SWAP-C034(102)--FE-34
On B35 (180th Street), Over SHELL ROCK RIVER, onNLINE S33 T96 R18
Bridge Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$1,400,000
$1,400,000
$1,400,000
$1,400,00038736
Franklin County
BROS-SWAP-C035()--SE-35
On Indigo Avenue, Over SPRING CR, S21 T92 R21
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$375,000
$375,000
$375,000
$375,00032526
Mitchell County
BROS-SWAP-C066()--SE-66
On A19, Over WAPSIPINICON RIVER, on WLINE S21T100 R15
Bridge Replacement
TIP Approved
3/17/2020
TotalFederal Aid
RegionalSwap
$640,000
$640,000
$640,000
$640,00037666
Worth County
BROS-SWAP-C098()--FE-98
On S18, Over STREAM, S3 T98 R22
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00036340
Worth County
BROS-SWAP-C098()--SE-98
On 350TH ST, Over DRAINAGE DITCH, from Killdeer AveW .55 miles S34 T98 R21
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00026731
Cerro GordoCounty
BRS-SWAP-C017(M-24-C)--FF-17
On B65/Larch St, Over unnamed drainage ditch, 1500 Feetto east of Finch Avenue, in S24 T94 R22
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00024978
Kossuth County
BRS-SWAP-C055(B583120)--FF-55
On B55, Over E FORK DES MOINES RIVER, on NLINES31 T95 R28
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,000
100
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38550
Mitchell County
BHS-SWAP-C066()--FC-66
On A 19, Over SMALL STREAM, S23 T100N R18W
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$100,000
$100,000
$100,000
$100,00036035
Floyd County
BROS-SWAP-C034(104)--SE-34
On VICTORY AVE, Over LITTLE CEDAR, along ELINE S16T96 R15
Bridge Replacement
TIP Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$1,400,000
$1,400,000
$1,400,000
$1,400,00036259
Franklin County
BROS-SWAP-C035()--SE-35
On FRANKLIN AVE, Over HARTGRAVE CK, S19 T92 R18
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,0004917
Hancock County
BROS-SWAP-C041(125)--FE-41
225th Street: From Deer Avenue to Estate Avenue
Bridge Replacement
TIP Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$630,000
$630,000
$630,000
$630,00029411
Mitchell County
BROS-SWAP-C066(070)--SE-66
On ECHO AVE, Over ROCK CREEK, S23 T98 R18
Bridge Replacement
TIP Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00037053
Winnebago County
BROS-SWAP-C095(77)--SE-95
On 160TH AVE, Over PIKE RUN, from 430th Street North.25 Miles to existing structure, along WLINE S14 T99 R24
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00037667
Worth County
BROS-SWAP-C098()--SE-98
On A39, Over Winans Creek, S10 T98 R22
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00024975
Kossuth County
BRS-SWAP-C055(B671608)--FF-55
P64: W Line 16 Wesley Twp. over PLUM CREEK
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00024976
Kossuth County
BRS-SWAP-C055(B773304)--FF-55
P64: W. Line of 33 Buffalo Twp. over Lidner Creek
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,000
101
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38549
Mitchell County
BRS-SWAP-C066()--FF-66
On T40, Over Unnamed Creek, S30 T100N R16W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,0002888
Cerro GordoCounty
BROS-SWAP-C017(35)--SE-17
From Lark 1/4 mile East, Over Dam Creek Section 1 T-90N,R-20W on 160th street
Bridge Replacement
TIP Approved
6/20/2023
TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00037655
Floyd County
BROS-SWAP-C034()--SE-34
On 170TH ST, Over FLOOD CREEK, on NLINE S30 T96R17
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00038741
Franklin County
BROS-SWAP-C035()--SE-35
On 40th Street, Over BEAVER CREEK, S26 TT90N RR20
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00045216
Franklin County
BROS-SWAP-C035()--SE-35
On RAIL AVE, Over SMALL STREAM, S14 T91 R20
TIP Approved TotalFederal Aid
RegionalSwap
$270,000
$270,000
$270,000
$270,00010477
Hancock County
BROS-SWAP-C041()--SE-41
On Birch Avenue, Over Lindsey Creek, from 290th StreetNorth 0.91 Miles to 300th Street, at NW S29 T97 R26
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00037670
Worth County
BROS-SWAP-C098()--SE-98
On SPRUCE AVE, Over DRAINAGE DITCH, S31 T100 R19
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00037668
Worth County
BROS-SWAP-C098()--SE-98
On 380TH ST, Over Beaver Creek, S16 T98 R20
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00039011
Floyd County
BROS-SWAP-C034()--FE-34
On T42, Over CEDAR RIVER, at E1/4 S24 T97N R17W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,400,000
$1,400,000
$1,400,000
$1,400,000
102
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38740
Franklin County
BROS-SWAP-C035()--SE-35
On Vine Avenue, Over N BEAVER CREEK, S15 TT90NRR19
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00037060
Winnebago County
BRS-SWAP-C095()--FF-95
On R20 (20th Ave), Over BLUE EARTH RIVER, from 440thSt N 0.25 miles to existing structure S9 T99 R26
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,000
103
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36921
Algona
STBG-SWAP-0085(617)--SG-55
In the city of Algona, On Main Street, from Lucas St. .26Miles to Commercial St.
Grade and Pave
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$1,247,000
$997,000
$997,000
$1,247,000
$997,000
$997,00039413
Charles City
STBG-SWAP-1242()--SG-34
In the city of Charles City, On Us 18, from Gilbert north .3Miles to Grand
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$600,000
$278,000
$278,000
$600,000
$278,000
$278,00036923
Mason City
STBG-SWAP-4822()--SG-17
In the city of Mason City, On Monroe Avenue, from 5thStreet SW 1.04 Miles to 12th Street NW
Pavement Rehab, Culvert Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,500,000
$1,000,000
$1,000,000
$1,500,000
$1,000,000
$1,000,00036924
RPA 2
STBG-SWAP-PA02()--SG-34
On US 18, from ECL of Charles City East to ChickasawCounty Line
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,607,000
$900,000
$900,000
$2,607,000
$900,000
$900,00038315
Clear Lake
STBG-SWAP-1372()--SG-17
In the city of Clear Lake, On Main Avenue, from 8th StreetEast 0.35 Miles to 14th Street
Grade and Pave
TIP Approved TotalFederal Aid
RegionalSwap
$1,987,000
$1,000,000
$1,000,000
$1,987,000
$1,000,000
$1,000,00039563
Hancock County
STBG-SWAP-C041()--SG-41
On B20, from Kossuth County Line East 9 Miles to CountyRoad R-35.
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,625,000
$1,625,000
$1,625,000
$1,625,000
$1,625,000
$1,625,00036598
Kossuth County
STBG-SWAP-C055(B46)--FG-55
On B46, from Kossuth County Route P60 East 6 Miles to IA17
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,000
$1,000,000
$1,000,00038317
RPA 2
STBG-SWAP-PA02()--SG-41
On US HWY 18, from Four miles west of Wesley East toGarner
Pavement Rehab/Widen, Pavement Planing
TIP Approved TotalFederal Aid
RegionalSwap
$6,462,000
$700,000
$700,000
$6,462,000
$700,000
$700,00039412
Mason City
STBG-SWAP-4822()--SG-17
In the city of Mason City, On ,Winn. Way 4th to Pierce, 12stNE Federal to Kentucy, Penn. 1st to 4th
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,350,000
$1,250,000
$1,250,000
$1,350,000
$1,250,000
$1,250,000
104
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
35069
Mitchell County
STBG-SWAP-C066()--FG-66
On S 70, from State Highway 9 9 miles to Highway 105
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,100,000
$1,500,000
$1,500,000
$2,100,000
$1,500,000
$1,500,00036213
Worth County
STBG-SWAP-C098()--FG-98
On S 56, from A 39 N 7.7 miles to Co. 105
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,300,000
$500,000
$500,000
$1,300,000
$500,000
$500,00045514
RPA 2
STBG-SWAP-PA02()--SG-35
On IA 3 E, Over SQUAW CREEK, S34 T92 R19
Pavement Rehab/Widen
TIP Approved TotalFederal Aid
RegionalSwap
$5,400,000
$600,000
$600,000
$5,400,000
$600,000
$600,00045228
Charles City
STBG-SWAP-1242()--SG-34
In Charles City, Main Street from Gilbert St. to Lane St.
TIP Approved TotalFederal Aid
RegionalSwap
$1,200,000
$800,000
$800,000
$1,200,000
$800,000
$800,00037658
Floyd County
STBG-SWAP-C034()--FG-34
On T64,(155th Street & Underwood Ave), from ShadowAveue East and North 7.5 Miles to Mitchell County Line
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,100,000
$1,000,000
$1,000,000
$2,100,000
$1,000,000
$1,000,00039066
Franklin County
STBG-SWAP-C035()--FG-35
On C13 (250th Street), from S25 (Grouse Avenue) E 8miles to S43 (Olive Avenue)
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,200,000
$500,000
$500,000
$2,200,000
$500,000
$500,00039022
Kossuth County
STBG-SWAP-C055(A16)--FG-55
On A16, from West County Line East 18 Miles to US 169
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,500,000
$1,250,000
$1,250,000
$2,500,000
$1,250,000
$1,250,000
105
106
107
RPA 3CHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36416
Dickinson County
BROSCHBP-C030(59)--GA-30
On 140th St, Over Little SIoux River, N1/4 S32 T100 R37
Bridge Replacement
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$750,000$562,000
$750,000$562,000
HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45283
Iowa Department ofTransportation
HSIPX-10()--3L-84
IA10: IA 12 IN HAWARDEN TO NEAR OHIO AVE
Pavement Widening
TIP Approved TotalFederal Aid
RegionalSwap
$893,000$803,700
$893,000$803,700
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37993
Iowa Department ofTransportation
BRF-59()--38-71
US59: ABANDONED RR 0.9 MI S OF CO RD B40(REMOVE BRIDGE)
Grade and Pave, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$3,189,000$2,551,200
$3,189,000$2,551,200
39356
Iowa Department ofTransportation
NHSX-75()--3H-84
US75: IN SIOUX CENTER (STATE SHARE)
Grade and Pave, Right of Way
TIP Approved
12/20/2022
TotalFederal Aid
RegionalSwap
$250,000$200,000
$20,000,000$16,000,000
$20,250,000$16,200,000
108
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38028
Iowa Department ofTransportation
BRFN-12()--39-84
IA12: DRY CREEK 0.3 MI S OF IA 10 IN HAWARDEN
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$339,000 $339,000
37887
Iowa Department ofTransportation
BRFN-3()--39-11
IA3: DITCH 0.4 MI W OF CO RD M54
Culvert Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$862,000 $862,000
37992
Iowa Department ofTransportation
BRFN-59()--39-71
US59: DRY RUN 5.1 MI N OF N JCT IA 10
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$450,000 $450,000
45370
Iowa Department ofTransportation
STPN-10()--2J-71
IA10: 0.35 MI S OF SUTHERLAND
Culvert Extension, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$175,000 $175,000
45401
Iowa Department ofTransportation
STPN-75()--2J-60
US75: S OF S 8TH AVE TO FAIRLAMB ST IN ROCKRAPIDS
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$306,000 $306,000
45403
Iowa Department ofTransportation
STPN-9()--2J-60
IA9: E JCT US 75 TO 0.3 MI W OF ECL ROCK RAPIDS
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$976,000 $976,000
37910
Iowa Department ofTransportation
BRFN-18()--39-21
US18: LOST ISLAND OUTLET 1.0 MI E OF CO RD M54
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$466,000 $466,000
37995
Iowa Department ofTransportation
BRFN-18()--39-74
US18: W FORK DES MOINES RIVER 2.5 MI E OF W JCTIA 4
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$446,000 $446,000
37994
Iowa Department ofTransportation
BRFN-18()--39-74
US18: CYLINDER CREEK AT W JCT CO RD N60
Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$1,440,000 $1,440,000
109
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45298
Iowa Department ofTransportation
NHSN-18()--2R-21
US18: LOST ISLAND OUTLET 1.6 MI E OF CO RD M54
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$333,000 $333,000
38186
Iowa Department ofTransportation
NHSN-71()--2R-30
US71: OKOBOJI GROVE RD IN ARNOLDS PARK TOEAST VIEW AVE
Grade and Pave, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$1,000 $12,249,000 $12,250,000
38284
Iowa Department ofTransportation
STPN-9()--2J-60
IA9: SOUTH DAKOTA EAST 0.5 MI
Grade and Pave, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$407,000 $407,000
39313
Iowa Department ofTransportation
BRFN-10()--39-71
IA10: MUD CREEK 1.9 MI W OF CO RD L48
Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$1,456,000 $1,456,000
39314
Iowa Department ofTransportation
BRFN-59()--39-71
US59: DRY RUN 0.4 MI N OF N JCT IA 10
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$360,000 $360,000
45312
Iowa Department ofTransportation
BRFN-10()--39-84
IA10: BIG SIOUX RIVER AT SOUTH DAKOTA (STATESHARE)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,300,000 $1,300,000
45359
Iowa Department ofTransportation
BRFN-18()--39-74
US18: PRAIRIE CREEK 2.8 MI W OF W JCT IA 15
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$950,000 $950,000
45322
Iowa Department ofTransportation
BRFN-3()--39-11
IA3: STREAM 1.2 MI W OF US 71
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$300,000 $300,000
45435
Iowa Department ofTransportation
BRFN-3()--39-11
IA3: MAPLE CREEK 0.2 MI W OF CO RD M27
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$300,000 $300,000
110
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45299
Iowa Department ofTransportation
BRFN-4()--39-74
IA4: DITCH 3.0 MI N OF N JCT US 18
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$300,000 $300,000
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
141
RPA 3
RGPL-PA03(RTP)--ST-00
NWIPDC - RPA 3: RPA 3 FHWA PLANNING
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$48,000$38,000
$38,000
$48,000$38,000
$38,000
$48,000$38,000
$38,000
$48,000$38,000
$38,000
$192,000$152,000
$152,000
36951
RPA 3
RGTR-PA03()--ST-00
RTA dba/RIDES
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$111,600$89,600
$89,600
$111,600$89,600
$89,600
PA Note: Purchase replacement of 2 minivans
45321
Iowa Department ofTransportation
STP-10()--2C-84
IA10: IA 12 IN HAWARDEN TO US 75
Pavement Widening, Pavement Rehab, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$7,427,000$5,941,600
$7,427,000$5,941,600
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39446
Clay County Boardof Supervisors
TAP-U-C021()--8I-21
Along US Highway 71 ROW, from 300th St. N 1.5 Miles toSCL of City of Fostoria
Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$729,000$583,000
$583,000
$729,000$583,000
$583,000
39447
Dickinson CountyBoard ofSupervisors
TAP-U-C030()--8I-30
On Former IA & NW RR ROW, from 219th Ave in SpiritLake W 1.6 Miles to Jct. IA Highway 86
Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$695,000$180,000
$180,000
$695,000$180,000
$180,000
111
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
44791
Clay County
BROS-SWAP-1987(601)--SE-21
On 1ST ST S, Over Pickeral Run, S18 T96 R35
TIP Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00032593
Clay County
BROS-SWAP-C021(145)--FE-21
On N14, Over ELK CREEK, in NW S15 T95 R35
Bridge Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00037616
Palo Alto County
BROS-SWAP-C074()--SE-74
On 400th Ave, 0.25 miles North of Hwy 18
Bridge Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$240,000
$240,000
$240,000
$240,00019547
Sioux County
BROS-SWAP-C084(161)--FE-84
On 420th Street (B46): NE of Hawarden, Over NO NAMECREEK, from Cleveland Ave E 0.45 miles S21 T95 R47
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$400,000
$398,000
$400,000
$398,00022229
Buena Vista County
BRS-SWAP-C011(100)--FF-11
M36: Over Bluebird Creek NW1/4 S5 T93N R37W
Culvert Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00036271
Lyon County
BRS-SWAP-C060(123)--FF-60
On K52, Over KANARANZI CREEK
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$668,000
$668,000
$668,000
$668,00037518
Osceola County
BRS-SWAP-C072(75)--FF-72
On L40, Over CLOVERDALE CREEK, S29 T99 R41
Bridge Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$550,000
$550,000
$550,000
$550,00019653
Lyon County
BROS-SWAP-C060()--FE-60
On K-52, Over Kanaranzi Creek, S22 T100 R45
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,296,000
$1,296,000
$1,296,000
$1,296,00039092
Obrien County
BROS-SWAP-C071(87)--SE-71
On L 40, Over MUD CREEK, SW S31 TT95N RR41W
Bridge Replacement
TIP Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$150,000
$150,000
$150,000
$150,000
112
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
44838
Osceola County
BROS-SWAP-C072()--SE-72
On 100TH ST, Over STREAM, S9 T100N R42W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00035937
Palo Alto County
BROS-SWAP-C074()--FE-74
On 460th St, from Hwy 15 West Approximately 1 Miles
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$95,000 $340,000
$340,000
$435,000
$340,00012558
Sioux County
BROS-SWAP-C084()--FE-84
On B58 (470th Street), Over W BRANCH FLOYD RIVER,from Grant Ave E approx 0.1 miles, NW-NW 1/4 S17 T94R45
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$450,000
$448,000
$450,000
$448,000
8684
Sioux County
BROS-SWAP-C084()--SE-84
On 14TH ST, Over CREAMERY CREEK, S21 T97 R46
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$450,000
$445,000
$450,000
$445,00026988
Sioux County
BROS-SWAP-C084()--SE-84
On 270TH ST, Over SM STREAM, from Dogwood Ave ENE-NW 1/4 S1 T97 R47
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$402,000
$400,000
$402,000
$400,00032322
Sioux County
BROS-SWAP-C084()--SE-84
On Dogwood Avenue SW of Ireton, IA, Over SMALLSTREAM, from 470th St S approx .10 miles NW-NW 1/4S13 T94 R47
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$140,000
$138,000
$140,000
$138,000
36201
Emmet County
BRS-SWAP-C032()--FF-32
On A 17, Over EF DES MOINES RIVER, S13 T100 R32
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,00044919
Lyon County
BRS-SWAP-C060(40Y)--FF-60
On L 26, Over TAFT CREEK, S24 T99 R43
TIP Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00044923
Lyon County
BRS-SWAP-C060(65Y)--FF-60
On L 26, Over WEST RAT CREEK, S1 T98 R43
TIP Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,000
113
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36065
Sioux County
BRS-SWAP-C084()--FF-84
On 360th Street (B30), Over Rock River, SW-SE 1/4 S16T96 R47
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$2,800,000
$2,795,000
$2,800,000
$2,795,00035253
Sioux County
BRS-SWAP-C084()--FF-84
On BIRCH AVE, Over BIG SIOUX RIVER, from 290th St(A54B) S approx .25 miles NW 1/4 S15 T97 R48
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$200,000
$197,000
$200,000
$197,00021407
Buena Vista County
BROS-SWAP-C011(BV95)--SE-11
220TH AVE: Over BR RACCOON RIVER NW1/4 S27 T92NR35W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00034547
Obrien County
BROS-SWAP-C071(K-20)--SE-71
On Roosevelt Avenue 0.2 Miles South of 420th Street.
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00044839
Osceola County
BROS-SWAP-C072()--SE-72
On ORIOLE AVE, Over OTTER CREEK, S31 T99 R41
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,00032321
Sioux County
BROS-SWAP-C084()--FE-84
On Lily Ave.(L22) NW of Hospers, IA, Over NO NAMECREEK, from 380th St S approx .90 miles SW-SW 1/4 S34T96 R43
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$375,000
$373,000
$375,000
$373,000
32320
Sioux County
BROS-SWAP-C084()--FE-84
On 470th St.(B58) W. of Ireton, IA, Over Indian Creek, fromDogwood Ave E approx .10 miles NW-NW 1/4 S13 T94 R47
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$362,000
$360,000
$362,000
$360,00017855
Sioux County
BROS-SWAP-C084()--FE-84
On 340th Street (B20), SMALL STREAM, from Indian Eapprox 0.40 miles, NE-NW 1/4 S7 T96 R44
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$450,000
$448,000
$450,000
$448,00045132
Lyon County
BHS-SWAP-C060(39W)--FC-60
On K 30, Over MUD CREEK, S4 T98 R46
TIP Approved TotalFederal Aid
RegionalSwap
$150,000
$150,000
$150,000
$150,000
114
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45131
Lyon County
BHS-SWAP-C060(51W)--FC-60
On K 42, Over ROCK RIVER, S23 T98 R46
TIP Approved TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,00034901
Dickinson County
BROS-SWAP-C030(##)--SE-30
On 180th Street , Over Little Sioux River, S20 T99 R37
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,00012560
Sioux County
BROS-SWAP-C084()--FE-84
290th Street: North of Hull, IA, from Harrison Ave E approx1/4 mile NW 1/4 S15 T97 R45
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$422,000
$419,000
$422,000
$419,00035252
Sioux County
BROS-SWAP-C084()--FE-84
On 280th Street, from NW of Rock Valley from DogwoodAve E approx 3/4 mile NE-NE 1/4 S12 T97 R47
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$450,000
$447,000
$450,000
$447,000
SWAP-HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
44785
Emmet County
HSIP-SWAP-C032(53)--FJ-32
Emmet County - Multiple Locations,
Pavement Widening
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$346,000
$329,000
$346,000
$329,000
115
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36950
Spencer
STBG-SWAP-7170(629)--SG-21
In the city of Spencer, On 4th Street, from from intersectionof 5th Ave E W 5680 Feet
Grade and Pave
TIP Approved
7/20/2021
TotalFederal Aid
RegionalSwap
$800,000
$400,000
$400,000
$800,000
$400,000
$400,00036952
Storm Lake
STBG-SWAP-7422()--SG-11
In the city of Storm Lake, On Richland St., from Intersectionof Industry St. E 600 Feet
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$295,000
$155,000
$155,000
$295,000
$155,000
$155,00026809
Buena Vista County
STBG-SWAP-C011(BV61)--FG-11
On C49, from US 71 E 6 miles to 190th Ave
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,800,000
$570,000
$570,000
$1,800,000
$570,000
$570,00032222
Emmet County
STBG-SWAP-C032(54)--FG-32
On N52, from Highway 4 4 miles to City of Dolliver
Pavement Rehab
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$1,040,000
$600,000
$600,000
$1,040,000
$600,000
$600,00020702
Lyon County
STBG-SWAP-C060(A18)--FG-60
On A18, from Big Sioux River East to Int of IA 9
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,640,000
$445,000
$445,000
$2,640,000
$445,000
$445,00035938
Palo Alto County
STBG-SWAP-C074(108)--FG-74
On B63, from 535th Ave East Approximately 4 Miles to CityLimits of West Bend
Pavement Rehab/Widen
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$1,295,000
$768,000
$768,000
$1,295,000
$768,000
$768,00034999
Sioux County
STBG-SWAP-C084(167)--FG-84
On Eagle Ave (K30) N of Ireton, from 420th St (B46) S 3.0miles to IA Hwy #10 (450th St)
Pavement Rehab
TIP Approved
3/16/2021
TotalFederal Aid
RegionalSwap
$878,000
$527,000
$527,000
$878,000
$527,000
$527,00038376
Estherville
STBG-SWAP-2417()--SG-32
In the city of Estherville, On S. 1st St., from IA 9 SE .74Miles to IA 4
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$300,000
$208,000
$208,000
$300,000
$208,000
$208,00038377
Milford
STBG-SWAP-5057()--SG-30
In the city of Milford, On 13th St., from US Highway 71 west.75 Miles to 213th Ave.
Pavement Rehab/Widen
TIP Approved TotalFederal Aid
RegionalSwap
$4,737,000
$1,657,800
$1,657,800
$4,737,000
$1,657,800
$1,657,800
116
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38378
Storm Lake
STBG-SWAP-7422()--SG-11
In the city of Storm Lake, On E Richland St., from IndustrySt east 600 Feet to Radio Road
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$252,000
$163,529
$163,529
$252,000
$163,529
$163,52936431
Buena Vista County
STBG-SWAP-C011(116)--FG-11
On M36, Over LITTLE SIOUX RIVER, S5 T93 R37
Bridge Replacement
TIP Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$3,014,000
$514,000
$2,094,000
$3,014,000
$514,000
$2,094,00037714
Lyon County
STBG-SWAP-C060(L14)--FG-60
On L14, from the South George City Limits south 5 Miles tothe Sioux County Line
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,650,000
$825,000
$825,000
$1,650,000
$825,000
$825,00036066
Sioux County
STBG-SWAP-C084()--FG-84
On L14 (Kiwi Ave), from IA Hwy #10 W. of Alton S 5 miles toSioux/Plymouth Co. Line
Pavement Rehab/Widen
TIP Approved TotalFederal Aid
RegionalSwap
$1,607,000
$800,000
$800,000
$1,607,000
$800,000
$800,00021026
Sioux Center
NHSX-075-3(55)--3H-84
MAIN AVE: widening of Highway 75 (Main Ave.) from 3 to 5lane approx distance 1.4 mi.
Pavement Rehab/Widen
TIP Approved
12/20/2022
TotalFederal Aid
RegionalSwap
$4,066,000
$980,000
$980,000
$4,066,000
$980,000
$980,00039445
Spencer
STBG-SWAP-7170()--SG-21
In the city of Spencer, On E 4th St from 5th Ave E to 10thAve E
Grade and Pave
TIP Approved TotalFederal Aid
RegionalSwap
$1,821,000
$453,000
$453,000
$1,821,000
$453,000
$453,00038904
Clay County
STBG-SWAP-C021()--FG-21
On M27, from B40 North 6.0 Miles to City of Everly
TIP Approved TotalFederal Aid
RegionalSwap
$1,800,000
$900,000
$900,000
$1,800,000
$900,000
$900,00038864
Emmet County
STBG-SWAP-C032()--FG-32
On A20, from Dickinson County Line East 3.4 Miles toCounty Road N26
Pave
TIP Approved TotalFederal Aid
RegionalSwap
$820,000
$492,000
$492,000
$820,000
$492,000
$492,00038631
Palo Alto County
STBG-SWAP-C074()--FG-74
On N28, from Highway 18 South 6 Miles to City of Ayshire
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,800,000
$900,000
$900,000
$1,800,000
$900,000
$900,000
117
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37582
Sioux County
STBG-SWAP-C084()--FG-84
On 400th St (B40) Near 7th Ave. SE at Sioux Center, IAEast Approx. 5.5 Miles to Jefferson Ave. (K64),
Pavement Rehab/Widen
TIP Approved TotalFederal Aid
RegionalSwap
$1,868,000
$1,080,000
$1,080,000
$1,868,000
$1,080,000
$1,080,00045027
Lyon County
STBG-SWAP-C060()--FG-60
On K16, from IA 9 N 3 miles to MN State Ln S30 T100 R47
TIP Approved TotalFederal Aid
RegionalSwap
$1,050,000
$500,000
$500,000
$1,050,000
$500,000
$500,00038876
Osceola County
STBG-SWAP-C072(2024)--FG-72
On L32,L40,A22,A30,A34, from L32:HWY9-MNLINE;L40:HWY9-A30; A22:SIBLEY-HWY59; A30:NWBLVD-HWY59; A34:ASHTON-HWY59
Pavement Rehab, Granular Shoulders
TIP Approved TotalFederal Aid
RegionalSwap
$5,160,000
$1,419,000
$1,419,000
$5,160,000
$1,419,000
$1,419,000
39102
Sioux County
STBG-SWAP-C084()--FG-84
On Jackson Avenue (K64), from 400th Street (B40) N 3miles to 370th Street (B30)
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$927,294
$533,294
$533,294
$927,294
$533,294
$533,294
118
I I
0 5 10
RPA 4 - Siouxland Regional Transportation Planning Association
1122 Pierce Street, P.O. Box 1077, Sioux City, IA 51102
Phone: 712-279-6286, Fax: 712-279-6920, www.simpco.org
Executive Director: Michelle Bostinelos, [email protected]
Regional Planning Director: Erin Berzina, [email protected]
Siouxland Interstate
Metropolitan Planning
Council (SIMPCO)
I
20 Miles
Plymouth
County
Woodbury
County
Cherokee
County
�orts � Commercial
- Interstate
- National Highway System
El Enhanced - Primary Roads
El General Service
El Basic Service
El Local Service Transit [el Regional
[el Large Urban
[el Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
Local Roads
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] RPA Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
119
120
RPA 4CHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
12827
Woodbury County
BROSCHBP-C097(141)--GA-97
On O'Brien Ave., from D38 to 210th Street S36 T88 R43
Bridge Replacement
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$1,100,000$600,820
$499,180
$1,100,000$600,820
$499,18033890
Woodbury County
BRS-CHBP-C097(139)--GB-97
On K64, Over unnamed creek, from 160th St n 0.1 Miles toUS 20, at NW S32 T89 R44
Bridge Approach Repair, Bridge Replacement, Guardrail
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$850,000$464,270
$385,730
$850,000$464,270
$385,730
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38001
Iowa Department ofTransportation
BRF-12()--38-75
IA12: INDIAN CREEK 4.0 MI N OF CO RD C16
Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$2,355,000$1,884,000
$2,355,000$1,884,000
39379
Iowa Department ofTransportation
IMX-29()--02-97
I-29: IA 141 INTERCHANGE
Grade and Pave, Bridge Replacement, Erosion Control
TIP Approved TotalFederal Aid
RegionalSwap
$5,000$4,500
$15,240,000$13,716,000
$249,000$224,100
$15,494,000$13,944,600
38246
Iowa Department ofTransportation
NHSX-75()--3H-75
US75: N OF MAPLE ST IN HINTON TO S OF 2ND ST INMERRILL (NB)
Grade and Pave, Culvert Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$22,043,000$17,634,400
$22,043,000$17,634,400
39318
Iowa Department ofTransportation
NHSX-75()--3H-75
US75: N OF MAPLE ST IN HINTON TO S OF 2ND ST INMERRILL (SB)
Grade and Pave, Culvert Replacement, Erosion Control
TIP Approved TotalFederal Aid
RegionalSwap
$20,866,000$16,692,800
$374,000$299,200
$21,240,000$16,992,000
121
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37984
Iowa Department ofTransportation
BRFN-175()--39-67
IA175: MISSOURI RIVER E OF DECATUR NEBRASKA(STATE SHARE)
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$37,000 $37,000 $37,000 $37,000 $148,000
37982
Iowa Department ofTransportation
BRFN-175()--39-67
IA175: MISSOURI RIVER E OF DECATUR NEBRASKA(STATE SHARE)
Bridge Cleaning
TIP Approved TotalFederal Aid
RegionalSwap
$37,000 $37,000 $37,000 $37,000 $148,000
37999
Iowa Department ofTransportation
BRFN-3()--39-75
IA3: STREAM 1.0 MI W OF CO RD K42
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$103,000 $103,000
38110
Iowa Department ofTransportation
IMN-29()--0E-67
I-29: CO RD E60 TO CO RD E24 (VAR RAMP LOC)
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,440,000 $1,440,000
45407
Iowa Department ofTransportation
NHSN-75()--2R-75
US75: HINTON TO MERRILL (SB)
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$715,000 $715,000
38245
Iowa Department ofTransportation
NHSN-75()--2R-75
US75: WOODBURY CO TO S OF W GROVER ST INHINTON (NB)
Erosion Control
TIP Approved TotalFederal Aid
RegionalSwap
$382,000 $382,000
45417
Iowa Department ofTransportation
STPN-12()--2J-75
IA12: E JCT IA 3 IN AKRON TO IA 10 IN HAWARDEN
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000 $1,000,000
37981
Iowa Department ofTransportation
BRFN-141()--39-67
IA141: MIDDLE SOLDIER RIVER 1.6 MI E OF IA 183
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$377,000 $377,000
37986
Iowa Department ofTransportation
BRFN-175()--39-67
IA175: DITCH 1.9 MI W OF E JCT IA 141
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$259,000 $259,000
122
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37985
Iowa Department ofTransportation
BRFN-175()--39-67
IA175: MAPLE RIVER 1.0 MI W OF E JCT IA 141
Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$2,979,000 $2,979,000
38000
Iowa Department ofTransportation
BRFN-3()--39-75
IA3: MINK CREEK 0.4 MI W OF CO RD K42
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$294,000 $294,000
38047
Iowa Department ofTransportation
BRFN-31()--39-97
IA31: LITTLE SIOUX RIVER 0.8 MI S OF US 20
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$774,000 $774,000
38003
Iowa Department ofTransportation
BRFN-404()--39-75
IA404: FLOYD RIVER 0.4 MI N OF IA 3 (SB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$330,000 $330,000
38147
Iowa Department ofTransportation
IMN-29()--0E-97
I-29: CO RD K25 4.7 MI S OF US 20
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$160,000 $160,000
45347
Iowa Department ofTransportation
STPN-175()--2J-47
IA175: MAPLE RIVER 1.0 MI E OF BATTLE CREEK
Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$174,000 $174,000
39319
Iowa Department ofTransportation
BRFN-140()--39-75
IA140: W FORK LITTLE SIOUX RIVER 1.5 MI N OF CORD C66
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$531,000 $531,000
39320
Iowa Department ofTransportation
BRFN-140()--39-75
IA140: CLEAR CREEK 2.8 MI S OF IA 3
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$180,000 $180,000
39321
Iowa Department ofTransportation
BRFN-140()--39-75
IA140: RATHBURN CREEK 3.3 MI S OF CO RD C38
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$235,000 $235,000
123
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39305
Iowa Department ofTransportation
BRFN-175()--39-67
IA175: DITCH 3.0 MI E OF CO RD L12
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$816,000 $816,000
39304
Iowa Department ofTransportation
BRFN-175()--39-67
IA175: MAPLE RIVER 3.8 MI E OF CO RD L20
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,050,000 $1,050,000
39303
Iowa Department ofTransportation
BRFN-175()--39-67
IA175: MCCANDLESS CLEGHORN DITCH 0.6 MI E OF I-29 IN ONAWA
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,275,000 $1,275,000
39381
Iowa Department ofTransportation
NHSN-20()--2R-97
US20: ABANDONED RR 0.1 MI E OF CO RD D25(REMOVE BRIDGE)
Grade and Pave
TIP Approved TotalFederal Aid
RegionalSwap
$2,700,000 $2,700,000
45282
Iowa Department ofTransportation
STPN-12()--2J-75
IA12: NEAR N JCT CO RD K18
TIP Approved TotalFederal Aid
RegionalSwap
$1,200,000 $1,200,000
45262
Iowa Department ofTransportation
BRFN-3()--39-18
IA3: LITTLE SIOUX RIVER 1.5 MI E OF US 59
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$1,388,000 $1,388,000
45436
Iowa Department ofTransportation
BRFN-31()--39-97
IA31: STREAM 3.2 MI S OF CO RD D22
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$400,000 $400,000
45314
Iowa Department ofTransportation
BRFN-31()--39-97
IA31: STREAM 1.9 MI N OF CO RD D30
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$400,000 $400,000
124
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
218
RPA 4
RGPL-PA04(RTP)--ST-00
SIMPCO - RPA 4: RPA 4 FHWA PLANNING
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$58,500$46,800
$46,800
$58,500$46,800
$46,800
$58,500$46,800
$46,800
$58,500$46,800
$46,800
$234,000$187,200
$187,200
37804
RPA 4
RGTR-PA04()--ST-00
One (1) Light Duty Bus, ADA compliant
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$102,000$81,000
$81,000
$102,000$81,000
$81,000
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38952
Marcus
TAP-R-4762()--8T-18
In the city of Marcus, Recreational Trail extending from theCity Park around the School and residential areas
Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$507,000$140,000
$140,000
$507,000$140,000
$140,000
45225
Marcus
TAP-R-4762()--8T-18
In the City of Marcus, Recreational Trail extending from theCity Park around the School and residential areas.
Ped/Bike Paving
TIP Approved TotalFederal Aid
RegionalSwap
$749,410$95,300
$95,300
$749,410$95,300
$95,300
125
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
44804
Cherokee County
BHS-SWAP-C018()--FC-18
On C38, Over LITTLE SIOUX RIVER, 0.18 mile E ofCherokee City limits S35 T92 R40
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00038551
Ida Grove
BRM-SWAP-3650(606)--SD-47
In the city of Ida Grove, On Moorhead Ave., Over OdeboltCreek
Bridge Replacement
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$2,785,000
$1,000,000
$2,785,000
$1,000,00029289
Plymouth County
BROS-SWAP-C075(158)--SE-75
On Diamond Ave, S9/10 T93 R48
Bridge Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$520,000
$520,000
$520,000
$520,00032716
Plymouth County
BROS-SWAP-C075(159)--SE-75
On SHAMROCK AVE, S15 T93 R43
Bridge Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00029291
Plymouth County
BROS-SWAP-C075(161)--FE-75
On K-42 , S2/3 T90 R46
Bridge Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00037539
Cherokee County
BROS-SWAP-C018()--SE-18
On 630th St, Over Silver Creek, 0.23 mile W of theintersection of 630th St and Hwy 59 S22 T90 R40
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$648,000
$648,000
$648,000
$648,00036634
Ida County
BROS-SWAP-C047()--SE-47
On A Ave, Over Outter Creek/ Crawford County, S35 T39R86
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$220,000
$220,000
$220,000
$220,00038912
Monona County
BROS-SWAP-C067(90)--FE-67
On 160th Street, Over Rush Creek, SE S35 T85 R42
Bridge Replacement
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,00033857
Monona County
BROS-SWAP-C067(91)--FE-67
On L37, Over East Soldier River, S35 T84 R42
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,200,000
$1,200,000
$1,200,000
$1,200,000
126
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38760
Monona County
BROS-SWAP-C067(93)--FE-67
On L37, Over NE Norway Creek, in SW S26 T83 R42
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00035184
Plymouth County
BROS-SWAP-C075(240260)--SE-75
On 160TH ST, Over DEEP CREEK, S2 T92 R44
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00029298
Plymouth County
BROS-SWAP-C075(373407)--SE-75
On Granite Ave, S33/34 T93 R47
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00045187
Ida County
BRS-SWAP-C047()--FF-47
On D 22, Over UNNAMED CREEK, S6 T88 R41
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$360,000
$360,000
$360,000
$360,00045188
Ida County
BRS-SWAP-C047()--FF-47
On D 22, Over BACON CREEK, S6 T88 R41
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00038703
Monona County
BRS-SWAP-C067(89)--FF-67
On E16, Over Rush Creek, N1/4 S24 T83 R42
Bridge Replacement
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$900,000
$900,000
$900,000
$900,00018344
Woodbury County
BRS-SWAP-C097()--FF-97
D12 Over Pierson Creek 0.75 miles east of Mason Avenuein section 9, T89N, R42W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00038913
Monona County
BROS-SWAP-C067(94)--FE-67
On 270th Street, Over Norway Creek, SW S27 T83 R42
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00038918
Monona County
BROS-SWAP-C067(95)--FE-67
On L20, Over Jordan Creek, NE S28 T83 R43
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$825,000
$825,000
$825,000
$825,000
127
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36245
Plymouth County
BROS-SWAP-C075(142870)--SE-75
On 260TH ST, Over DRY BRANCH, S28 T91 R44
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00036229
Plymouth County
BROS-SWAP-C075(331080)--SE-75
On 110th St, S3/10 T93 R43
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00014259
Woodbury County
BROS-SWAP-C097(E-299-1)--FE-97
On CORRECTIONVILLE RD, Over WHISKEY CREEK,from Charles Ave. E 0.1 miles in Section 35 T89N R46W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00045204
Ida County
BRS-SWAP-C047()--FF-47
On M 25, Over UNNAMED CREEK, from N city limits ofGalva N .04 miles S23 T89 R39
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00045205
Ida County
BRS-SWAP-C047()--FF-47
On M 25, Over UNNAMED STREAM, from Cherokee/IdaCounty Line S .1 miles to Bridge S1 T89 R39
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00044999
Woodbury County
BRS-SWAP-C097(D15)--FF-97
Bridge Replacement Project D15 over Muddy Creek, 0.8miles east of Eastland Ave. in section 8 T89N R45W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,00038973
Plymouth County
BROS-SWAP-C075(270407)--SE-75
On FIR AVE, S4 T92N R47W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00038977
Plymouth County
BROS-SWAP-C075(270407)--SE-75
On LYNX AVE, S4 T91N R45W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$550,000
$550,000
$550,000
$550,00044820
Cherokee County
BRS-SWAP-C018()--FF-18
On L 48, Over BEAR CREEK, 0.76 miles N of theintersection of L48 and C16 S15 T93 R41
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$358,000
$358,000
$358,000
$358,000
128
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45203
Ida County
BRS-SWAP-C047()--FF-47
On D 15, Over UNNAMED CREEK, from Ida/Sac W .04miles to Bridge S25 T89 R39
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,000
129
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37810
Cherokee
STBG-SWAP-1272()--SG-18
In the city of Cherokee, On N. Roosevelt Street, fromE.Main Street to Fountain Street
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,050,000
$840,000
$840,000
$1,050,000
$840,000
$840,00036642
Le Mars
STBG-SWAP-4257()--SG-75
In the city of Le Mars, On 12th Street SW, from CentralAvenue to 6th Avenue SW
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$700,000
$465,000
$465,000
$700,000
$465,000
$465,00035396
Le Mars
STBG-SWAP-4257(632)--SG-75
In the city of Le Mars, On Central Ave, from 12th St SE to5th St
Pavement Rehab
TIP Approved
3/16/2021
TotalFederal Aid
RegionalSwap
$750,000
$600,000
$600,000
$750,000
$600,000
$600,00036085
Woodbury County
STBG-SWAP-C097(K64)--FG-97
On K64, from Intersection of IA 141 North and East 3.6Miles to County Route D25
Pavement Rehab, Granular Shoulders
TIP Approved
2/16/2021
TotalFederal Aid
RegionalSwap
$1,800,000
$1,200,000
$1,200,000
$1,800,000
$1,200,000
$1,200,00036643
Cherokee
STBG-SWAP-1272()--SG-18
In the city of Cherokee, On Euclid Avenue, from E SpruceStreet to E Bluff Street
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$377,000
$269,000
$269,000
$377,000
$269,000
$269,00037319
Monona County
STBG-SWAP-C067(92)--FG-67
On E16, from Mapleton East 5.5 Miles to Woodbury CountyLine
Pave
TIP Approved TotalFederal Aid
RegionalSwap
$1,450,000
$1,160,000
$1,160,000
$1,450,000
$1,160,000
$1,160,00039094
Ida County
STBG-SWAP-C047()--FG-47
On D 50, from the intersection of Woodbury Ave and D50 E2 miles to the intersection of D50 and L51
Pavement Rehab/Widen
TIP Approved TotalFederal Aid
RegionalSwap
$1,130,000
$904,000
$904,000
$1,130,000
$904,000
$904,00036249
Plymouth County
STBG-SWAP-C075(49-2023)--FG-75
On K49, from from C38 N 1mile, S27/28 T92 R45
Pave
TIP Approved TotalFederal Aid
RegionalSwap
$1,244,000
$990,200
$990,200
$1,244,000
$990,200
$990,20045226
Le Mars
STBG-SWAP-4257()--SG-75
On 18TH ST SW, Over SMALL STREAM, S21 T92 R45
TIP Approved TotalFederal Aid
RegionalSwap
$782,000
$625,600
$625,600
$782,000
$625,600
$625,600
130
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45042
Woodbury County
STBG-SWAP-C097(K-42)--FG-97
On Dallas Ave/K42, from K45 north approx 5 miles to theeast intersection of D53/280th St.and K42.
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$3,000,000
$1,263,000
$1,263,000
$3,000,000
$1,263,000
$1,263,000
131
RPA 5 - Mid-Iowa Development Association Council of Governments
602 1st Avenue South, Fort Dodge, IA 50501
Phone: 515-576-7183, Fax: 515-576-7184, www.midascog.net
Executive Director: Kathy Pfiffner, [email protected]
Local Assistance Manager: Shirley Helgevold, [email protected]
I
Pocahontas i---4 County i
I
I - ---------------1 I I
Calhoun
County
o,...1
....,..N ....... 5----,-1,...1
0 ---,----.-----.-,,. Mi:7
Webster
County
Wright
County
�orts � Commercial
El Enhanced
General Service
Basic Service
El Local Service Transit rel Regional
[el Large Urban
rel Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
- Interstate
- National Highway System
- Primary Roads
Local Roads
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] RPA Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
132
133
RPA 5CHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
2806
Webster County
BROSCHBP-C094(124)--NC-94
On Mining Boulevard, Over Unnamed Creek, in NE1/4 S18T88 R28
Bridge Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$100,000$54,620
$45,380
$100,000$54,620
$45,38032243
Webster County
BROSCHBP-C094(125)--NC-94
On 120TH ST, Over Bass Creek, along NLINE S14 T90R29
Bridge Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$130,000$71,006
$130,000$71,006
36553
Calhoun County
BRS-CHBP-C013()--GB-13
On 270th Street (D36), Over Lake Creek, from NW cornerSec. 32 East 0.2 Miles, along NLINE S32 T88N R32W
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$690,410$300,410
$389,000
$690,410$300,410
$389,000
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39373
Iowa Department ofTransportation
BRF-926()--38-94
IA926: BUSINESS US 20 OVER CN RR AND 7TH ST 1.5MI N OF S JCT US 169 (WB)
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$8,000,000$6,400,000
$8,000,000$6,400,000
39372
Iowa Department ofTransportation
BRF-926()--38-94
IA926: BUSINESS US 20 OVER DES MOINES RIVER ANDB AVE 1.3 MI N OF S JCT US 169 (WB)
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$6,500,000$5,200,000
$6,500,000$5,200,000
134
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38042
Iowa Department ofTransportation
BRFN-20()--39-94
US20: DES MOINES RIVER 2.6 MI E OF US 169 (WB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$774,000 $774,000
37892
Iowa Department ofTransportation
BRFN-4()--39-13
IA4: PURGATORY CREEK 2.8 MI S OF N JCT IA 175
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$461,000 $461,000
45399
Iowa Department ofTransportation
IMN-35()--0E-40
I-35: US 20 AND CO RD D25 INTERCHANGE RAMPS
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$950,000 $950,000
45279
Iowa Department ofTransportation
NHSN-20()--2R-40
US20: 1.8 MI W OF E JCT IA 17
TIP Approved TotalFederal Aid
RegionalSwap
$20,000 $20,000
45427
Iowa Department ofTransportation
NHSN-20()--2R-94
US20: APPROX 1 MI E OF CO RD P59
Slope Improvement
TIP Approved TotalFederal Aid
RegionalSwap
$294,000 $294,000
45276
Iowa Department ofTransportation
STPN-175()--2J-40
IA175: 0.45 MI E OF YOUNG AVE
Culvert Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$114,000 $114,000
45280
Iowa Department ofTransportation
STPN-175()--2J-94
IA175: 0.26 MI E OF THE DES MOINES RIVER
TIP Approved TotalFederal Aid
RegionalSwap
$156,000 $156,000
38299
Iowa Department ofTransportation
STPN-69()--2J-99
US69: N OF UP RR TO N JCT CO RD C20
Grade and Pave, Bridge Replacement, Wetland Mitigation
TIP Approved TotalFederal Aid
RegionalSwap
$9,203,000 $9,203,000
38054
Iowa Department ofTransportation
BRFN-17()--39-99
IA17: PRAIRIE CREEK 0.9 MI N OF CO RD C26
Bridge Replacement, Wetland Mitigation, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$2,326,000 $2,326,000
135
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38041
Iowa Department ofTransportation
BRFN-7()--39-94
IA7: NORTH LIZARD CREEK 0.5 MI W OF US 169
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$822,000 $822,000
39258
Iowa Department ofTransportation
BRFN-169()--39-46
US169: TRULNER CREEK 0.2 MI S OF CO RD C20
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$505,000 $505,000
39375
Iowa Department ofTransportation
BRFN-20()--39-94
US20: CO RD D20 AND UP RR 0.4 MI E OF CO RD D36(EB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,338,000 $1,338,000
39389
Iowa Department ofTransportation
BRFN-69()--39-99
US69: DRAINAGE DITCH 5 3.7 MI S OF IA 3
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$501,000 $501,000
39374
Iowa Department ofTransportation
BRFN-7()--39-94
IA7: SOUTH LIZARD CREEK 0.8 MI E OF W JCT CO RDP29
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$625,000 $625,000
45422
Iowa Department ofTransportation
STPN-35()--2J-40
I-35: S OF US 20 INTERCHANGE
Traffic Signs
TIP Approved TotalFederal Aid
RegionalSwap
$20,000 $20,000
45326
Iowa Department ofTransportation
BRFN-175()--39-13
IA175: HARDIN CREEK 0.7 MI W OF CO RD P21
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$375,000 $375,000
45356
Iowa Department ofTransportation
BRFN-3()--39-76
IA3: BIG CEDAR CREEK 6.3 MI W OF IA 4
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$950,000 $950,000
136
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45444
Iowa Department ofTransportation
STP-17()--2C-99
IA17: HAMILTON CO TO SCL OF EAGLE GROVE
Pavement Widening, Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$3,465,000$2,772,000
$3,465,000$2,772,000
45418
Iowa Department ofTransportation
STP-175()--2C-94
IA175: ECL OF LOHRVILLE TO GOWRIE
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$4,494,000$3,595,200
$4,494,000$3,595,200
280
RPA 5
RGPL-PA05()--ST-94
MIDAS - RPA 5: RPA 5 TRANSPORTATION PLANNING
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$40,000$32,000
$32,000
$40,000$32,000
$32,000
$43,750$35,000
$35,000
$123,750$99,000
$99,000
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39465
Webster CountyConservation Board
TAP-R-C094(123)--8T-94
Trail around Badger Lake in Kennedy Park approximately10,860' x 8' trail.
Ped/Bike Development
TIP Approved
4/20/2021
TotalFederal Aid
RegionalSwap
$561,000$350,000
$350,000
$561,000$350,000
$350,000
39166
Fort Dodge
TAP-U-2690(635)--8I-94
On 170th Street, from End of existing trail west 1.25 Miles toNelson Avenue/N 15th St
Ped/Bike Development
TIP Approved
2/16/2021
TotalFederal Aid
RegionalSwap
$578,000$350,000
$350,000
$578,000$350,000
$350,000
38367
Humboldt
TAP-R-3595()--8T-46
In the city of Humboldt, On Trail, from East of Eagle RidgeDrive East to 3rd Ave N and Cottonwood Trail
Ped/Bike Structures
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000$700,000
$700,000
$1,000,000$700,000
$700,000
45500
Humboldt
TAP-R-3595()--8T-46
Eagle Ride Nature Trail Extension
Ped/Bike Structures
TIP Approved TotalFederal Aid
RegionalSwap
$370,227$254,181
$254,181
$370,227$254,181
$254,181
45489
Hamilton CountyConservation Board
TAP-R-C040()--8T-40
Construct 2 identical observation decks on both side of theexisting JewEllsworth Trail to include benches.
Ped/Bike Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$103,681$82,160
$82,160
$103,681$82,160
$82,160
137
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36996
Fort Dodge
BROS-SWAP-2690(631)--SE-94
On HIGHLAND PARK AVE, Over OVER UP RR, S29 T89R28
Bridge Replacement
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$1,200,000
$1,000,000
$1,200,000
$1,000,00036551
Calhoun County
BROS-SWAP-C013(100)--SE-13
On 380th Street, Over Stream, from NW corner Sec. 25East 0.7 Miles, along NLINE S25 T86N R33W
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$250,000
$249,000
$250,000
$249,00037722
Calhoun County
BROS-SWAP-C013(101)--SE-13
On 165th Street, Over Lake Creek, Ctr S06 T89 R32
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$251,000
$1,000
$251,000
$1,00037344
Hamilton County
BROS-SWAP-C040()--SE-40
On 390th St., Over SQUAW CREEK, NW S32 T86 R25
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$550,000
$550,000
$550,000
$550,00032396
Humboldt County
BROS-SWAP-C046(73)--SE-46
On Virginia Avenue, from NW cor S 0.9 Miles, S3 T93NR27W
Bridge Replacement
TIP Approved
2/18/2020
TotalFederal Aid
RegionalSwap
$400,000
$320,000
$400,000
$320,00035219
Humboldt County
BROS-SWAP-C046(74)--SE-46
On Washington Ave., from NW corner Section 26 NorwayTwp S 0.6 miles S26 T91N R27W
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$125,000
$120,000
$125,000
$120,00035337
Pocahontas County
BROS-SWAP-C076()--SE-76
On 150th Ave and 510th St, Over BIG CEDAR CK DD #41,at NW S36 T92 R34 (Crooked Bridge)
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$455,000
$450,000
$455,000
$450,00014191
Pocahontas County
BROS-SWAP-C076(19/30Ma)--SE-76
On 500TH ST, Over LITTLE CEDAR CREEK, S30 T92 R34
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$354,000
$350,000
$354,000
$350,00029480
Pocahontas County
BROS-SWAP-C076(70)--SE-76
On 160TH ST, Over SOUTH BRANCH LIZARD, S3 T89R31
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$328,000
$325,000
$328,000
$325,000
138
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36538
Calhoun County
BROS-SWAP-C076(S34 Liz)--SE-76
On 160th Street, Over Lizard Creek, from NW Corner Sec.3 East 0.6 Miles, on NLINE S3 T89N R31W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$325,000
$323,000
$325,000
$323,00023611
Webster County
BROS-SWAP-C094(112)--SE-94
On 170th Street, Over Lizard Creek, along NLINE S11 T89R30
Bridge Replacement
TIP Approved
10/20/2020
TotalFederal Aid
RegionalSwap
$1,070,000
$1,070,000
$1,070,000
$1,070,00035909
Webster County
BROS-SWAP-C094(126)--FE-94
On D60, Over DD, along NLINE S8 T86 R30
Bridge Replacement
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00035910
Webster County
BROS-SWAP-C094(127)--FE-94
On D60, Over BUTTRICK CREEK, along NLINE S10 T86R30
Bridge Replacement
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00034885
Wright County
BROS-SWAP-C099()--SE-99
On Buchanan Avenue, Over Humboldt County DrainageDitch 3, from 290th Street North 1.1 Miles, S32 T91 R26
Bridge Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$425,000
$425,000
$425,000
$425,00037728
Calhoun County
BROS-SWAP-C013()--FE-13
On 310th Street (D46), Over Drainage Ditch, from N.W.Cor. Sec.23 East 0.2 Miles, along NLINE S23 T87N R31W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$250,000
$249,000
$250,000
$249,00019451
Calhoun County
BROS-SWAP-C013()--SE-13
On 320TH ST, Over Purgatory Creek, from NW Cor Sec 27East 0.7 Miles, along NLINE S27 T87 R32
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$400,000
$398,000
$400,000
$398,00020429
Hamilton County
BROS-SWAP-C040(102)--SE-40
On XIRCUS AVE, Over Long Dick Creek, S22 T86 R23
Bridge Replacement
TIP Approved
7/20/2021
TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00026825
Hamilton County
BROS-SWAP-C040(103)--SE-40
On TOLLMAN AVE, Over TRIB TO SKUNK, S12 T86 R24
Bridge Replacement
TIP Approved
7/20/2021
TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,000
139
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
27098
Humboldt County
BROS-SWAP-C046()--SE-46
On Lone Tree Road, from NW corner E 0.3 mi & S 0.8 mi,S32 T91N R28W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$585,000
$585,000
$585,000
$585,00035340
Pocahontas County
BROS-SWAP-C076()--SE-76
On 470TH ST, Over CROOKED CREEK, S9 T92 R31
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$503,000
$500,000
$503,000
$500,00032250
Webster County
BROS-SWAP-C094(128)--FE-94
On D68, Over Lost Grove Creek, along NLINE S34 T86R29
Bridge Replacement
TIP Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00037063
Wright County
BROS-SWAP-C099()--SE-99
On 210TH ST, Over EAGLE CREEK, along NLINE S33 T92R25
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00012449
Calhoun County
BROS-SWAP-C013()--SE-13
On 380th Street , Over Purgatory Creek, from NW cornerof Sec. 30 E 0.7 miles S30 T86N R32W
Bridge Replacement
TIP Approved
6/20/2023
TotalFederal Aid
RegionalSwap
$380,000
$378,000
$380,000
$378,00029443
Calhoun County
BROS-SWAP-C013()--SE-13
On 160th St., Over DD181 Big Cedar Creek, from NEcorner of Sec. 4 West 0.4 Miles, on NLINE S04 T89 R34
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$325,000
$324,000
$325,000
$324,00037352
Hamilton County
BROS-SWAP-C040()--SE-40
On 310TH ST, Over Main Branch of Mud Lake DD #71, NWS21 T87 R24
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$425,000
$425,000
$425,000
$425,00038558
Humboldt County
BROS-SWAP-C046()--SE-46
On HAWAII AVENUE, Over DD HK JT2, from NWCORNER S 0.8 Miles, S8 TT93N RR29W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$265,000
$260,000
$265,000
$260,00037041
Wright County
BROS-SWAP-C099()--SE-99
On BAXTER AVE, Over STREAM, along NLINE S7 T91R26
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$150,000
$150,000
$150,000
$150,000
140
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
35912
Webster County
BRS-SWAP-C094()--FF-94
On P33, Over STREAM-D.D.196, along WLINE S12 T86R30
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00037044
Wright County
BRS-SWAP-C099()--FF-99
On R75, Over Sheldon Creek, at Ctr S27 T90 R23
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00045102
Calhoun County
BROS-SWAP-C013()--SE-13
On 280TH ST, Over DD. NO 31, S6 T87 R31
TIP Approved TotalFederal Aid
RegionalSwap
$400,000
$399,000
$400,000
$399,00038715
Humboldt County
BROS-SWAP-C046()--SE-46
On Iowa Avenue, Over drainage ditch, from C49 S 0.7 milesto H. Web. Jt 1-10 Crossing S33 T91 R29
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$125,000
$120,000
$125,000
$120,00037779
Pocahontas County
BROS-SWAP-C076(S33Ced)--SE-76
On 640th St / 160Th St, Over BIG CEDAR CR DD 181,between S33 T90 R34 and S4 T89 R34
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$328,000
$325,000
$328,000
$325,00037263
Webster County
BRS-SWAP-C094(900121)--FF-94
On P29 (Fairbanks Ave) over Lizard Creek S01 T89 R30
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$960,000
$960,000
$960,000
$960,00038690
Webster County
BRS-SWAP-C094(901213)--FF-94
On P29 (Fairbanks Ave) over W Branch Lizard Creek S12T89 R30
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$960,000
$960,000
$960,000
$960,00036518
Wright County
BRS-SWAP-C099()--FF-99
On R59, Over WHEELER CREEK, on WLINE S20 T91 R23
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,000
141
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
35265
Calhoun County
STBG-SWAP-C013()--FG-13
On D36, from East Corporate Line Rockwell City East 11Miles to Webster County Line
Pave
TIP Approved TotalFederal Aid
RegionalSwap
$4,627,000
$1,000,000
$1,000,000
$4,627,000
$1,000,000
$1,000,00034565
Hamilton County
STBG-SWAP-C040(100)--FG-40
On D65, from 1st Street in the City of Randall E 7 miles toHardin County Line S26 T86 R24
Pavement Rehab/Widen
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$2,000,000
$1,630,000
$1,630,000
$2,000,000
$1,630,000
$1,630,00038369
Fort Dodge
STBG-SWAP-2690()--SG-94
In the city of Fort Dodge, On 3rd Ave NW/Hawkeye Ave,from Northwest Des Moines River Bridge east to east of 6thSt NW
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$3,536,000
$1,900,000
$1,900,000
$3,536,000
$1,900,000
$1,900,000
37777
Pocahontas County
STBG-SWAP-C076(C-49)--FG-76
On C-49, from the Buena Vista County line east 12 Miles toHwy 4
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,503,000
$1,500,000
$1,500,000
$2,503,000
$1,500,000
$1,500,00035186
Webster County
STBG-SWAP-C094(D14)--FG-94
On D14 (170th Street), from P56 (Nelson Avenue) east 8Miles to P71 (Vincent Avenue)
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$3,500,000
$3,050,000
$3,050,000
$3,500,000
$3,050,000
$3,050,00045488
Humboldt
STBG-SWAP-3595()--SG-46
Rehabilitation of Sumner Avenue from the intersection of13th St SW East to the Humboldt city limits.
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$900,000
$900,000
$900,000
$900,000
$900,000
$900,00045452
Thor
STBG-SWAP-7637()--SG-46
In the city of Thor: Dean St approx .25 miles east of P66
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$130,000
$130,000
$130,000
$130,000
$130,000
$130,00039045
Calhoun County
STBG-SWAP-C013()--FG-13
On N28 Dakota Ave, from Ia Hwy 175 North 11.5 Miles toD36 255th St.
Pave
TIP Approved TotalFederal Aid
RegionalSwap
$5,000,000
$2,000,000
$2,000,000
$5,000,000
$2,000,000
$2,000,00038561
Humboldt County
STBG-SWAP-C046()--FG-46
On P66, from US Hwy 3 N 5.5 Miles to C26
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,400,000
$1,000,000
$1,000,000
$1,400,000
$1,000,000
$1,000,000
142
0 5 10
RPA 6 - Region 6 Resource Partners
903 East Main St, Suite A, Marshalltown, IA 50158
Phone: 641-752-0717, Fax: 641-752-9857, www.region6resources.org
Executive Director: Marty Wymore, [email protected]
Senior Planner: Julie Winter [email protected]
(INRCOG)
Tama
County
______ § _____________ _
r
Dorts
Commercial
(I Enhanced
(I General Service
(I Basic Service
(I Local ServiceTransit
[el Regional
[el Large Urban
[el Small Urban
[el Intercity Bus
CE! Amtrak
I Park & Ride
- Interstate
- National Highway System
- Primary Roads
Local Roads
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] RPA Planning Arear--1
L_ _ _J Counties
City Limits
Urban Area
143
144
RPA 6CHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
35106
Marshall County
BROSCHBP-C064()--NC-64
On In 2500 Mile of 260th St, Over North Timber Creek, S23T83 R18
Bridge Replacement
TIP Approved
4/20/2021
TotalFederal Aid
RegionalSwap
$600,000$327,720
$272,280
$600,000$327,720
$272,28037809
Poweshiek County
BRS-CHBP-C079()--GB-79
On F62, Over SUGAR CREEK, S7 T78 R16
Bridge Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$850,000$464,270
$385,730
$850,000$464,270
$385,730
HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45286
Iowa Department ofTransportation
HSIPX-20()--3L-42
US20: E OF US 65 TO 2.0 MI E OF CO RD S56 (VARLOC)
Pavement Widening
TIP Approved TotalFederal Aid
RegionalSwap
$2,215,000$1,993,500
$2,215,000$1,993,500
145
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38154
Iowa Department ofTransportation
IM-NHS-80()--03-79
I-80: 1.0 MI W OF IA 146 TO 2.0 MI E OF IA 146
Grade and Pave, Pave, Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$8,524,000$7,245,400
$16,960,000$14,416,000
$358,000$304,300
$25,842,000$21,965,700
38249
Iowa Department ofTransportation
NHSX-30()--3H-86
US30: W OF IA 21 TO 11TH AVE DR
Grade and Pave, Bridge New, Culvert Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$18,403,000$14,722,400
$18,403,000$14,722,400
38250
Iowa Department ofTransportation
NHSX-30()--3H-86
US30: TAMA BYPASS TO W OF IA 21
Culvert Extension, Grading, Erosion Control
TIP Approved TotalFederal Aid
RegionalSwap
$9,482,000$7,585,600
$328,000$262,400
$9,810,000$7,848,000
45341
Iowa Department ofTransportation
NHSX-63()--3H-79
US63: W JCT US 6 TO SCL TAMA
Grade and Pave, Traffic Signs, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$10,777,000$8,621,600
$10,777,000$8,621,600
146
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39343
Iowa Department ofTransportation
IMN-80()--0E-79
I-80: 1.1 MI W OF US 63 AND 0.7 MI E OF IA 21
TIP Approved TotalFederal Aid
RegionalSwap
$60,000 $60,000
45429
Iowa Department ofTransportation
NHSN-14()--2R-64
IA14: 0.7 MI S OF US 30
Slope Improvement
TIP Approved TotalFederal Aid
RegionalSwap
$105,000 $105,000
39361
Iowa Department ofTransportation
NHSN-63()--2R-86
US63: S OF TAMA (VAR LOC)
Culvert Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$30,000 $30,000
39342
Iowa Department ofTransportation
STPN-6()--2J-79
US6: PENROSE ST TO OAK ST IN GRINNELL
Grading, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$195,000 $195,000
38015
Iowa Department ofTransportation
BRFN-6()--39-79
US6: ROCK CREEK 0.7 MI E OF W JCT IA 21
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$220,000 $220,000
45389
Iowa Department ofTransportation
IMN-80()--0E-79
I-80: 1.0 MI E OF US 63 TO E OF IOWA CO
TIP Approved TotalFederal Aid
RegionalSwap
$2,500,000 $2,500,000
39360
Iowa Department ofTransportation
BRFN-63()--39-86
US63: WOLF CREEK 0.3 MI N OF IA 8 IN TRAER
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$820,000 $820,000
147
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
319
RPA 6
RGPL-PA06(RTP)--ST-00
RSPC - RPA 6: RPA 6 TRANSPORTATION PLANNING
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$25,000$20,000
$20,000
$25,000$20,000
$20,000
$25,000$20,000
$20,000
$25,000$20,000
$20,000
$100,000$80,000
$80,000
36302
RPA 6
STP-U-PA06()--70-64
Purchase 1 expansion non-accessible minivan
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$53,000$42,000
$42,000
$53,000$42,000
$42,000
39485
Hardin CountyBoard ofSupervisors
TAP-R-C042(104)--8T-42
On DOTUR 6TH AVE UNSIGNED RTE, Over CREEK, fromSteamboat Rock 4.36 miles to 12th Ave S6 T87 R19
Ped/Bike Grade & Pave
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$1,130,000$570,000
$145,000
$1,130,000$570,000
$145,000
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36931
Hardin CountyBoard ofSupervisors
TAP-R-C042(87)--8T-42
On Iowa River Trail, from Bridge 19 south 9.3 Miles toBridge 25
Bridge Rehabilitation, Culvert Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$618,000$494,000
$247,000
$618,000$494,000
$247,000
34112
Marshalltown
TAP-U-4797(625)--8I-64
In the city of Marshalltown, On Iowa River Trail, from Bridge#2 1 Miles to Bridge #5
Ped/Bike Structures
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$683,750$547,000
$547,000
$683,750$547,000
$547,000
DOT Note: Project eligible for FHWA TAP funding
37613
Marshall County
TAP-U-C064()--8I-64
Paving Bike Trail Int's at 233rd St,238th St,242nd St,250thSt, Jessup Av,265th St,Ingram Av,Hart Av,Glick Av
Ped/Bike Paving
TIP Approved TotalFederal Aid
RegionalSwap
$180,000$144,000
$144,000
$180,000$144,000
$144,000
35405
Grinnell
TAP-U-3127()--8I-79
On Grinnell Trail, from SE corner of Industrial Ave & Ia Hwy146 south 1.21 Miles to NE corner of Stagecoach Rd
Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$420,000$336,000
$336,000
$420,000$336,000
$336,000
DOT Note: Project eligible for FHWA TAP funding
148
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
32615
Hardin County
BHS-SWAP-0077(601)--FC-42
On Main St. Alden, Over Iowa River, in S18 T89 R21
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$1,300,000
$1,000,000
$1,300,000
$1,000,00037808
Poweshiek County
BHS-SWAP-C079()--FC-79
On F57, Over BUCK CREEK, S8 T78 R15
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00033877
Tama County
BHS-SWAP-C086()--FC-86
On Business 30, Over Deer Creek, S21 T83 R15
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,00038364
Traer
BROS-SWAP-7710(604)--SE-86
In the city of Traer, On 1st Street, Over Coon Creek
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$740,000
$592,000
$740,000
$592,00038990
Hardin County
BROS-SWAP-C042(11009)--SE-42
On M Avenue, Over the South Fork of the Iowa River, W1/4S1 T87N R21W
Bridge Replacement
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00045114
Marshall County
BROS-SWAP-C064()--SE-64
On ABBOTT AVE, Over BR SUGAR CREEK, S1 T84 R17
Culvert Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$125,000
$125,000
$125,000
$125,00045115
Marshall County
BROS-SWAP-C064()--SE-64
On ABBOTT AVE, Over BR SUGAR CREEK, S1 T84 R17
Culvert Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$125,000
$125,000
$125,000
$125,00045125
Tama County
BROS-SWAP-C064()--SE-86
On ABBOTT AVE, Over BR SUGAR CREEK, S1 T84 R17
TIP Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00045127
Tama County
BROS-SWAP-C064()--SE-86
On ABBOTT AVE, Over BR SUGAR CREEK, S1 T84 R17
TIP Approved TotalFederal Aid
RegionalSwap
$125,000
$125,000
$125,000
$125,000
149
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
21775
Marshall County
BROS-SWAP-C064(132)--FE-64
NORTH CENTER ST RD: Over ASHER CREEK
Bridge Replacement
TIP Approved
3/17/2020
TotalFederal Aid
RegionalSwap
$1,300,000
$1,300,000
$1,300,000
$1,300,00021777
Marshall County
BROS-SWAP-C064(133)--FE-64
NORTH CENTER ST RD: Over ASHER CREEK
Bridge Replacement
TIP Approved
3/17/2020
TotalFederal Aid
RegionalSwap
$1,200,000
$1,200,000
$1,200,000
$1,200,00034679
Poweshiek County
BROS-SWAP-C079()--FE-79
On 520TH AVE, Near the NW Corner of S28 T78N R13W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00013588
Poweshiek County
BROS-SWAP-C079(53)--FE-79
80th St.: From F17 to 330th St.
Bridge Replacement
TIP Approved
4/21/2020
TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00013586
Poweshiek County
BROS-SWAP-C079(57)--SE-79
On 370TH AVE, Over STONY CREEK, S10 T80 R14
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00035288
Tama County
BROS-SWAP-C086()--SE-86
On P AVE, Over NORTH WALNUT CREEK, from 400thStreet North 0.75 Miles, S33 T82 R14
Bridge Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00045095
Tama County
BROS-SWAP-C086(103)--FE-86
On B AVE, Over SUGAR CREEK, S17 T84 R16
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00029469
Tama County
BROS-SWAP-C086(98)--SE-86
On M Ave., Over Wolf Creek & Four Mile Creek, from US63 North 0.75 Miles, on WLINE S7 T85 R14
Bridge Replacement
TIP Approved
5/19/2020
TotalFederal Aid
RegionalSwap
$1,750,000
$1,750,000
$1,750,000
$1,750,00036418
Tama County
BROS-SWAP-C086(99)--SE-86
On K AVE, Over NORTH WALNUT CREEK, from 400th St.North 1500 Feet, S35 T82 R15
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,000
150
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
44623
Hardin County
BRS-SWAP-C042(63)--FF-42
On S 27, Over TIPTON CREEK, from D41 S 1.1 miles S2T87 R22
TIP Approved
10/20/2020
TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00036417
Tama County
BRS-SWAP-C086(97)--FF-86
On E64, Over BRANCH OF IOWA RIVER, from US63 East1300 Feet, S11 T82 R15
Bridge Replacement
TIP Approved
3/17/2020
TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00035995
Marshall County
BROS-SWAP-C064()--FE-64
On 1000 mile of Gerhart Ave, Over Branch of HoneyCreek, in NW S6 T85 R19
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00035992
Marshall County
BROS-SWAP-C064()--FE-64
On 2900 mile of Oaks Ave, Over South Timber Creek, atSW S9 T82 R18
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00012250
Marshall County
BROS-SWAP-C064(115)--SE-64
On JESSUP AVE, Over MINERVA CREEK, Near N 1/4corner of S3 T84 R19
Bridge Replacement
TIP Approved
6/15/2021
TotalFederal Aid
RegionalSwap
$1,300,000
$1,300,000
$1,300,000
$1,300,00034677
Poweshiek County
BROS-SWAP-C079()--SE-79
On 155TH ST, Over Dugout Creek, S16 T79 R14
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00039070
Tama County
BROS-SWAP-C086()--FE-86
On G Avenue, Near the W 1/4 Corner of S24 T84N R16W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00039071
Tama County
BROS-SWAP-C086()--SE-86
On P Avenue, Over BRANCH COON CREEK, S15 T85NR14W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00039072
Tama County
BROS-SWAP-C086()--SE-86
On 220th Street, Over SIMPSON CREEK, S6 T84N R13
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,000
151
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37781
Tama County
BROS-SWAP-C086()--SE-86
On P AVE, Over STONY CREEK, from 110th Street North,WLINE S3 T86 R14
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00039068
Tama County
BROS-SWAP-C086()--SE-86
On E Avenue, Over BRANCH WOLF CREEK, S26 T86NR16W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00039069
Tama County
BROS-SWAP-C086()--SE-86
On F Avenue, Over BRANCH WOLF CREEK, S25 T86NR16W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00037782
Tama County
BROS-SWAP-C086(104)--SE-86
On 220TH ST, Over BRANCH SALT CREEK, from UAvenue East, NLINE S4 T84 R13
Bridge Replacement
TIP Approved
2/02/2021
TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00036262
Hardin County
BRS-SWAP-C042(15163)--FF-42
On S57, Over Honey Creek, from 305th St. South 0.2 Miles,S15 T86 R20
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00032544
Hardin County
BRS-SWAP-C042(16075)--FF-42
On S62, Over Small Stream, from D55 South 0.5 Miles, inSE S5 T86 R19
Culvert Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$275,000
$275,000
$275,000
$275,00032258
Marshall County
BRS-SWAP-C064()--FF-64
On 2800 Mile of 290th St (E63), Over SNIPE CREEK, in NWS7 T82 R17
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00029486
Poweshiek County
BRS-SWAP-C079()--FF-79
On F29, Over Small Stream, S23 T80 R13
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00039040
Poweshiek County
BRS-SWAP-C079()--FF-79
On V18, Over Big Bear Creek, S14 T80N R14W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,200,000
$1,200,000
$1,200,000
$1,200,000
152
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39065
Tama County
BRS-SWAP-C086()--FF-86
On E 44, Over TROUBLESOME CREEK, S14 T83N R13W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00037640
Marshall County
BROS-SWAP-C064()--FE-64
On 3000 mile of 260th St, Over South Timber Creek,(Bridge I-22), NLINE S28 T83 R17
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,0009136
Marshall County
BROS-SWAP-C064()--SE-64
On 3100 MILE OF WALLACE AVE, Over Brush Creek, from310th St S 0.92 miles S22 T82 R17
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00021779
Marshall County
BROS-SWAP-C064()--SE-64
On 140TH ST, Over MINERVA CREEK, from Durham AveE 0.02 miles S27 T85 R20
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00029489
Poweshiek County
BROS-SWAP-C079()--SE-79
On 140th Street, Over Walnut Creek, S17 T81 R14
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00045107
Poweshiek County
BROS-SWAP-C079()--SE-79
On 100TH ST, Over N ENGLISH RIVER, S15 T79 R15
TIP Approved TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,00045092
Tama County
BROS-SWAP-C086()--FE-86
On S AVE, Over BRANCH WOLF CREEK, S6 T85 R13
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00045094
Tama County
BROS-SWAP-C086()--SE-86
On 230TH ST, Over SUGAR CREEK, S7 T84 R16
TIP Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00034805
Hardin County
BRS-SWAP-C042(15305)--FF-42
On D65, Over Small Stream, from T Ave. West 2000 Feet,in NE S24 T86 R20
Culvert Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,000
153
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
35994
Marshall County
BROS-SWAP-C064()--SE-64
On 1000 mile of Langford Ave, Over Dowd Creek, S1 T85R19
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00045106
Poweshiek County
BROS-SWAP-C079()--SE-79
On 460TH AVE, Over BUCK CREEK, S27 T79 R16
TIP Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,000
154
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
35412
Ackley
STBG-SWAP-0015()--SG-42
In the city of Ackley, On Butler Street, from 3rd Ave north .3Miles to Park Avenue
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$125,000
$100,000
$100,000
$125,000
$100,000
$100,00038337
State Center
STBG-SWAP-7272()--SG-64
In the city of State Center, On 4th Street SE, from 3rd StreetNW East 1.34 Miles to 6th Avenue SE
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$493,000
$394,000
$394,000
$493,000
$394,000
$394,00016532
Hardin County
STBG-SWAP-C042(D55/S33)--FG-42
On D55, from US Hwy 65 E 7.25 miles to Co Hwy S55, andOn S33, from Co Hwy D55 North 4.5 Miles to US Hwy 65
Pave
TIP Approved TotalFederal Aid
RegionalSwap
$3,650,000
$1,500,000
$1,500,000
$3,650,000
$1,500,000
$1,500,00016616
Marshall County
STBG-SWAP-C064(119)--FG-64
S52: From STATE CENTER, N to E29 (190TH ST)
Pave
TIP Approved
3/16/2021
TotalFederal Aid
RegionalSwap
$1,400,000
$600,000
$600,000
$1,400,000
$600,000
$600,00034932
Poweshiek County
STBG-SWAP-C079(61)--FG-79
On V30/F17, from Main Street in Hartwick Northeasterly 3.0Miles to Poweshiek-Iowa Rd
Pavement Rehab
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$1,500,000
$1,000,000
$1,000,000
$1,500,000
$1,000,000
$1,000,00045049
Tama County
STBG-SWAP-C086()--FG-86
On HWY E64, from Richland Creek to V18
TIP Approved TotalFederal Aid
RegionalSwap
$2,500,000
$970,000
$970,000
$2,500,000
$970,000
$970,00038915
Marshall County
STBG-SWAP-C064()--FG-64
On E63, from Story Co Line E 5 miles to IA Hwy 330
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,800,000
$1,500,000
$1,500,000
$1,800,000
$1,500,000
$1,500,00045044
Tama County
STBG-SWAP-C086()--FG-86
On T47, from E27 to IA96
TIP Approved TotalFederal Aid
RegionalSwap
$2,500,000
$1,000,000
$1,000,000
$2,500,000
$1,000,000
$1,000,00045060
Alden
STBG-SWAP-0077()--SG-42
On Main Street, Over from D20 NE .53 miles to Iowa RiverBridge S18 T89 R21
TIP Approved TotalFederal Aid
RegionalSwap
$198,000
$198,000
$198,000
$198,000
$198,000
$198,000
155
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45064
Marshalltown
STBG-SWAP-4797()--SG-64
On HIGHLAND ACRES RD, from Lincoln Way 1.2 miles toMain Street S5 T83 R18
TIP Approved TotalFederal Aid
RegionalSwap
$4,875,000
$3,900,000
$3,900,000
$4,875,000
$3,900,000
$3,900,000
156
0
Butler County
RPA 7 - Iowa Northland Regional Transportation Authority
229 East Park Avenue, Waterloo, IA 50703
Phone: 319-235-0311, Fax: 319-235-2891, www.inrcog.org
Executive Director: Kevin Blanshan, [email protected]
Transportation Planner: Kyle Durant, [email protected]
Chickasa� s3
County\
l �.,.I � Commercial
�--_,...,;;;;..._,�-�---;r,--:at\� El Enhanced
El General Service
El Basic Service
El Local Service
Transit
Buchanan County
--+
[el Regional
[el Large Urban
[el Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
- Interstate
- National Highway System
- Primary Roads
Local Roads
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] RPA Planning Area
r--1
L_ _ _J Counties
City Limits
Urban Area
157
158
RPA 7CHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
16345
Bremer County
BROSCHBP-C009(084)--NC-09
On GRAND AVE, Over STREAM, S18 T91 R13
Culvert Replacement
TIP Approved
4/20/2021
TotalFederal Aid
RegionalSwap
$581,088$131,088
$450,000
$581,088$131,088
$450,00037638
Bremer County
BRS-CHBP-C009(82)--GB-09
On V14, Over HORTON CREEK, on WLINE S23 T93 R14
Bridge Replacement
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$726,036$426,036
$300,000
$726,036$426,036
$300,00037534
Chickasaw County
BRS-CHBP-C019(105)--GB-19
On V48 (Quinlan Ave), Over EAST FORK WAPSIPINICON,S1/4 S13 T94 R12
Bridge Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$600,000$327,720
$272,280
$600,000$327,720
$272,28032353
Grundy County
BRS-CHBP-C038(114)--GB-38
On D35, Over tributary of Black Hawk Creek, Ctr S34 T88R15
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$450,000$245,790
$450,000$245,790
ILL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
34610
Buchanan County
ILL-C010()--92-10
On V62, Over WAPSIPINICON RIVER, from D-16 1.5 milesto Bridge
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$2,800,000 $2,800,000
159
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45419
Iowa Department ofTransportation
NHSX-3()--3H-12
IA3: W JCT IA 14 TO IA 188
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$4,062,000$3,249,600
$4,062,000$3,249,600
38159
Iowa Department ofTransportation
IMX-380()--02-7
I-380: BUCHANAN CO TO 0.2 MI S OF E JCT US 20 (SB)
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$7,739,000$6,965,100
$7,739,000$6,965,100
39177
Iowa Department ofTransportation
BRF-3()--38-9
IA3: CEDAR RIVER 3.7 MI E OF US 218 IN WAVERLY
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$6,000,000$4,800,000
$6,000,000$4,800,000
39180
Iowa Department ofTransportation
NHSX-218()--3H-9
US218: CEDAR RIVER IN JANESVILLE TO IA 116 INWAVERLY
Bridge Replacement, Grading, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$5,100,000$4,080,000
$19,588,000$15,670,400
$24,688,000$19,750,400
45383
Iowa Department ofTransportation
BRF-14()--38-38
IA14: BLACK HAWK CREEK 1.5 MI S OF S JCT CO RDD35
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$2,070,000$1,656,000
$2,070,000$1,656,000
160
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39183
Iowa Department ofTransportation
NHSN-150()--2R-10
IA150: 8TH ST SE TO CN RR IN INDEPENDENCE (STATESHARE)
Grade and Pave
TIP Approved TotalFederal Aid
RegionalSwap
$3,800,000 $3,800,000
39244
Iowa Department ofTransportation
STPN-175()--2J-38
IA175: E OF CO RD T53 (VAR LOC)
Culvert Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$198,000 $198,000
45413
Iowa Department ofTransportation
STPN-188()--2J-12
IA188: IA 3 TO SYCAMORE ST IN CLARKSVILLE
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$264,000 $264,000
37890
Iowa Department ofTransportation
BRFN-188()--39-12
IA188: STREAM 1.9 MI N OF CO RD C33
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$235,000 $235,000
37889
Iowa Department ofTransportation
BRFN-57()--39-12
IA57: GRAN CREEK 0.5 MI E OF CO RD T19
Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$733,000 $733,000
39184
Iowa Department ofTransportation
BRFN-57()--39-12
IA57: DITCH 2.1 MI E OF E JCT IA 14
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$933,000 $933,000
45357
Iowa Department ofTransportation
BRFN-18()--39-19
US18: WINTERS LAKE OVERFLOW 2.9 MI E OF CO RDT76
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,200,000 $1,200,000
45317
Iowa Department ofTransportation
BRFN-20()--39-10
US20: IA 150 INTERCHANGE IN INDEPENDENCE (EB &WB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$497,000 $497,000
45297
Iowa Department ofTransportation
BRFN-20()--39-10
US20: WAPSIPINICON RIVER 1.5 MI E OF IA 150 (EB &WB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,360,000 $1,360,000
161
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45292
Iowa Department ofTransportation
BRFN-20()--39-10
US20: CO RD W45 3.4 MI W OF IA 187
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$600,000 $600,000
45291
Iowa Department ofTransportation
BRFN-218()--39-7
US218: MUD CREEK 0.9 MI N OF CO RD D46
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$450,000 $450,000
45363
Iowa Department ofTransportation
BRFN-3()--39-12
IA3: HARTGRAVES CREEK OVERFLOW 0.5 MI W OF CORD T16
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$600,000 $600,000
45360
Iowa Department ofTransportation
BRFN-63()--39-9
US63: CRANE CREEK 1.5 MI S OF IA 188 (SB)
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,100,000 $1,100,000
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
1403
RPA 7
RGPL--PA07(RTP)--ST-00
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$50,000$40,000
$40,000
$50,000$40,000
$40,000
$50,000$40,000
$40,000
$50,000$40,000
$40,000
$200,000$160,000
$160,000
45058
RPA 7
RGTR-PA07()--ST-00
Replace one light duty bus
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$85,000$68,000
$68,000
$85,000$68,000
$68,000
20948
RPA 7
STP-U-PA07()--70-10
IA 150: From I-380 to Oelwein
Planning Study
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000$100,000
$100,000
$1,000,000$100,000
$100,000
PA Note: Planning Study
162
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39128
Waverly
TAP-U-8190()--8I-09
In the city of Waverly, On 10th Ave SW, from Heritage Wayeast 0.5 Miles to 16th St SW
Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$235,000$184,000
$184,000
$235,000$184,000
$184,000
45024
Buchanan County
TAP-U-C010()--8I-10
On Taylor's Ford Bridge, Over WAPSIPINICON RIVER,from 262nd St 0.8 miles to structure S32 T88 R08
Historic Preservation, Ped/Bike Structures
TIP Approved TotalFederal Aid
RegionalSwap
$350,000$184,000
$184,000
$350,000$184,000
$184,000
163
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45227
Waverly
BRM-SWAP-8190()--SD-09
On 3RD ST SE, Over CEDAR RIVER, from 6th Ave SE N.05 miles to structure
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$4,480,000
$1,000,000
$4,480,000
$1,000,00033908
Sumner
BROS-SWAP-7490(601)--SE-09
In the city of Sumner, On 3rd St, Over Drainage, from NDivision St west 0.1 miles to bridge
Bridge Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$773,000
$773,000
$773,000
$773,00029322
Black Hawk County
BROS-SWAP-C007()--SE-07
On Kimball Ave, Over Miller Creek, S27 T87 R13
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00036531
Black Hawk County
BROS-SWAP-C007(161)--SE-07
On E GRESHAM RD, Over CRANE CREEK, from V49Raymond Road East 0.25 Miles, S10 T90 R12
Bridge Replacement
TIP Approved
2/16/2021
TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,00027164
Bremer County
BROS-SWAP-C009()--SE-9
On 240TH ST, Over CREEK, S17 T91 R14
Bridge Replacement
TIP Approved
7/23/2018
TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,00032451
Butler County
BROS-SWAP-C012(114)--SE-12
On BIRCH AVE, Over Unnamed Creek, from Birch Ave0.01 miles to Bridge Location
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00038757
Chickasaw County
BRS-SWAP-2750(603)--FF-19
On V48, Roanoke Avenue, Over PLUM CREEK, S7 TT94NRR11
Bridge Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00035012
Bremer County
BROS-SWAP-C009()--SE-9
On V19, Over QUARTER SEC RUN, S20 T91 R13
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$800,000
$800,000
$800,000
$800,0008508
Bremer County
BROS-SWAP-C009(53)--SE-09
On KILLDEER AVE, Over QUARTER SECTION RUN, S35T91 R13
Bridge Replacement
TIP Approved
6/15/2021
TotalFederal Aid
RegionalSwap
$575,000
$575,000
$575,000
$575,000
164
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
9951
Bremer County
BROS-SWAP-C009(L-7-109)--SE-9
On MIDWAY AVE, Over CRANE CREEK, S7 T92 R12
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00036522
Chickasaw County
BROS-SWAP-C019()--FE-19
On KENWOOD AVE, Over EAST WAPSIPINICON RIVER,on WLINE S24 T96 R13
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00032354
Grundy County
BROS-SWAP-C038()--FE-38
On T37, Over Minnehaha Creek, S13 T87 R17
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00032326
Grundy County
BROS-SWAP-C038(B21)--SE-38
On R Ave, Over tributary of Black Hawk Creek, NW S36T89 R16
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$396,000
$396,000
$396,000
$396,00037695
Grundy County
BROS-SWAP-C038(F04)--SE-38
On 160th St from I Ave west 0.1 mi. to the South Fork ofBeaver Creek, near the NE Sec.6-88-17
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$820,000
$650,000
$820,000
$650,00045072
Grundy County
BROS-SWAP-C038(F04)--SE-38
On 160TH ST, Over SOUTH FORK BEAVER CREEK, fromI Ave W 0.1 miles S6 T88 R17
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$820,000
$820,000
$820,000
$820,00038925
Black Hawk County
BRS-SWAP-C007(XXX)--FF-07
On Cedar Wapsi Rd (C57), Over Tributary to Crane Creek,S17 T90N R12
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00030990
Butler County
BRS-SWAP-C012(113)--FF-12
On T55, Over OVERFLOW W FORK CEDAR RIV, from280th Street South 1800 Feet to Bridge
Bridge Replacement
TIP Approved
2/16/2021
TotalFederal Aid
RegionalSwap
$1,250,000
$1,250,000
$1,250,000
$1,250,00037170
Butler County
BHS-SWAP-C012(K08W10)--FC-12
On T25, Over WEST FORK CEDAR RIVER, from 245thStreet North 0.7 Miles to Bridge Location, S8 T91 R17
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,000
165
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36218
Bremer County
BROS-SWAP-C009(L-11-1-21)--SE-09
On 270th Street, Over Crane Creek
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00040191
Butler County
BROS-SWAP-C012(K22W30)--SE-12
On JAY AVE, Over SMALL STREAM, S21 T91 R17
TIP Approved TotalFederal Aid
RegionalSwap
$380,000
$380,000
$380,000
$380,00037171
Butler County
BROS-SWAP-C012(M28W10)--SE-12
On CEDAR AVE, Over BEAVER CREEK, from 335th StreetN 0.6 miles to Bridge Location S28 T90 R18
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00037708
Chickasaw County
BROS-SWAP-C019()--SE-19
On ODESSA AVE, Over EAST WAPSIPINICON RIVER, atS1/4 S9 T95 R12
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,00037709
Chickasaw County
BROS-SWAP-C019()--SE-19
On 180TH ST, Over CRANE CREEK RIVER, S32 T96 R11
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00019177
Grundy County
BROS-SWAP-C038(C5)--SE-38
I Ave: From 120th St north 1/8mi to an un-named stream
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00037697
Grundy County
BROS-SWAP-C038(D10)--SE-38
On 120TH ST, Over MIDDLE FORK BEAVER CREEK, S18T89 R18
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$262,000
$262,000
$262,000
$262,00034854
Grundy County
BROS-SWAP-C038(K02)--SE-38
On 225TH ST, Over BRANCH BLACKHAWK CREEK, fromL Ave west 0.4 Miles to K-2, at Ctr S3 T87 R17
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$554,000
$554,000
$554,000
$554,00037463
Black Hawk County
BRS-SWAP-C007(XXX)--FF-07
On Eagle Road (D46), Over MILLER CREEK, on NLINES24 T87 R13
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$525,000
$525,000
$525,000
$525,000
166
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38994
Bremer County
BRS-SWAP-C009()--FF-09
On C50, Over CRANE CREEK, S21 TT91N RR12
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,00037121
Buchanan County
BROS-SWAP-C010()--SE-10
On 150TH ST, Over OTTER CR, from Indiana Ave. west0.1 Miles to Bridge, S32 T90 R09
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$990,000
$990,000
$990,000
$990,00038951
Chickasaw County
BROS-SWAP-C033()--FE-33
On York Avenue, Over SMALL STREAM, on WLINE S31T94N R10W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00037703
Grundy County
BROS-SWAP-C038(E01)--SE-38
On 160TH St from H Ave east 0.3mi to the South Fork ofBeaver Creek, near the N1/4 S1 T88 R18
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$720,000
$720,000
$720,000
$720,00036650
Grundy County
BROS-SWAP-C038(H11)--SE-38
On T AVE, Over BRANCH BLACK HAWK CREEK, S18 T88R15
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$507,000
$507,000
$507,000
$507,00044898
Black Hawk County
BRS-SWAP-C007(XXX)--FF-07
On Poyner Rd (D38), Over INDIAN CREEK, S25 T88 R12
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00038995
Bremer County
BRS-SWAP-C009()--FF-09
On V48, Over STREAM, S24 TT93N RR12W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00037127
Buchanan County
BRS-SWAP-C010()--FF-10
On D48, Over LIME CREEK, from Brandon East .25 Milesto Lime Creek Bridge, S27 T87 R10
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,525,000
$1,525,000
$1,525,000
$1,525,00038950
Chickasaw County
BRS-SWAP-C019()--FF-19
On B28 (140th Street), Over LITTLE WAPSIPINICONRIVER, on SLINE S6 T96N R13W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,400,000
$1,400,000
$1,400,000
$1,400,000
167
SWAP-HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
44723
Bremer County
HSIP-SWAP-C009(85)--FJ-09
On C33 and C50, V14, V43, V49, V56, V62,
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$59,500
$54,500
$59,500
$54,50044614
Buchanan County
HSIP-SWAP-C010(114)--FJ-10
W13, IA 281 to 175th St; 118th St, Hazleton ECL to MasonAve; Olympic Ave/155th St, 205th St/Nathan Bethel Ave
TIP Approved
10/20/2020
TotalFederal Aid
RegionalSwap
$44,000
$40,000
$44,000
$40,000
168
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36216
Waverly
STBG-SWAP-8190()--SG-09
In the city of Waverly, On 1st St NW, from W Bremer Ave(IA-3) north 0.3 Miles to 5th Ave NW
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$900,000
$450,000
$450,000
$900,000
$450,000
$450,00036175
Black Hawk County
STBG-SWAP-C007(XXX)--FG-07
On Dunkerton Road (C66), from Hwy 63 East 4 Miles to ElkRun Road (V43)
Pave, Pavement Rehab
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$1,810,000
$800,000
$800,000
$1,810,000
$800,000
$800,00034435
Butler County
STBG-SWAP-C012(119)--FG-12
On C55, from HWY 14 7 miles to T55
Pavement Rehab
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$1,750,000
$800,000
$800,000
$1,750,000
$800,000
$800,00032698
Chickasaw County
STBG-SWAP-C019(92)--FG-19
On B44 (210th Street), from V56 East 3 Miles to FayetteCounty line.
Pave
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$1,200,000
$500,000
$500,000
$1,200,000
$500,000
$500,00037826
Readlyn
STBG-SWAP-6345()--SG-09
In the city of Readlyn, On Main St, from 4th St south 0.22Miles to 1st St
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,061,000
$531,000
$531,000
$1,061,000
$531,000
$531,00034783
Black Hawk County
STBG-SWAP-C007(XXX)--FG-07
On D46 Eagle Road, from V37 Dysart Road East to Hwy218
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,400,000
$800,000
$800,000
$1,400,000
$800,000
$800,00034434
Butler County
STBG-SWAP-C012(T47 North)--FG-12
On T47, from C55 north 8.0 Miles to Hwy 3
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,975,000
$1,000,000
$1,000,000
$1,975,000
$1,000,000
$1,000,00039131
Janesville
BRM-SWAP-3792(602)--SD-07
In the city of Janesville, On 7th St, Over Cedar River, fromMain St West 0.1 Miles to Bridge
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$5,700,000
$500,000
$500,000
$5,700,000
$500,000
$500,00039132
Nashua
STBG-SWAP-5375()--SG-19
In the city of Nashua, On Greeley St, from Panama StSouth 0.35 Miles to 0.1 mi S of Livingston St
Grade and Pave
TIP Approved TotalFederal Aid
RegionalSwap
$1,301,000
$500,000
$500,000
$1,301,000
$500,000
$500,000
169
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
35024
Bremer County
STBG-SWAP-C009(L-10-121)--FG-09
On C50, from East Corporate Limits of Janesville East 3.5Miles to V25
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$900,000
$600,000
$600,000
$900,000
$600,000
$600,00034855
Grundy County
STBG-SWAP-C038()--FG-38
On D67, from IA 14 5 miles to the county line S35 T86 R18
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,925,000
$819,000
$819,000
$1,925,000
$819,000
$819,00040124
Buchanan County
STBG-SWAP-C010()--FG-10
On W35, from D22 to Quasqueton
TIP Approved TotalFederal Aid
RegionalSwap
$3,150,000
$1,731,000
$1,731,000
$3,150,000
$1,731,000
$1,731,00036494
Chickasaw County
STBG-SWAP-C019()--FG-19
On V18, from Highway 18 8.5 miles to South City Limits ofAlta Vista S6 TT96N RR13
Pave
TIP Approved TotalFederal Aid
RegionalSwap
$3,300,000
$1,157,000
$1,157,000
$3,300,000
$1,157,000
$1,157,000
170
171
172
RPA 8NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45438
Iowa Department ofTransportation
NHSX-136()--3H-31
IA136: CC RR IN DYERSVILLE TO IA 3 IN LUXEMBURG
Pavement Widening, Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$4,845,000$3,876,000
$4,845,000$3,876,000
38255
Iowa Department ofTransportation
NHSX-3()--3H-31
IA3: E JCT PFEILER RD TO 0.7 MI N OF BOY SCOUT RD
Grade and Pave, Erosion Control, Traffic Signs
TIP Approved TotalFederal Aid
RegionalSwap
$11,316,000$9,052,800
$328,000$262,400
$11,644,000$9,315,200
39204
Iowa Department ofTransportation
BRF-30()--38-23
US30: WAPSIPINICON RIVER 1.5 MI E OF CO RD Y4E
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$5,012,000$4,009,600
$5,012,000$4,009,600
45273
Iowa Department ofTransportation
NHSX-13()--3H-28
IA13: HONEY CREEK 0.2 MI N OF CO RD D13 TO S JCTIA 3
Grade and Pave
TIP Approved TotalFederal Aid
RegionalSwap
$16,099,000$12,879,200
$16,099,000$12,879,200
173
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45261
Iowa Department ofTransportation
BRFN-136()--39-23
IA136: MISSISSIPPI RIVER IN CLINTON
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$50,000 $50,000
37917
Iowa Department ofTransportation
BRFN-136()--39-23
IA136: MISSISSIPPI RIVER IN CLINTON (STATE SHARE)
Bridge Cleaning
TIP Approved TotalFederal Aid
RegionalSwap
$40,000 $40,000 $40,000 $40,000 $160,000
37921
Iowa Department ofTransportation
BRFN-20()--39-28
US20: CO RD X15/180TH AVE 1.2 MI E OF IA 13
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$388,000 $388,000
37915
Iowa Department ofTransportation
BRFN-30()--39-23
US30: MISSISSIPPI RIVER IN CLINTON (STATE SHARE)
Bridge Rehabilitation, Bridge Cleaning
TIP Approved TotalFederal Aid
RegionalSwap
$20,000 $770,000 $20,000 $20,000 $830,000
37922
Iowa Department ofTransportation
BRFN-38()--39-28
IA38: ALLISON CREEK 0.3 MI S OF CO RD X35
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$233,000 $233,000
37952
Iowa Department ofTransportation
BRFN-52()--39-49
US52: MISSISSIPPI RIVER IN SABULA (STATE SHARE)
Bridge Cleaning
TIP Approved TotalFederal Aid
RegionalSwap
$20,000 $20,000 $20,000 $20,000 $80,000
37954
Iowa Department ofTransportation
BRFN-62()--39-49
IA62: MAQUOKETA RIVER 1.1 MI E OF IA 64
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$775,000 $775,000
35683
Manchester
NHSN-013-2(44)--2R-28
On Highway 13,from N 13th Street to Honey Creek Bridge.
Pavement Rehab
TIP Approved
1/22/2020
TotalFederal Aid
RegionalSwap
$1,400,000
$1,200,000
$1,200,000
$1,400,000
$1,200,000
$1,200,00045378
Iowa Department ofTransportation
NHSN-151()--2R-31
US151: 0.35 MI S OF CO RD D53 (SB)
Slope Improvement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$102,000 $102,000
174
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45408
Iowa Department ofTransportation
NHSN-3()--2R-31
IA3: IN LUXEMBURG FROM US 52 TO ECL (STATESHARE)
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$297,000 $297,000
38254
Iowa Department ofTransportation
NHSN-3()--2R-31
IA3: ECL OF LUXEMBURG TO TOLLGATE RD (CO RDY13)
Erosion Control
TIP Approved TotalFederal Aid
RegionalSwap
$273,000 $273,000
38058
Iowa Department ofTransportation
NHSN-3()--2R-31
IA3: TOLLGATE RD (CO RD Y13) TO E JCT PFEILER RD
Erosion Control
TIP Approved TotalFederal Aid
RegionalSwap
$314,000 $314,000
39261
Iowa Department ofTransportation
NHSN-64()--2R-49
IA64: US 61 TO IA 62 IN MAQUOKETA (STATE SHARE)
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$3,600,000 $3,600,000
37916
Iowa Department ofTransportation
BRFN-30()--39-23
US30: UP RR 5.8 MI E OF S JCT US 61 (EB & WB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$2,158,000 $2,158,000
39209
Iowa Department ofTransportation
BRFN-136()--39-23
IA136: DEEP CREEK 0.2 MI S OF CO RD Z2E
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$401,000 $401,000
39206
Iowa Department ofTransportation
BRFN-30()--39-23
US30: AMES CREEK 3.5 MI E OF E JCT US 61 (EB & WB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$965,000 $965,000
39207
Iowa Department ofTransportation
BRFN-61()--39-23
US61: N JCT US 30 IN DE WITT (NB & SB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,632,000 $1,632,000
39263
Iowa Department ofTransportation
BRFN-64()--39-49
IA64: STREAM 0.1 MI W OF CO RD E29
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$300,000 $300,000
175
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39262
Iowa Department ofTransportation
BRFN-64()--39-49
IA64: PRAIRIE CREEK 0.4 MI E OF IA 62
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$742,000 $742,000
39208
Iowa Department ofTransportation
STPN-136()--2J-23
IA136: MISSISSIPPI RIVER IN CLINTON
Traffic Signs
TIP Approved TotalFederal Aid
RegionalSwap
$200,000 $200,000
39205
Iowa Department ofTransportation
STPN-30()--2J-23
US30: MISSISSIPPI RIVER IN CLINTON
Traffic Signs
TIP Approved TotalFederal Aid
RegionalSwap
$200,000 $200,000
45327
Iowa Department ofTransportation
BRFN-20()--39-28
US20: BRANCH PLUM CREEK 5.0 MI E OF IA 38 (EB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$118,000 $118,000
45305
Iowa Department ofTransportation
BRFN-20()--39-31
US20: IA 136 IN DYERSVILLE (EB & WB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$557,000 $557,000
45307
Iowa Department ofTransportation
BRFN-20()--39-31
US20: CO RD Y17 IN EPWORTH (EB & WB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$329,000 $329,000
45335
Iowa Department ofTransportation
BRFN-20()--39-31
US20: CO RD Y13 IN FARLEY (EB & WB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$310,000 $310,000
45337
Iowa Department ofTransportation
BRFN-20()--39-31
US20: N FORK MAQUOKETA RIVER 0.5 MI W OF IA 136(EB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$354,000 $354,000
45318
Iowa Department ofTransportation
BRFN-30()--39-23
US30: SILVER CREEK 0.7 MI E OF W JCT US 61 IN DEWITT (EB & WB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,700,000 $1,700,000
176
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
478
RPA 8
RGPL-PA08(RTP)--ST-00
On ECIA Transportation Planning
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$90,375$72,300
$72,300
$65,300$52,300
$52,300
$65,300$52,300
$52,300
$65,300$52,300
$52,300
$286,275$229,200
$229,200
45442
Iowa Department ofTransportation
STP-67()--2C-23
US67: 37TH AVE N IN CLINTON TO CO RD E50
Pavement Widening, Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$3,433,000$2,746,400
$3,433,000$2,746,400
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45515
Dyersville
TAP-R-2160()--8T-31
Heritage Trail Paving and Trailhead Improvements: From11th ST SE to Heritage Trail
Ped/Bike Grade & Pave, Ped/Bike Structures
TIP Approved TotalFederal Aid
RegionalSwap
$750,000$242,111
$242,111
$750,000$242,111
$242,111
45516
Maquoketa
TAP-U-4742()--8I-49
On ALLEN ST, S25 T84 R02E
Ped/Bike Grade & Pave, Ped/Bike Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$577,952$242,111
$242,111
$577,952$242,111
$242,111
177
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36143
Clinton County
BHS-SWAP-C023(118)--FC-23
On Y52, Over DRAINAGE DITCH 5, S1 T80 RE2
Bridge Deck Overlay
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,00035155
Clinton County
BROS-SWAP-C023(xx)--FE-23
On F21, Over BARBER CREEK, S32 T81 RE3
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00026844
Delaware County
BROS-SWAP-C028(95)--SE-28
On 285th Street , from 110th Ave East 0.2 Miles, S5 T87 R6
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00037088
Dubuque County
BROS-SWAP-C031(106)--FE-31
On Simon Road, in NE S26 T87N R1W
Bridge Replacement
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,00037745
Jackson County
BROS-SWAP-C049(81)--SE-49
On 400th Street, Over Lux Creek, S2 T87N R3E
Bridge Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00038765
Delaware County
BRS-SWAP-C028(98)--FF-28
On 110th Avenue, in NE S31 T88N R6W
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00036148
Clinton County
BHS-SWAP-C023()--FC-23
On Y4E, Over YANKEE RUN CREEK, S15 T81 RE1
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,00037337
Delaware County
BROS-SWAP-C028()--SE-28
On 130th Avenue, in NW S15 T89N R6W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00037302
Dubuque County
BROS-SWAP-C031()--FE-31
On Clear Creek Road, in W1/4 S14 T90N R2W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,000
178
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36548
Jackson County
BROS-SWAP-C049()--SE-49
On 49th Street, Over Creek, S18 T84 R1
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00035332
Jackson County
BROS-SWAP-C049(82)--FE-49
On 475th Avenue, Over Unnamed creek, S35 T86 R5
Bridge Replacement
TIP Approved
12/21/2021
TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00036188
Clinton County
BRS-SWAP-C023()--FF-23
On Y68, Over WAPSI RIVER OVERFLOW, S31 T81 RE4
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00029281
Clinton County
BHS-SWAP-C023()--FC-23
On Y-32, Over overflow , in NE S17 T82 R1
Bridge New
TIP Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00012619
Clinton County
BROS-SWAP-C023()--SE-23
100th Street: Over -Drainage Ditch
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00044755
Delaware County
BROS-SWAP-C028()--SE-28
Replace bridge on 140th Street
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00037106
Dubuque County
BROS-SWAP-C031()--SE-31
On Fishpond Road, in SW S34 T89N R1W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00036550
Jackson County
BROS-SWAP-C049()--FE-49
On 208th Street, S35 T86 R2
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00037751
Jackson County
BROS-SWAP-C049()--FE-49
On 17th Street, Over Elk Creek, S33 T84N R6E
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,000
179
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
44756
Delaware County
BROS-SWAP-C028()--SE-28
Replace bridge on 215th Avenue
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$225,000
$225,000
$225,000
$225,000
$225,000
$225,00037304
Dubuque County
BROS-SWAP-C031()--FE-31
On Graf Road, in NE S20 T89N R1E
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00039021
Jackson County
BROS-SWAP-C049()--FE-49
On 362nd Avenue (Z15), Over Duck creek, S25 T86 R4E
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00039020
Jackson County
BROS-SWAP-C049()--SE-49
On 239th Avenue, Over unnamed creek, S4 T87 R3E
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,000
SWAP-HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
35162
Clinton County
HSIP-SWAP-C023()--FJ-23
CIR with HMA overlay on 245 ST, from DeWitt City Limits toUS 30
TIP Approved TotalFederal Aid
RegionalSwap
$1,400,000
$503,500
$1,400,000
$503,500
180
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36932
Camanche
STBG-SWAP-1040(608)--SG-23
In the city of Camanche, On 9th Avenue, from Railroad toAnamosa Rd
Pavement Rehab
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$380,000
$303,000
$303,000
$380,000
$303,000
$303,00044638
Dubuque County
STBG-SWAP-C031()--FG-31
On Sundown Road (Y21) from Old Highway Road North 2.7miles to Asbury Road
TIP Approved TotalFederal Aid
RegionalSwap
$1,400,000
$1,400,000
$1,400,000
$1,400,000
$1,400,000
$1,400,00037744
Jackson County
STBG-SWAP-C049()--FG-49
On Z34 (418th Avenue), from Hwy 64 1.56 Miles to ClintonCounty Line
Pavement Rehab
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,000
$450,000
$450,00037749
Jackson County
STBG-SWAP-C049(85)--FG-49
On 188th Street, Over Lytle Creek, S5 T85N R2E
Bridge Replacement
TIP Approved
3/16/2021
TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,000
$450,000
$450,00035633
Clinton
STBG-SWAP-1415(634)--SG-23
In the city of Clinton, On Manufacturing Drive , from BluffBlvd to Rail road tracks
Pavement Rehab
TIP Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$3,900,000
$3,900,000
$3,900,000
$3,900,000
$3,900,000
$3,900,00044694
Clinton County
STBG-SWAP-C023()--FG-23
CIR with HMA overlay on E-50 from 432nd Ave west to390th Ave the south to 148th St
TIP Approved TotalFederal Aid
RegionalSwap
$1,400,000
$1,180,000
$1,180,000
$1,400,000
$1,180,000
$1,180,00044629
Delaware County
STBG-SWAP-C028()--FG-28
PCC Paving on Robinson Road
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,143,683
$1,499,342
$1,499,342
$2,143,683
$1,499,342
$1,499,34237309
Dubuque County
STBG-SWAP-C031()--FG-31
On Higginsport Road from Hwy 151 east 5.87 miles toMoloney Road
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,042,528
$1,492,528
$1,492,528
$2,042,528
$1,492,528
$1,492,528
181
N
0
RPA 9 - Bi-State Regional Commission
1504 Third Avenue, Third Floor, Rock Island, IL 61201-8612Phone: 309-793-6300, Fax: 309-793-6305, www.bistateonline.org
Executive Director: Denise Bulat, [email protected]
Transportation Director: Gena McCullough, [email protected]
Muscatine 38
County
/
5 10
@]
20 Miles
Scott
County
Bi-State Regional
Commission (BSRC)
- Interstate
Commercial -National Highway System
- Primary Roads
(I General Service Local Roads
(I Basic Service -Ramps
(I Local Service -Trails
Transit -+- Railroad
[el Regional
[el Rivers
Large Urban
[el Major Lakes
Small Urban
[el C] RPA Planning Area
Intercity Bus r--1
CE! L_ _ _J Counties
Amtrak
I City Limits
Park & Ride Urban Area
182
183
RPA 9PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37991
Iowa Department ofTransportation
BRFN-92()--39-70
IA92: MISSISSIPPI RIVER IN MUSCATINE (STATESHARE)
Bridge Cleaning
TIP Approved TotalFederal Aid
RegionalSwap
$25,000 $25,000 $25,000 $25,000 $100,000
39311
Iowa Department ofTransportation
STPN-6()--2J-70
US6: 1.2 MI E OF CO RD X46 TO 1.1 MI W OF IA 38
Slope Improvement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$271,000 $271,000
37990
Iowa Department ofTransportation
BRFN-6()--39-70
US6: SUGAR CREEK 2.3 MI W OF IA 38
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$184,000 $184,000
39310
Iowa Department ofTransportation
BRFN-6()--39-70
US6: SUGAR CREEK 1.7 MI W OF W JCT IA 38
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$855,000 $855,000
39309
Iowa Department ofTransportation
BRFN-6()--39-70
US6: IAIS RR 1.2 MI E OF IA 38
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$513,000 $513,000
45311
Iowa Department ofTransportation
BRFN-22()--39-70
IA22: WAPSINONOC CREEK 1.6 MI E OF W JCT IA 70
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$600,000 $600,000
45252
Iowa Department ofTransportation
BRFN-92()--39-70
IA92: MISSISSIPPI RIVER IN MUSCATINE (STATESHARE)
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$200,000 $200,000
184
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
533
RPA 9
RGPL-PA09(RTP)--ST-00
Region 9
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$17,566$10,000
$10,000
$17,566$10,000
$10,000
$17,566$10,000
$10,000
$17,566$10,000
$10,000
$70,264$40,000
$40,000
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39494
Long Grove
TAP-R-4497()--8T-82
In the city of Long Grove, On 1st St, from E Grove Rd N0.60 Miles to Long Grove Corporate Limits
Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$480,000$384,000
$384,000
$480,000$384,000
$384,000
185
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
20378
Muscatine County
BROS-SWAP-C070(64)--SE-70
120TH STREET: Near NE Corner NW-NW
Bridge Replacement
TIP Approved
11/19/2019
TotalFederal Aid
RegionalSwap
$330,000
$330,000
$330,000
$330,00036076
Muscatine County
BROS-SWAP-C070(68)--SE-70
On DOUGLAS AVENUE, Near SW Corner NE-NE, S3 T77R4W
Bridge Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00032310
Muscatine County
BROS-SWAP-C070(70)--SE-70
On YORK AVENUE, from Near E 1/4 Corner, S2 T78 R1E
Bridge Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00037447
Muscatine County
BROS-SWAP-C070()--SE-70
On 150TH STREET, Near S 1/4 Corner, S30 T78N R1W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$270,000
$270,000
$270,000
$270,00037452
Muscatine County
BROS-SWAP-C070()--SE-70
On HOLLY AVENUE, Near NW Corner SW-SW, S20 T78NR3W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$260,000
$260,000
$260,000
$260,00044842
Muscatine County
BROS-SWAP-C070( )--SE-70
On N ISETT AVE, Over MOSQUITO CREEK, Near NECorner, S27 T78 R02
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$540,000
$540,000
$540,000
$540,00036077
Muscatine County
BROS-SWAP-C070()--SE-70
On TROLLEY AVENUE, Near SE Corner NE-NE, S27 T77R1W
Bridge Replacement
TIP Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$540,000
$540,000
$540,000
$540,00035837
Scott County
BRS-SWAP-C082(622)--FF-82
On Y68, Over WAPSI RIVER OVERFLOW, S31 T81 RE4
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,000
186
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
35023
Muscatine County
STBG-SWAP-C070()--FG-70
On OLD HWY 927 F58, from Durant Corp. to Walcott Corp.
Pavement Rehab/Widen
TIP Approved TotalFederal Aid
RegionalSwap
$2,500,000
$2,100,000
$2,100,000
$2,500,000
$2,100,000
$2,100,00035835
Scott County
STBG-SWAP-C082(522)--FG-82
On F58, from Y40 W 6 miles to 14th Ave
Pave
TIP Approved TotalFederal Aid
RegionalSwap
$2,600,000
$2,600,000
$2,600,000
$2,600,000
$2,600,000
$2,600,000
187
RPA 10 - East Central Iowa Council of Governments
700 16th St, Suite 301, Cedar Rapids, IA 52402
Phone: 319-365-9941, Fax: 319-365-9981, www.ecicog.org
Transportation and Regional Development Director: Mary Rump, [email protected]
� N
I
0 5 10
Iowa
) I
20 Miles
:,
Corridor Metropolitan
Planning Organization
(CMPO)
6
r
iorts - Interstate
Commercial - National Highway System
(I Enhanced - Primary Roads
(I General Service Local Roads
(I Basic Service -Ramps
(I Local Service -TrailsTransit
-+- Railroad [el Regional
[el Rivers
Large Urban
[el Major Lakes
Small Urban C] RPA Planning Area
[el Intercity Busr--1
CE! L_ _ _J Counties
Amtrak
I City Limits
Park & Ride Urban Area
188
189
RPA 10CHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
35353
Johnson County
BROSCHBP-C052(123)--NC-52
On BLACK HAWK AVE, Over BR CLEAR CR, S20 T80 R08
Bridge Replacement
TIP Approved
10/20/2020
TotalFederal Aid
RegionalSwap
$413,100$273,100
$140,000
$413,100$273,100
$140,000
HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38055
Iowa Department ofTransportation
HSIPX-150()--3L-6
IA150: CURVE W OF URBANA NEAR 31ST AVE AND55TH ST
Grade and Pave, Erosion Control, Lighting
TIP Approved TotalFederal Aid
RegionalSwap
$24,000$21,600
$3,177,000$2,859,300
$179,000$161,100
$3,380,000$3,042,000
45285
Iowa Department ofTransportation
HSIPX-22()--3L-92
IA22: 9TH ST IN KALONA TO E OF BOISE ST INRIVERSIDE
Pavement Widening
TIP Approved TotalFederal Aid
RegionalSwap
$2,103,000$1,892,700
$2,103,000$1,892,700
190
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38151
Iowa Department ofTransportation
IM-NHS-80()--03-52
I-80: 1.5 MI E OF IA 1 TO 0.5 MI E OF CO RD X30
Grade and Pave, Pave, Grading
TIP Approved TotalFederal Aid
RegionalSwap
$38,211,000$32,479,350
$28,619,000$24,326,150
$41,946,000$35,654,100
$15,295,000$13,000,750
$124,071,000$105,460,350
45437
Iowa Department ofTransportation
NHSX-150()--3H-6
IA150: I-380 TO INDEPENDENCE
Pavement Widening, Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$5,400,000$4,320,000
$5,400,000$4,320,000
45439
Iowa Department ofTransportation
NHSX-150()--3H-6
IA150: VINTON TO I-380
Pavement Widening, Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$4,494,000$3,595,200
$4,494,000$3,595,200
39282
Iowa Department ofTransportation
NHSX-151()--3H-57
US151: CRABAPPLE CREEK 2.9 MI N OF N JCT IA 13(NB)
Grade and Pave, Bridge Replacement, Traffic Signs
TIP Approved TotalFederal Aid
RegionalSwap
$4,006,000$3,204,800
$4,006,000$3,204,800
38216
Iowa Department ofTransportation
NHSX-30()--3H-6
US30: 11TH AVE DR TO W JCT US 218
Grade and Pave, Bridge New, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$2,800,000$2,240,000
$60,392,000$48,313,600
$36,509,000$29,207,200
$99,701,000$79,760,800
39171
Iowa Department ofTransportation
BRF-218()--38-6
US218: ABANDONED RR 2.6 MI N OF N JCT US 30(REMOVE BRIDGE)
Grade and Pave
TIP Approved TotalFederal Aid
RegionalSwap
$2,500,000$2,000,000
$2,500,000$2,000,000
38168
Iowa Department ofTransportation
IM-NHS-80()--03-16
I-80: E OF THE CEDAR RIVER TO W OF CO RD Y26
Grade and Pave, Bridge Replacement, Wetland Mitigation
TIP Approved TotalFederal Aid
RegionalSwap
$21,503,000$18,277,550
$21,503,000$18,277,550
38214
Iowa Department ofTransportation
NHSX-92()--3H-92
IA92: E OF US 218 TO IA 70 IN COLUMBUS JUNCTION
Grade and Pave, Wetland Mitigation, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$25,645,000$20,516,000
$25,645,000$20,516,000
39172
Iowa Department ofTransportation
IMX-380()--02-6
I-380: IA 150 TO BLACK HAWK CO (NB)
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$9,845,000$8,860,500
$9,845,000$8,860,500
191
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39173
Iowa Department ofTransportation
IMX-380()--02-6
I-380: IA 150 TO BLACK HAWK CO (SB)
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$10,288,000$9,259,200
$10,288,000$9,259,200
192
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37971
Iowa Department ofTransportation
BRFN-151()--39-57
US151: EAST BIG CREEK 1.1 MI S OF CO RD X20 (SB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$269,000 $269,000
38038
Iowa Department ofTransportation
BRFN-22()--39-92
IA22: BULGERS RUN 4.8 MI E OF IA 1
Culvert Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$964,000 $964,000
37961
Iowa Department ofTransportation
BRFN-38()--39-53
IA38: WAPSIPINICON RIVER 0.6 MI N OF S JCT CO RDE45
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$943,000 $943,000
39192
Iowa Department ofTransportation
IMN-80()--0E-16
I-80: 0.5 MI E OF CO RD X30 TO 3.0 MI E OF CO RD X30(EB)
TIP Approved TotalFederal Aid
RegionalSwap
$341,000 $341,000
45277
Iowa Department ofTransportation
IMN-80()--0E-16
I-80: 0.9 MI W OF CO RD X40 AND 2.0 MI E OF CO RDX40
Culvert Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$108,000 $108,000
38094
Iowa Department ofTransportation
IMN-80()--0E-48
I-80: CO RD V38 (EB & WB)
Bridge Deck Overlay, Traffic Signs
TIP Approved TotalFederal Aid
RegionalSwap
$1,046,000 $1,046,000
38092
Iowa Department ofTransportation
IMN-80()--0E-48
I-80: EB REST AREA NEAR VICTOR
Rest Area Improvement
TIP Approved TotalFederal Aid
RegionalSwap
$4,149,000 $4,149,000
45271
Iowa Department ofTransportation
NHSN-1()--2R-52
IA1: 1.7 MI N OF I-80
Grading
TIP Approved TotalFederal Aid
RegionalSwap
$100,000 $100,000
38237
Iowa Department ofTransportation
NHSN-30()--2R-57
US30: MOUNT VERNON/LISBON BYPASS FROM W OFWILCOX RD TO CHARLES AVE
Erosion Control
TIP Approved TotalFederal Aid
RegionalSwap
$165,000 $165,000
193
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38176
Iowa Department ofTransportation
NHSN-30()--2R-6
US30: W JCT US 218 INTERCHANGE
Erosion Control, Traffic Signs
TIP Approved TotalFederal Aid
RegionalSwap
$228,000 $75,000 $303,000
39190
Iowa Department ofTransportation
STPN-38()--2J-16
IA38: SCL TO NCL IN TIPTON (STATE SHARE)
Grade and Pave
TIP Approved TotalFederal Aid
RegionalSwap
$2,137,000 $2,137,000
37962
Iowa Department ofTransportation
BRFN-136()--39-53
IA136: STREAM 0.2 MI N OF CO RD E45
Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$1,135,000 $1,135,000
38039
Iowa Department ofTransportation
BRFN-218()--39-92
US218: N FORK LONG CREEK 1.0 MI S OF IA 92 (NB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$337,000 $337,000
38101
Iowa Department ofTransportation
IMN-380()--0E-52
I-380: CO RD F12 INTERCHANGE
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$459,000 $459,000
38100
Iowa Department ofTransportation
IMN-80()--0E-52
I-80: EAGLE AVE 6.1 MI W OF I-380
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$252,000 $252,000
38197
Iowa Department ofTransportation
NHSN-1()--2R-53
IA1: LINN CO TO US 151 AT VARIOUS LOCATIONS
Culvert Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$4,000 $1,076,000 $1,080,000
39174
Iowa Department ofTransportation
BRFN-150()--39-6
IA150: CEDAR RIVER 1.0 MI S OF CO RD E16
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,163,000 $1,163,000
39271
Iowa Department ofTransportation
BRFN-6()--39-52
US6: BUFFALO CREEK 4.9 MI E OF CO RD W38
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$422,000 $422,000
194
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39193
Iowa Department ofTransportation
IMN-80()--0E-16
I-80: CO RD Y26 AND CO RD Y30 INTERCHANGE(RAMPS)
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,486,000 $1,486,000
45349
Iowa Department ofTransportation
IMN-80()--0E-48
I-80: REST AREA NEAR VICTOR (EB)
Grade and Pave, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$4,350,000 $4,350,000
39285
Iowa Department ofTransportation
STPN-30()--2J-57
US30: IA 1 INTERCHANGE IN MOUNT VERNON
Traffic Signs
TIP Approved TotalFederal Aid
RegionalSwap
$75,000 $75,000
45368
Iowa Department ofTransportation
BRFN-150()--39-6
IA150: PRAIRIE CREEK 1.8 MI N OF CO RD V71
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000 $500,000
45385
Iowa Department ofTransportation
BRFN-151()--39-53
US151: KITTY CREEK 1.1 MI S OF CO RD X44 (SB)
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$750,000 $750,000
45364
Iowa Department ofTransportation
BRFN-218()--39-6
US218: STREAM 0.1 MI E OF CO RD V61
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$575,000 $575,000
45315
Iowa Department ofTransportation
IMN-80()--0E-16
I-80: W IA 38/CO RD X54 INTERCHANGE (MOSCOW RD)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$500,000 $500,000
195
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
16834
RPA 10
RGPL-PA10()--ST-00
Region 10-ECICOG: Region 10 Planning
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$103,750$83,000
$83,000
$107,500$86,000
$86,000
$111,250$89,000
$89,000
$115,000$92,000
$92,000
$437,500$350,000
$350,000
45406
Iowa Department ofTransportation
STP-64()--2C-53
IA64: WYOMING TO MONMOUTH
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$3,487,000$2,789,600
$3,487,000$2,789,600
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39442
Jones CountyConservation Board
TAP-R-C053(089)--8T-53
On Wapsipinicon Trail , from The end of Phase 1 0.5 milesto Hale Bridge
Ped/Bike Grade & Pave
TIP Approved
7/20/2021
TotalFederal Aid
RegionalSwap
$466,145$243,145
$243,145
$466,145$243,145
$243,145
39444
Washington CountyConservation Board
TAP-R-C092(110)--8T-92
On Kewash Nature Trail, from end of Phase 1, 7400 feet(1.40 miles) to bridge over Crooked Creek
Ped/Bike Grade & Pave
TIP Approved
2/16/2021
TotalFederal Aid
RegionalSwap
$517,315$317,315
$317,315
$517,315$317,315
$317,315
39441
Johnson CountyConservation Board
TAP-U-C052(124)--8I-52
On Clear Creek Trail, from Half Moon Ave 2.5 miles to FWKent Park
Ped/Bike Development
TIP Approved
6/15/2021
TotalFederal Aid
RegionalSwap
$580,260$337,260
$337,260
$580,260$337,260
$337,260
39443
Linn CountyConservation Board
TAP-U-C057(147)--8I-57
On Grant Wood Trail, from Oxley Road .113 miles toSecrist Rd, and then approx. 2935 feet East
Ped/Bike Paving, Ped/Bike Structures
TIP Approved
4/20/2021
TotalFederal Aid
RegionalSwap
$1,410,087$634,087
$634,087
$1,410,087$634,087
$634,087
196
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
16307
Benton County
BHS-SWAP-C006(118)--FC-06
On V-66, Over Prairie Creek, S13 T82 R11
Bridge Rehabilitation
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00021820
Benton County
BROS-SWAP-C006()--FE-06
W14: Over BR LITTLE BEAR CREEK
Grade and Pave, Culvert Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00032447
Benton County
BROS-SWAP-C006()--SE-06
On 32 AVE DR, Over BR PRAIRIE CK, S11 T82 R09
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00032448
Benton County
BROS-SWAP-C006(109)--SE-06
On E24, Over SPRING CREEK, S24 T85 R09
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00034829
Cedar County
BROS-SWAP-C016(110)--SE-16
On RED STAR RD, Over SUGAR CREEK, S4 T80 R02
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,00038569
Iowa County
BROS-SWAP-C048(90)--SE-48
On WW Ave, S11 T78 R9
Bridge New
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00045021
Washington County
BROS-SWAP-C092()--SE-92
On Elm Avenue, Over Small Stream, from 120th Street N0.50 miles
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$275,000
$275,000
$275,000
$275,00032704
Benton County
BRS-SWAP-C006(114)--FF-06
On V37, Over WOLF CREEK, S19 T86 R12
TIP Approved
10/20/2020
TotalFederal Aid
RegionalSwap
$2,400,000
$400,000
$2,400,000
$400,000DOT Note: Project was awarded $2,000,000 of state county bridge funds.
38935
Linn County
BRS-SWAP-C057(BR 1028)--FF-57
On BURNETT STATION RD, Over INDIAN CREEK, S30T85N R06W
Bridge Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,000
197
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36374
Cedar County
BROS-SWAP-C016()--FE-16
On F51-Old Muscatine Road, Over OTTER CREEK, S25T79 R02
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,00035920
Iowa County
BROS-SWAP-C048(HC-5025)--SE-48
On 125th St, Over Honey Creek, S14 T81 R12
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00037760
Linn County
BROS-SWAP-C057(BR 878)--SE-57
On ROSEDALE RD, Over INDIAN CR, S20 T83 R06
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,00037758
Linn County
BROS-SWAP-C057(BR1053)--SE-57
On BERTRAM RD, Over INDIAN CREEK, S30 T83 R06
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,350,000
$1,350,000
$1,350,000
$1,350,00016421
Washington County
BROS-SWAP-C092()--SE-92
On Juniper Avenue, Over SMALL STREAM, S27 T74 R08
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00032633
Cedar County
BROS-SWAP-C016()--SE-16
On Green Road, Over ROCK RUN CR, in S8 T80 R03
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,00038669
Cedar County
BROS-SWAP-C016()--SE-16
On Taylor Ave., Over SUGAR CREEK, S29 T80 R01
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00039061
Johnson County
BROS-SWAP-C052()--SE-52
On 520TH ST SW, Over DEER CREEK, S20 T78 R08
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,00018444
Benton County
BROS-SWAP-C057(BR 1912)--SE-57
LINN BENTON RD: Over Bear Creek
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$600,000
$200,000
$600,000
$200,000
198
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37737
Linn County
BRS-SWAP-C057(BR 2737)--FF-57
On NORTH CENTER POINT RD, Over EAST OTTER CK,S6 T84 R07
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$800,000
$800,000
$800,000
$800,00044627
Cedar County
BROS-SWAP-C016()--FE-16
On 325th St. (F51), Over ELKHORN CREEK (LITTLE), S28T79 R01
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00021862
Iowa County
BRS-SWAP-C048(E-5005)--FF-48
F-52: Over English River
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,250,000
$1,250,000
$1,250,000
$1,250,00016422
Washington County
BRS-SWAP-C092(73)--FF-92
On W64, Over Long Creek, S22 T75 R6
Bridge Replacement
TIP Approved
11/21/2023
TotalFederal Aid
RegionalSwap
$850,000
$850,000
$850,000
$850,000
199
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
35664
Urbana
STBG-SWAP-7872(605)--SG-06
In the city of Urbana, On Hutton Drive, from at Hwy 150intersection
Pavement Widening
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$527,400
$246,400
$246,400
$527,400
$246,400
$246,40035666
Washington
STBG-SWAP-8140(612)--SG-92
In the city of Washington, On W. Buchanan, from currenttermination to South Avenue E.
Grade and Pave
TIP Approved
2/16/2021
TotalFederal Aid
RegionalSwap
$1,936,440
$1,936,440
$1,936,440
$1,936,440
$1,936,440
$1,936,44032700
Benton County
STBG-SWAP-C006()--FG-06
On V66, from Hwy 30 south to Blairstown
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,150,000
$920,000
$920,000
$1,150,000
$920,000
$920,00032639
Cedar County
STBG-SWAP-C016(111)--FG-16
On Y14 from F44 (290th Street) N 5.2 miles to StateHighway 130 & Y4F from Hwy 130 to Inland Cemetary
Pavement Rehab
TIP Approved
2/16/2021
TotalFederal Aid
RegionalSwap
$2,850,000
$1,645,000
$1,645,000
$2,850,000
$1,645,000
$1,645,00036530
Johnson County
STBG-SWAP-C052(120)--FG-52
On F44 (Herbert Hoover Highway), from 1 mile East ofWapsi to Johnson Cedar Road, S12 T79 R05
Grade and Pave
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$5,000,000
$1,935,000
$1,935,000
$5,000,000
$1,935,000
$1,935,00038850
Washington County
STBG-SWAP-C092(114)--FG-92
On W61, from G26 north to Spruce Avenue
Pave, Pavement Widening
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$3,720,000
$2,520,000
$2,520,000
$3,720,000
$2,520,000
$2,520,000DOT Note: Actual funding limit $2,110,232
45009
Iowa County
STBG-SWAP-C048(V52)--FG-48
V44; I-80 South to 240th St
TIP Approved TotalFederal Aid
RegionalSwap
$1,100,000
$1,100,000
$1,100,000
$1,100,000
$1,100,000
$1,100,00035762
Jones County
STBG-SWAP-C053(C-928)--FG-53
On CO RD E34, from FAIRVIEW RD to City of AnamosaCorporate Limits
Pave, Pavement Widening
TIP Approved TotalFederal Aid
RegionalSwap
$1,250,000
$1,250,000
$1,250,000
$1,250,000
$1,250,000
$1,250,00032702
Benton County
STBG-SWAP-C006()--FG-06
On E22, from Hwy 218 west 4.5 Miles to Near Garrison
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,000,000
$1,600,000
$1,600,000
$2,000,000
$1,600,000
$1,600,000
200
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
35908
Cedar County
STBG-SWAP-C016()--FG-16
On X54, from Muscatine County Line North 3.5 Miles toInterstate 80
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,500,000
$1,145,000
$1,145,000
$1,500,000
$1,145,000
$1,145,00036441
Linn County
STBG-SWAP-C057(D62)--FG-57
On WALKER RD (D62), from BETTY'S GROVE RD (W35)EASTERLY 4.7 Miles to TROY MILLS RD (W45)
Pave
TIP Approved TotalFederal Aid
RegionalSwap
$2,208,000
$2,208,000
$2,208,000
$2,208,000
$2,208,000
$2,208,000
201
202
203
RPA 11CHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36285
Dallas County
BROSCHBP-C025(115)--NC-25
On 250TH ST, Over Walnut Creek, On the south line of S2,T79, R26, Walnut Township
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$480,000$245,790
$230,000
$480,000$245,790
$230,00037548
Madison County
BROSCHBP-C061(124)--NC-61
On HOGBACK BRIDGE RD, Over DRAINAGE, at S1/4 S23T76 R28
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$1,000,000$655,440
$344,560
$1,000,000$655,440
$344,56032785
Warren County
BROSCHBP-C091(132)--GA-91
On R35 (10TH AVE), Over BRANCH BADGER CREEK,S31 T77 R25
Bridge Replacement
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$900,000$491,580
$408,420
$900,000$491,580
$408,42024850
Warren County
BROSCHBP-C091(134)--NC-91
On IDAHO ST, Over BRANCH MIDDLE RIVER, from 50THAVE 0.3 miles S15 T76 R25
Bridge Replacement
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$400,000$218,480
$181,520
$400,000$218,480
$181,52037403
Jasper County
BRS-CHBP-C050(128)--GB-50
On T38, Over SUGAR CREEK, S13 T80 R17
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$450,000$245,790
$204,210
$450,000$245,790
$204,21015532
Jasper County
BRS-CHBP-C050(129)--GB-50
On F-24, Over Clear Creek, S2 T80 R21
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$750,000$409,650
$340,350
$750,000$409,650
$340,35014749
Madison County
BRS-CHBP-C061(125)--GB-61
On CLARK TOWER RD., Over North Fork Clanton Creek,S12 T74 R28
Bridge Replacement
TIP Approved
2/16/2021
TotalFederal Aid
RegionalSwap
$1,250,000$955,850
$294,150
$1,250,000$955,850
$294,15029272
Story County
BRS-CHBP-C085(155)--GB-85
On E18, Over East Indian Creek, on NLINE S19 T85 R22
Bridge Replacement
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$550,410$300,410
$250,000
$550,410$300,410
$250,00032798
Warren County
BRS-CHBP-C091(133)--GB-91
On S23, Over COTTON CREEK, S27 T74 R22
Bridge Replacement
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$700,000$382,340
$317,660
$700,000$382,340
$317,660
204
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38156
Iowa Department ofTransportation
IM-NHS-35()--03-91
I-35: N OF NORTH RIVER TO S OF BADGER CREEK(SB)
Grade and Pave, Bridge Replacement, Wetland Mitigation
TIP Approved TotalFederal Aid
RegionalSwap
$14,339,000$12,188,150
$14,339,000$12,188,150
38096
Iowa Department ofTransportation
IMX-80()--02-50
I-80: 0.9 MI E OF IA 224 TO 1.0 MI W OF IA 146 (EB &WB)
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$4,990,000$4,491,000
$4,990,000$4,491,000
38066
Iowa Department ofTransportation
IM-80()--13-25
I-80: US 6/169 IN DE SOTO TO CO RD R16
Grade and Pave, Pave, Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$17,792,000$16,012,800
$9,387,000$8,448,300
$25,078,000$22,570,200
$52,257,000$47,031,300
38150
Iowa Department ofTransportation
IM-NHS-80()--03-50
I-80: NORTH SKUNK RIVER 2.1 MI E OF IA 224
Grade and Pave, Bridge Replacement, Erosion Control
TIP Approved TotalFederal Aid
RegionalSwap
$12,659,000$10,760,150
$377,000$320,450
$13,036,000$11,080,600
39367
Iowa Department ofTransportation
IM-NHS-35()--03-91
I-35: N OF IA 92 TO S OF NORTH RIVER (SB)
Grade and Pave, Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$21,238,000$18,052,300
$21,238,000$18,052,300
38248
Iowa Department ofTransportation
NHSX-30()--3H-85
US30: 0.5 MI E OF I-35 TO E OF 590TH AVE
Pave, Grading, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$14,527,000$11,621,600
$10,296,000$8,236,800
$24,823,000$19,858,400
39357
Iowa Department ofTransportation
NHSX-30()--3H-85
US30: CO RD S14 INTERSECTION IN NEVADA
Grade and Pave, Bridge New
TIP Approved TotalFederal Aid
RegionalSwap
$5,688,000$4,550,400
$5,688,000$4,550,400
45366
Iowa Department ofTransportation
BRF-14()--38-63
IA14: BRUSH CREEK 0.2 MI S OF CO RD G28
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$3,500,000$2,800,000
$3,500,000$2,800,000
45361
Iowa Department ofTransportation
BRF-65()--38-91
US65: OTTER CREEK 1.6 MI S OF CO RD G58
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$2,200,000$1,760,000
$2,200,000$1,760,000
205
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37956
Iowa Department ofTransportation
BRFN-117()--39-50
IA117: STREAM 0.5 MI S OF CO RD F24
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$190,000 $190,000
38036
Iowa Department ofTransportation
BRFN-5()--39-91
IA5: MIDDLE RIVER 1.5 MI S OF CO RD G16 (NB & SB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$534,000 $534,000
39359
Iowa Department ofTransportation
IMN-35()--0E-85
I-35: SE RAMP OF THE US 30 INTERCHANGE
Grading, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$147,000 $147,000
45272
Iowa Department ofTransportation
IMN-35()--0E-85
I-35: SB REST AREA LAGOON
Grading
TIP Approved TotalFederal Aid
RegionalSwap
$52,000 $52,000
45446
Iowa Department ofTransportation
IMN-80()--0E-25
I-80: US 6 / US 169 INTERCHANGE
Pavement Widening, Traffic Signals
TIP Approved TotalFederal Aid
RegionalSwap
$1,660,000 $1,660,000
45255
Iowa Department ofTransportation
IMN-80()--0E-25
I-80: S RACCOON RIVER AND N RACCOON RIVER E OFUS 169 (EB & WB)
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$500,000 $500,000
45425
Iowa Department ofTransportation
IMN-80()--0E-25
I-80: WEIGH STATION 2.0 MI E OF VAN METER
Weigh Scale Improvement
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000 $1,000,000
38097
Iowa Department ofTransportation
IMN-80()--0E-50
I-80: SOUTH SKUNK RIVER 2.5 MI W OF IA 117 (EB &WB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$2,056,000 $2,056,000
45426
Iowa Department ofTransportation
IMN-80()--0E-50
I-80: WEIGH STATION 1.8 MI E OF MITCHELLVILLE
Weigh Scale Improvement
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000 $1,000,000
206
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39296
Iowa Department ofTransportation
NHSN-14()--2R-63
IA14: 0.6 MI S OF CO RD G18
Culvert Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$75,000 $75,000
39175
Iowa Department ofTransportation
NHSN-30()--2R-8
US30: 1.8 MI W OF DES MOINES RIVER TO W OFSNEDDEN DR (VAR LOC)
Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$202,000 $202,000
45243
Iowa Department ofTransportation
STPN-69()--2J-91
US69: 120TH AVE 0.75 MI N OF CO RD G64
Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$10,000 $10,000
37957
Iowa Department ofTransportation
BRFN-117()--39-50
IA117: SQUAW CREEK 1.7 MI N OF CO RD S6G
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$444,000 $444,000
37975
Iowa Department ofTransportation
BRFN-169()--39-61
US169: NORTH RIVER 3.5 MI N OF N JCT IA 92
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$378,000 $378,000
37885
Iowa Department ofTransportation
BRFN-210()--39-8
IA210: DES MOINES RIVER 0.3 MI E OF CO RD E62
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$4,309,000 $4,309,000
37955
Iowa Department ofTransportation
BRFN-6()--39-50
US6: DITCH 0.2 MI E OF CO RD T12
Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$604,000 $604,000
38006
Iowa Department ofTransportation
BRFN-65()--39-77
US65: SKUNK RIVER 7.6 MI N OF I-80 (NB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$463,000 $463,000
38142
Iowa Department ofTransportation
IMN-35()--0E-91
I-35: CO RD G50 INTERCHANGE 4.7 MI S OF IA 92
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$385,000 $385,000
207
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38141
Iowa Department ofTransportation
IMN-35()--0E-91
I-35: CO RD G64 INTERCHANGE
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$422,000 $422,000
45388
Iowa Department ofTransportation
IMN-80()--0E-50
I-80: 2.6 MI E OF CO RD S27 TO 1.3 MI E OF CO RD T14(WB)
TIP Approved TotalFederal Aid
RegionalSwap
$2,080,000 $2,080,000
45390
Iowa Department ofTransportation
IMN-80()--0E-50
I-80: 2.6 MI E OF CO RD S27 TO 0.8 MI E OF IA 14 (EB)
TIP Approved TotalFederal Aid
RegionalSwap
$1,689,000 $1,689,000
45392
Iowa Department ofTransportation
IMN-80()--0E-50
I-80: CO RD T14 AND IA 224 INTERCHANGE RAMPS
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,400,000 $1,400,000
38180
Iowa Department ofTransportation
NHSN-30()--2R-8
US30: CO RD R18 INTERSECTION
Grade and Pave, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$1,697,000 $1,697,000
38185
Iowa Department ofTransportation
NHSN-6()--2R-25
US6: S OF 302ND PL TO GREENWOOD HILLS DR INADEL (STATE SHARE)
Pavement Rehab/Widen
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000 $1,000,000
39265
Iowa Department ofTransportation
BRFN-14()--39-50
IA14: ALLOWAY CREEK 1.6 MI S OF IA 224
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,708,000 $1,708,000
39294
Iowa Department ofTransportation
BRFN-5()--39-63
IA5: S JCT IA 92
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,674,000 $1,674,000
39368
Iowa Department ofTransportation
BRFN-5()--39-91
IA5: COAL CREEK 0.8 MI N OF IA 316 (NB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$670,000 $670,000
208
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45386
Iowa Department ofTransportation
BRFN-69()--39-85
US69: WALNUT CREEK 0.2 MI N OF CO RD E57
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000 $1,000,000
45431
Iowa Department ofTransportation
BRFN-92()--39-63
IA92: OLD HIGHWAY 92 3.9 MI E OF E JCT IA 5
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000 $1,000,000
45309
Iowa Department ofTransportation
IMN-80()--0E-50
I-80: CHERRY CREEK 1.2 MI W OF IA 14 (EB & WB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$750,000 $750,000
45344
Iowa Department ofTransportation
NHSN-169()--2R-25
US169: S OF N RACCOON RIVER 1.4 MI N OF US 6
Culvert Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$401,000 $401,000
RTP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45471
Dallas CountyConservation Board
NRT-C025(116)--9G-25
On M AVE, Over BEAVER CREEK, S12 T81 R28
Ped/Bike Grade & Pave
TIP Approved
7/20/2021
TotalFederal Aid
RegionalSwap
$664,000$328,175
$664,000$328,175
209
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36937
RPA 11
RGPL-PA11()--ST-00
HIRTA: Vehicle Purchase
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$167,795$134,236
$134,236
$144,820$115,820
$115,820
$124,795$99,836
$99,836
$437,410$349,892
$349,892
38272
Iowa Department ofTransportation
STP-17()--2C-8
IA17: 0.5 MI N OF US 30 TO 3.0 MI N (STATE SHARE)
Pave, Bridge New, Grading
TIP Approved TotalFederal Aid
RegionalSwap
$7,854,000$6,283,200
$6,062,000$4,849,600
$200,000$160,000
$14,116,000$11,292,800
45415
Iowa Department ofTransportation
STP-65()--2C-85
US65: 0.5 MI S OF US 30 TO IA 175 IN HUBBARD
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$6,767,000$5,413,600
$6,767,000$5,413,600
45521
RPA 11
STP-PA11()--2C-00
Pavement Data Collection Opt In
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$281,250$225,000
$225,000
$281,250$225,000
$225,000
STBG-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37566
Madison County
BRM-C061()--8N-61
On R21 (PERU RD), Over CLANTON CREEK, S12 T74R27
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,800,000$360,000
$1,800,000$360,000
DOT Note: Project includes city bridge funding
32547
Dallas County
BROS-C025(113)--8J-25
On 170th St, Over Slough Creek, S27 T81 R27
Bridge Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$300,000$280,000
$300,000$280,000
38665
Madison County
BROS-C061(119)--5F-61
On Settlers Ave., Over STREAM, at SE S36 T77N R27W
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$550,000$440,000
$550,000$440,000
210
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39404
Boone CountyConservation Board
TAP-U-C008()--8I-08
High Trestle to City of Boone Trail - Phase 1
Ped/Bike Grade & Pave, Ped/Bike Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$418,000$100,000
$100,000
$418,000$100,000
$100,000
45520
Dallas CountyConservation Board
TAP-U-C025()--8I-25
RRVT Bridge Improvements Phase 2 - Bridge S OverMOSQUITO CREEK, S34 T79 R29
Ped/Bike Structures
TIP Approved TotalFederal Aid
RegionalSwap
$462,500$250,000
$250,000
$462,500$250,000
$250,000
39399
Dallas CountyConservation Board
TAP-U-C025(117)--8I-25
RRVT Bridge Improvements Phase 3 - Bridge D
Ped/Bike Structures
TIP Approved
4/20/2021
TotalFederal Aid
RegionalSwap
$462,500$250,000
$250,000
$462,500$250,000
$250,000
39406
Milo
TAP-R-5087()--8T-91
In the city of Milo, Multi-use Path Project - From SoutheastWarren Elementary School to Centennial Park
Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$370,000$230,000
$230,000
$370,000$230,000
$230,000
39483
Adel
TAP-U-0035()--8I-25
In the city of Adel, Adel Recrational Trails
Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$519,000$180,000
$180,000
$519,000$180,000
$180,000
45467
Adel
TAP-R-0035()--8T-25
Over S29 T79 R27
Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$635,000$125,000
$125,000
$635,000$125,000
$125,000
45468
Pleasantville
TAP-R-6125()--8T-63
In the City of Pleasantville, Highway 5 Trail Project
Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$320,000$150,000
$150,000
$320,000$150,000
$150,000
211
SWAP-CMAQ
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45465
Boone County
ICAAP-SWAP-C008()--FH-08
On R AVE, S23 T84 R26
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,578,000
$800,000
$2,578,000
$800,000PA Note: Project will be designed and bid in conjunction with TPMS 38272.
212
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45461
Zearing
BROS-SWAP-8612(602)--SE-85
On S PEARL ST, Over MIDDLE MINERVA CREEK, S21T85 R21
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$550,000
$550,000
$550,000
$550,00035886
Boone County
BROS-SWAP-C008(83)--SE-08
On QW LN, Over BIKE TRAIL, S35 T82 R26
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$950,000
$950,000
$950,000
$950,00024907
Dallas County
BROS-SWAP-C025(120)--FE-25
On Pioneer Avenue, Over Slough Creek, S27 T81 R27,Beaver Township
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$375,000
$370,000
$375,000
$370,00037672
Madison County
BROS-SWAP-C061()--FE-61
On R35 (10th Ave.), Over BRANCH BADGER CREEK, atS31 T77 R25
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$113,000
$113,000
$113,000
$113,00035066
Madison County
BROS-SWAP-C061(116)--SE-61
On VALLEYVIEW AVE., Over DRAINAGE, S10 T75 R26
Bridge Replacement
TIP Approved
9/15/2020
TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00038596
Polk County
BROS-SWAP-C077(231)--SE-77
On NW 134 Ave 0.20 Mi E of NW 2nd St
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$800,000
$800,000
$800,000
$800,00027021
Jasper County
BRS-SWAP-C050(116)--FF-50
On County Road F48, Over Squaw Creek, from on thewest side of W 116th St S S11 T79 R21
Bridge Rehabilitation
TIP Approved
1/19/2022
TotalFederal Aid
RegionalSwap
$1,500,000
$1,500,000
$1,500,000
$1,500,00037567
Madison County
BRS-SWAP-C061(115)--FF-61
On R35 (BEV. PARK RD.), Over CLANTON CREEK, S12T75 R26
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$2,000,000
$500,000
$2,000,000
$500,000DOT Note: Project awarded State Bridge Replacement funds ($1,500,000)
44728
Marion County
BRS-SWAP-C063(135)--FF-63
On G 62, Over WALNUT CREEK, S28 T75 R18
Bridge Replacement
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,000
213
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
32218
Jasper County
BHS-SWAP-C050()--FC-50
On County Road F48, Over Small Stream, along WLINES10 T79 R21
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,00035884
Boone County
BROS-SWAP-C008(78)--FE-08
On J AVE, OVER UP RR, S27 T84 R27
Bridge Replacement
TIP Approved
10/19/2021
TotalFederal Aid
RegionalSwap
$720,000
$720,000
$720,000
$720,00036286
Dallas County
BROS-SWAP-C025(119)--SE-25
On 270th St, Over Panther Creek, S15 T79 R28, ColfaxTownship
Bridge Replacement
TIP Approved
7/20/2021
TotalFederal Aid
RegionalSwap
$600,000
$590,000
$600,000
$590,00032516
Dallas County
BROS-SWAP-C025(E-44)--SE-25
On B Avenue, Over Mosquito Creek, on the east line of S6,T80, R29, Lincoln Township
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$620,000
$600,000
$620,000
$600,00032498
Madison County
BROS-SWAP-C061()--FE-61
On R21, Over BRANCH TO CLANTON CREEK, at S1 T74R27
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00044730
Marion County
BROS-SWAP-C063()--SE-63
On STORY DR, Over ENGLISH CREEK, from 103rd to94th S16 T74 R20
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$800,000
$800,000
$800,000
$800,00032685
Dallas County
BROS-SWAP-C025(C-41)--FE-25
On R30, Over Beaver Creek, S8/9 T81 R27, BeaverTownship
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$600,000
$595,000
$600,000
$595,00016565
Jasper County
BROS-SWAP-C050( )--SE-50
N 75th Ave W: Over Clear Creek
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$375,000
$375,000
$375,000
$375,00037408
Jasper County
BROS-SWAP-C050()--FE-50
On S 44th Ave, Over SMALL STREAM, on NLINE S16 T79R19
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$550,000
$550,000
$550,000
$550,000
214
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38753
Jasper County
BROS-SWAP-C050()--SE-50
On Eagle St, Over INDIAN CREEK, in SW Corner of S27TT81N RR21W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00038606
Polk County
BROS-SWAP-C077(BR9150)--SE-77
ON SE 48TH AVE, IN THE NW 1/4 SEC 28-78-22, 0.98 MI.EAST OF SE POWERS DRIVE
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00032507
Story County
BROS-SWAP-C085(H31)--FE-85
On 150th St., Over Skunk River, NLINE S31 T85 R23
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00038624
Boone County
BRS-SWAP-C008(xx)--FF-08
On E 18, Over BLUFF CREEK, on NLINE S20 T85N R27W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$620,000
$620,000
$620,000
$620,00032336
Marion County
BRS-SWAP-C063(T15)--FF-63
On T15, Over BNSF RR AND STREAM, from 165th toLisbon Dr.
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$2,750,000
$2,750,000
$2,750,000
$2,750,00032791
Warren County
BROS-SWAP-C091(M2009)--SE-91
On 20TH AVE, Over PAINTER CREEK, S20 T75 R25
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00036390
Warren County
BROS-SWAP-C091(N1410)--FE-91
On G64, Over S RIVER BRANCH, S15 T74 R25
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$660,000
$660,000
$660,000
$660,00020595
Madison County
BRS-SWAP-C061()--FF-61
On P53, Over NORTH RIVER, S10 T76 R29
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,200,000
$960,000
$1,200,000
$960,00044736
Marion County
BRS-SWAP-C063()--FF-63
On 155th, Over HICKORY CREEK, from Vermont toMonroe Co. Line S33 T74 R19
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$800,000
$800,000
$800,000
$800,000
215
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45469
Huxley
STBG-SWAP-3630()--SG-91
In the City of Huxley, on East 1st Street from approx. 100feet east of Hwy 69 to approx. 240 feet east of ParkridgeAve
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$431,000
$125,000
$125,000
$431,000
$125,000
$125,000
39410
Huxley
STBG-SWAP-3630(093)--SG-85
In the city of Huxley, East 1st Street Rec Phase 1- Fromapprox. 240' east of Parkridge Ave east approx. 650'
Pavement Rehab
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$365,000
$240,000
$240,000
$365,000
$240,000
$240,00039160
Knoxville
STBG-SWAP-4040(612)--SG-63
In the city of Knoxville, On Park Lane Dr, Larson St, RockIsland St, 2nd St, and Roche St
Pavement Rehab
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$935,000
$935,000
$935,000
$935,000
$935,000
$935,00045470
Story City
STBG-SWAP-7430()--SG-85
In the City of Story City, on Broad Street from Lafayette toGrand
Pavement Rehab, Ped/Bike Paving
TIP Approved TotalFederal Aid
RegionalSwap
$560,000
$125,000
$125,000
$560,000
$125,000
$125,00036920
Winterset
STBG-SWAP-8497(603)--SG-61
In the city of Winterset, 10th Street Reconstruction, fromIowa 92 and Benton Street.
Pavement Rehab
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$1,300,000
$1,300,000
$1,300,000
$1,300,000
$1,300,000
$1,300,00023591
Boone County
STBG-SWAP-C008(67)--FG-08
On Lower Ledges Rd and E-52, from Lower LedgesEasterly 4.2 Miles to Hwy 17
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,500,000
$1,500,000
$1,500,000
$1,500,000
$1,500,000
$1,500,00036033
Jasper County
STBG-SWAP-C050(125)--FG-50
On F62, from State Highway 163 East 4.285 Miles to StateHighway 14
Pavement Rehab/Widen
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$2,500,000
$2,500,000
$2,500,000
$2,500,000
$2,500,000
$2,500,00034906
Marion County
STBG-SWAP-C063(137)--FG-63
On T14, from Pella Corp. Limit to Jasper Co. Line S15 T77R18
Pavement Widening, Shoulder Grading
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$1,200,000
$700,000
$700,000
$1,200,000
$700,000
$700,00034601
Polk County
STBG-SWAP-C077(230)--FG-77
On NE 112 St/Camp Dr/SE 116 St, from Hwy 163 to E CL ofRunnells
Pavement Rehab
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$1,204,000
$1,204,000
$1,204,000
$1,204,000
$1,204,000
$1,204,000
216
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45450
Indianola
STBG-SWAP-3680()--SG-91
On S K ST, S35 T76 R24
Grade and Pave, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$3,200,000
$1,600,000
$1,600,000
$3,200,000
$1,600,000
$1,600,00045451
Indianola
STBG-SWAP-3680()--SG-91
In the City of Indianola, East Hillcrest Avenue from NorthJefferson Way to North 14th Street
Grade and Pave, Traffic Signals
TIP Approved TotalFederal Aid
RegionalSwap
$4,600,000
$1,500,000
$1,500,000
$4,600,000
$1,500,000
$1,500,00029505
Newton
STBG-SWAP-5482(622)--SG-50
In the city of Newton, Union Drive Reconstruction, fromaprox 520ft S of N 4th Avenue to aprox 80ft N of N 19thAvenue
Pavement Rehab
TIP Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$2,800,000
$2,800,000
$2,800,000
$2,800,000
$2,800,000
$2,800,000
35889
Boone County
STBG-SWAP-C008()--FG-8
On E26, approximately .58 miles west and .50 miles east ofthe Des Moines River
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,000
$600,000
$600,00010913
Madison County
STBG-SWAP-C061()--FG-61
On G61 (MACKSBURG RD), from ADAIR/MADISONCOUNTY LINE EAST 6 Miles to FIELDSTONE AVE.
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,500,000
$2,500,000
$2,500,000
$2,500,000
$2,500,000
$2,500,00036012
Story County
STBG-SWAP-C085(R38)--FG-85
On R38, from Slater City Limits north 8.0 Miles
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,240,000
$2,240,000
$2,240,000
$2,240,000
$2,240,000
$2,240,00036930
Pella
STBG-SWAP-5947()--SG-63
In the city of Pella, Oskaloosa St, from SE 16 to 240 St(Eagle Lane) including the intersection approx. 300 ft
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,650,000
$1,650,000
$1,650,000
$1,650,000
$1,650,000
$1,650,00039163
Perry
STBG-SWAP-5970()--SG-25
In the city of Perry, Willis Avenue Overlay from 3rd to 16thStreet
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$539,000
$539,000
$539,000
$539,000
$539,000
$539,00037454
Dallas County
STBG-SWAP-C025(H-43)--FG-25
On R22, from Highway 44 N 5 miles to F31, GrantTownship
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,000,000
$800,000
$800,000
$2,000,000
$800,000
$800,000
217
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
44747
Polk County
STBG-SWAP-C077(NE 42 St)--SG-77
On NE 42 St from NE 166 Ave to NE 150 Ave, 2.0 Miles
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,000
$350,000
$350,000
218
RPA 12 - Region XII Council of Governments
1009 East Anthony Street, P.O. Box 768, Carroll, IA 51401
Phone: 712-792-9914, Fax: 712-792-1751, www.region12cog.org
Executive Director: Rick Hunsaker, [email protected]
Local Assistance Director: Chris Whitaker, [email protected]
\.
i i
Audubon! I County I
Gutherie County
�orts � Commercial
- Interstate
- National Highway System
El Enhanced - Primary Roads
El General Service
El Basic Service
El Local Service Transit [el Regional
[el Large Urban
[el Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
Local Roads
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] RPA Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
219
220
RPA 12CHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
35111
Guthrie County
BROSCHBP-C039(95)--NC-39
On P20, Over STREAM, S34 T78 R31
Bridge Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$576,000$314,611
$261,389
$576,000$314,611
$261,389
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39242
Iowa Department ofTransportation
BRF-144()--38-37
IA144: EAST BUTTRICK CREEK 6.7 MI S OF IA 175
Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$1,068,000$854,400
$1,068,000$854,400
221
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37918
Iowa Department ofTransportation
BRFN-30()--39-24
US30: DITCH 3.8 MI E OF CO RD M36
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$309,000 $309,000
37944
Iowa Department ofTransportation
BRFN-44()--39-39
IA44: MIDDLE RACCOON RIVER 1.2 MI W OF IA 4
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$772,000 $772,000
45414
Iowa Department ofTransportation
STPN-141()--2J-14
IA141: WCL MANNING TO JUST E OF MANNING
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,165,000 $1,165,000
37941
Iowa Department ofTransportation
BRFN-144()--39-37
IA144: EAST BUTTRICK CREEK 4.0 MI S OF IA 175
Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$871,000 $871,000
39211
Iowa Department ofTransportation
NHSN-59()--2R-24
US59: N OF CO RD E59 TO N OF CO RD E53
Culvert Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$622,000 $622,000
39212
Iowa Department ofTransportation
STPN-141()--2J-24
IA141: 2.8 MI E OF CO RD M36
Culvert Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$224,000 $224,000
38208
Iowa Department ofTransportation
STPN-20()--2J-81
US20: W OF ADAMS AVE TO W OF US 71
Wetland Mitigation
TIP Approved TotalFederal Aid
RegionalSwap
$164,000 $164,000
39185
Iowa Department ofTransportation
BRFN-141()--39-14
IA141: WEST NISHNABOTNA RIVER IN MANNING
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$347,000 $347,000
39213
Iowa Department ofTransportation
BRFN-141()--39-24
IA141: EAST SOLDIER RIVER 0.1 MI W OF CO RD L51
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$605,000 $605,000
222
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39210
Iowa Department ofTransportation
BRFN-30()--39-24
US30: ROCKY RUN CREEK 4.5 MI W OF CO RD M55
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$575,000 $575,000
38019
Iowa Department ofTransportation
BRFN-39()--39-81
IA39: PORTER CREEK 2.4 MI S OF CO RD D59
Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$618,000 $618,000
45266
Iowa Department ofTransportation
BRFN-30()--39-24
US30: EAST BOYER RIVER 0.4 MI E OF W JCT US 59(EB & WB)
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$1,578,000 $1,578,000
45376
Iowa Department ofTransportation
BRFN-59()--39-24
US59: DITCH 2.1 MI S OF US 30
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$950,000 $950,000
223
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
35649
RPA 12
RGPL-PA12()--ST-14
Regional Transportation Planning
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$100,000$80,000
$80,000
$100,000$80,000
$80,000
$100,000$80,000
$80,000
$100,000$80,000
$80,000
$400,000$320,000
$320,000
45440
Iowa Department ofTransportation
STP-39()--2C-24
IA39: US 59 TO MAIN ST N IN DELOIT
Pavement Widening, Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,701,000$2,160,800
$2,701,000$2,160,800
45353
Iowa Department ofTransportation
STP-IA141()--2C-24
IA141: S JCT US 59 TO WCL MANNING
Pavement Rehab/Widen, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$6,705,000$5,364,000
$500,000
$6,705,000$5,364,000
$500,000
DOT Note: Project includes RPA 12 contribution of $500,000
39475
Manning
TAP-R-4702(607)--8T-14
Manning SRTS South Phase I from 10th Street to PleasantStreet
Ped/Bike Paving
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$164,000$131,200
$82,000
$164,000$131,200
$82,000
224
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45509
Audubon
TAP-R-0300()--8T-05
On Audubon Rec Center Link Trail, 0.32 miles S28 T80 R35
Ped/Bike Paving
TIP Approved TotalFederal Aid
RegionalSwap
$140,000$70,000
$70,000
$140,000$70,000
$70,000
38397
Panora
TAP-R-5900()--8T-39
In the city of Panora, at the Raccoon River Water Trail,Middle Raccoon River at Panora
Miscellaneous
TIP Approved TotalFederal Aid
RegionalSwap
$125,000$100,000
$100,000
$125,000$100,000
$100,000
45511
Stuart
TAP-U-7457()--8I-39
On N 2ND ST, to West Central Valley School S33 T78 R30
Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$216,000$108,000
$108,000
$216,000$108,000
$108,000
45510
Wall Lake
TAP-U-8065()--8I-81
On Wall Lake Trail , 1.0 miles S17 T86 R36
Ped/Bike Grade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$250,000$200,000
$200,000
$250,000$200,000
$200,000
225
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36097
Audubon County
BROS-SWAP-C005(73)--SE-05
On 300th St., Over Troublesome Creek, in NE S7 T78NR34W
Bridge Replacement
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00037367
Carroll County
BROS-SWAP-C014(E12)--FE-14
On E35, Over FIELD STREAM, S30 T84 R36
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00036465
Sac County
BROS-SWAP-C081(BV3660)--SE-81
On 270TH ST, Over INDIAN CREEK, 0.60 miles East ofMace Ave., NE S36 T88 R37
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,00041351
Guthrie County
BRS-SWAP-C039()--FF-39
On F 25, Over MOSQUITO CREEK, S1 T80 R30
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,150,000
$1,150,000
$1,150,000
$1,150,00039562
Casey
BROS-SWAP-1152()--SE-39
In the city of Casey, On Thomas Street, Over Middle River
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$675,000
$540,000
$675,000
$540,00036095
Audubon County
BROS-SWAP-C005()--FE-05
On 170th St., Over Creek, on NLINE S10 T80N R35W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$425,000
$425,000
$425,000
$425,00017396
Carroll County
BROS-SWAP-C014(B5)--FE-14
E13: 3-10 SHERIDAN
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$350,000
$350,000
$350,000
$350,00010848
Crawford County
BROS-SWAP-C024(B48-33N)--SE-24
L Ave.: From East of Rocky Run to East of Rocky Run
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00024904
Crawford County
BROS-SWAP-C024(C51-3N)--SE-24
A Ave.: From 130th St. to 140th St. to
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,000
226
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36451
Sac County
BROS-SWAP-C081(79)--SE-81
On IRA AVE, Over STREAM, from 0.40 miles South of280th St S5 T87 R37
Culvert New
TIP Approved
5/18/2021
TotalFederal Aid
RegionalSwap
$180,000
$180,000
$180,000
$180,00036468
Sac County
BROS-SWAP-C081(DO-2308)--FE-81
On N14 (Union Ave), Over DD 19, 0.80 Miles South of190th Ave (D15), SW S23 T89 R35
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$325,000
$325,000
$325,000
$325,00027134
Crawford County
BROS-SWAP-C024(BR39-21)--FE-24
On Westcott Rd, Over Unnamed Stream, in W1/4 S21T83N R39W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$550,000
$550,000
$550,000
$550,00036459
Sac County
BROS-SWAP-C081(78)--FE-81
On XAVIER AVE, Over RACCOON RIVER, from 0.20 milesSouth of 335th St. S35 T87 R35
Bridge Replacement
TIP Approved
9/19/2023
TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00036455
Sac County
BROS-SWAP-C081(CO-0109)--SE-81
On GARD AVE, Over SMALL STREAM, from 0.90 milessouth of 220th Street, SW S1 T88 R38
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$160,000
$160,000
$160,000
$160,00037459
Sac County
BROS-SWAP-C081(JA-0730)--FE-81
On 230th St., Over Indian River, 0.30 miles east ofNeedham Ave., NW 1/4 S7 T88N R36W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00038541
Crawford County
BRS-SWAP-C024()--FF-24
On Co Rd L51, Over Soldier River, WLINE S13 T84 R41
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,00036463
Sac County
BRS-SWAP-C081(VI-0795)--FF-81
On D54 or 355th St, Over DD #60, 0.05 miles West of OtterAve.
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,00038947
Audubon County
BROS-SWAP-C005()--SE-05
On 240th St., Over Creek, in NE S16 T79N R34W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,000
227
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37457
Sac County
BROS-SWAP-C081(77)--FE-81
On D 54, Over RACOON RIVER, S11 T86 R35
Bridge Replacement
TIP Approved
9/17/2024
TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00044846
Crawford County
BRS-SWAP-C024()--FF-24
Near the center of Section 30 Westside Twp.
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$850,000
$850,000
$850,000
$850,000
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
32532
Carroll County
STBG-SWAP-C014(N33 HMA)--FG-14
On N33, from THE JCT OF E60 AND N33 IN THE TOWNOF DEDHAM, THEN, NORTH 10.4 Miles to JCT US 30
Pavement Rehab/Widen
TIP Approved TotalFederal Aid
RegionalSwap
$2,800,000
$750,000
$750,000
$2,800,000
$750,000
$750,00032773
Crawford County
STBG-SWAP-C024(E16 Overlay)--FG-24
On E16, from ECL Schleswig East 17.25 Miles toIntersection with Co. Rd. M64
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$4,600,000
$2,000,000
$2,000,000
$4,600,000
$2,000,000
$2,000,00037622
Guthrie County
STBG-SWAP-C039()--FG-39
On F32, from Guthrie Center approx 14 miles to N46
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$4,000,000
$1,000,000
$1,000,000
$4,000,000
$1,000,000
$1,000,00037676
Audubon County
STBG-SWAP-C005()--FG-05
On F32, from Co. Hwy M66 E 7.2 miles to US Hwy 71
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$3,000,000
$900,000
$900,000
$3,000,000
$900,000
$900,00037659
Greene County
STBG-SWAP-C037()--FG-37
On E57, from P-14 East 4.469 Miles to HWY-4
Pavement Rehab/Widen
TIP Approved
1/18/2023
TotalFederal Aid
RegionalSwap
$2,550,000
$2,040,000
$2,040,000
$2,550,000
$2,040,000
$2,040,00038804
Sac County
STBG-SWAP-C081(N28-PCC)--FG-81
On N28, from Lytton-D36 South 11.597 Miles to IA 175
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$5,000,000
$2,000,000
$2,000,000
$5,000,000
$2,000,000
$2,000,000
228
0
RPA 13 - Southwest Iowa Planning Council
1501 Southwest 7th Street, Atlantic, IA 50022
Phone: 712-243-4196, Fax: 712-243-3458, www.swipco.org
Executive Director: John Mccurdy, [email protected]
Grant Specialist: Tammy Debord, [email protected]
Omaha - Council Bluffs
Metropolitan Area
Planning Agency
(MAPA)
5 10
Fremont County
48
Montgo���r 48 County
71
•
Cass County
148
�orts � Commercial
- Interstate
- National Highway System
El Enhanced - Primary Roads
El General Service
El Basic Service
El Local Service Transit [el Regional
[el Large Urban
[el Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
Local Roads
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] RPA Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
229
230
RPA 13CHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37142
MontgomeryCounty
BROS-CHBP-C069()--GA-69
On N18 (T Ave), Over Tributary to West Nodaway River atNW 1/4 corner, S33 T71 R36
Culvert Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$300,000$177,515
$122,485
$300,000$177,515
$122,48537637
Cass County
BROSCHBP-C015(71)--GA-15
On Boston Road, Over small creek, from Hwy 71 east 1.0,on NLINE S7 T77 R35
Bridge Replacement
TIP Approved
10/20/2020
TotalFederal Aid
RegionalSwap
$400,000$218,480
$400,000$218,480
20520
Fremont County
BROSCHBP-C036(78)--GA-36
On J40, Over Fisher Creek, S35 T69 R40
Bridge Replacement
TIP Approved
10/20/2020
TotalFederal Aid
RegionalSwap
$750,000$409,650
$340,350
$750,000$409,650
$340,35031031
MontgomeryCounty
BRS-CHBP-C069(73)--GB-69
On M37, Over Crabapple Creek, on Ctr S16 T72 R39
Bridge Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$700,000$327,720
$372,280
$700,000$327,720
$372,28022376
Page County
BRS-CHBP-C073(123)--GB-73
On J-20, Over West Tarkio River, S27 T70 R38
Bridge Replacement
TIP Approved
10/20/2020
TotalFederal Aid
RegionalSwap
$650,030$355,030
$295,000
$650,030$355,030
$295,000
ER
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45245
Iowa Department ofTransportation
ER-2()--58-36
IA2: 0.8 MI E OF THE MISSOURI RIVER TO HORSECREEK DITCH
Bridge New
TIP Approved TotalFederal Aid
RegionalSwap
$2,000,000 $2,000,000
231
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37865
Iowa Department ofTransportation
BRF-59()--38-73
US59: EAST NISHNABOTNA RIVER 1.0 MI N OF IA 48
Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$40,000$32,000
$6,475,000$5,180,000
$6,515,000$5,212,000
39186
Iowa Department ofTransportation
BRF-92()--38-15
IA92: SEVENMILE CREEK 1.7 MI W OF W JCT US 71
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$2,528,000$2,022,400
$2,528,000$2,022,400
45384
Iowa Department ofTransportation
BRF-2()--38-36
IA2: DITCH 2.8 MI E OF I-29
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$3,500,000$2,800,000
$3,500,000$2,800,000
45354
Iowa Department ofTransportation
BRF-2()--38-36
IA2: DITCH 3.1 MI E OF I-29
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$3,500,000$2,800,000
$3,500,000$2,800,000
45350
Iowa Department ofTransportation
NHSX-34()--3H-69
US34: W OF IA 48 TO CO RD H34
Grade and Pave
TIP Approved TotalFederal Aid
RegionalSwap
$14,022,000$11,217,600
$14,022,000$11,217,600
232
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37939
Iowa Department ofTransportation
BRFN-2()--39-36
IA2: MISSOURI RIVER E OF NEBRASKA CITY (STATESHARE)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$799,000 $799,000
37938
Iowa Department ofTransportation
BRFN-2()--39-36
IA2: MISSOURI RIVER E OF NEBRASKA CITY (STATESHARE)
Bridge Cleaning
TIP Approved TotalFederal Aid
RegionalSwap
$21,000 $21,000 $21,000 $21,000 $84,000
37989
Iowa Department ofTransportation
BRFN-48()--39-69
IA48: E NISHNABOTNA RIVER 1.9 MI S OF CO RD H14
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$459,000 $459,000
39238
Iowa Department ofTransportation
NHSN-2()--2R-36
IA2: MISSOURI RIVER OVERFLOW EAST OF MISSOURIRIVER
Erosion Control, Wetland Mitigation
TIP Approved TotalFederal Aid
RegionalSwap
$673,000 $673,000
37988
Iowa Department ofTransportation
BRFN-34()--39-69
US34: WEST NODAWAY RIVER 0.3 MI W OF US 71 (EB &WB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,342,000 $1,342,000
37894
Iowa Department ofTransportation
BRFN-6()--39-15
US6: INDIAN CREEK 0.4 MI E OF IA 48
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$460,000 $460,000
37897
Iowa Department ofTransportation
BRFN-83()--39-15
IA83: EAST NISHNABOTNA RIVER 1.1 MI W OF W JCTUS 6
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$431,000 $431,000
38086
Iowa Department ofTransportation
IMN-29()--0E-36
I-29: MAIN DITCH #6 0.4 MI S OF IA 333 (NB & SB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,725,000 $1,725,000
38087
Iowa Department ofTransportation
IMN-29()--0E-36
I-29: MISSOURI TO 1.0 MI S OF IA 2 (NB)
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,226,000 $2,226,000
233
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38077
Iowa Department ofTransportation
IMN-80()--0E-15
I-80: 0.7 MI E OF IA 173 TO 0.7 MI W OF US 71 (EB & WB)
TIP Approved TotalFederal Aid
RegionalSwap
$2,338,000 $2,338,000
38079
Iowa Department ofTransportation
IMN-80()--0E-15
I-80: POTTAWATTAMIE CO TO E OF IA 173 (WB)
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,401,000 $1,401,000
45346
Iowa Department ofTransportation
NHSN-34()--2R-69
US34: WEST NODAWAY RIVER 0.3 MI W OF US 71 (EB)
Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$1,159,000 $1,159,000
39308
Iowa Department ofTransportation
BRFN-34()--39-69
US34: MIDDLE NODAWAY RIVER 3.0 MI E OF US 71
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$638,000 $638,000
39187
Iowa Department ofTransportation
BRFN-6()--39-15
US6: EAST NISHNABOTNA RIVER 2.6 MI E OF IA 48
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$817,000 $817,000
38088
Iowa Department ofTransportation
IMN-29()--0E-36
I-29: 1.5 MI N OF CO RD L31 TO 1.0 MI N OF CO RD J18(SB)
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,047,000 $1,047,000
39188
Iowa Department ofTransportation
IMN-80()--0E-15
I-80: 570TH ST 2.0 MI W OF IA 173 (EB & WB)
Grade and Pave
TIP Approved TotalFederal Aid
RegionalSwap
$1,500,000 $1,500,000
45313
Iowa Department ofTransportation
BRFN-2()--39-36
IA2: FISHER CREEK 2.2 MI W OF US 59
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$450,000 $450,000
37940
Iowa Department ofTransportation
BRFN-2()--39-36
IA2: STREAM 3.9 MI E OF I-29
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$3,500,000 $3,500,000
234
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45290
Iowa Department ofTransportation
IMN-29()--0E-36
I-29: ABANDONED RR 1.6 MI S OF IA 2 (SB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$800,000 $800,000
45264
Iowa Department ofTransportation
IMN-80()--0E-15
I-80: 770TH ST 1.9 MI E OF IA 148 (EB & WB)
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$3,000,000 $3,000,000
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
791
RPA 13
RGPL-PA13(RTP)--ST-00
SW IA 4/SWIPCO: RPA 13 TRANSPORTATION PLANNING
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$10,000$8,000
$8,000
$10,000$8,000
$8,000
$10,000$8,000
$8,000
$30,000$24,000
$24,000
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38394
Shenandoah
TAP-U-6965(616)--8I-73
In the city of Shenandoah, On Ferguson Ave.
Ped/Bike Structures
TIP Approved
4/20/2021
TotalFederal Aid
RegionalSwap
$118,000$88,000
$88,000
$118,000$88,000
$88,000
235
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
23745
Cass County
BROS-SWAP-C015(208)--FE-15
Bridge 208 - On Indian Creek St, from White Pole Rd North0.4 Miles, at S5 T75 R37
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,0002842
Fremont County
BROS-SWAP-C036()--SE-36
On 260th Ave, Over COOPER CREEK, S32 T69 R42
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,00034341
MontgomeryCounty
BROS-SWAP-C069()--FE-69
On M41 (Evergreen Avenue), Over Tributary toNishnabotna River, at S1/4 S25 T71 R39
Culvert Replacement
TIP Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$325,000
$300,000
$325,000
$300,00022363
MontgomeryCounty
BROS-SWAP-C069(69)--FE-69
H20: Over Seven Mile Creek
Bridge Replacement
TIP Approved
3/16/2021
TotalFederal Aid
RegionalSwap
$835,000
$800,000
$835,000
$800,00036140
Cass County
BRS-SWAP-C015(65)--FF-15
On Olive Street (N-16), Over Creek, from Chicago RoadNorth 1/2 Miles, on WLINE S9 T77 R36
Bridge Replacement
TIP Approved
7/21/2020
TotalFederal Aid
RegionalSwap
$700,000
$690,000
$700,000
$690,00031035
MontgomeryCounty
BRS-SWAP-C069(63)--FF-69
On H54, Over Tributary to Tarkio Creek, on NLINE S33T71 R37
Bridge Replacement
TIP Approved
4/20/2021
TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00038802
Cass County
BROS-SWAP-C015(250)--FE-15
On 710th Street, Over Creek, on WLINE S1 T76N R35W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00036170
Cass County
BROS-SWAP-C015(68)--SE-15
On 680th Street, Over West Nodaway River, BetweenVictoria Road Intersections, on WLINE S16 T74 R35
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,00036178
Cass County
BROS-SWAP-C015(73)--FE-15
On Boston Road, Over Creek, from Olive Street East 0.1Miles, on NLINE S9 T77 R36
Bridge Rehabilitation
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,000
236
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
34494
Cass County
BROS-SWAP-C015(BR 269)--FE-15
On 660th Street, from Jackson Rd South 3/8 Miles, at S19T76 R35
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00035856
MontgomeryCounty
BROS-SWAP-C069()--FE-69
On L Avenue (M59), Over BNSF RR, on WLINE S31 T72R37
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,025,000
$1,000,000
$1,025,000
$1,000,00020488
MontgomeryCounty
BROS-SWAP-C069()--SE-69
On H46/250th Street, Over Tarkio Creek, S21 T71 R37
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$625,000
$625,000
$625,000
$625,00045183
Page County
BROS-SWAP-C073()--FE-73
On M 32, Over STREAM, S8 T67 R39
TIP Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,0007118
Cass County
BRS-SWAP-C015(46)--FF-15
On Highland Road (G-30), Over Indian Creek, from 555thSt West 1/2 Miles, at S5 T76 R37
Bridge Replacement
TIP Approved
7/19/2022
TotalFederal Aid
RegionalSwap
$1,200,000
$1,200,000
$1,200,000
$1,200,00024823
Fremont County
BRS-SWAP-C036()--FF-36
On J18, Over WALNUT CREEK, from 400th Street E 0.51miles S13 T70 R40
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$900,000
$900,000
$900,000
$900,00037689
Cass County
BROS-SWAP-C015(401)--SE-15
On Crooked Creek Road, Over Troublesome Creek, fromBoston Road South 0.9 Miles to Troublesome Creek, in S12T77 R35
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,000
38523
MontgomeryCounty
BROS-SWAP-C069()--FE-69
On H42/240th St, Over LITTLE TARKIO TRIB, from L AveE 0.1 miles S7 T71 R37
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00037146
MontgomeryCounty
BROS-SWAP-C069()--FE-69
On L Avenue, Over Trib. to Little Tarkio Creek, from 230thSt South .1 Miles, on WLINE S7 T71 R37
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$320,000
$300,000
$320,000
$300,000
237
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38812
MontgomeryCounty
BROS-SWAP-C069()--SE-69
On W Avenue, Over Tributary to Nodaway River, fromCass Co line south 0.3 Miles, on WLINE S1 T73 R36
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00031034
MontgomeryCounty
BRS-SWAP-C069(62)--FF-69
On H54, Over Tarkio Creek, on NLINE S32 T71 R37
Bridge Replacement
TIP Approved
10/18/2022
TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,00036622
Page County
BRS-SWAP-C073()--FF-73
On 190th Street (M56), Over Middle Tarkio River, in S23T69 R38
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,200,000
$1,200,000
$1,200,000
$1,200,00045184
Page County
BRS-SWAP-C073()--FF-73
On J 53, Over BUCHANAN CREEK, S11 T67 R36
TIP Approved TotalFederal Aid
RegionalSwap
$1,200,000
$1,200,000
$1,200,000
$1,200,00015626
Cass County
BROS-SWAP-C015()--FE-15
Br 132 - Rockport Rd - 1/4 mile west of the City ofMassena S32:T75N:R34W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00039013
Cass County
BROS-SWAP-C015(182)--FE-15
On 610th Street, Over Creek, from Oxford Road North 0.6Miles to Bridge #182, in NW S8 T75N R36W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00037144
MontgomeryCounty
BROS-SWAP-C069()--FE-69
On M65 (Q Ave), Over BNSF RR, on WLINE S12 T71 R37
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,025,000
$1,000,000
$1,025,000
$1,000,00038524
MontgomeryCounty
BROS-SWAP-C069()--FE-69
On 225th Street (H42), Over Tarkio Creek, from StantonWCL West 0.2 Miles, on Ctr S4 T71 R37
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00039058
Page County
BROS-SWAP-C073()--FE-73
On F Ave, Over unnamed tributary of West Tarkio Creek, inS13 T68 R39
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,000
238
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37542
Fremont County
BRS-SWAP-C036()--FF-36
On L44 (Bluff Road), Over COOPER CREEK, in NE S7 T68R42
Grade and Pave, Bridge New
TIP Approved TotalFederal Aid
RegionalSwap
$1,100,000
$1,100,000
$1,100,000
$1,100,000
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36169
Cass County
STBG-SWAP-C015(N-28)--FG-15
On 690th Street, from Iowa HWY 92 North 10.2 Miles toIowa HWY 83
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,250,000
$750,000
$750,000
$2,250,000
$750,000
$750,00029201
Fremont County
STBG-SWAP-C036()--FG-36
On J18, from M16 East 4.0 Miles to 410th Ave
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,400,000
$1,200,000
$1,200,000
$1,400,000
$1,200,000
$1,200,00032471
Page County
STBG-SWAP-C073()--FG-73
On O Avenue (M63), from IA 2 north 11 Miles to Page/Montgomery County Line
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,750,000
$2,000,000
$2,000,000
$2,750,000
$2,000,000
$2,000,00037525
Fremont County
STBG-SWAP-C036()--FG-36
On J18, from 410th Ave. E 1.043 miles to U.S Hwy 59
Pave
TIP Approved TotalFederal Aid
RegionalSwap
$800,000
$640,000
$640,000
$800,000
$640,000
$640,00038717
MontgomeryCounty
STBG-SWAP-C069()--FG-69
On M63, from Page County Line North 5 Miles to StantonCity Limits
Pavement Rehab, Granular Shoulders
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,000
$1,000,000
$1,000,00026730
MontgomeryCounty
STBG-SWAP-C069(65)--FG-69
On H34, from ECL Red Oak East 2.5 Miles to N Corner 25-72-38
Pavement Rehab
TIP Approved
1/17/2024
TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,000
$450,000
$450,000
239
L
0 5
/
10
RPA 14 -ATURA Transportation Planning Affiliation
101 East Montgomery Street, Creston, IA 50801
P hone: 641-782-8491, Fax: 641-782-8492, www.sicog.org
Executive Director: Timothy Ostroski, [email protected]
Transportation Planner: Stu Burzette, burzette.sicog.com
92
Adair County'
.-,.----..-----(
�orts � Commercial
- Interstate
- National Highway SystemUnion
County El Enhanced - Primary Roads
Taylor County
.. , Ringgold County
•
•
El General Service
El Basic Service
El Local Service Transit [el Regional
[el Large Urban
[el Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
Local Roads
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] RPA Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
240
241
RPA 14HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45274
Iowa Department ofTransportation
HSIPX-34()--3L-88
US34: W JCT US 169 IN AFTON
Grade and Pave
TIP Approved TotalFederal Aid
RegionalSwap
$376,000$338,400
$376,000$338,400
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38018
Iowa Department ofTransportation
BRF-169()--38-80
US169: MIDDLE FORK GRAND RIVER 5.3 MI S OF IA 2
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,551,000$1,240,800
$1,551,000$1,240,800
45362
Iowa Department ofTransportation
BRF-92()--38-1
IA92: W FORK NODAWAY RIVER 1.6 MI E OF CO RD N51
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,800,000$1,440,000
$1,800,000$1,440,000
242
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37874
Iowa Department ofTransportation
BRFN-148()--39-2
IA148: MIDDLE NODAWAY RIVER 1.8 MI S OF S JCT CORD H20
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$712,000 $712,000
45402
Iowa Department ofTransportation
STPN-25()--2J-1
IA25: GREENFIELD TO I-80
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,350,000 $1,350,000
37872
Iowa Department ofTransportation
BRFN-25()--39-1
IA25: I-80 INTERCHANGE
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$333,000 $333,000
38074
Iowa Department ofTransportation
IMN-80()--0E-1
I-80: IA 25 TO MADISON CO (EB)
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,866,000 $2,866,000
39345
Iowa Department ofTransportation
BRFN-169()--39-80
US169: STREAM 0.1 MI N OF MISSOURI
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$920,000 $920,000
39362
Iowa Department ofTransportation
BRFN-169()--39-88
US169: ABANDONED RR 2.8 MI N OF N JCT US 34(REMOVE BRIDGE)
Grade and Pave
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000 $1,000,000
45325
Iowa Department ofTransportation
BRFN-148()--39-87
IA148: MIDDLE BRANCH 102 RIVER 2.8 MI S OF CO RDJ20
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$300,000 $300,000
45331
Iowa Department ofTransportation
BRFN-34()--39-88
US34: FOUR MILE CREEK 2.0 MI E OF E JCT US 169
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$600,000 $600,000
243
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
19871
RPA 14
RGPL-PA14(FY15)--ST-0
RPA 14: Transportation Planning ATURA RPA 14
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$96,705$33,516
$33,516
$96,705$33,516
$33,516
$96,705$33,516
$33,516
$96,705$33,516
$33,516
$386,820$134,064
$134,064
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45231
Corning
TAP-R-1590()--8T-02
On Hull Street, from Hull Street Bridge Replacement NW0.32 miles to School Sports Complex S34 T72 R34
TIP Approved TotalFederal Aid
RegionalSwap
$200,000$160,000
$160,000
$200,000$160,000
$160,000
PA Note: Project received Regional STBG funding AND Regional TAP Funding. Actual Regional STBG Funding: $40,000; Actual Regional TAP Funding: $120,000.
244
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36063
Adair County
BROS-SWAP-C001()--SE-01
On 330th St, Over Shanghar Creek, on NLINE S34 T74R32
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$675,000
$675,000
$675,000
$675,00039120
Ringgold County
BROS-SWAP-C080(77)--FE-80
On 200th Street, Over unknown stream, from Hwy P33 0.5miles to Washington 20 bridge S29 T69 R30
Bridge Replacement
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00038468
Taylor County
BROS-SWAP-C087(62)--SE-87
On 240th St, Over MIDDLE 102 RIVER, in NE S17 T68NR34W
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$650,000
$650,000
$650,000
$650,00037356
Union County
BROS-SWAP-C088(65)--FE-88
On H45, Over SMALL STREAM, from P17 west 0.32 Miles,on NLINE S18 T71 R31
Culvert Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$307,000
$307,000
$307,000
$307,00041342
Adams County
BRS-SWAP-1590(603)--FF-02
On HULL ST, Over STREAM, S34 T72 R34
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$550,000
$550,000
$550,000
$550,00038948
Adams County
BRS-SWAP-C002()--FF-02
On H 33, Over MT. ZION BRANCH, from W approach Eastand West Bound 500 Feet to E approach, on NLINE S13T72N R33W
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,000
44924
Ringgold County
BHS-SWAP-C080()--FC-80
On J 23, Over PLATTE RIVER, S34 T70 R31
TIP Approved TotalFederal Aid
RegionalSwap
$275,000
$275,000
$275,000
$275,00037320
Taylor County
BROS-SWAP-C087(63)--SE-87
On 255th St., Over West 102 River, in S22 T68N R35W
Bridge Replacement
TIP Approved
12/21/2021
TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00037160
Adair County
BROS-SWAP-C001()--SE-01
On 300th St, Over West Fork of Nodaway River, on NLINES16 T74 R33
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,000
245
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45074
Union County
BROS-SWAP-C088()--SE-88
On JOSHUA AVE, Over THREE MILE CREEK, from H17 N1.4 miles S10 T73 R30
Bridge Replacement, Bridge Removal
TIP Approved TotalFederal Aid
RegionalSwap
$528,000
$528,000
$528,000
$528,00023439
Ringgold County
BRS-SWAP-C080()--FF-80
On P27, Over Old Railroad ROW, from Hwy 2 S 1.3 miles toBenton 11 bridge S14 T68 R31
TIP Approved TotalFederal Aid
RegionalSwap
$430,000
$430,000
$430,000
$430,00034578
Ringgold County
BHS-SWAP-C080()--FC-80
On COUNTY HIGHWAY J55, Over W FORK GRANDRIVER, from US HIGHWAY 169 W 1.3 miles S15 T67 R31
TIP Approved TotalFederal Aid
RegionalSwap
$325,000
$325,000
$325,000
$325,00034368
Adams County
BRS-SWAP-C002()--FF-02
On 150th St., Over East Nodaway River, S28 T72N R33W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,00039121
Ringgold County
BRS-SWAP-C080()--FF-80
On P14, Over unknown stream, from 255th Street S 1.4miles to Benton 12 bridge S30 T68 R31
TIP Approved TotalFederal Aid
RegionalSwap
$440,000
$440,000
$440,000
$440,000
246
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
40141
Bedford
STBG-SWAP-0487(604)--SG-87
On State St, from Bedford Coroporate Limits N .32 miles toMain St S26 T68 R34
TIP Approved
2/16/2021
TotalFederal Aid
RegionalSwap
$110,000
$110,000
$110,000
$110,000
$110,000
$110,00037776
Taylor County
STBG-SWAP-C087(60)--FG-87
On J35, Over WEST 102 RIVER, on NLINE S36 T69 R35
Bridge Replacement
TIP Approved
7/20/2021
TotalFederal Aid
RegionalSwap
$1,200,000
$1,000,000
$1,000,000
$1,200,000
$1,000,000
$1,000,00039079
Union County
STBG-SWAP-C088()--FG-88
On P27, from Ringgold-Union Street N 5.3 Miles
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$4,240,000
$2,120,000
$2,120,000
$4,240,000
$2,120,000
$2,120,00037223
Union County
STBG-SWAP-C088()--FG-88
On OSAGE ST, from US Highway 34 north 0.5 Miles toAdams Street
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,000
$700,000
$700,000
247
248
249
RPA 15ILL
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45501
Oskaloosa
ILL-5780()--93-62
PEL/PA Planning Study for SE (IA 163 to IA 92) and NE (IA92 to US 63) connectors around Oskaloosa.
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$950,000 $950,000
45502
Ottumwa
ILL-5825()--93-90
Bus and passsenger rail, complete streets, parking lot, trailimprovements
Sanitary Sewer, Ped/Bike Grade & Pave, TransitInvestments
TIP Approved TotalFederal Aid
RegionalSwap
$18,161,865 $18,161,865
250
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37976
Iowa Department ofTransportation
BRF-92()--38-62
IA92: MUCHAKINOCK CREEK 1.3 MI W OF IA 163
Bridge Replacement, Wetland Mitigation
TIP Approved TotalFederal Aid
RegionalSwap
$3,925,000$3,140,000
$3,925,000$3,140,000
45395
Iowa Department ofTransportation
NHSX-92()--3H-54
IA92: E JCT IA 149 TO CO RD V67
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$3,586,000$2,868,800
$3,586,000$2,868,800
37963
Iowa Department ofTransportation
BRF-78()--38-54
IA78: DME RR 8.8 MI E OF IA 149
Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$8,458,000$6,766,400
$8,458,000$6,766,400
37977
Iowa Department ofTransportation
BRF-92()--38-62
IA92: NORTH SKUNK RIVER 2.6 MI E OF E JCT CO RDV13
Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$6,373,000$5,098,400
$6,373,000$5,098,400
39363
Iowa Department ofTransportation
BRF-1()--38-89
IA1: LITTLE LICK CREEK 1.2 MI N OF S JCT IA 16
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$4,408,000$3,526,400
$4,408,000$3,526,400
39365
Iowa Department ofTransportation
BRF-63()--38-90
US63: VILLAGE CREEK 3.1 MI S OF US 34
Bridge Widening
TIP Approved TotalFederal Aid
RegionalSwap
$1,902,000$1,521,600
$1,902,000$1,521,600
39293
Iowa Department ofTransportation
NHSX-63()--3H-62
US63: NW BYPASS OF OSKALOOSA
Culvert New, Grading, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$5,900,000$4,720,000
$16,689,000$13,351,200
$22,589,000$18,071,200
39364
Iowa Department ofTransportation
NHSX-63()--3H-90
US63: LITTLE SOAP CREEK 1.9 MILES N OF DAVIS CO
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$1,777,000$1,421,600
$1,777,000$1,421,600
251
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38032
Iowa Department ofTransportation
BRFN-34()--39-90
US34: E MAIN ST 1.4 MI E OF W JCT US 63 INOTTUMWA
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$252,000 $252,000
37964
Iowa Department ofTransportation
BRFN-92()--39-54
IA92: CLEAR CREEK 2.5 MI W OF CO RD W15
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$338,000 $338,000
38293
Iowa Department ofTransportation
STPN-1()--2J-89
IA1: 0.1 MI N OF FRANKLIN ST IN KEOSAUQUA
Culvert Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$733,000 $733,000
45352
Iowa Department ofTransportation
STPN-21()--2J-54
IA21: 0.2 MI S OF POWESHIEK CO
Ditch Improvement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$208,000 $208,000
45404
Iowa Department ofTransportation
STPN-81()--2J-89
IA81: MISSOURI TO 0.3 MI S OF IA 2
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$126,000 $126,000
37960
Iowa Department ofTransportation
BRFN-1()--39-51
IA1: MIDDLE WALNUT CREEK 3.1 MI S OF S JCT IA 78
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$330,000 $330,000
38033
Iowa Department ofTransportation
BRFN-34()--39-90
US34: BEAR CREEK 1.2 MI W OF CO RD H35
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$489,000 $489,000
38034
Iowa Department ofTransportation
BRFN-34()--39-90
US34: BARDELL ST 0.5 MI E OF IA 149 IN OTTUMWA(WB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$262,000 $262,000
39269
Iowa Department ofTransportation
BRFN-1()--39-51
IA1: BIG CEDAR CREEK 2.8 MI S OF US 34
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$960,000 $960,000
252
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39292
Iowa Department ofTransportation
BRFN-23()--39-62
IA23: TRIBUTARY OF CEDAR CREEK 0.8 MI N OF CORD T67
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,057,000 $1,057,000
39366
Iowa Department ofTransportation
BRFN-34()--39-90
US34: SOUTH AVERY CREEK 0.7 MI E OF CO RD T61
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$645,000 $645,000
39275
Iowa Department ofTransportation
BRFN-78()--39-54
IA78: RICHLAND CREEK 5.8 MI E OF IA 149
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,038,000 $1,038,000
38198
Iowa Department ofTransportation
NHSN-92()--2R-54
IA92: IA 21 AND CO RD V33 INTERSECTIONS
Grade and Pave, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$6,290,000 $6,290,000
38195
Iowa Department ofTransportation
STPN-001()--2J-51
IA1: S OF LIBERTYVILLE RD TO FILLMORE AVE INFAIRFIELD
Grade and Pave, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$3,500,000 $3,500,000
45256
Iowa Department ofTransportation
BRFN-2()--39-89
IA2: FOX RIVER 1.5 MI E OF CO RD V64
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$1,214,000 $1,214,000
45267
Iowa Department ofTransportation
BRFN-34()--39-90
US34: BNSF RR 1.2 E OF W JCT US 63 IN OTTUMWA(EB & WB)
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$2,994,000 $2,994,000
253
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
881
RPA 15
RGPL-PA15(RTP)--ST-00
RPA 15: RPA 15 TRANSPORTATION PLANNING
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$43,750$35,000
$35,000
$43,750$35,000
$35,000
45496
RPA 15
RGTR-PA15()--ST-00
Transit Capital Investment, Replace bus # 151
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$55,000$44,000
$44,000
$55,000$44,000
$44,000
45497
RPA 15
RGTR-PA15()--ST-00
Transit Capital Investment, replace bus # 152
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$55,000$44,000
$44,000
$55,000$44,000
$44,000
45498
RPA 15
RGTR-PA15()--ST-00
Transit Capital Replacement, replace bus # 156
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$55,000$44,000
$44,000
$55,000$44,000
$44,000
45499
RPA 15
RGTR-PA15()--ST-00
Transit Capital Investment, replace bus # 102
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$55,000$44,000
$44,000
$55,000$44,000
$44,000
45320
Iowa Department ofTransportation
STP-2()--2C-89
IA2: CO RD W40 TO PARK ST IN DONNELLSON
Pavement Widening, Pavement Rehab, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$2,721,000$2,176,800
$2,721,000$2,176,800
45373
Iowa Department ofTransportation
STP-21()--2C-54
IA21: IA 92 TO NCL OF WHAT CHEER
Pavement Rehab, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$3,007,000$2,405,600
$3,007,000$2,405,600
254
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37786
Jefferson County
BROS-SWAP-4650(601)--SE-51
On 175TH ST, Over CREEK, S9 T72 R10
Bridge Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$425,000
$340,000
$425,000
$340,00036337
Jefferson County
BROS-SWAP-C051(81)--FE-51
On CEDAR AVE, Over ROCK CREEK, S4 T71 R11
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$675,000
$675,000
$675,000
$675,00034366
Mahaska County
BROS-SWAP-C062(100)--FE-62
On 335'th Street, Over Cedar Creek, in NW S34 T74NR14W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$850,000
$850,000
$850,000
$850,00036068
Mahaska County
BROS-SWAP-C062(96)--FE-62
On 110th Str., Over Elk Creek, from Int. of Adams Ave and110th East 0.5 Miles to Bridge 238410, along ELINE S7 T77R17
Bridge Replacement, Grading, Right of Way
TIP Approved
9/15/2020
TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,000
29230
Wapello County
BROS-SWAP-C090()--SE-90
On 15th Street, Over Brush Creek, ELINE S32 T71 R15
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00036333
Jefferson County
BRS-SWAP-C051(72)--FF-51
On H43 Libertyville RD, Over BIG CEDAR CREEK, S3 T71R10
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$1,500,000
$1,500,000
$1,500,000
$1,500,00036349
Jefferson County
BROS-SWAP-C051()--SE-51
On GRASSTREE AVE, Over EAST BRANCH LICK CREEK,S30 T71 R10 BRIDGE REPLACEMENT
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$570,000
$570,000
$570,000
$570,00036351
Jefferson County
BROS-SWAP-C051()--SE-51
On IRIS AVE, Over MITCHELL CREEK, S16 T72 R10
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$486,000
$486,000
$486,000
$486,00044744
Van Buren County
BROS-SWAP-C089()--SE-89
On ROBIN AVE, Over Bear Creek
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$450,000
$450,000
$450,000
$450,000
255
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
34989
Wapello County
BROS-SWAP-C090()--SE-90
On 180th Ave, Over Little Soap Creek, NE S19 T71 R14
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00040091
Mahaska County
BRS-SWAP-C062()--FF-62
On G 29, Including Bridge Number 236910 Over N SKUNKRIVER and Overflow Bridge Number 236920, S10 T76NR14
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$3,250,000
$3,250,000
$3,250,000
$3,250,000
36350
Jefferson County
BROS-SWAP-C051()--SE-51
On 148TH ST, Over CREEK, S30 T73 R11
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$570,000
$570,000
$570,000
$570,00044762
Van Buren County
BROS-SWAP-C089()--SE-89
On 210TH ST, Over TRIB COATES CR, S31 T69 R08
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$150,000
$150,000
$150,000
$150,00044763
Van Buren County
BROS-SWAP-C089()--SE-89
On 197TH RD, Over WILDCAT CREEK, S19 T69 R10
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00026927
Van Buren County
BROS-SWAP-C089(92)--SE-89
On 205th Road, Over Chequest Creek, S20 T69 R11W
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,00034990
Wapello County
BROS-SWAP-C090()--FE-90
On Whiskey Ridge, Over Middle Avery Creek, SW S6 T72R15
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00038927
Wapello County
BRS-SWAP-C090()--FF-90
On Lake Rd, Over VILLAGE CREEK, NW S10 T71N R14W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00036346
Jefferson County
BHOS-SWAP-C051()--FB-51
On CARNATION BLVD, Over CREEK, S22 T72 R11
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$260,000
$260,000
$260,000
$260,000
256
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37797
Jefferson County
BROS-SWAP-C051()--FE-51
On BUCKEYE AVE, Over COMPETINE CREEK, S5 T72R11
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$580,000
$580,000
$580,000
$580,00037047
Keokuk County
BROS-SWAP-C054()--SE-54
On 328TH AVE, Over SOUTH FORK ENGLISH RIVER,S11 T77 R10
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$972,000
$972,000
$972,000
$972,00038928
Wapello County
BROS-SWAP-C090()--SE-90
On Soap Creek Road, Over LITTLE SOAP CREEK, S18T71N R14W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00038929
Wapello County
BRS-SWAP-C090()--FF-90
On 165th Street, Over COMPETINE CREEK, S14 T73NR12W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$150,000
$150,000
$150,000
$150,000
SWAP-HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
44745
Van Buren County
HSIP-SWAP-C089()--FJ-89
On W 20, S19 T68 R09
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$93,900
$88,900
$93,900
$88,900
257
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39432
Fairfield
STBG-SWAP-2465(626)--SG-51
In the city of Fairfield, On 4th Street, from BroadwayAvenue North 0.25 Miles to BNSF Right-of-way
Grade and Pave
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$447,700
$447,700
$447,700
$447,700
$447,700
$447,700PA Note: Includes $30,500 in FY20 for PE and $417,200 in FY21 for construction.
39431
Fairfield
STBG-SWAP-2465(627)--SG-51
On 32nd Street, from Jackpine Loop 0.65 miles toBurlington Avenue S34 T72 R10
Grade and Pave
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$768,000
$768,000
$768,000
$768,000
$768,000
$768,000PA Note: Includes $60,000 in FY20 for PE and $708,000 in FY21 for construction.
45142
Jefferson County
STBG-SWAP-C051()--FG-51
On H 33, from Jackpine Rd 1.4 miles to Libertyville Rd S3T71 R10
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$430,000
$430,000
$430,000
$430,000
$430,000
$430,00036939
Fairfield
NHSN-001-2(35)--2R-51
On Highway 1/South Main, from Fillmore Ave 0.53 miles to300 ft S of Libertyville Rd
Pavement Widening, Ped/Bike Paving
TIP Approved
8/17/2021
TotalFederal Aid
RegionalSwap
$700,000
$560,000
$560,000
$700,000
$560,000
$560,000PA Note: RPA funding should be debited as follows: $240,000 STBG and $320,000 TAP. DOT funding is programmed as TPMS #38195.
35815
Keokuk County
STBG-SWAP-C054(120)--FG-54
On G29, from THE MAHASKA COUNTY LINE EAST toHIGHWAY 21
Pave
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$1,500,000
$1,500,000
$1,500,000
$1,500,000
$1,500,000
$1,500,00044764
Van Buren County
STBG-SWAP-C089()--FG-89
On J 40, from Davis County Line 5.7 miles to V64
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,900,000
$1,900,000
$1,900,000
$1,900,000
$1,900,000
$1,900,00039430
Ottumwa
STBG-SWAP-5825()--SG-90
In the city of Ottumwa, On Mary Street, from Ferry StreetWest 0.70 to Shaul Avenue
Grade and Pave
TIP Approved TotalFederal Aid
RegionalSwap
$2,197,128
$2,055,354
$2,055,354
$2,197,128
$2,055,354
$2,055,35445491
Oskaloosa
STBG-SWAP-5780()--SG-62
On South 7th Street, S19 T75 R15
Grade and Pave
TIP Approved TotalFederal Aid
RegionalSwap
$1,400,000
$1,400,000
$1,400,000
$1,400,000
$1,400,000
$1,400,000
258
I I
0 5 10
RPA 16 - Southeast Iowa Regional Planning Commission
211 North Gear Avenue, Suite 100, West Burlington, IA 52655
Phone: 319-753-5107, Fax: 319-754-4763, www.seirpc.com
Executive Director: Mike Norris, [email protected]
Planning Director: Zach James, [email protected]
�orts � Commercial
- Interstate
- National Highway System
El Enhanced - Primary Roads
I
20 Miles
El General Service
El Basic Service
El Local Service Transit [el Regional
[el Large Urban
[el Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
Local Roads
-Ramps
-Trails
-+- Railroad
Rivers
Major Lakes
C] RPA Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
259
260
RPA 16CHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
34468
Lee County
BROSCHBP-C056(107)--NC-56
On 190th St, Over MUD CREEK, from X38 east 1.1 Miles,in NW S24 T68 R04
Bridge Replacement
TIP Approved
10/20/2020
TotalFederal Aid
RegionalSwap
$801,000$436,960
$363,040
$801,000$436,960
$363,040
DEMO
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38347
Burlington
EDP-0977(650)--7Y-29
In the city of Burlington, On MAIN ST, from High St toAngular St; then on JEFFERSON ST, from Central Ave toFront St
Grade and Pave, Landscaping, Ped/Bike ROW
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$83,417,000$17,000,000
$83,417,000$17,000,000
NHFP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39425
Mount Pleasant
NHFP-5292(626)--2F-44
In the city of Mount Pleasant, BJRY Transload Building
Buildings, Outside Services Engineering
TIP Approved
12/16/2020
TotalFederal Aid
RegionalSwap
$670,000$536,000
$670,000$536,000
38427
Keokuk JunctionRailway Company
NHFP-KJRC(001)--2F-00
Replace existing structure with box culvert
Culvert Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$446,000$223,000
$446,000$223,000
PA Note: Federal Aid source is LIFTS grant
261
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37966
Iowa Department ofTransportation
BRF-2()--38-56
IA2: SUGAR CREEK 1.8 MI W OF US 218
Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$2,974,000$2,379,200
$2,974,000$2,379,200
38226
Iowa Department ofTransportation
NHSX-61()--3H-29
US61: S OF 210TH ST TO N OF MEDIAPOLIS
Pave, Bridge New, Grading
TIP Approved TotalFederal Aid
RegionalSwap
$2,200,000$1,760,000
$16,915,000$13,532,000
$26,853,000$21,482,400
$45,968,000$36,774,400
38225
Iowa Department ofTransportation
NHSX-61()--3H-29
US61: MEMORIAL PARK RD IN BURLINGTON TO S OF210TH ST
Grade and Pave, Bridge Replacement, Erosion Control
TIP Approved TotalFederal Aid
RegionalSwap
$27,240,000$21,792,000
$2,669,000$2,135,200
$29,909,000$23,927,200
39230
Iowa Department ofTransportation
NHSX-61()--3H-29
US61: N OF MEDIAPOLIS TO 0.5 MI N OF IA 78
Culvert New, Grading, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$2,400,000$1,920,000
$18,164,000$14,531,200
$20,564,000$16,451,200
262
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37969
Iowa Department ofTransportation
BRFN-136()--39-56
IA136: MISSISSIPPI RIVER IN KEOKUK (STATE SHARE)
Bridge Cleaning
TIP Approved TotalFederal Aid
RegionalSwap
$20,000 $20,000 $20,000 $20,000 $80,000
37967
Iowa Department ofTransportation
BRFN-2()--39-56
IA2: LICK CREEK 4.3 MI E OF IA 81
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,631,000 $1,631,000
37924
Iowa Department ofTransportation
BRFN-34()--39-29
US34: MISSISSIPPI RIVER IN BURLINGTON (STATESHARE)
Bridge Cleaning
TIP Approved TotalFederal Aid
RegionalSwap
$35,000 $35,000 $35,000 $35,000 $140,000
39253
Iowa Department ofTransportation
NHSN-218()--2R-44
US218: 3.1 MI N OF CO RD J20 (NB)
Slope Improvement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$48,000 $48,000
39252
Iowa Department ofTransportation
NHSN-218()--2R-44
US218: 1.0 MI N OF CO RD J20 (NB)
Slope Improvement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$217,000 $217,000
39250
Iowa Department ofTransportation
NHSN-34()--2R-44
US34: E OF GRAND AVE AT N JCT US 218 (WB)
Slope Improvement
TIP Approved TotalFederal Aid
RegionalSwap
$27,000 $27,000
37972
Iowa Department ofTransportation
BRFN-78()--39-58
IA78: HONEY CREEK 1.8 MI W OF US 61
Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$2,446,000 $2,446,000
37973
Iowa Department ofTransportation
BRFN-92()--39-58
IA92: LITTLE INDIAN CREEK 1.9 MI W OF S JCT US 61
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$425,000 $425,000
45380
Iowa Department ofTransportation
NHSN-218()--2R-56
US218: NB ON RAMP TO IA 27
Grade and Pave, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$305,000 $305,000
263
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39227
Iowa Department ofTransportation
BRFN-34()--39-29
US34: N CENTRAL AVE IN BURLINGTON
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,307,000 $1,307,000
45379
Iowa Department ofTransportation
STPN-2()--2J-56
IA2: 3.5 MI E OF CO RD J56
Slope Improvement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$128,000 $128,000
45260
Iowa Department ofTransportation
BRFN-136()--39-56
IA136: SOAP CREEK AND BNSF RR 1.8 MI E OF US 61 INKEOKUK
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000 $1,000,000
37968
Iowa Department ofTransportation
BRFN-136()--39-56
IA136: MISSISSIPPI RIVER IN KEOKUK (STATE SHARE)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$5,000,000 $5,000,000
45358
Iowa Department ofTransportation
BRFN-218()--39-44
US218: NORTH FISH CREEK 1.1 MI N OF CO RD J20(NB)
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000 $1,000,000
45333
Iowa Department ofTransportation
BRFN-34()--39-29
US34: 8TH ST 1.8 MI E OF US 61 IN BURLINGTON
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$400,000 $400,000
45265
Iowa Department ofTransportation
BRFN-34()--39-29
US34: WB RAMP TO US 34 0.4 MI W OF IL INBURLINGTON
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000 $1,000,000
45263
Iowa Department ofTransportation
BRFN-34()--39-29
US34: CURRAN ST 0.8 MI E OF US 61 IN BURLINGTON
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$500,000 $500,000
264
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
949
RPA 16
RGPL-PA16(RTP)--ST-00
SEIRPC: RPA 16 TRANSPORTATION PLANNING
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$277,549$222,039
$222,039
$277,549$222,039
$222,039
$277,549$222,039
$222,039
$277,549$222,039
$222,039
$1,110,196$888,156
$888,156
39156
SEIBUS
RGTR-SEIBUS()--ST-29
SEIBUS: Purchase of two Light Duty ADA Buses
Transit Investments
TIP Approved TotalFederal Aid
RegionalSwap
$158,000$126,400
$126,400
$158,000$126,400
$126,400
265
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
18682
Burlington
STP-E-0977()--8V-29
Flint River Trail, in the City of Burlington, on Bluff Road fromCash Street south to approx. 200 ft S of 8th St
Ped/Bike Grade & Pave, Ped/Bike Miscellaneous,Ped/Bike Development
TIP Approved TotalFederal Aid
RegionalSwap
$515,000$300,000
$300,000
$515,000$300,000
$300,000
DOT Note: Project eligible for FHWA TAP funding
25472
Houghton
TAP-R-3562(601)--8T-56
Loop trail south of Houghton, starting and ending at BentlerStreet and south city limits, 1.2 miles in length
Outside Services Engineering, Ped/Bike ROW, Ped/BikeGrade & Pave
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$166,286$133,028
$133,028
$166,286$133,028
$133,028
PA Note: PE consultant previously authorized $13,600 in Federal Aid (original FA amount was $146,628)
DOT Note: Project eligible for FHWA TAP funding
34170
Louisa County
TAP-R-C058(060)--8T-58
145th Street from 500 ft E of west C J city limits west toX17, then south to 110 ft W of Mulberry St in Columbus City
Shoulder Grading, Ped/Bike Paving
TIP Approved
10/15/2019
TotalFederal Aid
RegionalSwap
$203,024$133,229
$133,229
$203,024$133,229
$133,229
39157
Burlington
TAP-U-0977(652)--8I-29
In the City of Burlington, trail along West Ave fromRoosevelt Ave east to Terrace Dr
Traffic Signals, Pavement Markings, Ped/Bike Grade &Pave
TIP Approved
4/20/2021
TotalFederal Aid
RegionalSwap
$298,601$238,880
$238,880
$298,601$238,880
$238,880
39158
Fort Madison
TAP-U-2697(635)--8I-56
In the City of Fort Madison, trail along 48th St from AvenueL north to River Valley Rd
Pavement Markings, Ped/Bike Grade & Pave
TIP Approved
3/16/2021
TotalFederal Aid
RegionalSwap
$415,180$25,635
$25,635
$415,180$25,635
$25,635
45448
Keokuk
TAP-U-3942()--8I-56
In the City of Keokuk, trail along Mississippi River fromVictory Park S 1.0 mi. to boat launch
Subdrains, Outside Services Engineering, Ped/Bike Grade& Pave
TIP Approved TotalFederal Aid
RegionalSwap
$962,105$324,244
$324,244
$962,105$324,244
$324,244
29688
Des Moines CountyBoard ofSupervisors
TAP-U-C029()--8I-29
Flint River Trail, North along US Hwy 61 to Flint Bottom Rd
Ped/Bike Grade & Pave, Ped/Bike Structures
TIP Approved TotalFederal Aid
RegionalSwap
$500,000$400,000
$400,000
$500,000$400,000
$400,000
DOT Note: Project eligible for FHWA TAP funding
266
SWAP-CMAQ
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39489
Burlington
ICAAP-SWAP-0977(651)--SH-29
In the City of Burlington, on Roosevelt Ave from Sunnysideto Mason; Agency St from West Burlington to Columbus
Traffic Signals, Outside Services Engineering
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$1,232,000
$760,587
$1,232,000
$760,587PA Note: Project includes traffic signal systems enhancements and fiber-optic installation
267
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45482
Fort Madison
BHM-SWAP-2697()--SA-56
In the City of Fort Madison, On 27TH ST, Over DRYCREEK
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,090,000
$870,000
$1,090,000
$870,00039409
Fort Madison
BROS-SWAP-2697(630)--SE-56
In the city of Fort Madison, On AVENUE F, Over FRENCHCREEK
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,090,000
$870,000
$1,090,000
$870,00025009
Lee County
BROS-SWAP-C056()--FE-56
On 140th Ave, Over Little Sugar Creek, from 210th St north0.7 Miles; S26 T68N R7W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$501,000
$500,000
$501,000
$500,00012810
Des Moines County
BRS-SWAP-C029(86)--FF-29
On DMC Hwy 99 , Over Dry Branch Creek
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$1,100,000
$1,100,000
$1,100,000
$1,100,00038943
Des Moines County
BHS-SWAP-C029(PG27)--FC-29
Danville Road Bridge, Over Flint Creek
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00035119
Des Moines County
BROS-SWAP-C029(FR11)--FE-29
Upper Flint Road Bridge, Over Knotty Creek
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00012784
Des Moines County
BROS-SWAP-C029(FR14)--FE-29
North Gear Avenue Bridge, Over Flint Creek
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00044805
Henry County
BROS-SWAP-C044(173)--SE-44
On Iowa Ave, Over Fish Creek
TIP Approved TotalFederal Aid
RegionalSwap
$610,000
$600,000
$610,000
$600,00037155
Lee County
BROS-SWAP-C056()--SE-56
On 265TH AVE, Over tributary to Devil's Creek, from ChalkRidge Rd N 500 Feet; NW1/4 S26 T68 R05
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$351,000
$350,000
$351,000
$350,000
268
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
3508
Lee County
BROS-SWAP-C056(63)--FE-56
On Chalk Ridge Rd, Over Devil's Creek, from 265th Aveeast 220 Feet; NW1/4 S26 T68 R5
Bridge Replacement
TIP Approved
1/18/2023
TotalFederal Aid
RegionalSwap
$1,201,000
$1,200,000
$1,201,000
$1,200,00037154
Lee County
BROS-SWAP-C056()--FE-56
On BELFAST RD, Over MONK CREEK, from 140th Aveeast 4300 Feet, in NE1/4 S2 T66 R07
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$401,000
$400,000
$401,000
$400,000
269
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
35391
Fort Madison
STBG-SWAP-2697()--SG-56
In the city of Fort Madison, On AVE H, from 10th St west to18th St
Grade and Pave, Outside Services Engineering, Ped/BikeGrade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$4,182,800
$1,246,179
$1,246,179
$4,182,800
$1,246,179
$1,246,179
34167
Fort Madison
STBG-SWAP-2697(633)--SG-56
In the city of Fort Madison, On AVE H, from 6th Street westto 10th Street
Grade and Pave, Outside Services Engineering, Ped/BikeGrade & Pave
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$2,022,800
$1,011,400
$1,011,400
$2,022,800
$1,011,400
$1,011,400
36954
West Burlington
STBG-SWAP-8255()--SG-29
In the city of West Burlington, On MT PLEASANT ST, fromSouth Gear Avenue west to US 34 Exit Ramp E ofinterchange
Pavement Rehab, Outside Services Engineering
TIP Approved TotalFederal Aid
RegionalSwap
$1,290,000
$374,637
$374,637
$1,290,000
$374,637
$374,637
35817
Lee County
STBG-SWAP-C056(109)--FG-56
On J40, from West Point Corporate Limits east 8.7 Miles toFort Madison Corporate Limits
Pavement Rehab
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$3,088,000
$2,300,000
$2,300,000
$3,088,000
$2,300,000
$2,300,00036915
Burlington
STBG-SWAP-0977()--SG-29
In the City of Burlington, On WASHINGTON ST, from FrontStreet W to approximately 100 feet east of Hawkeye Street
Grade and Pave, Outside Services Engineering, Ped/BikeGrade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$4,500,000
$867,275
$867,275
$4,500,000
$867,275
$867,275
38314
Burlington
STBG-SWAP-0977()--SG-29
In the city of Burlington, On 9TH ST, from Angular St S toSouth St, and on MADISON AVE, from South St S to SunsetAve
Grade and Pave, Outside Services Engineering, Ped/BikeGrade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$1,866,512
$376,482
$376,482
$1,866,512
$376,482
$376,482
38312
Fort Madison
STBG-SWAP-2697()--SG-56
In the city of Fort Madison, On AVE L, from 20th St. W to30th St.
Pavement Rehab, Outside Services Engineering, Ped/BikeGrading
TIP Approved TotalFederal Aid
RegionalSwap
$1,560,000
$780,000
$780,000
$1,560,000
$780,000
$780,000
32640
Louisa County
STBG-SWAP-C058(X17-305)--FG-58
On X17, from G62 to Market Street in Columbus City. Thenon CR305, From X43 to US 61, 7.96 Miles total.
Pave, Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,757,000
$1,457,000
$1,457,000
$1,757,000
$1,457,000
$1,457,000
270
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39155
Burlington
STBG-SWAP-0977()--SG-29
In the city of Burlington, On AGENCY ST, from Melrose Ct Eto Curran St
Grade and Pave, Outside Services Engineering, Ped/BikeGrade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$1,597,523
$1,278,018
$1,278,018
$1,597,523
$1,278,018
$1,278,018
PA Note: Project includes approx. 50' of sidewalk improvements to the east, north, and south from the Curran Street intersection, plus an additional 300' of sidewalk to the north along CurranStreet.
32282
Henry County
STBG-SWAP-C044(W55 South)--FG-44
On W55, from 235th Street south to J20 in Salem
TIP Approved TotalFederal Aid
RegionalSwap
$2,300,000
$1,400,000
$1,400,000
$2,300,000
$1,400,000
$1,400,00045447
Burlington
STBG-SWAP-0977()--SG-29
In the City of Burlington, on SUMMER ST, from HarrisonAve S to Koestner St
Grade and Pave, Outside Services Engineering, Ped/BikeGrade & Pave
TIP Approved TotalFederal Aid
RegionalSwap
$2,912,002
$1,156,307
$1,156,307
$2,912,002
$1,156,307
$1,156,307
45116
Lee County
STBG-SWAP-C056()--FG-56
On J40, from US 218 / Hwy 27 E 5.9 miles to West PointCorp Limits
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,212,000
$1,400,000
$1,400,000
$2,212,000
$1,400,000
$1,400,000
271
..
RPA 17 - Chariton Valley Planning and Development
308 North 12th Street, Centerville, IA 52544
Phone: 641-437-4359, Fax: 641-437-1161, www.charitonvalleyplanning.com
Executive Director: Nichole Moore, [email protected]
Program Support Specialist: Julie Pribyl, [email protected]
!I
-�-·---
I I I I
.--- i ayne f ppanoo
ount
(
�I I I
�orts � Commercial
- Interstate
- National Highway System
El Enhanced - Primary Roads
El General Service
El Basic Service
Local Roads
-Ramps
II _Jc!.,......:......::::.:::.:::J..L. __ ...J. __ .:.J_....,1.�...;,---..a..-"'--.....,. __1
El Local Service � Transit
-Trails
I I I I I
0 5 10 20 Miles
[el Regional
[el Large Urban
[el Small Urban
[el Intercity Bus
C[I Amtrak
I Park & Ride
-+- Railroad
Rivers
Major Lakes
C] RPA Planning Arear--1 L_ _ _J Counties
City Limits
Urban Area
272
273
RPA 17CHBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
19094
Monroe County
BROSCHBP-C068(74)--GA-68
On T55, 720th Ave, Over Miller Creek, from Hwy 137 SouthApprox 1 Miles to said bridge, at NE S14 T73 R16
Bridge Replacement
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$750,000$409,650
$340,350
$750,000$409,650
$340,350
274
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37881
Iowa Department ofTransportation
BRF-5()--38-4
IA5: DITCH 0.6 MI S OF CO RD T30
Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$2,457,000$1,965,600
$2,457,000$1,965,600
37882
Iowa Department ofTransportation
BRF-5()--38-4
IA5: SHOAL CREEK 2.8 MI N OF CO RD T20
Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$3,964,000$3,171,200
$3,964,000$3,171,200
45397
Iowa Department ofTransportation
NHSX-5()--3H-4
IA5: N OF N 18TH ST IN CENTERVILLE TO S OF US 34IN ALBIA
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$8,624,000$6,899,200
$8,624,000$6,899,200
38224
Iowa Department ofTransportation
NHSX-63()--3H-26
US63: SOAP CREEK 0.9 MI S OF WAPELLO CO
Bridge Replacement, Wetland Mitigation
TIP Approved TotalFederal Aid
RegionalSwap
$6,975,000$5,580,000
$6,975,000$5,580,000
37883
Iowa Department ofTransportation
BRF-5()--38-4
IA5: NORTH CREEK 2.6 MI S OF CO RD T20
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$4,517,000$3,613,600
$4,517,000$3,613,600
39168
Iowa Department ofTransportation
BRF-5()--38-4
IA5: COOPER CREEK 1.5 MI N OF IA 2
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$2,181,000$1,744,800
$2,181,000$1,744,800
39218
Iowa Department ofTransportation
BRF-63()--38-26
US63: FOX RIVER 2.1 MI N OF IA 2
Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$6,000$4,800
$3,335,000$2,668,000
$3,341,000$2,672,800
39370
Iowa Department ofTransportation
BRF-65()--38-93
US65: CALEB CREEK 2.0 MI S OF CO RD J46
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$2,557,000$2,045,600
$2,557,000$2,045,600
275
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37879
Iowa Department ofTransportation
BRFN-2()--39-4
IA2: COOPER CREEK 1.5 MI W OF IA 5
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$266,000 $266,000
38040
Iowa Department ofTransportation
BRFN-2()--39-93
IA2: STEEL CREEK 2.0 MI E OF CO RD R69
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$628,000 $628,000
37909
Iowa Department ofTransportation
BRFN-69()--39-20
US69: WHITE BREAST CREEK 4.9 MI S OF US 34
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$384,000 $384,000
38161
Iowa Department ofTransportation
IMN-35()--0E-27
I-35: S OF REST AREA TO S OF IA 2 (SB)
Erosion Control
TIP Approved TotalFederal Aid
RegionalSwap
$350,000 $350,000
38083
Iowa Department ofTransportation
IMN-35()--0E-27
I-35: MISSOURI TO POLK CO
Guardrail
TIP Approved TotalFederal Aid
RegionalSwap
$100,000 $100,000 $100,000 $100,000 $400,000
45393
Iowa Department ofTransportation
NHSN-34()--2R-20
US34: I-35 TO ECL OF OSCEOLA
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,303,000 $2,303,000
39306
Iowa Department ofTransportation
NHSN-5()--2R-68
IA5: 0.1 MI S OF CO RD T19
Culvert Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$279,000 $279,000
38283
Iowa Department ofTransportation
STPN-14()--2J-59
IA14: 1.2 MI N OF N JCT CO RD H50
Culvert Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$565,000 $565,000
45345
Iowa Department ofTransportation
STPN-202()--2J-26
IA202: MISSOURI TO IA 2
Culvert Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$596,000 $596,000
276
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45411
Iowa Department ofTransportation
STPN-69()--2J-20
US69: PEARL ST TO N OF SHAW ST IN OSCEOLA(STATE SHARE)
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$399,000 $399,000
39222
Iowa Department ofTransportation
STPN-69()--2J-27
US69: 1.8 MI S OF CO RD J66
Ditch Improvement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$241,000 $241,000
39223
Iowa Department ofTransportation
STPN-69()--2J-27
US69: 1.6 MI S OF CO RD J66
Culvert Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$413,000 $413,000
39221
Iowa Department ofTransportation
STPN-69()--2J-27
US69: DICKERSONS BRANCH 1.1 MI S OF CO RD J66
Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$38,000 $38,000
37880
Iowa Department ofTransportation
BRFN-2()--39-4
IA2: WALNUT CREEK 0.8 MI E OF CO RD S70
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$253,000 $253,000
37974
Iowa Department ofTransportation
BRFN-34()--39-59
US34: STREAM 2.1 MI E OF E JCT US 65
Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$2,056,000 $2,056,000
45369
Iowa Department ofTransportation
NHSN-65()--2R-93
US65: STREAM 0.3 MI N OF CO RD J54
Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$262,000 $262,000
39290
Iowa Department ofTransportation
BRFN-34()--39-59
US34: LITTLE WHITE BREAST CREEK 2.5 MI W OF CORD S56
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$312,000 $312,000
39307
Iowa Department ofTransportation
BRFN-34()--39-68
US34: BNSF RR 4.5 MI W OF IA 5
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$443,000 $443,000
277
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39200
Iowa Department ofTransportation
IMN-35()--0E-20
I-35: 0.5 MI N OF US 34 TO WARREN CO (NB)
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,746,000 $2,746,000
39220
Iowa Department ofTransportation
IMN-35()--0E-27
I-35: 310TH ST 2.5 MI S OF US 69 (NB & SB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$937,000 $937,000
45423
Iowa Department ofTransportation
STPN-63()--2J-26
US63: N FABIUS CREEK 2.6 MI N OF MISSOURI STATELINE
Traffic Signs
TIP Approved TotalFederal Aid
RegionalSwap
$20,000 $20,000
45294
Iowa Department ofTransportation
BRFN-2()--39-93
IA2: JACKSON CREEK 3.8 MI W OF CO RD S56
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$350,000 $350,000
45412
Iowa Department ofTransportation
IMN-35()--0E-20
I-35: 0.5 MI N OF US 34 TO WARREN CO (SB)
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,204,000 $2,204,000
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
1001
RPA 17
RGPL-PA17(RTP)--ST-00
RPA 17: RPA 17 TRANSPORTATION PLANNING
Trans Planning
TIP Approved TotalFederal Aid
RegionalSwap
$41,000$33,000
$33,000
$41,000$33,000
$33,000
$41,000$33,000
$33,000
$41,000$33,000
$33,000
$164,000$132,000
$132,000
278
STBG-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
1040
Lucas County
BROS-C059(28)--5F-59
On H 50, Over UP RR, S21 T71 R21
Bridge Replacement
TIP Approved
10/19/2021
TotalFederal Aid
RegionalSwap
$1,300,000$1,000,000
$1,300,000$1,000,000
279
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37208
Appanoose County
BROS-SWAP-C004()--FE-04
On 110th Ave, Over Unnamed Trib to Cooper Crk, from105th Ave South .45 Miles to Zeiss Bridge, on WLINE S8T68N R19W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,000
38554
Clarke County
BROS-SWAP-C020(118)--FE-20
On 260TH AVE, Over WHITE BREAST CREEK, S10 T71R25
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,00038553
Clarke County
BROS-SWAP-C020(119)--FE-20
1/2 Mi. East of 250th. on Meadow St. Sec. 34, T-73N, R-25W.
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$550,000
$550,000
$550,000
$550,00037192
Davis County
BROS-SWAP-C026(112)--SE-26
On Mahogany Ave, 0.2 miles North of 265th St
Bridge Replacement
TIP Approved
9/15/2020
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00037665
Lucas County
BROS-SWAP-C059(64)--FE-59
On 530TH ST, Over NORTH CEDAR CREEK, S27/34 T73R20
Bridge Replacement
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$725,000
$725,000
$725,000
$725,0003992
Monroe County
BROS-SWAP-C068()--SE-68
On 730th Ave, Over Middle Avery Creek, from 189th St N1.3 miles to said bridge S11 T72 R16
Bridge Replacement
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$475,000
$475,000
$475,000
$475,00026792
Monroe County
BRS-SWAP-C068(76)--FF-68
On H27, 165th St., Over Abandoned Railroad, from 677thAve West Approx 700 Feet to Bridge, in S1 T72 R17
Bridge Removal
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$700,000
$700,000
$700,000
$700,00026793
Monroe County
BRS-SWAP-C068(77)--FF-68
On H27, 165th st, Over BNSF RR, from 685th Ave WestApprox .1 Miles to said Bridge, in S6 T72 R16
Bridge Replacement
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$2,300,000
$2,300,000
$2,300,000
$2,300,00038783
Decatur County
BHS-SWAP-C027()--FC-27
On J66, Over Weldon River, S22 T67 R24
Bridge Deck Overlay
TIP Approved
10/18/2022
TotalFederal Aid
RegionalSwap
$691,200
$691,200
$691,200
$691,200
280
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
44776
Clarke County
BROS-SWAP-C020(123)--FE-20
On PACIFIC ST, Over OTTER CREEK, S17 T73 R24
Bridge Replacement
TIP Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,0006407
Clarke County
BROS-SWAP-C020(43)--FE-20
On KANSAS ST, Over S SQUAW CREEK, S15 T72 R26
Bridge Replacement
TIP Approved
11/16/2021
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00037195
Davis County
BROS-SWAP-C026(117)--SE-26
On Ice Ave, 0.9 miles South of 260th St
Bridge Replacement
TIP Approved
5/17/2022
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00017227
Wayne County
BROS-SWAP-C093(85)--FE-93
On Birch Rd, Over Locust Creek, S22 T67 R20
Bridge Replacement
TIP Approved
3/15/2022
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00037363
Wayne County
BROS-SWAP-C093(97)--SE-93
On 245th St, Over Walnut Creek, S36 T69 R20
Bridge Replacement
TIP Approved
12/21/2021
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00037213
Appanoose County
BROS-SWAP-C004()--FE-04
On 130th Ave, Over Unnamed Trib to Cooper Crk, fromHWY J46 North 1.25 Miles to McElvain Bridge, on WLINES10 T68N R19W
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,000
8899
Clarke County
BROS-SWAP-C020(67)--SE-20
SCOTT STREET: .25 MI. W. OF 195TH AVE. ON SCOTTST.
Bridge Replacement
TIP Approved
11/15/2022
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00037191
Davis County
BROS-SWAP-C026()--FE-26
On 245th St, 0.6 miles West of Ebony Ave
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,00037193
Davis County
BROS-SWAP-C026()--SE-26
On Kress Ave, 0.6 miles North of 125th St
Bridge Replacement
TIP Approved
6/20/2023
TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,000
281
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
34825
Monroe County
BROS-SWAP-C068()--FE-68
On T55 (275th St), Over Soap Creek, from 690th Ave.West 2300 Feet to Said Bridge, S31 T71 R16
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00038781
Decatur County
BRS-SWAP-C027(81)--FF-27
On J66, Over Little River, in SE S13 T67 R25
Bridge Replacement
TIP Approved
12/20/2022
TotalFederal Aid
RegionalSwap
$1,100,000
$1,100,000
$1,100,000
$1,100,00039597
Appanoose County
BROS-SWAP-C004()--SE-04
On 110th Ave, Over Walnut Creek, from IA 2 South 1.1Miles, on WLINE S32 T69 R19
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00041345
Davis County
BROS-SWAP-C026()--FE-26
Richard Harris Bridge - 202nd St
TIP Approved TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,00040111
Davis County
BROS-SWAP-C026()--SE-26
On Fern Blvd, from Fern Blvd 0.3 miles to 250th Street
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,000
$500,000
$500,00037190
Davis County
BROS-SWAP-C026(118)--FE-26
On Alpine Ave, 0.7 miles South of Bunch Road
Bridge Replacement
TIP Approved
4/15/2025
TotalFederal Aid
RegionalSwap
$100,000
$100,000
$100,000
$100,00040228
Decatur County
BROS-SWAP-C027()--FE-27
On J 48, Over Unnamed Tributary to Elk Creek, S16 T68R26
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$375,000
$375,000
$375,000
$375,00020715
Decatur County
BROS-SWAP-C027(Z3548)--SE-27
J67: Over Shane Creek
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$550,000
$550,000
$550,000
$550,00037673
Lucas County
BROS-SWAP-C059(66)--SE-59
On 220TH AVE, Over WOLF CREEK, in the SE1/4 S25 T71R22
Bridge Replacement
TIP Approved
11/21/2023
TotalFederal Aid
RegionalSwap
$360,000
$360,000
$360,000
$360,000
282
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37715
Monroe County
BROS-SWAP-C068()--SE-68
On 264th Trl, Over Inghram branch creek, from 635th AveW 1 miles to Said bridge S19 T71 R17
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,000
SWAP-HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38451
Davis County
HSIP-SWAP-C026(111)--FJ-26
On On 180th St / Eagle Blvd, 215th St, Floris Rd, Ice Ave,Lilac Ave, Nuthatch Ave & Timber Ave
Pavement Markings
TIP Approved
7/16/2019
TotalFederal Aid
RegionalSwap
$269,000
$242,000
$269,000
$242,000
283
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
40163
Davis County
STBG-SWAP-C026()--FG-26
On 180th Street, from Drakesville Oval west 4.3 miles
TIP Approved
8/18/2020
TotalFederal Aid
RegionalSwap
$750,000
$750,000
$750,000
$750,000
$750,000
$750,00044691
Decatur County
STBG-SWAP-C027()--FG-27
On J 20, from WCL Grand River, Iowa E 0.64 miles to R15
Pavement Rehab
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$600,000
$200,000
$200,000
$600,000
$200,000
$200,00032177
Decatur County
STBG-SWAP-C027(79)--FG-27
On J 20, from R15 E 7.26 miles to I-35
Pavement Rehab
TIP Approved
12/15/2020
TotalFederal Aid
RegionalSwap
$4,100,000
$1,200,000
$1,200,000
$4,100,000
$1,200,000
$1,200,00017484
Lucas County
STBG-SWAP-C059(51)--FG-59
On H20, from Iowa Highway 14 E 0.9 miles to West RRROW in Williamson
Pavement Rehab/Widen
TIP Approved
6/15/2021
TotalFederal Aid
RegionalSwap
$600,000
$500,000
$500,000
$600,000
$500,000
$500,00045211
Lucas County
STBG-SWAP-C059(70)--FG-59
On H 30, from H32 NE 2.25 miles to Iowa Hwy 14
Pavement Rehab/Widen
TIP Approved
2/16/2021
TotalFederal Aid
RegionalSwap
$1,500,000
$500,000
$500,000
$1,500,000
$500,000
$500,00015657
Davis County
STBG-SWAP-C026()--FG-26
On 276th St, from Hwy 63 to Dewberry Ave
Pavement Rehab
TIP Approved
4/20/2021
TotalFederal Aid
RegionalSwap
$1,200,000
$1,000,000
$1,200,000
$1,200,000
$1,000,000
$1,200,00045055
Monroe County
STBG-SWAP-C068()--SG-68
On T 61, from State Hwy 137 S 1 miles to 170th St
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,000
$1,000,000
$1,000,00044836
Wayne County
STBG-SWAP-C093(98)--FG-93
On S-60, from the North C.L. of Seymour N 4.1 miles to ST.Hwy 2 R20
Pave, Pavement Rehab/Widen, Granular Shoulders
TIP Approved
4/19/2022
TotalFederal Aid
RegionalSwap
$1,000,000
$1,000,000
$1,000,000
$1,000,000
$1,000,000
$1,000,00039511
Appanoose County
STBG-SWAP-C004()--FG-04
On S70, from J5T North 7.8 Miles to Monroe County Line
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,250,000
$1,250,000
$1,250,000
$1,250,000
$1,250,000
$1,250,000
284
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
39512
Appanoose County
STBG-SWAP-C004()--FG-04
On J5T, from 195th Ave North & East 1 Miles to J29
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,000
$250,000
$250,00038623
Wayne County
STBG-SWAP-C093(94)--FG-93
On J-46, from S-40 E 3 miles to 190th Street, T68 R21
Pave
TIP Approved
8/16/2022
TotalFederal Aid
RegionalSwap
$1,800,000
$1,500,000
$1,500,000
$1,800,000
$1,500,000
$1,500,0008941
Davis County
STBG-SWAP-C026(Airport Rd)--FG-26
On 230th St, Airport Rd
Pave
TIP Approved TotalFederal Aid
RegionalSwap
$250,000
$250,000
$250,000
$250,000
$250,000
$250,00038780
Decatur County
STBG-SWAP-C027(J66)--FG-27
On J 66, from HWY 69 SE 6.93 miles to Missouri State Line
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,640,000
$1,140,000
$1,140,000
$2,640,000
$1,140,000
$1,140,000
285
286
287
RPA 18HSIP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45275
Iowa Department ofTransportation
IHSIPX-80()--08-78
I-80: CO RD G30 TO CO RD L66
Guardrail
TIP Approved TotalFederal Aid
RegionalSwap
$2,000,000$2,000,000
$2,000,000$2,000,000
288
NHPP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45253
Iowa Department ofTransportation
BRF-34()--38-65
US34: DOUGLAS CREEK 0.7 MI E OF W JCT CO RD H34
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$592,000$473,600
$592,000$473,600
39297
Iowa Department ofTransportation
BRF-34()--38-65
US34: BNSF RR 0.9 MI E OF CO RD L55
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$1,309,000$1,047,200
$1,309,000$1,047,200
45441
Iowa Department ofTransportation
NHSX-30()--3H-43
US30: MISSOURI RIVER TO I-29
Pavement Widening, Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$5,738,000$4,590,400
$5,738,000$4,590,400
45409
Iowa Department ofTransportation
NHSX-59()--3H-78
US59: CO RD G30 TO SCL OF AVOCA
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$3,449,000$2,759,200
$3,449,000$2,759,200
38164
Iowa Department ofTransportation
IMX-29()--02-78
I-29: CO RD G12 0.4 MI N OF I-880
Grade and Pave, Bridge Replacement, Traffic Signs
TIP Approved TotalFederal Aid
RegionalSwap
$3,789,000$3,410,100
$3,789,000$3,410,100
38115
Iowa Department ofTransportation
IMX-29()--02-78
I-29: DITCH 2.4 MI S OF I-880
Bridge Replacement, Traffic Signs
TIP Approved TotalFederal Aid
RegionalSwap
$1,267,000$1,140,300
$1,267,000$1,140,300
38117
Iowa Department ofTransportation
IMX-29()--02-78
I-29: DITCH 0.5 MI S OF I-880
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,703,000$1,532,700
$1,703,000$1,532,700
38116
Iowa Department ofTransportation
IMX-29()--02-78
I-29: DITCH 1.6 MI S OF I-880
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$912,000$820,800
$912,000$820,800
39338
Iowa Department ofTransportation
BRF-59()--38-78
US59: E BRANCH W NISHNABOTNA RIVER 1.0 MI S OFIA 83
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$2,875,000$2,300,000
$2,875,000$2,300,000
289
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
37947
Iowa Department ofTransportation
BRFN-30()--39-43
US30: MISSOURI RIVER E OF BLAIR NEBRASKA (STATESHARE)
Bridge Cleaning
TIP Approved TotalFederal Aid
RegionalSwap
$35,000 $35,000 $35,000 $35,000 $140,000
37979
Iowa Department ofTransportation
BRFN-34()--39-65
US34: MISSOURI RIVER N OF PLATTSMOUTHNEBRASKA (STATE SHARE)
Bridge Cleaning
TIP Approved TotalFederal Aid
RegionalSwap
$45,000 $45,000 $45,000 $45,000 $180,000
38009
Iowa Department ofTransportation
BRFN-59()--39-78
US59: STREAM 0.2 MI S OF CO RD G30 IN HANCOCK
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$879,000 $879,000
45287
Iowa Department ofTransportation
IMN-29()--0E-43
I-29: US 30 INTERCHANGE IN MISSOURI VALLEY
Lighting
TIP Approved TotalFederal Aid
RegionalSwap
$690,000 $690,000
38120
Iowa Department ofTransportation
IMN-80()--0E-78
I-80: I-880 INTERCHANGE (WB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$774,000 $774,000
45336
Iowa Department ofTransportation
IMN-880()--0E-78
I-880: POTATO CREEK 0.8 MI E OF CO RD L34 (EB &WB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,330,000 $1,330,000
37949
Iowa Department ofTransportation
BRFN-30()--39-43
US30: WILSON DITCH 2.1 MI W OF I-29
Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$938,000 $938,000
37948
Iowa Department ofTransportation
BRFN-30()--39-43
US30: STREAM 2.3 MI E OF CO RD F32
Bridge Replacement, Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$1,283,000 $1,283,000
38010
Iowa Department ofTransportation
BRFN-59()--39-78
US59: I-80 INTERCHANGE AT AVOCA (NB & SB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$647,000 $647,000
290
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38008
Iowa Department ofTransportation
BRFN-59()--39-78
US59: STREAM 2.4 MI N OF IA 92
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$138,000 $138,000
38012
Iowa Department ofTransportation
BRFN-92()--39-78
IA92: JORDAN CREEK 3.5 MI E OF US 59
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$371,000 $371,000
38108
Iowa Department ofTransportation
IMN-29()--0E-65
I-29: REST AREA N OF US 34 (NB)
Rest Area Improvement
TIP Approved TotalFederal Aid
RegionalSwap
$3,971,000 $3,971,000
38121
Iowa Department ofTransportation
IMN-80()--0E-78
I-80: CO RD M16 INTERCHANGE AT SHELBY
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$272,000 $272,000
38122
Iowa Department ofTransportation
IMN-80()--0E-78
I-80: W NISHNABOTNA RIVER TO 1.0 MI E OF RESTAREA (WB)
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,406,000 $1,406,000
39249
Iowa Department ofTransportation
BRFN-127()--39-43
IA127: STEER CREEK 0.5 MI E OF IA 183
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$740,000 $740,000
39248
Iowa Department ofTransportation
BRFN-30()--39-43
US30: MISSOURI RIVER E OF BLAIR NEBRASKA (STATESHARE)
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$125,000 $125,000
39355
Iowa Department ofTransportation
BRFN-44()--39-83
IA44: MOSQUITO CREEK 0.3 MI E OF IA 191
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,102,000 $1,102,000
39340
Iowa Department ofTransportation
BRFN-92()--39-78
IA92: GRAYBILL CREEK 1.2 MI E OF E JCT US 59
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$573,000 $573,000
291
PRF
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45250
Iowa Department ofTransportation
IMN-880()--0E-78
I-880: MOSQUITO CREEK 0.5 MI E OF IA 191 (WB)
Bridge Rehabilitation
TIP Approved TotalFederal Aid
RegionalSwap
$1,000,000 $1,000,000
45424
Iowa Department ofTransportation
STPN-29()--2J-43
I-29: LITTLE SIOUX RIVER N OF CO RD F20INTERCHANGE
Traffic Signs
TIP Approved TotalFederal Aid
RegionalSwap
$75,000 $75,000
45293
Iowa Department ofTransportation
BRFN-92()--39-78
IA92: SILVER CREEK 2.8 MI E OF TREYNOR
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$400,000 $400,000
45306
Iowa Department ofTransportation
IMN-80()--0E-78
I-80: IDLEWOOD RD 4.6 MI E OF US 6 (EB & WB)
Bridge Deck Overlay
TIP Approved TotalFederal Aid
RegionalSwap
$1,600,000 $1,600,000
45244
Iowa Department ofTransportation
NHSN-30()--2R-43
US30: MISSOURI VALLEY BYPASS
Right of Way
TIP Approved TotalFederal Aid
RegionalSwap
$6,800,000 $6,800,000
STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
45445
Iowa Department ofTransportation
STP-275()--2C-65
US275: N OF NCL OF TABOR TO US 34
Pavement Widening, Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$5,026,000$4,020,800
$5,026,000$4,020,800
292
STBG-TAP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
38386
Elk Horn
TAP-R-2305(602)--8T-83
On In the City of Elk Horn between Salem Street andMadison Street., from This project will be a loop of .31 Miles
Ped/Bike Paving, Ped/Bike Grade & Pave, Ped/BikeDevelopment
TIP Approved
1/20/2021
TotalFederal Aid
RegionalSwap
$152,000$100,000
$100,000
$152,000$100,000
$100,000
40089
Mills CountyConservation Board
TAP-R-C065(109)--8T-65
On On the Wabash Trace in Silver City
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$189,000$151,000
$151,000
$189,000$151,000
$151,000
26699
PottawattamieCountyConservation Board
TAP-R-C078()--8T-78
On Railroad Highway, from Council Bluffs N 27 Miles toNeola and Crescent
Ped/Bike Miscellaneous, Ped/Bike Development
TIP Approved
1/21/2026
TotalFederal Aid
RegionalSwap
$936,000$200,000
$200,000
$936,000$200,000
$200,000
DOT Note: Project eligible for FHWA TAP funding.
39439
Glenwood
TAP-T-2955()--8V-65
In the city of Glenwood, On East Sharp Street walking/biketrail, from Vine Street to Lake Drive
Ped/Bike Paving
TIP Approved TotalFederal Aid
RegionalSwap
$141,000$113,000
$113,000
$141,000$113,000
$113,000
38389
Glenwood
TAP-U-2955()--8I-65
On Pedestrian trail south of E Sharp Street in GlenwoodLake Park for 2.5 Miles
Ped/Bike Grade & Pave, Ped/Bike Structures,Ped/Bike Development
TIP Approved TotalFederal Aid
RegionalSwap
$1,255,000$72,000
$72,000
$1,255,000$72,000
$72,000
293
SWAP-HBP
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
32693
Harrison County
BROS-SWAP-C043(Cass2)--SE-43
On VIENNA AVE, Over PIGEON CREEK, from 220th St. S0.3 miles S1 T79 R41
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00036207
PottawattamieCounty
BRS-SWAP-C078(199)--FF-78
On M16, Over STREAM, on WLINE S4 T76 R40
Culvert Replacement
TIP Approved
11/17/2020
TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,00037119
Harrison County
BROS-SWAP-C042(Jef1)--SE-43
On PARKER TRL, Over BOYER RIVER, S4 T79 R42
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$1,400,000
$1,400,000
$1,400,000
$1,400,00032804
Mills County
BROS-SWAP-C065()--FE-65
On Paddock Ave, Over Local Creek, in NE S21 T71 R43
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$300,000
$300,000
$300,000
$300,00035284
Mills County
BROS-SWAP-C065()--SE-65
On 400th Street, Over Indian Creek, on ELINE S27 T72R40
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$400,000
$400,000
$400,000
$400,00032569
PottawattamieCounty
BRS-SWAP-C078()--FF-78
On G66, Over W NISHNABOTNA
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$2,000,000
$2,000,000
$2,000,000
$2,000,00020363
Mills County
BHOS-SWAP-C065(84)--FB-65
On M 21, Over FARM CREEK, S15 T73 R40
Bridge Rehabilitation
TIP Approved
12/20/2022
TotalFederal Aid
RegionalSwap
$600,000
$600,000
$600,000
$600,00027001
Shelby County
BROS-SWAP-C083()--FE-83
On Cedar Rd: 1600th St N 0.5 Mi, Over Pigeon Creek
Bridge Replacement
TIP Approved TotalFederal Aid
RegionalSwap
$200,000
$200,000
$200,000
$200,00013048
PottawattamieCounty
BRS-SWAP-C078()--FF-78
On G 18, Over BNSF RR, S19 T77 R41
Bridge Removal
TIP Approved TotalFederal Aid
RegionalSwap
$1,500,000
$1,500,000
$1,500,000
$1,500,000
294
SWAP-STBG
Project IDSponsor
STIP ID
Project NumberLocation
Work Codes
Approval LevelLetting Date
2021 2022 2023 2024 Totals
36205
PottawattamieCounty
STBG-SWAP-C078(204)--FG-78
On L66, from the Highway 6 Intersection North 6.5 Miles tothe South Intersection of G30
Patching
TIP Approved
3/16/2021
TotalFederal Aid
RegionalSwap
$6,050,000
$1,250,000
$1,250,000
$6,050,000
$1,250,000
$1,250,00035296
Mills County
STBG-SWAP-C065()--FG-65
On L55, from H20 N 3.1 miles to Dobney Avenue S26 T73R42
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$1,800,000
$340,000
$340,000
$1,800,000
$340,000
$340,00021847
PottawattamieCounty
STBG-SWAP-C078()--FG-78
On M47, from Montgomery County Line N 16 miles to G30
Pavement Rehab, Patching
TIP Approved TotalFederal Aid
RegionalSwap
$3,700,000
$900,000
$900,000
$3,700,000
$900,000
$900,00037436
Harrison County
STBG-SWAP-C043(L16)--FG-43
On L16, from Willow Creek N 6.6 Miles to Monona CountyLine
Pave, Granular Shoulders
TIP Approved TotalFederal Aid
RegionalSwap
$1,200,000
$1,200,000
$1,200,000
$1,200,000
$1,200,000
$1,200,00035289
Mills County
STBG-SWAP-C065()--FG-65
On Gaston Ave. , from 245th Street East 4.0 Miles to 287thStreet
Pavement Rehab/Widen
TIP Approved TotalFederal Aid
RegionalSwap
$500,000
$500,000
$500,000
$500,000
$500,000
$500,00044761
Harrison County
STBG-SWAP-C043(F66)--FG-43
On F-66 (335th Street), from Seward Ave E 4 miles to Hwy191
Pave
TIP Approved TotalFederal Aid
RegionalSwap
$360,000
$145,000
$145,000
$360,000
$145,000
$145,00035293
Mills County
STBG-SWAP-C065()--FG-65
On L-63, Over SILVER CREEK, from Malvern City LimitsSouth 7 miles to Fremont County Line
Pavement Rehab
TIP Approved TotalFederal Aid
RegionalSwap
$2,000,000
$1,250,000
$1,250,000
$2,000,000
$1,250,000
$1,250,00032566
PottawattamieCounty
STBG-SWAP-C078()--FG-78
On G30, from Mosquito Creek Bridge East 8 Miles to L66
Pavement Rehab, Patching, Pavement Planing
TIP Approved TotalFederal Aid
RegionalSwap
$1,325,000
$325,000
$325,000
$1,325,000
$325,000
$325,000
295
FTA Programs
RPA-00 / Statewide (4 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5311 OPT 4978 Interregional Express Bus (IRXB) Total 1,741,650 1,787,289Operations FA 1,393,320 1,429,831Other SA 348,330 357,458
5311 OPT 6091 Intercity Bus Assistance Program Total 6,433,242Operations FA 2,144,414Other SA
5311 OPT 6092 RTAP Program Total 240,024Operations FA 240,024Other SA
STA OPT 6093 Urban Fellowships Total 150,000Operations FAOther SA 150,000
296
MPO-22 / AAMPO (45 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5307 Ames 5575 Heavy Duty Articulated Bus Total 281,250 281,250 281,250Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 225,000 225,000 225,000Expansion SA
STA, 5307 Ames 914 General Operations Total 12,086,406 12,569,863 13,072,657 13,595,563Operations FA 2,593,894 2,697,650 2,805,556 2,917,778Misc SA 809,363 841,738 875,407 910,423
5310 Ames 919 Contracted Paratransit Service Total 175,000 187,500 187,500 187,500Capital FA 140,000 150,000 150,000 150,000Misc SA
5339 Ames 4044 Heavy Duty Bus (40-42 ft.) Total 513,032Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 436,077Replacement Unit #: 07125 SA
5339 Ames 4045 Heavy Duty Bus (40-42 ft.) Total 513,032Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 436,077Replacement Unit #: 01140 SA
5339 Ames 4046 Heavy Duty Bus (40-42 ft.) Total 513,032Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 436,077Replacement Unit #: 07132 SA
5339 Ames 4047 Heavy Duty Bus (40-42 ft.) Total 513,032Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 436,077Replacement Unit #: 07123 SA
5339 Ames 4048 Heavy Duty Bus (40-42 ft.) Total 513,032Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 436,077Replacement Unit #: 01141 SA
5339 Ames 4049 Heavy Duty Bus (40-42 ft.) Total 513,032Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 436,077Replacement Unit #: 00958 SA
5310 Ames 5100 Annunciators LED Signage Total 126,720Capital FA 101,376Expansion SA
5339 Ames 4660 Heavy Duty Bus (40-42 ft.) Total 513,032Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 436,077Replacement Unit #: 00956 SA
5339 Ames 4662 Heavy Duty Bus (40-42 ft.) Total 513,032Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 436,077Replacement Unit #: 00955 SA
5310 Ames 5570 Light Duty Bus (176" wb) Total 156,198Capital UFRC, VSS, Low Floor FA 124,958Replacement Unit #: 00390 SA
5310 Ames 5571 Light Duty Bus (176" wb) Total 156,198Capital UFRC, VSS FA 124,958Replacement Unit #: 00391 SA
5339 Ames 6010 Heavy Duty Bus (40-42 ft.) Total 513,032Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 436,077Replacement Unit #: 00957 SA
297
MPO-22 / AAMPO (45 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5310 Ames 6012 Annunciator Annual Service Fees Total 82,146 94,000 94,000 94,000Operations FA 65,714 75,200 75,200 75,200Misc SA
PTIG Ames 6013 Maintenance Bay Ventilation Improvements Total 281,346Capital FARehabilitation SA 225,077
PTIG Ames 6014 HVAC Rehabilitation Total 187,574 307,329Capital FARehabilitation SA 150,059 245,863
PTIG Ames 6034 Bus Vehicle Exhaust Modifications Total 168,708Capital FA 134,966Rehabilitation SA
5310 Ames 920 Associated Transit Improvements Total 50,000 50,000 50,000Capital FA 40,000 40,000 40,000Replacement SA
5339 Ames 5097 Heavy Duty Bus (40-42 ft.) Total 517,615Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 439,973Replacement Unit #: 00970 SA
5339 Ames 5098 Heavy Duty Bus (40-42 ft.) Total 517,615Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 439,973Replacement Unit #: 00971 SA
5339 Ames 5099 Heavy Duty Bus (40-42 ft.) Total 517,615Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 439,973Replacement Unit #: 00977 SA
5339 Ames 4661 Heavy Duty Bus (40-42 ft.) Total 517,615Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 439,973Replacement Unit #: 00975 SA
5339 Ames 4663 Heavy Duty Bus (40-42 ft.) Total 517,615Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 439,973Replacement Unit #: 00954 SA
5339 Ames 4664 Heavy Duty Bus (40-42 ft.) Total 517,615Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 439,973Replacement Unit #: 00953 SA
5339 Ames 4665 Heavy Duty Bus (40-42 ft.) Total 517,615Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 439,973Replacement Unit #: 00972 SA
5339 Ames 4666 Heavy Duty Bus (40-42 ft.) Total 517,615Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 439,973Replacement Unit #: 00974 SA
5339 Ames 5555 Heavy Duty Bus (40-42 ft.) Total 538,320Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 457,572Replacement Unit #: 00973 SA
5339 Ames 5563 Heavy Duty Bus (40-42 ft.) Total 538,320Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 457,572Replacement Unit #: 00976 SA
298
MPO-22 / AAMPO (45 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Ames 5564 Heavy Duty Bus (40-42 ft.) Total 538,320Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 457,572Replacement Unit #: 00950 SA
5339 Ames 5565 Heavy Duty Bus (40-42 ft.) Total 538,320Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 457,572Replacement Unit #: 00952 SA
5339 Ames 5566 Heavy Duty Bus (40-42 ft.) Total 538,320Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 457,572Replacement Unit #: 00951 SA
5339 Ames 5567 Heavy Duty Bus (40-42 ft.) Total 538,320Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 457,572Replacement Unit #: 00949 SA
5339 Ames 5568 Heavy Duty Bus (40-42 ft.) Total 538,320Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 457,572Replacement Unit #: 00504 SA
5339 Ames 5569 Heavy Duty Bus (40-42 ft.) Total 538,320Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 457,572Replacement Unit #: 00502 SA
5339 Ames 3314 Maintenance Facility Expansion Total 6,300,166Capital FA 5,000,000Expansion SA
5339 Ames 6015 Heavy Duty Bus (40-42 ft.) Total 559,853Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 475,875Replacement Unit #: 00501 SA
5339 Ames 6016 Heavy Duty Bus (40-42 ft.) Total 559,853Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 475,875Replacement Unit #: 00503 SA
5339 Ames 6017 Heavy Duty Bus (40-42 ft.) Total 559,853Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 475,875Replacement Unit #: 00188 SA
5339 Ames 6018 Heavy Duty Bus (40-42 ft.) Total 559,853Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 475,875Replacement Unit #: 00186 SA
5339 Ames 6019 Heavy Duty Bus (40-42 ft.) Total 559,853Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 475,875Replacement Unit #: 00189 SA
5339 Ames 6020 Heavy Duty Bus (40-42 ft.) Total 559,853Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 475,875Replacement Unit #: 00187 SA
5339 Ames 6021 Heavy Duty Bus (40-42 ft.) Total 559,853Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 475,875Replacement Unit #: 00785 SA
5339 Ames 6022 Heavy Duty Bus (40-42 ft.) Total 559,853Capital Diesel, UFRC, VSS, Low Floor, BioDiesel FA 475,875Replacement Unit #: 00762 SA
299
MPO-23 / CMPO (12 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
PTIG Cedar Rapids 5870 Construct a Transit Fleet Maintenance Facility Total 2,400,000Capital FAOther SA 600,000
STP Cedar Rapids 4711 CR Transit - Purchase 2 Heavy-Duty (35' diesel) Replacing bus #s 2091 &2092
Total 1,032,000
Capital FA 825,000Replacement SA
STP Cedar Rapids 4712 CR Transit - 1 medium-duty 32' ADA paratransit bus; Replacing bus#2402 Total 205,000Capital FA 164,000Replacement SA
STA, 5307,5310
Cedar Rapids 960 General Ops./Maint./Admin. Total 10,410,000 10,390,000 10,440,000 10,490,000Operations FA 3,270,000 3,150,000 3,150,000 3,150,000Misc SA 640,000 640,000 640,000 640,000
STP MPO-23 4708 In the City of Marion bus stop improvements located on non-local roads. Total 394,000Capital FA 315,000Other SA
STP Cedar Rapids 4986 CR Transit - Purchase 2 Heavy-Duty (35' diesel) Replacing bus #s 2093 &2094
Total 1,084,000
Capital FA 866,000Replacement SA
STP Cedar Rapids 4987 CR Transit - 1 medium-duty 32' ADA paratransit bus; Replacing bus#2403 Total 216,000Capital FA 172,000Replacement SA
STP Cedar Rapids 5322 CR Transit - Purchase 2 Heavy-duty buses Replacing bus #s 2131 & 2132 Total 1,116,000Capital FA 893,000Other SA
STP Cedar Rapids 5323 CR Transit - Purchase 1 medium-duty bus; Replacing bus#2875 Total 215,000Capital FA 172,000Replacement SA
STP MPO-23 5639 Edgewood Road Transit Stops and Sidewalk Total 554,000Capital FA 325,000Expansion SA
STP Cedar Rapids 5872 CR Transit - 1 medium-duty 32' ADA paratransit bus - Replacing bus#2876 Total 215,000Capital FA 172,000Replacement SA
STP Cedar Rapids 5873 CR Transit - Purchase 2 Heavy-duty replacement buses - bus #s 2133 &2134
Total 1,116,000
Capital FA 893,000Replacement SA
300
MPO-24 / MAPA (6 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5310 Region 13 / SWITA 5666 Non-ADA Standard Minivan Total 38,750 38,750Capital Low Floor FA 31,000 31,000Expansion SA
STA, 5307 Council Bluffs 3036 General Operations Maint./Admin Total 1,152,000 1,152,000 1,152,000 1,152,000Operations FA 273,000 273,000 273,000 273,000Other SA 175,000 175,000 175,000 175,000
5310 Council Bluffs 3796 Council Bluffs Special Transit Service (STS) Contracting Total 177,000 29,040 175,000 175,000Capital FA 88,500 14,520 87,500 87,500Other SA
5310 Council Bluffs 6085 Light Duty Bus (176" wb) Total 45,375Capital Low Floor FA 36,300Replacement Unit #: AG3 SA
5310 Council Bluffs 6086 Light Duty Bus (176" wb) Total 45,375Capital Low Floor FA 36,300Replacement Unit #: AG2A SA
5310 Council Bluffs 6087 Light Duty Bus (176" wb) Total 45,375Capital Low Floor FA 36,300Replacement Unit #: AG8 SA
301
MPO-25 / BSRC (14 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
STA, 5307,5310
BMTA 3787 ADA Operations Total 162,636 167,516 172,540 177,718Operations FA 81,318 83,758 86,270 88,859Other SA 81,318 83,758 86,270 88,859
STA, 5307 BMTA 985 General Operations Total 795,675 819,545 844,132 869,456Operations FA 127,308 131,127 135,061 139,113Misc SA 185,612 204,304 201,790 199,771
5307 BMTA 987 Preventative Maintenance Total 95,481 98,345 101,296 104,335Capital FA 76,385 78,676 81,037 83,468Replacement SA
5307 BMTA 993 Transit Planning Total 32,962 33,951 34,969 36,018Planning FA 26,370 27,161 27,976 28,815Misc SA
5307 BMTA 5657 ADP Software Total 16,000 16,000 16,000 16,000Capital FA 12,800 12,800 12,800 12,800Misc SA
STA, 5307 Davenport 979 General Operations Total 5,135,817 5,135,817 5,135,817 5,135,817Operations FA 850,000 850,000 850,000 850,000Misc SA 500,000 500,000 500,000 500,000
5307 Davenport 980 Preventative maintenance Total 792,227 792,227 792,227 792,227Capital FA 530,000 530,000 530,000 530,000Replacement SA
5307 Davenport 981 ADA paratransit assistance Total 622,854 622,854 622,854 622,854Operations FA 115,000 115,000 115,000 115,000Misc SA
5307 Davenport 2595 Bus Amenities Total 60,000 60,000 60,000 60,000Capital FA 48,000 48,000 48,000 48,000Expansion SA
Davenport 3022 JARC Projects Total 152,982 152,982 152,982 152,982Operations FAOther SA
5339 Davenport 4746 Heavy Duty Bus (35-39 ft.) Total 480,000Capital Diesel, UFRC, VSS, Low Floor FA 384,000Replacement Unit #: 3505 SA
5339 Davenport 4747 Heavy Duty Bus (35-39 ft.) Total 480,000Capital Diesel, UFRC, VSS, Low Floor FA 384,000Replacement Unit #: 3506 SA
5303 MPO-25 2203 MPO Transit Planning Total 76,246 76,246 76,246 76,246Planning FA 60,997 60,997 60,997 60,997Other SA
5339 BMTA 6079 Bus Replacement Total 380,217Capital FA 304,174Replacement SA
302
MPO-26 / DMAMPO (28 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5307 Des Moines DART 2480 Twenty Lease Buses - 20 (2015 Lease) Total 820,000 845,000 845,000 845,000Capital FA 656,000 676,000 676,000 676,000Replacement SA
5307 Des Moines DART 2482 Computer Software Total 10,000 10,000 10,000 10,000Capital FA 8,000 8,000 8,000 8,000Replacement SA
STA Des Moines DART 995 General Operations/Maintenance/Administration Total 2,182,281 2,247,750 2,292,705 2,338,559Operations FAMisc SA 1,745,825 1,798,200 1,834,164 1,870,847
5311 Des Moines DART 996 Operations for Rural Services Total 25,746 26,260 26,786 27,322Operations FA 12,873 13,130 13,393 13,661Misc SA
5310 Des Moines DART 997 Subcontracted Paratransit Operations Total 57,500 78,750 170,000 135,000Operations FA 46,000 63,000 136,000 108,000Misc SA
5307 Des Moines DART 1020 Preventive Maintenance Total 3,437,500 3,437,500 3,437,500 3,437,500Operations FA 2,750,000 2,750,000 2,750,000 2,750,000Misc SA
5307 Des Moines DART 1021 ADA Paratransit Total 593,750 593,750 593,750 593,750Operations FA 475,000 475,000 475,000 475,000Misc SA
5307 Des Moines DART 1024 Admin and Maint. Facility Engineering and Design Total 10,000 50,000 10,000 10,000Capital FA 8,000 40,000 8,000 8,000Replacement SA
5307 Des Moines DART 1026 Facility Renovations Total 10,000 450,000 10,000 10,000Capital FA 8,000 360,000 8,000 8,000Replacement SA
5307 Des Moines DART 1027 Security/Safety Improvements at Facilities Total 10,000 200,000 10,000Capital FA 8,000 160,000 8,000Replacement SA
5307 Des Moines DART 1028 Shop and Garage Equipment Total 120,000 205,000 25,000 25,000Capital FA 96,000 200,000 20,000 20,000Replacement SA
5307 Des Moines DART 1029 Miscellaneous Equipment Total 10,000 10,000 10,000 10,000Capital FA 8,000 8,000 8,000 8,000Replacement SA
5307 Des Moines DART 1030 Computer Hardware Total 45,000 100,000 65,000 45,000Capital FA 36,000 80,000 52,000 36,000Replacement SA
STP, 5307 Des Moines DART 1032 Associated Transit Improvements Total 125,000 120,000 206,250 525,000Capital FA 100,000 96,000 165,000 420,000Replacement SA
5307 Des Moines DART 1042 Support Vehicles Total 35,000 185,000 425,000Capital FA 28,000 148,000 340,000Replacement SA
303
MPO-26 / DMAMPO (28 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5307 Des Moines DART 1046 RideShare Vehicles (Repl/Exp) Total 575,000 775,000 805,000 700,000Capital FA 460,000 620,000 644,000 560,000Replacement SA
STP, 5307,5339
Des Moines DART 4326 Eight Heavy-Duty Buses w/Surv. & AVL Total 4,405,462Capital FA 3,657,143Replacement SA
5339 Des Moines DART 4766 Two 40' HD Buses w/Surv. & AVL (2006 Orion Buses) Total 1,015,414Operations FA 863,102Other SA
ICAAP Des Moines DART 4783 Euclid/Douglas Avenue Crosstown Total 392,186Operations FA 313,749Expansion SA
PTIG, 5339,5307
Des Moines DART 5115 New Maintenance & Operations Facility Total 26,000,000 1,245,000 2,443,750 1,625,000Capital FA 20,800,000 496,000 1,455,000 1,300,000Replacement SA 500,000 500,000
5307, 5310,5311
Des Moines DART 5676 Four less than 30' Buses w/Surv., Fareboxes & AVL Total 549,120Capital FA 466,752Replacement SA
STP, 5307,5339
Des Moines DART 4762 Six Heavy-Duty Buses w/Surv. & AVL Total 3,407,461 3,606,159Capital FA 2,808,204 2,977,735Replacement SA
ICAAP Des Moines DART 1049 Park & Ride Lot Total 500,000Capital FA 400,000Expansion SA
ICAAP Des Moines DART 1756 Local Routes Service Improvements Total 300,000 309,000 318,270Operations FA 240,000 247,200 254,616Expansion SA
ICAAP Des Moines DART 3120 Express Service Improvements Total 200,000 206,000 212,180Operations FA 160,000 164,800 169,744Expansion SA
5307, 5310 Des Moines DART 4292 Five to Six Less Than 30' Buses w/Surv., Fareboxes & AVL Total 960,461 742,410 1,038,834Capital FA 816,392 631,048 883,009Replacement SA
STP, 5307,5339
Des Moines DART 5673 Three Heavy-Duty Articulated Buses w/Surv. & AVL Total 3,421,836Capital FA 2,823,873Replacement SA
5309 Des Moines DART 3867 Enhanced Corridors Total 25,000,000Capital FA 20,000,000Expansion SA
304
MPO-27 / DMATS (4 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
STA Dubuque 4628 STA Operating Funding Total 598,520Operations FAOther SA 299,260
5307 Dubuque 4228 5307 FTA Formula Funding Total 2,693,766Operations FA 1,346,883Other SA
5311 Dubuque 4230 Intercity Bus Marketing Funding (Competitive) Total 9,375Operations FA 7,500Other SA
5310 Dubuque 6064 5310 Preventative Maintenance Total 150,114Operations FA 120,091Other SA
305
MPO-28 / MPOJC (39 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
STA, 5307,5310
CAMBUS 5965 General operations/maintenance/administration/planning Total 4,175,770Operations FA 990,941Other SA 750,359
5339 CAMBUS 5966 In-ground hoist system Total 120,000Capital FA 96,000Expansion SA
5339 CAMBUS 5967 Associated capital bus maintenance (spare parts) Total 200,000Capital FA 160,000Replacement SA
5339 CAMBUS 5968 6 replacement passenger shelters Total 90,000Capital FA 72,000Replacement SA
5339 CAMBUS 5969 Forklift for maintenance Total 60,000Capital FA 48,000Replacement SA
5339 CAMBUS 5970 Expansion and upgrade of maintenance facility Total 5,250,000Capital FA 4,200,000Replacement SA
5339 CAMBUS 5971 Heavy Duty Bus (30-34 ft.) Total 475,267Capital Diesel, UFRC, VSS, Low Floor FA 403,977Replacement Unit #: 11 SA
5339, 5310 CAMBUS 5972 Heavy Duty Bus (30-34 ft.) Total 475,267Capital Diesel, UFRC, VSS, Low Floor FA 403,977Replacement Unit #: 12 SA
STA, 5307 Coralville 5907 General Operations/Maintenance/Administrative/Planning Total 2,131,439Operations FA 550,000Other SA 283,235
5310 Coralville 5908 Contract servicesfor persons with special needs Total 334,800Operations FA 63,889Other SA
5339 Coralville 5909 Associated capital bus maintenance (spare parts) Total 75,000Capital FA 60,000Misc SA
5339 Coralville 5910 Design and construct Intermodal Transportation Center/Phase II Total 10,500,000Capital FA 8,400,000Expansion SA
5339 Coralville 5911 Construct new transit facility (Phase II) Total 1,500,000Capital FA 1,200,000Expansion SA
5339 Coralville 5912 Two passenger shelters and associated improvements Total 14,000Capital FA 11,200Replacement SA
5339 Coralville 5913 Three passenger shelters and associated improvements Total 21,000Capital FA 16,800Expansion SA
306
MPO-28 / MPOJC (39 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Coralville 5914 Shop equipment for transit maintenance (armature lathe, misc.) Total 75,000Capital FA 60,000Expansion SA
5339 Coralville 5935 Light Duty Bus (176" wb) Total 99,197Capital VSS, Low Floor FA 84,318Expansion SA
5339 Coralville 5936 Light Duty Bus (176" wb) Total 99,197Capital VSS, Low Floor FA 84,318Expansion SA
5339 Coralville 5937 Light Duty Bus (176" wb) Total 99,197Capital VSS, Low Floor FA 84,318Expansion SA
5339 Coralville 5938 Light Duty Bus (176" wb) Total 99,197Capital VSS, Low Floor FA 84,318Expansion SA
5339 Coralville 5939 Heavy Duty Bus (40-42 ft.) Total 507,706Capital Diesel, UFRC, VSS, Low Floor FA 431,550Expansion SA
5339 Coralville 5940 Heavy Duty Bus (40-42 ft.) Total 507,706Capital Diesel, UFRC, VSS, Low Floor FA 431,550Expansion SA
5339 Coralville 5941 Heavy Duty Bus (40-42 ft.) Total 507,706Capital Diesel, UFRC, VSS, Low Floor FA 431,550Expansion SA
5339 Coralville 5942 Heavy Duty Bus (40-42 ft.) Total 507,706Capital Diesel, UFRC, VSS, Low Floor FA 431,550Replacement Unit #: 108 SA
5339 Iowa City 5944 Light Duty Bus (176" wb) Total 99,197Capital VSS, Low Floor FA 84,318Expansion SA
5339 Iowa City 5945 Light Duty Bus (176" wb) Total 99,197Capital VSS, Low Floor FA 84,318Expansion SA
5339 Iowa City 5946 Heavy Duty Bus (40-42 ft.) Total 1,107,238Capital UFRC, VSS, Low Floor FA 833,095Replacement Unit #: 637U SA
5339 Iowa City 5947 Heavy Duty Bus (40-42 ft.) Total 1,107,238Capital UFRC, VSS, Low Floor FA 833,095Replacement Unit #: 638U SA
5339 Iowa City 5948 Heavy Duty Bus (40-42 ft.) Total 1,107,238Capital UFRC, VSS, Low Floor FA 833,095Replacement Unit #: 657 SA
5339 Iowa City 5949 Heavy Duty Bus (40-42 ft.) Total 1,107,238Capital UFRC, VSS, Low Floor FA 833,095Replacement Unit #: 659 SA
307
MPO-28 / MPOJC (39 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Iowa City 5950 Heavy Duty Bus (40-42 ft.) Total 1,107,238Capital UFRC, VSS, Low Floor FA 941,152Replacement Unit #: 656 SA
5339 Iowa City 5951 Heavy Duty Bus (40-42 ft.) Total 1,107,238Capital UFRC, VSS, Low Floor FA 941,152Replacement Unit #: 658 SA
5339 Iowa City 5952 Heavy Duty Bus (40-42 ft.) Total 1,107,238Capital UFRC, VSS, Low Floor FA 941,152Replacement Unit #: 660 SA
STA, 5307 Iowa City 5926 General Operations/Maintenance/Administration/Planning Total 8,050,895Operations FA 1,900,000Misc SA 516,813
5310 Iowa City 5927 Contracted services for persons with special needs Total 1,800,000Operations FA 233,124Misc SA
5339 Iowa City 5928 Passenger shelters and associated improvements Total 50,000Capital FA 40,000Replacement SA
5339 Iowa City 5929 Associated capital bus maintenance (spare parts) Total 338,000Capital FA 270,400Replacement SA
5339 Iowa City 5930 New transit maintenance/bus storage facility Total 20,000,000Capital FA 16,000,000Replacement SA
5339 Iowa City 5934 Light Duty Bus (176" wb) Total 99,197Capital VSS, Low Floor FA 84,318Replacement Unit #: 810 SA
308
Fund Sponsor Transit #Expense Class Project Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
Total 45,576 45,576 45,576 45,576FA 36,461 36,461 36,461 36,461SATotal 75,000FASA 60,000Total 9,513,971FA 7,547,337SATotal 3,761,249FA 1,694,749SA 371,751Total 76,000FA 60,800SATotal 150,000FA 120,000SATotal 119,846
FA 95,877SATotal 10,000
FA 5,000SATotal 170,000FA 136,000SATotal 85,000FASA 68,000Total 30,000FA 24,000SATotal 45,000FA 36,000SATotal 60,000FA 48,000SATotal 199,800FA 169,830SATotal 199,800FA 169,830
Replacement Unit #: 1325 SA
MPO-29 / SIMPCO (25 Projects)
5311 MPO-29 1313PlanningMisc
FTA Planning
PTIG, 5307 Sioux City 5688OperationsOther
MLK Structural Rehabilitation, concrete sealing, and concrete repairs
5339 Sioux City 5691CapitalReplacement
New Transit Maintenance & Storage Facility
STA, 5307 Sioux City 5812OperationsOther
Governor's apportionment for 5307 from IA, NE, & SD plus Iowa STA
5310 Sioux City 5814CapitalReplacement
Light Duty Bus (176" wb)UFRC, VSSUnit #: 1349
5307, 5339 Sioux City 5815CapitalOther
Automated Fare Collection Hardware, Software & Technology
5310 Sioux City 5816Capital Expansion
Capital Expenditure for ADA improvements to Bus Shelters and Bus StopAreas
5310 Sioux City 5817Operations Other
Projects & Svc Exceeding ADA Requirements, Saturday SSC DemandResponse Rides
5307 Sioux City 5818CapitalReplacement
Garage Parking Lot concrete replacement - Phase III
PTIG, 5307 Sioux City 5819CapitalReplacement
MLK Heat Pump Replacement: five units
PTIG, 5307 Sioux City 5820CapitalReplacement
MLK Boiler and Chiller repairs and replacement
5307 Sioux City 5821CapitalReplacement
New ProjectUnit #: 1303
5307 Sioux City 5823CapitalReplacement
New ProjectUnit #: 1304
5339, 5307 Sioux City 5825CapitalReplacement
Medium Duty Bus (29-32 ft.)Diesel, UFRC, VSS, Low FloorUnit #: 1324
5339, 5307 Sioux City 5826Capital
Medium Duty Bus (29-32 ft.)Diesel, UFRC, VSS, Low Floor
309
Fund Sponsor Transit #Expense Class Project Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
Total 199,800FA 169,830SATotal 459,200FA 390,320SATotal 469,200FA 398,820SATotal 469,200FA 398,820SATotal 469,200FA 398,820SATotal 469,200FA 398,820SATotal 493,300FA 419,305SATotal 493,300FA 419,305SATotal 493,300FA 419,305SATotal 493,300FA 419,305SA
MPO-29 / SIMPCO (25 Projects)
5339, 5307 Sioux City 5827CapitalReplacement
Medium Duty Bus (29-32 ft.) Diesel, UFRC, VSS, Low Floor Unit #: 1326
5339, 5307 Sioux City 5828CapitalReplacement
Heavy Duty Bus (35-39 ft.)Unit #: 1331
5339, 5307 Sioux City 5829CapitalReplacement
Heavy Duty Bus (35-39 ft.)Diesel, UFRC, VSS, Low FloorUnit #: 1332
5339, 5307 Sioux City 5830CapitalReplacement
Heavy Duty Bus (35-39 ft.)Diesel, UFRC, VSS, Low FloorUnit #: 1338
5339, 5307 Sioux City 5831CapitalReplacement
Heavy Duty Bus (35-39 ft.)Diesel, UFRC, VSS, Low FloorUnit #: 1339
5339 Sioux City 5832CapitalReplacement
Heavy Duty Bus (35-39 ft.)Diesel, UFRC, VSS, Low FloorUnit #: 1340
5339, 5307 Sioux City 5833CapitalReplacement
Heavy Duty Bus (40-42 ft.)Diesel, UFRC, VSS, Low FloorUnit #: 1341
5339, 5307 Sioux City 5835CapitalReplacement
Heavy Duty Bus (40-42 ft.)Diesel, UFRC, VSS, Low FloorUnit #: 1352
5339, 5307 Sioux City 5836CapitalReplacement
Heavy Duty Bus (40-42 ft.)Diesel, UFRC, VSS, Low FloorUnit #: 1353
5339 Sioux City 5837CapitalReplacement
Heavy Duty Bus (40-42 ft.)Diesel, UFRC, VSS, Low FloorUnit #: 1354
310
MPO-30 / INRCOG (36 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Waterloo MET 5839 Light Duty Bus (176" wb) Total 104,500Capital Diesel, VSS FA 88,825Replacement Unit #: 412 SA
5339 Waterloo MET 5840 Heavy Duty Bus (30-34 ft.) Total 461,800Capital Diesel, UFRC, VSS, Low Floor FA 392,530Replacement Unit #: 902 SA
5339 Waterloo MET 5841 Heavy Duty Bus (30-34 ft.) Total 461,800Capital Diesel, UFRC, VSS, Low Floor FA 392,530Replacement Unit #: 901 SA
5339 Waterloo MET 5842 Light Duty Bus (176" wb) Total 104,500Capital Diesel, VSS FA 88,825Replacement Unit #: 116 SA
5339 Waterloo MET 5843 Light Duty Bus (176" wb) Total 104,500Capital Diesel, VSS FA 88,825Replacement Unit #: 216 SA
5339 Waterloo MET 5844 Heavy Duty Bus (30-34 ft.) Total 461,800Capital Diesel, VSS FA 392,530Replacement Unit #: 301 SA
5339 Waterloo MET 5845 Light Duty Bus (176" wb) Total 104,500Capital Diesel, VSS FA 88,825Replacement Unit #: 415 SA
5339 Waterloo MET 5846 Light Duty Bus (176" wb) Total 104,500Capital Diesel, VSS FA 88,825Replacement Unit #: 515 SA
5339 Waterloo MET 5847 Light Duty Bus (176" wb) Total 104,500Capital Diesel, VSS FA 88,825Replacement Unit #: 615 SA
5339 Waterloo MET 5694 Heavy Duty Bus (30-34 ft.) Total 461,800Capital Diesel, UFRC, VSS, Low Floor FA 392,530Replacement Unit #: 110 SA
5339 Waterloo MET 5695 Medium Duty Bus (29-32 ft.) Total 199,800Capital Diesel, UFRC, VSS FA 169,830Replacement Unit #: 512 SA
5339 Waterloo MET 5696 Heavy Duty Bus (30-34 ft.) Total 461,800Capital Diesel, UFRC, VSS, Low Floor FA 392,530Replacement Unit #: 210D SA
5339 Waterloo MET 5697 Heavy Duty Bus (30-34 ft.) Total 461,800Capital VSS FA 392,530Replacement Unit #: 310D SA
5339 Waterloo MET 5698 Light Duty Bus (176" wb) Total 104,500Capital Diesel, VSS FA 88,825Replacement Unit #: 111 SA
5339 Waterloo MET 5699 Heavy Duty Bus (30-34 ft.) Total 461,800Capital Diesel, UFRC, VSS FA 392,530Replacement Unit #: 0503 SA
311
MPO-30 / INRCOG (36 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Waterloo MET 5700 Heavy Duty Bus (30-34 ft.) Total 461,800Capital VSS FA 392,530Replacement Unit #: 702 SA
5303, 5303 Waterloo MET 2128 Planning Total 120,000 120,000 120,000 120,000Planning FA 96,000 96,000 96,000 96,000Other SA
5310 Waterloo MET 2278 Preventative Maintenance Total 170,514 94,000 94,000 94,000Capital FA 136,411 75,200 75,200 75,200Other SA
STA Waterloo MET 2279 State Transit Operating Total 335,000 340,000 345,000 375,000Operations FAOther SA 335,000 340,000 345,000 375,000
5307 Waterloo MET 1168 General Operations/Maintenance/Administration/Planning Total 5,200,000 5,400,000 5,600,000 6,000,000Operations FA 2,600,000 2,700,000 2,800,000 3,000,000Misc SA
5339 Waterloo MET 4320 Heavy Duty Bus (35-39 ft.) Total 472,888Capital Diesel, UFRC, VSS, Low Floor FA 401,955Replacement Unit #: 903 SA
5339 Waterloo MET 4324 Heavy Duty Bus (35-39 ft.) Total 482,888Capital Diesel, UFRC, VSS, Low Floor FA 410,455Replacement Unit #: 410 SA
5339 Waterloo MET 4325 Heavy Duty Bus (35-39 ft.) Total 482,888Capital Diesel, UFRC, VSS, Low Floor FA 410,455Replacement Unit #: 510D SA
5339 Waterloo MET 5279 Medium Duty Bus (to 28 ft.) Total 185,000Capital Diesel, VSS FA 157,250Replacement Unit #: 115 SA
5339 Waterloo MET 5280 Medium Duty Bus (to 28 ft.) Total 185,000Capital Diesel, VSS FA 157,250Replacement Unit #: 215 SA
5339 Waterloo MET 5848 Light Duty Bus (176" wb) Total 104,500Capital Diesel, VSS FA 88,825Replacement Unit #: 218 SA
5339 Waterloo MET 5849 Medium Duty Bus (to 28 ft.) Total 187,449Capital Diesel, VSS FA 159,332Replacement Unit #: 315 SA
5339 Waterloo MET 5850 Light Duty Bus (176" wb) Total 90,500Capital FA 76,925Replacement Unit #: 117 SA
5339 Waterloo MET 5701 Heavy Duty Bus (30-34 ft.) Total 475,268Capital Diesel, UFRC, VSS, Low Floor FA 403,978Replacement Unit #: 113 SA
5339 Waterloo MET 5852 Light Duty Bus (176" wb) Total 104,500Capital Diesel, VSS FA 88,825Replacement Unit #: 219 SA
312
MPO-30 / INRCOG (36 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Waterloo MET 5276 Heavy Duty Bus (30-34 ft.) Total 478,908Capital Diesel, UFRC, VSS, Low Floor FA 407,072Replacement Unit #: 112 SA
5339 Waterloo MET 5277 Heavy Duty Bus (30-34 ft.) Total 478,908Capital Diesel, UFRC, VSS, Low Floor FA 407,072Replacement Unit #: 212 SA
5339 Waterloo MET 5278 Heavy Duty Bus (30-34 ft.) Total 478,908Capital Diesel, UFRC, VSS, Low Floor FA 407,072Replacement Unit #: 312 SA
5339 Waterloo MET 5702 Heavy Duty Bus (30-34 ft.) Total 495,268Capital Diesel, UFRC, VSS, Low Floor FA 420,978Replacement Unit #: 114 SA
5339 Waterloo MET 5853 Light Duty Bus (176" wb) Total 104,500Capital Diesel, VSS FA 88,825Replacement Unit #: 119 SA
5339 Waterloo MET 5854 Light Duty Bus (176" wb) Total 104,500Capital Diesel, VSS FA 88,825Replacement Unit #: 120 SA
313
RPA-01 (16 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
STA, PTIG,5311
Region 1 /NEICAC-Transit
4179 General Operations/Maintenance/Administration Total 1,083,856 1,140,000 1,151,000Operations FA 620,976 690,000 700,000Other SA 462,880 450,000 451,000
5339 Region 1 /NEICAC-Transit
4648 Light Duty Bus (176" wb) Total 93,198Capital VSS FA 79,219Replacement Unit #: 10188 SA
5339 Region 1 /NEICAC-Transit
4637 Light Duty Bus (176" wb) Total 93,198Capital VSS FA 79,219Replacement Unit #: 10181 SA
5339 Region 1 /NEICAC-Transit
4638 Minivan Total 54,065Capital VSS FA 45,955Replacement Unit #: 12051 SA
5339 Region 1 /NEICAC-Transit
4643 Light Duty Bus (176" wb) Total 93,198Capital VSS FA 79,219Replacement Unit #: 10186 SA
5339 Region 1 /NEICAC-Transit
4649 Light Duty Bus (176" wb) Total 93,700Capital VSS FA 79,645Replacement Unit #: 11184 SA
5339 Region 1 /NEICAC-Transit
4644 Light Duty Bus (176" wb) Total 93,700Capital VSS FA 79,645Replacement Unit #: 10187 SA
5339 Region 1 /NEICAC-Transit
4645 Minivan Total 53,500Capital VSS FA 45,475Replacement Unit #: 12053 SA
5339 Region 1 /NEICAC-Transit
4646 Minivan Total 53,500Capital VSS FA 45,475Replacement Unit #: 12054 SA
5339 Region 1 /NEICAC-Transit
4639 Minivan Total 55,000Capital VSS FA 46,750Replacement Unit #: 12052 SA
5339 Region 1 /NEICAC-Transit
4642 Light Duty Bus (176" wb) Total 93,700Capital VSS FA 79,645Replacement Unit #: 10185 SA
PTIG Region 1 /NEICAC-Transit
1220 Maintenance Facility HVAC Upgrade Total 100,000Capital FARehabilitation SA 80,000
5339 Region 1 /NEICAC-Transit
4651 Light Duty Bus (176" wb) Total 93,700Capital VSS FA 79,645Replacement Unit #: 12186 SA
5339 Region 1 /NEICAC-Transit
4652 Light Duty Bus (176" wb) Total 93,700Capital VSS FA 79,645Replacement Unit #: 12187 SA
5339 Region 1 /NEICAC-Transit
4653 Minivan Total 53,500Capital VSS FA 45,475Replacement Unit #: 14054 SA
314
RPA-01 (16 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Region 1 /NEICAC-Transit
4654 Minivan Total 53,500Capital VSS FA 45,475Replacement Unit #: 14055 SA
315
RPA-02 (34 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Mason City 4570 Light Duty Bus (176" wb) Total 111,500Capital Diesel, UFRC, VSS FA 94,775Replacement Unit #: #47 SA
STA, 5311 Mason City 4697 General Operations Total 1,560,138 1,600,795 1,642,611 1,685,620Operations FA 626,407 645,199 664,555 684,492Other SA 307,324 310,397 313,501 316,636
5339 Mason City 4837 Light Duty Bus (176" wb) Total 111,500Capital Diesel, UFRC, VSS FA 94,775Replacement Unit #: 46 SA
5339 Mason City 4839 Light Duty Bus (176" wb) Total 111,500Capital Diesel, UFRC, VSS FA 94,775Replacement Unit #: 45 SA
5339 Region 2 / NIARTS 4853 Light Duty Bus (176" wb) Total 107,197Capital Diesel, VSS FA 91,118Replacement Unit #: D078 SA
5339 Region 2 / NIARTS 4854 Light Duty Bus (176" wb) Total 107,197Capital Diesel, VSS FA 91,118Replacement Unit #: D079 SA
5339 Region 2 / NIARTS 4858 Light Duty Bus (158" wb) Total 101,637Capital Diesel, VSS FA 86,391Replacement Unit #: W005 SA
5339 Region 2 / NIARTS 4859 Light Duty Bus (176" wb) Total 107,198Capital Diesel, VSS FA 91,118Replacement Unit #: D077 SA
5339 Region 2 / NIARTS 4861 Light Duty Bus (176" wb) Total 107,197Capital Diesel, VSS FA 91,118Replacement Unit #: D076 SA
5339 Region 2 / NIARTS 4862 Light Duty Bus (158" wb) Total 101,637Capital Diesel, VSS FA 86,391Replacement Unit #: U003 SA
5339 Region 2 / NIARTS 4864 Light Duty Bus (158" wb) Total 101,636Capital Diesel, VSS FA 86,391Replacement Unit #: D071 SA
STA, 5311,5310
Region 2 / NIARTS 1238 General Operations/Maintenance/Administration Total 2,800,074 2,940,078 3,087,082 3,241,436Operations FA 779,371 818,340 859,257 902,220Misc SA 453,486 476,160 499,968 524,966
5339 Region 2 / NIARTS 2077 Light Duty Bus (158" wb) Total 101,636Capital Diesel, VSS FA 86,391Replacement Unit #: 9010 SA
5339 Region 2 / NIARTS 2808 Light Duty Bus (158" wb) Total 101,636Capital Diesel, VSS FA 86,391Replacement Unit #: D069 SA
5339 Region 2 / NIARTS 2815 Light Duty Bus (158" wb) Total 101,637Capital Diesel, VSS FA 86,391Replacement Unit #: D070 SA
316
RPA-02 (34 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Region 2 / NIARTS 5738 Light Duty Bus (138" wb) Total 99,474Capital Diesel, VSS FA 84,553Replacement Unit #: B021 SA
5339 Region 2 / NIARTS 5739 Light Duty Bus (176" wb) Total 107,198Capital Diesel, VSS FA 91,118Replacement Unit #: 9015 SA
5339 Region 2 / NIARTS 6043 Light Duty Bus (138" wb) Total 99,474Capital Diesel, VSS FA 84,553Replacement Unit #: B019 SA
5339 Region 2 / NIARTS 6044 Light Duty Bus (158" wb) Total 101,636Capital Diesel, VSS FA 86,391Replacement Unit #: 9022 SA
5339 Region 2 / NIARTS 2816 Light Duty Bus (176" wb) Total 107,197Capital Diesel, VSS FA 91,118Replacement Unit #: D074 SA
5339 Region 2 / NIARTS 2824 Light Duty Bus (158" wb) Total 101,636Capital Diesel, VSS FA 86,391Replacement Unit #: D067 SA
5339 Region 2 / NIARTS 4865 Light Duty Bus (158" wb) Total 101,636Capital Diesel, VSS FA 86,391Replacement Unit #: T001 SA
5339 Region 2 / NIARTS 4867 Light Duty Bus (158" wb) Total 101,636Capital Diesel, VSS FA 86,391Replacement Unit #: D073 SA
5339 Region 2 / NIARTS 4868 Light Duty Bus (158" wb) Total 101,636Capital Diesel, VSS FA 86,391Replacement Unit #: 1001 SA
5339 Region 2 / NIARTS 4869 Light Duty Bus (158" wb) Total 101,636Capital Diesel, VSS FA 86,391Replacement Unit #: 1002 SA
5339 Region 2 / NIARTS 4863 Light Duty Bus (158" wb) Total 99,100Capital Diesel, VSS FA 84,235Replacement Unit #: M006 SA
5339 Mason City 4876 Light Duty Bus (176" wb) Total 112,198Capital Diesel, UFRC, VSS FA 95,368Replacement Unit #: 49 SA
5339 Mason City 4877 Light Duty Bus (176" wb) Total 112,198Capital Diesel, UFRC, VSS FA 95,368Replacement Unit #: 50 SA
5339 Mason City 5430 Light Duty Bus (176" wb) Total 112,198Capital Diesel, UFRC, VSS FA 95,368Replacement Unit #: 56 SA
5339 Mason City 4878 Light Duty Bus (176" wb) Total 112,198Capital Diesel, UFRC, VSS FA 95,368Replacement Unit #: 51 SA
317
RPA-02 (34 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Mason City 4879 Light Duty Bus (176" wb) Total 112,198Capital Diesel, UFRC, VSS FA 95,368Replacement Unit #: 52 SA
5339 Mason City 4880 Light Duty Bus (176" wb) Total 112,198Capital Diesel, UFRC, VSS FA 95,368Replacement Unit #: 53 SA
5339 Mason City 4881 Light Duty Bus (176" wb) Total 112,198Capital Diesel, UFRC, VSS FA 95,368Replacement Unit #: 54 SA
5339 Mason City 4882 Light Duty Bus (176" wb) Total 112,198Capital Diesel, UFRC, VSS FA 95,368Replacement Unit #: 55 SA
318
RPA-03 (29 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5311 Region 3 / RIDES 5997 New Project TotalOperations FAOther SA
STA, STP,5311
Region 3 / RIDES 2890 General Operations/Maintenance/Administation Total 3,265,000 3,140,000 3,300,000 3,150,000Operations FA 765,000 640,000 750,000 650,000Misc SA 500,000 500,000 550,000 500,000
5339 Region 3 / RIDES 4371 Light Duty Bus (158" wb) Total 94,600Capital VSS FA 80,410Replacement Unit #: 0906 SA
5339 Region 3 / RIDES 4372 Light Duty Bus (158" wb) Total 94,600Capital VSS FA 80,410Replacement Unit #: 0929 SA
5339 Region 3 / RIDES 4373 Light Duty Bus (158" wb) Total 94,600Capital VSS FA 80,410Replacement Unit #: 0905 SA
5339 Region 3 / RIDES 4374 Light Duty Bus (158" wb) Total 94,600Capital VSS FA 80,410Replacement Unit #: 0925 SA
5339 Region 3 / RIDES 4375 Light Duty Bus (176" wb) Total 100,500Capital VSS FA 85,425Replacement Unit #: 0932 SA
5339 Region 3 / RIDES 4376 Light Duty Bus (176" wb) Total 100,500Capital VSS FA 85,425Replacement Unit #: 0902 SA
5339 Region 3 / RIDES 4377 Non-ADA LD bus (138" wb) Total 92,500Capital VSS FA 78,625Replacement Unit #: 0919 SA
5339 Region 3 / RIDES 4378 Light Duty Bus (158" wb) Total 94,600Capital VSS FA 80,410Replacement Unit #: 0928 SA
5339 Region 3 / RIDES 4379 Light Duty Bus (158" wb) Total 94,600Capital VSS FA 80,410Replacement Unit #: 0924 SA
STP, 5339 Region 3 / RIDES 4381 Minivan Total 56,000Capital VSS FA 44,800Expansion SA
STP, 5339 Region 3 / RIDES 4382 Minivan Total 56,000Capital VSS FA 44,800Expansion SA
5339 Region 3 / RIDES 6004 Light Duty Bus (138" wb) Total 91,473Capital VSS FA 77,752Replacement Unit #: 0923 SA
5339 Region 3 / RIDES 6007 Light Duty Bus (138" wb) Total 91,473Capital VSS FA 77,752Replacement Unit #: 0920 SA
319
RPA-03 (29 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Region 3 / RIDES 6009 Light Duty Bus (176" wb) Total 99,197Capital VSS FA 84,318Replacement Unit #: 0914 SA
5339 Region 3 / RIDES 4884 Light Duty Bus (158" wb) Total 96,500Operations VSS FA 82,025Replacement Unit #: 0926 SA
5339 Region 3 / RIDES 4885 Light Duty Bus (176" wb) Total 103,500Operations VSS FA 87,975Replacement Unit #: 0917 SA
5339 Region 3 / RIDES 4886 Light Duty Bus (158" wb) Total 96,500Operations VSS FA 82,025Replacement Unit #: 0931 SA
5339 Region 3 / RIDES 4887 Minivan Total 58,000Operations VSS FA 49,300Replacement Unit #: 1201 SA
5339 Region 3 / RIDES 4888 Light Duty Bus (176" wb) Total 103,500Operations VSS FA 87,975Replacement Unit #: 0915 SA
5339 Region 3 / RIDES 5420 Minivan Total 55,000Capital VSS FA 46,750Replacement Unit #: 1501 SA
5339 Region 3 / RIDES 5421 Light Duty Bus (158" wb) Total 91,100Capital VSS FA 77,435Replacement Unit #: 1602 SA
5339 Region 3 / RIDES 5422 Minivan Total 55,000Capital VSS FA 46,750Replacement Unit #: 1704 SA
5339 Region 3 / RIDES 5423 Minivan Total 55,000Capital VSS FA 46,750Replacement Unit #: 1703 SA
5339 Region 3 / RIDES 5424 Minivan Total 55,000Capital VSS FA 46,750Replacement Unit #: 1702 SA
5339 Region 3 / RIDES 5425 Minivan Total 55,000Capital VSS FA 46,750Replacement Unit #: 1701 SA
5339 Region 3 / RIDES 5426 Minivan Total 55,000Capital VSS FA 46,750Replacement Unit #: 1700 SA
5339 Region 3 / RIDES 5427 Minivan Total 55,000Capital VSS FA 46,750Replacement Unit #: 1801 SA
320
RPA-04 (21 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
TIGER Region 4 / SRTS 6037 Construction of new Operations and Bus Storage Facility (BUILD GRANT) Total 7,001,000Capital FA 7,000,000Expansion SA
5339 Region 4 / SRTS 5897 Light Duty Bus (176" wb) Total 96,500Capital VSS FA 82,025Replacement Unit #: 7441 SA
5339 Region 4 / SRTS 5898 Light Duty Bus (176" wb) Total 96,500Capital VSS FA 82,025Replacement Unit #: 7432 SA
5339 Region 4 / SRTS 5899 Light Duty Bus (176" wb) Total 96,500Capital VSS FA 82,025Replacement Unit #: 7351 SA
5339 Region 4 / SRTS 5900 Minivan Total 55,000Capital VSS FA 46,750Replacement Unit #: 7211 SA
5339 Region 4 / SRTS 5901 Minivan Total 55,000Capital VSS FA 46,750Replacement Unit #: 7141 SA
5339 Region 4 / SRTS 5888 Light Duty Bus (176" wb) Total 96,500Capital VSS FA 82,025Replacement Unit #: 7541 SA
5339 Region 4 / SRTS 5889 Light Duty Bus (176" wb) Total 96,500Capital VSS FA 82,025Replacement Unit #: 7550A SA
5339 Region 4 / SRTS 5890 Light Duty Bus (176" wb) Total 96,500Capital VSS FA 82,025Replacement Unit #: 7556 SA
5339 Region 4 / SRTS 5891 Light Duty Bus (176" wb) Total 96,500Capital VSS FA 82,025Replacement Unit #: 7558 SA
5339 Region 4 / SRTS 5892 Light Duty Bus (176" wb) Total 96,500Capital VSS FA 82,025Replacement Unit #: 7557 SA
5339 Region 4 / SRTS 5893 Light Duty Bus (176" wb) Total 96,500Capital VSS FA 82,025Replacement Unit #: 7559 SA
5311 RPA-04 2132 FTA Planning Total 30,418 30,418 30,418 30,418Planning FA 24,335 24,335 24,335 24,335Misc SA
5339 Region 4 / SRTS 5894 Light Duty Bus (176" wb) Total 99,000Capital VSS FA 84,150Replacement Unit #: 7560 SA
5339 Region 4 / SRTS 5895 Light Duty Bus (176" wb) Total 99,000Capital VSS FA 84,150Replacement Unit #: 7561 SA
321
RPA-04 (21 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Region 4 / SRTS 5896 Light Duty Bus (176" wb) Total 99,000Capital VSS FA 84,150Replacement Unit #: 7562 SA
STP Region 4 / SRTS 5128 Light Duty Bus (176" wb) with vss Total 99,000Capital FA 84,150Expansion SA
5339 Region 4 / SRTS 5902 Light Duty Bus (176" wb) Total 102,500Capital VSS FA 87,125Replacement Unit #: 7563 SA
5339 Region 4 / SRTS 5903 Light Duty Bus (176" wb) Total 102,500Capital VSS FA 87,125Replacement Unit #: 7564 SA
5339 Region 4 / SRTS 5904 Light Duty Bus (176" wb) Total 102,500Capital VSS FA 87,125Replacement Unit #: 7565 SA
5339 Region 4 / SRTS 5905 Light Duty Bus (176" wb) Total 102,500Capital VSS FA 87,125Replacement Unit #: 7566 SA
322
RPA-05 (20 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
STA, 5311 Fort Dodge 1331 General Operations/Maintenance/Administration Total 612,122 636,607 662,071 688,554Operations FA 381,629 396,894 412,770 429,281Misc SA 230,493 239,713 249,301 259,273
5311 Fort Dodge 3261 Intercity Bus Marketing Funds Total 9,400 9,400 9,400 9,400Operations FA 7,500 7,500 7,500 7,500Misc SA
5339 Fort Dodge 6029 Minivan Total 56,564Capital VSS FA 48,080Replacement Unit #: FD64 SA
5339 Fort Dodge 6030 Light Duty Bus (158" wb) Total 100,636Capital UFRC, VSS FA 85,541Replacement Unit #: FD63 SA
5339 Region 5 / MIDAS 6056 Light Duty Bus (176" wb) Total 99,197Capital VSS FA 84,318Replacement Unit #: 10-3 SA
5339 Region 5 / MIDAS 5544 Light Duty Bus (176" wb) Total 99,197Capital VSS FA 84,318Replacement Unit #: 09-2 SA
5307 Region 5 / MIDAS 1350 RPA Transportation Planning Total 33,853 35,207 36,616 38,081Planning FA 27,082 28,165 29,292 30,464Misc SA
STA, 5311 Region 5 / MIDAS 1314 General Operations/Maintenance/Administration Total 710,756 739,186 768,754 799,504Operations FA 349,535 363,516 378,057 393,179Misc SA 361,221 375,670 390,697 406,325
5339 Fort Dodge 6031 Light Duty Bus (176" wb) Total 110,446Capital UFRC, VSS FA 93,879Replacement Unit #: FD62 SA
5339 Fort Dodge 6032 Medium Duty Bus (29-32 ft.) Total 213,459Capital UFRC, VSS FA 181,440Replacement Unit #: FD60 SA
5339 Region 5 / MIDAS 6023 Light Duty Bus (176" wb) Total 103,166Capital VSS FA 87,691Replacement Unit #: 09-5 SA
5339 Region 5 / MIDAS 6024 Light Duty Bus (176" wb) Total 103,166Capital VSS FA 87,691Replacement Unit #: 09-3 SA
5339 Fort Dodge 6058 Light Duty Bus (176" wb) Total 114,864Capital UFRC, VSS FA 97,634Replacement Unit #: FD66 SA
5339 Fort Dodge 6059 Light Duty Bus (176" wb) Total 114,864Capital UFRC, VSS FA 97,634Replacement Unit #: FD67 SA
5339 Region 5 / MIDAS 6025 Light Duty Bus (176" wb) Total 107,293Capital VSS FA 91,199Replacement Unit #: 09-7 SA
323
RPA-05 (20 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Region 5 / MIDAS 6026 Light Duty Bus (176" wb) Total 107,293Capital VSS FA 91,199Replacement Unit #: 09-4 SA
5339 Fort Dodge 6060 Light Duty Bus (176" wb) Total 119,458Capital UFRC, VSS FA 101,540Replacement Unit #: FD68 SA
5339 Fort Dodge 6057 Light Duty Bus (176" wb) Total 119,458Capital UFRC, VSS FA 101,540Replacement Unit #: FD70 SA
5339 Region 5 / MIDAS 6027 Light Duty Bus (176" wb) Total 111,584Capital VSS FA 94,847Replacement Unit #: 09-8 SA
5339 Region 5 / MIDAS 6028 Light Duty Bus (158" wb) Total 105,329Capital VSS FA 89,530Replacement Unit #: 08-4 SA
324
RPA-06 (8 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
STA, 5311 Marshalltown 2134 General Operations/Maintenance/Administration Total 764,757 766,000 769,000 772,000Operations FA 211,895 212,000 213,000 214,000Other SA 178,862 179,000 180,000 181,000
STA, 5311 Region 6 /PeopleRides
1280 General Operations/Maintenance/Administration Total 1,000,815 1,007,000 1,014,000 1,021,000Operations FA 174,390 175,000 176,000 177,000Misc SA 236,425 237,000 238,000 239,000
5339 Region 6 /PeopleRides
5075 Conversion Van Total 56,227Capital FA 47,793Replacement Unit #: 412 SA
5339 Region 6 /PeopleRides
5076 Light Duty Bus (158" wb) Total 87,636Capital FA 74,491Replacement Unit #: 312 SA
5339 Region 6 /PeopleRides
5505 Light Duty Bus (158" wb) Total 56,228Capital FA 47,793Replacement Unit #: 114A SA
5339 Region 6 /PeopleRides
5077 Conversion Van Total 57,100Capital VSS FA 48,535Replacement Unit #: 214 SA
5339 Region 6 /PeopleRides
5998 Light Duty Bus (158" wb) Total 87,636Capital FA 74,491Replacement Unit #: 115 SA
5339 Region 6 /PeopleRides
5999 Light Duty Bus (176" wb) Total 93,197Capital FA 79,218Replacement Unit #: 215 SA
325
RPA-07 (18 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Region 7 / INRTC 2660 Light Duty Bus (176" wb) Total 97,500Capital VSS FA 82,875Replacement Unit #: 0906 SA
5339 Region 7 / INRTC 2661 Light Duty Bus (176" wb) Total 97,500Capital VSS FA 82,875Replacement Unit #: 0907 SA
5339 Region 7 / INRTC 2663 Light Duty Bus (176" wb) Total 97,500Capital VSS FA 82,875Replacement Unit #: 0909 SA
STA, 5311 Region 7 / INRTC 1377 General Operations/Maintenance/Administration Total 1,176,124 1,278,191 1,315,601 1,315,601Operations FA 320,253 394,867 414,610 414,610Misc SA 328,531 345,438 352,347 352,347
5307 Region 7 / INRTC 3499 Light Duty Bus (176" wb) Total 97,500Capital VSS FA 82,875Replacement Unit #: 1201 SA
5311 Region 7 / INRTC 3500 RPA Transportation Planning Total 39,000 39,000 39,000 39,000Planning FA 31,200 31,200 31,200 31,200Misc SA
5339 Region 7 / INRTC 3496 Light Duty Bus (176" wb) Total 97,500Capital VSS FA 82,875Replacement Unit #: 0911 SA
5339 Region 7 / INRTC 3497 Light Duty Bus (176" wb) Total 97,500Capital VSS FA 82,875Replacement Unit #: 0912 SA
5339 Region 7 / INRTC 3498 Light Duty Bus (176" wb) Total 99,450Capital VSS FA 84,532Replacement Unit #: 1001 SA
5339 Region 7 / INRTC 3860 Light Duty Bus (176" wb) Total 99,450Capital VSS FA 84,532Replacement Unit #: 1401 SA
5339 Region 7 / INRTC 3861 Light Duty Bus (176" wb) Total 99,450Capital VSS FA 84,532Replacement Unit #: 1402 SA
5307 Region 7 / INRTC 5707 New Project Total 67,000Capital VSS FA 56,950Replacement Unit #: V061 SA
5339 Region 7 / INRTC 5282 New Project Total 99,450Capital Low Floor FA 84,533Replacement Unit #: 1601 SA
5339 Region 7 / INRTC 5283 New Project Total 99,450Capital Low Floor FA 84,533Replacement Unit #: 1801 SA
5339 Region 7 / INRTC 5284 New Project Total 99,450Capital FA 84,533Replacement Unit #: 1802 SA
326
RPA-07 (18 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5307 Region 7 / INRTC 5705 New Project Total 62,000Capital VSS FA 52,700Replacement Unit #: 1701 SA
5307 Region 7 / INRTC 5706 New Project Total 62,000Capital VSS FA 52,700Replacement Unit #: 1702 SA
5307 Region 7 / INRTC 5693 New Project Total 99,450Capital VSS FA 84,533Replacement Unit #: 1901 SA
327
RPA-08 (18 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
STA, 5311 Clinton 5955 Operations Total 2,337,472Operations FA 736,410Other SA 257,231
5339 Clinton 5956 Light Duty Bus (158" wb) Total 100,636Capital UFRC, VSS FA 85,541Replacement Unit #: 1256 SA
5339 Clinton 5957 Light Duty Bus (158" wb) Total 100,636Capital UFRC, VSS FA 85,541Replacement Unit #: 1152 SA
5339 Clinton 5958 Light Duty Bus (176" wb) Total 156,198Capital UFRC, VSS, Low Floor FA 132,768Replacement Unit #: 1255 SA
5339 Region 8 / RTA 5680 Light Duty Bus (176" wb) Total 99,197Capital VSS FA 84,318Replacement Unit #: 4484 SA
Region 8 / RTA 5681 Technological solution to coordinating transportation Total 100,000Capital FA 80,000Expansion SA
5339 Region 8 / RTA 3275 Light Duty Bus (176" wb) Total 94,500Capital VSS FA 80,325Replacement Unit #: 486 SA
STA, 5311 Region 8 / RTA 4406 Operations Total 624,837 624,837Operations FA 315,363 315,363Other SA 309,474 309,474
5339 Region 8 / RTA 5342 Minivan Total 55,500Capital VSS FA 47,175Replacement Unit #: 960 SA
5339 Region 8 / RTA 4007 Light Duty Bus (176" wb) Total 94,500Capital VSS FA 80,325Replacement Unit #: 983 SA
5339 Region 8 / RTA 4008 Light Duty Bus (176" wb) Total 94,500Capital VSS FA 75,600Replacement Unit #: 984 SA
5339 Region 8 / RTA 4830 Light Duty Bus (176" wb) Total 96,500Capital VSS FA 82,025Replacement Unit #: 302 SA
5339 Region 8 / RTA 4831 Light Duty Bus (176" wb) Total 96,500Capital VSS FA 82,025Replacement Unit #: 303 SA
5339 Region 8 / RTA 4826 Minivan Total 55,000Capital VSS FA 46,750Replacement Unit #: 773 SA
5339 Region 8 / RTA 4827 Minivan Total 55,000Capital VSS FA 46,750Replacement Unit #: 328 SA
328
RPA-08 (18 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Region 8 / RTA 4832 Light Duty Bus (176" wb) Total 96,500Capital VSS FA 82,025Replacement Unit #: 316 SA
5339 Region 8 / RTA 4828 Minivan Total 55,000Capital VSS FA 46,750Replacement Unit #: 684 SA
5339 Region 8 / RTA 4829 Minivan Total 55,000Capital VSS FA 46,750Replacement Unit #: 607 SA
329
RPA-09 (56 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Muscatine 4718 Light Duty Bus (176" wb) Total 106,605Capital UFRC, VSS FA 90,615Replacement Unit #: 251 SA
5339 Muscatine 4719 Light Duty Bus (176" wb) Total 106,605Capital UFRC, VSS FA 90,615Replacement Unit #: 252 SA
STA, 5311 Muscatine 4174 Transit Operations Total 1,109,300 1,139,900 1,174,097 1,209,300Operations FA 443,900 452,700 461,700 475,500Other SA 262,000 267,200 272,500 280,600
5339 Muscatine 6038 Light Duty Bus (158" wb) Total 101,040Capital UFRC, VSS FA 85,884Replacement Unit #: 247 SA
5339 Region 9 / RBT 5719 Light Duty Bus (158" wb) Total 93,637Capital VSS FA 79,591Replacement Unit #: 516 SA
5339 Region 9 / RBT 5720 Light Duty Bus (158" wb) Total 93,637Capital VSS FA 79,591Replacement Unit #: 517 SA
5339 Region 9 / RBT 5722 Light Duty Bus (158" wb) Total 93,637Capital VSS FA 79,591Replacement Unit #: 522 SA
5339 Region 9 / RBT 5723 Light Duty Bus (158" wb) Total 93,637Capital VSS FA 79,591Replacement Unit #: 523 SA
5339 Region 9 / RBT 5724 Light Duty Bus (158" wb) Total 93,637Capital VSS FA 79,591Replacement Unit #: 524 SA
5339 Region 9 / RBT 5726 Light Duty Bus (158" wb) Total 93,637Capital VSS FA 79,591Replacement Unit #: 526 SA
5339 Region 9 / RBT 5731 Light Duty Bus (158" wb) Total 93,637Capital VSS FA 79,591Replacement Unit #: 527 SA
5339 Region 9 / RBT 5732 Light Duty Bus (158" wb) Total 93,637Capital VSS FA 79,591Replacement Unit #: 528 SA
5339 Region 9 / RBT 5736 Light Duty Bus (158" wb) Total 93,637Capital VSS FA 79,591Replacement Unit #: 529 SA
5339 Region 9 / RBT 5737 Light Duty Bus (158" wb) Total 93,637Capital VSS FA 79,591Replacement Unit #: 530 SA
CMAQ Region 9 / RBT 4361 Light Duty Bus (176" wb) Total 99,198Capital VSS FA 84,318Replacement Unit #: 440 SA
330
RPA-09 (56 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
CMAQ Region 9 / RBT 4362 Light Duty Bus (176" wb) Total 99,198Capital VSS FA 84,318Replacement Unit #: 441 SA
CMAQ Region 9 / RBT 4363 Light Duty Bus (176" wb) Total 99,198Capital VSS FA 84,318Replacement Unit #: 442 SA
CMAQ Region 9 / RBT 4364 Light Duty Bus (176" wb) Total 99,198Capital VSS FA 84,318Replacement Unit #: 443 SA
CMAQ Region 9 / RBT 4365 Light Duty Bus (176" wb) Total 99,198Capital VSS FA 84,318Replacement Unit #: 444 SA
STA, 5311 Region 9 / RBT 1425 General Operations/Maintenance/Administration Total 3,404,355 3,404,355 3,404,355 3,404,355Operations FA 356,881 356,881 356,881 356,881Misc SA 347,474 347,474 347,474 347,474
5304 RPA-09 1484 Transit Planning Total 25,328 25,328 25,328 55,328Planning FA 20,262 20,262 20,262 50,262Misc SA
5339 Muscatine 5132 Light Duty Bus (176" wb) Total 109,800Capital UFRC, VSS FA 93,330Replacement Unit #: 253 SA
5339 Muscatine 5133 Light Duty Bus (176" wb) Total 109,800Capital UFRC, VSS FA 93,330Replacement Unit #: 254 SA
5339 Region 9 / RBT 4366 Light Duty Bus (176" wb) Total 101,994Capital VSS FA 86,695Replacement Unit #: 747 SA
5339 Region 9 / RBT 4367 Light Duty Bus (176" wb) Total 101,994Capital VSS FA 86,695Replacement Unit #: 745 SA
5339 Region 9 / RBT 4368 Light Duty Bus (158" wb) Total 96,266Capital VSS FA 81,826Replacement Unit #: 772 SA
5339 Region 9 / RBT 4369 Light Duty Bus (158" wb) Total 96,266Capital VSS FA 81,826Replacement Unit #: 773 SA
5339 Region 9 / RBT 4370 Light Duty Bus (158" wb) Total 96,266Capital VSS FA 81,826Replacement Unit #: 774 SA
5339 Muscatine 5577 Light Duty Bus (176" wb) Total 113,100Capital UFRC, VSS FA 96,135Replacement Unit #: 255 SA
5339 Muscatine 5578 Conversion Van Total 68,110Capital UFRC, VSS FA 57,894Replacement Unit #: 256 SA
331
RPA-09 (56 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Muscatine 5579 Light Duty Bus (158" wb) Total 107,200Capital UFRC, VSS FA 91,120Replacement Unit #: 257 SA
5339 Region 9 / RBT 4908 Light Duty Bus (176" wb) Total 104,874Capital VSS FA 89,143Replacement Unit #: 901 SA
5339 Region 9 / RBT 4909 Light Duty Bus (158" wb) Total 98,974Capital VSS FA 84,128Replacement Unit #: 998 SA
5339 Region 9 / RBT 4910 Light Duty Bus (158" wb) Total 98,974Capital VSS FA 84,128Replacement Unit #: 999 SA
5339 Region 9 / RBT 5414 Light Duty Bus (176" wb) Total 104,874Capital VSS FA 89,143Replacement Unit #: 200 SA
5339 Region 9 / RBT 5415 Light Duty Bus (176" wb) Total 104,874Capital VSS FA 89,143Replacement Unit #: 201 SA
5339 Region 9 / RBT 5416 Light Duty Bus (176" wb) Total 104,874Capital VSS FA 89,143Replacement Unit #: 202 SA
5339 Region 9 / RBT 5417 Light Duty Bus (176" wb) Total 104,874Capital VSS FA 89,143Replacement Unit #: 241 SA
5339 Region 9 / RBT 5418 Light Duty Bus (176" wb) Total 104,874Capital VSS FA 89,143Replacement Unit #: 242 SA
5339 Region 9 / RBT 5419 Light Duty Bus (176" wb) Total 104,874Capital VSS FA 89,143Replacement Unit #: 243 SA
5339 Muscatine 6041 Light Duty Bus (158" wb) Total 110,400Capital UFRC, VSS FA 93,840Replacement Unit #: 258 SA
5339 Muscatine 6042 Light Duty Bus (176" wb) Total 116,400Capital UFRC, VSS FA 98,940Replacement Unit #: 259 SA
5339 Region 9 / RBT 5742 Light Duty Bus (158" wb) Total 101,763Capital VSS FA 86,499Replacement Unit #: 812 SA
5339 Region 9 / RBT 5743 Light Duty Bus (158" wb) Total 101,763Capital VSS FA 86,499Replacement Unit #: 813 SA
5339 Region 9 / RBT 5744 Light Duty Bus (158" wb) Total 101,763Capital VSS FA 86,499Replacement Unit #: 814 SA
332
RPA-09 (56 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Region 9 / RBT 5745 Light Duty Bus (158" wb) Total 101,763Capital VSS FA 86,499Replacement Unit #: 815 SA
5339 Region 9 / RBT 5746 Light Duty Bus (158" wb) Total 101,763Capital VSS FA 86,499Replacement Unit #: 817 SA
5339 Region 9 / RBT 5747 Light Duty Bus (158" wb) Total 101,763Capital VSS FA 86,499Replacement Unit #: 818 SA
5339 Region 9 / RBT 5748 Light Duty Bus (158" wb) Total 101,763Capital VSS FA 86,499Replacement Unit #: 819 SA
5339 Region 9 / RBT 5749 Light Duty Bus (158" wb) Total 101,763Capital VSS FA 86,499Replacement Unit #: 821 SA
5339 Region 9 / RBT 5750 Light Duty Bus (176" wb) Total 107,840Capital VSS FA 91,664Replacement Unit #: 820 SA
5339 Region 9 / RBT 5751 Light Duty Bus (158" wb) Total 101,763Capital VSS FA 86,499Replacement Unit #: 825 SA
5339 Region 9 / RBT 5752 Light Duty Bus (158" wb) Total 101,763Capital VSS FA 86,499Replacement Unit #: 826 SA
5339 Region 9 / RBT 5753 Light Duty Bus (158" wb) Total 101,763Capital VSS FA 86,499Replacement Unit #: 828 SA
5339 Region 9 / RBT 5754 Light Duty Bus (158" wb) Total 101,763Capital VSS FA 86,499Replacement Unit #: 829 SA
5339 Region 9 / RBT 5755 Light Duty Bus (176" wb) Total 107,840Capital VSS FA 91,664Replacement Unit #: 827 SA
333
RPA-10 (74 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5311 Region 10 / ECICOG 1485 General Operations/Maintenance/Administration Total 865,000 865,000 865,000 865,000Operations FA 692,000 692,000 692,000 692,000Misc SA
5311 Region 10 / ECICOG 1540 RPA Transportation Planning Total 32,760 32,760 32,760 32,760Planning FA 32,760 32,760 32,760 32,760Misc SA
5310 Region 10 / ECICOG 3576 General Operations/Maintenance/Contracted Service Total 390,000 350,000 350,000 350,000Operations FA 312,000 280,000 280,000 280,000Other SA
5339 Region 10 / ECICOG 3577 Light Duty Bus (138" wb) Total 89,474Capital VSS FA 76,053Replacement Unit #: 484 SA
5339 Region 10 / ECICOG 3580 Light Duty Bus (138" wb) Total 89,474Capital VSS FA 76,053Replacement Unit #: 400 SA
5339 Region 10 / ECICOG 4929 Minivan Total 58,065Capital VSS FA 49,355Replacement Unit #: 218 SA
5339 Region 10 / ECICOG 4968 Light Duty Bus (158" wb) Total 91,637Capital VSS FA 77,891Replacement Unit #: 341 SA
5339 Region 10 / ECICOG 4969 Light Duty Bus (138" wb) Total 89,474Capital VSS FA 76,053Replacement Unit #: 342 SA
5339 Region 10 / ECICOG 4970 Light Duty Bus (138" wb) Total 89,474Capital VSS FA 76,053Replacement Unit #: 343 SA
5339 Region 10 / ECICOG 4971 Light Duty Bus (138" wb) Total 89,474Capital VSS FA 76,053Replacement Unit #: 344 SA
5339 Region 10 / ECICOG 4973 Minivan Total 58,065Capital VSS FA 49,355Replacement Unit #: 310 SA
5339 Region 10 / ECICOG 4974 Light Duty Bus (176" wb) Total 97,198Capital VSS FA 82,618Replacement Unit #: 331 SA
5339 Region 10 / ECICOG 4975 Light Duty Bus (176" wb) Total 97,198Capital VSS FA 82,618Replacement Unit #: 332 SA
5339 Region 10 / ECICOG 4976 Light Duty Bus (138" wb) Total 89,474Capital VSS FA 76,053Replacement Unit #: 486 SA
5339 Region 10 / ECICOG 5447 Minivan Total 58,065Capital VSS FA 49,355Replacement Unit #: 485 SA
334
RPA-10 (74 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Region 10 / ECICOG 5772 Light Duty Bus (158" wb) Total 91,637Capital VSS FA 77,891Replacement Unit #: 214 SA
5339 Region 10 / ECICOG 5773 Light Duty Bus (158" wb) Total 91,637Capital VSS FA 77,891Replacement Unit #: 215 SA
5339 Region 10 / ECICOG 5774 Light Duty Bus (176" wb) Total 97,198Capital VSS FA 82,618Replacement Unit #: 216 SA
5339 Region 10 / ECICOG 5775 Minivan Total 58,065Capital VSS FA 49,355Replacement Unit #: 217 SA
5339 Region 10 / ECICOG 5763 Light Duty Bus (176" wb) Total 97,198Capital VSS FA 82,618Replacement Unit #: 301 SA
5339 Region 10 / ECICOG 5764 Light Duty Bus (138" wb) Total 89,474Capital VSS FA 76,053Replacement Unit #: 302 SA
5339 Region 10 / ECICOG 5765 Light Duty Bus (138" wb) Total 89,474Capital VSS FA 76,053Replacement Unit #: 303 SA
5339 Region 10 / ECICOG 5766 Minivan Total 58,065Capital VSS FA 49,355Replacement Unit #: 305 SA
5339 Region 10 / ECICOG 5767 Minivan Total 58,065Capital VSS FA 49,355Replacement Unit #: 306B SA
5339 Region 10 / ECICOG 5768 Minivan Total 58,065Capital VSS FA 49,355Replacement Unit #: 307 SA
5339 Region 10 / ECICOG 5769 Light Duty Bus (158" wb) Total 91,637Capital VSS FA 77,891Replacement Unit #: 308 SA
5339 Region 10 / ECICOG 5770 Light Duty Bus (138" wb) Total 89,474Capital VSS FA 76,053Replacement Unit #: 309 SA
5339 Region 10 / ECICOG 5778 Light Duty Bus (176" wb) Total 97,198Capital VSS FA 82,618Replacement Unit #: 327 SA
5339 Region 10 / ECICOG 5779 Light Duty Bus (176" wb) Total 97,198Capital VSS FA 82,618Replacement Unit #: 328 SA
5339 Region 10 / ECICOG 5780 Light Duty Bus (176" wb) Total 97,198Capital VSS FA 82,618Replacement Unit #: 329 SA
335
RPA-10 (74 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Region 10 / ECICOG 5781 Light Duty Bus (176" wb) Total 97,198Capital VSS FA 82,618Replacement Unit #: 330 SA
5339 Region 10 / ECICOG 5785 Light Duty Bus (158" wb) Total 91,637Capital VSS FA 77,891Replacement Unit #: 246 SA
5339 Region 10 / ECICOG 5786 Minivan Total 58,065Capital VSS FA 49,355Replacement Unit #: 247 SA
5339 Region 10 / ECICOG 5787 Minivan Total 58,065Capital VSS FA 49,355Replacement Unit #: 249 SA
5339 Region 10 / ECICOG 5788 Minivan Total 58,065Capital VSS FA 49,355Replacement Unit #: 340 SA
5339 Region 10 / ECICOG 5790 Medium Duty Bus (29-32 ft.) Total 192,249Capital VSS FA 163,412Replacement Unit #: 45L SA
5339 Region 10 / ECICOG 5791 Light Duty Bus (176" wb) Total 105,198Capital Diesel, VSS FA 89,418Replacement Unit #: 47L SA
5339 Region 10 / ECICOG 5792 Medium Duty Bus (29-32 ft.) Total 192,249Capital VSS FA 163,412Replacement Unit #: 258 SA
5339 Region 10 / ECICOG 5793 Medium Duty Bus (29-32 ft.) Total 192,249Capital VSS FA 163,412Replacement Unit #: 259 SA
5339 Region 10 / ECICOG 5794 Medium Duty Bus (29-32 ft.) Total 192,249Capital VSS FA 163,412Replacement Unit #: 260 SA
5339 Region 10 / ECICOG 5795 Light Duty Bus (176" wb) Total 105,198Capital Diesel, VSS FA 89,418Replacement Unit #: 261 SA
5339 Region 10 / ECICOG 5796 Light Duty Bus (176" wb) Total 105,198Capital Diesel, VSS FA 89,418Replacement Unit #: 263a SA
5339 Region 10 / ECICOG 5799 Light Duty Bus (176" wb) Total 97,198Capital VSS FA 82,618Replacement Unit #: 386 SA
5339 Region 10 / ECICOG 5800 Light Duty Bus (158" wb) Total 91,637Capital VSS FA 77,891Replacement Unit #: 387 SA
5339 Region 10 / ECICOG 5801 Minivan Total 58,065Capital VSS FA 49,355Replacement Unit #: 388 SA
336
RPA-10 (74 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Region 10 / ECICOG 5802 Light Duty Bus (158" wb) Total 91,637Capital VSS FA 77,891Replacement Unit #: 389 SA
5339 Region 10 / ECICOG 5803 Light Duty Bus (176" wb) Total 97,198Capital VSS FA 82,618Replacement Unit #: 390 SA
5339 Region 10 / ECICOG 5804 Light Duty Bus (138" wb) Total 89,474Capital VSS FA 76,053Replacement Unit #: 480 SA
5339 Region 10 / ECICOG 5805 Minivan Total 58,065Capital VSS FA 49,355Replacement Unit #: 481 SA
5339 Region 10 / ECICOG 5806 Light Duty Bus (158" wb) Total 91,637Capital VSS FA 77,891Replacement Unit #: 482 SA
5339 Region 10 / ECICOG 5807 Light Duty Bus (158" wb) Total 91,637Capital VSS FA 77,891Replacement Unit #: 483 SA
5339 Region 10 / ECICOG 4972 Minivan Total 55,000Capital VSS FA 46,750Replacement Unit #: 219 SA
5339 Region 10 / ECICOG 5454 Light Duty Bus (176" wb) Total 90,500Capital Low Floor FA 76,925Replacement Unit #: 333 SA
5339 Region 10 / ECICOG 5456 Light Duty Bus (138" wb) Total 89,000Capital VSS FA 75,650Replacement Unit #: 401 SA
5339 Region 10 / ECICOG 5448 Medium Duty Bus (29-32 ft.) Total 192,800Capital VSS FA 163,880Replacement Unit #: 267 SA
5339 Region 10 / ECICOG 5449 Medium Duty Bus (29-32 ft.) Total 192,800Capital VSS FA 163,880Replacement Unit #: 266 SA
5339 Region 10 / ECICOG 5450 Medium Duty Bus (29-32 ft.) Total 192,800Capital VSS FA 163,880Replacement Unit #: 265 SA
5339 Region 10 / ECICOG 5451 Medium Duty Bus (29-32 ft.) Total 192,800Capital VSS FA 163,880Replacement Unit #: 264 SA
5339 Region 10 / ECICOG 5452 Light Duty Bus (138" wb) Total 89,000Capital VSS FA 75,650Replacement Unit #: 345 SA
5339 Region 10 / ECICOG 5453 Light Duty Bus (138" wb) Total 89,000Capital VSS FA 75,650Replacement Unit #: 346 SA
337
RPA-10 (74 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Region 10 / ECICOG 4977 Light Duty Bus (138" wb) Total 89,000Capital VSS FA 75,650Replacement Unit #: 487 SA
5339 Region 10 / ECICOG 5446 Light Duty Bus (176" wb) Total 96,500Capital VSS FA 82,025Replacement Unit #: 488 SA
5339 Region 10 / ECICOG 5455 Light Duty Bus (176" wb) Total 96,500Capital VSS FA 82,025Replacement Unit #: 311 SA
5339 Region 10 / ECICOG 5797 Light Duty Bus (176" wb) Total 96,500Capital VSS FA 82,025Replacement Unit #: 268 SA
5339 Region 10 / ECICOG 5798 Light Duty Bus (176" wb) Total 96,500Capital VSS FA 82,025Replacement Unit #: 269 SA
5339 Region 10 / ECICOG 5789 Light Duty Bus (138" wb) Total 89,000Capital VSS FA 75,650Replacement Unit #: 347 SA
5339 Region 10 / ECICOG 5782 Light Duty Bus (176" wb) Total 96,500Capital VSS FA 82,025Replacement Unit #: 335 SA
5339 Region 10 / ECICOG 5783 Light Duty Bus (176" wb) Total 96,500Capital VSS FA 82,025Replacement Unit #: 336 SA
5339 Region 10 / ECICOG 5784 Light Duty Bus (176" wb) Total 96,500Capital VSS FA 82,025Replacement Unit #: 337 SA
5339 Region 10 / ECICOG 5771 Light Duty Bus (158" wb) Total 91,100Capital VSS FA 77,435Replacement Unit #: 402 SA
5339 Region 10 / ECICOG 5776 Light Duty Bus (158" wb) Total 91,100Capital VSS FA 77,435Replacement Unit #: 312 SA
5339 Region 10 / ECICOG 5777 Light Duty Bus (158" wb) Total 91,100Capital VSS FA 77,435Replacement Unit #: 313 SA
5339 Region 10 / ECICOG 5808 Light Duty Bus (158" wb) Total 91,100Capital VSS FA 77,435Replacement Unit #: 489 SA
5339 Region 10 / ECICOG 5809 Light Duty Bus (176" wb) Total 96,500Capital VSS FA 82,025Replacement Unit #: 490 SA
338
RPA-11 (42 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Region 11 / HIRTA 4461 Light Duty Bus (176" wb) TotalCapital VSS FAReplacement Unit #: 2228 SA
5339 Region 11 / HIRTA 5984 Conversion Van Total 58,727Capital VSS FA 49,918Replacement Unit #: 3329 SA
STA, 5311 Region 11 / HIRTA 5973 Day to Day Operations/Admin Total 1,374,462Operations FA 837,034Other SA 537,428
5339 Region 11 / HIRTA 5981 Light Duty Bus (176" wb) Total 99,197Capital VSS FA 84,318Replacement Unit #: 6525 SA
5339 Region 11 / HIRTA 5982 Minivan Total 56,564Capital VSS FA 48,080Replacement Unit #: 2227 SA
5339 Region 11 / HIRTA 5975 Light Duty Bus (176" wb) Total 99,197Capital VSS FA 84,318Replacement Unit #: 1136 SA
STP Region 11 / HIRTA 5156 Light Duty Bus (176" wb) Total 99,197Capital VSS FA 84,318Expansion SA
STP Region 11 / HIRTA 4736 Conversion Van Total 58,727Capital VSS FA 49,918Expansion SA
5339 Region 11 / HIRTA 4199 Minivan Total 56,564Capital VSS FA 48,080Replacement Unit #: 5515 SA
5339 Region 11 / HIRTA 4449 Light Duty Bus (176" wb) Total 99,197Capital VSS FA 84,318Replacement Unit #: 2225 SA
5339 Region 11 / HIRTA 4462 Light Duty Bus (176" wb) Total 99,197Capital VSS FA 84,318Replacement Unit #: 1137 SA
5310 Region 11 / HIRTA 6088 Mobility for All Project Total 88,400Operations FA 70,720Other SA
5339 Region 11 / HIRTA 5977 Minivan Total 56,564Capital VSS FA 48,080Replacement Unit #: 1143 SA
5339 Region 11 / HIRTA 5978 Light Duty Bus (176" wb) Total 99,197Capital VSS FA 84,318Replacement Unit #: 1144 SA
5339 Region 11 / HIRTA 5979 Minivan Total 56,564Capital VSS FA 48,080Replacement Unit #: 1145 SA
339
RPA-11 (42 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Region 11 / HIRTA 5983 Light Duty Bus (176" wb) Total 99,197Capital VSS FA 84,318Replacement Unit #: 3328 SA
5339 Region 11 / HIRTA 5974 Light Duty Bus (176" wb) Total 99,197Capital VSS FA 84,318Replacement Unit #: 1139 SA
5339 Region 11 / HIRTA 5987 Light Duty Bus (138" wb) Total 91,473Capital VSS FA 77,752Replacement Unit #: 4420 SA
5339 Region 11 / HIRTA 4448 Light Duty Bus (176" wb) Total 99,197Capital VSS FA 84,318Replacement Unit #: 2229 SA
STP Region 11 / HIRTA 5157 Light Duty Bus (176" wb) Total 144,775Capital VSS, Low Floor FA 115,820Expansion SA
5339 Region 11 / HIRTA 4463 Light Duty Bus (176" wb) Total 99,197Capital VSS FA 84,318Replacement Unit #: 8727 SA
5339 Region 11 / HIRTA 4450 Light Duty Bus (176" wb) Total 99,197Capital VSS FA 84,318Replacement Unit #: 2231 SA
5339 Region 11 / HIRTA 4452 Light Duty Bus (176" wb) Total 99,197Capital VSS FA 84,318Replacement Unit #: 3326 SA
5339 Region 11 / HIRTA 4460 Light Duty Bus (176" wb) Total 99,197Capital VSS FA 84,318Replacement Unit #: 3325 SA
5339 Region 11 / HIRTA 4442 Light Duty Bus (176" wb) Total 99,197Capital VSS FA 84,318Replacement Unit #: 1146 SA
5339 Region 11 / HIRTA 4444 Light Duty Bus (176" wb) Total 99,197Capital VSS FA 84,318Replacement Unit #: 1148 SA
5339 Region 11 / HIRTA 4445 Light Duty Bus (176" wb) Total 99,197Capital VSS FA 84,318Replacement Unit #: 1149 SA
5339 Region 11 / HIRTA 3242 Light Duty Bus (176" wb) Total 99,197Capital VSS FA 84,318Replacement Unit #: 2228 SA
5339 Region 11 / HIRTA 5986 Minivan Total 56,564Capital VSS FA 48,080Replacement Unit #: 3330 SA
STP Region 11 / HIRTA 6061 Conversion Van Total 58,727Capital UFRC, VSS FA 49,918Expansion SA
340
RPA-11 (42 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
STP Region 11 / HIRTA 6062 Conversion Van Total 58,727Capital UFRC, VSS FA 49,918Expansion SA
5339 Region 11 / HIRTA 5988 Light Duty Bus (176" wb) Total 99,197Capital VSS, Low Floor FA 84,318Replacement Unit #: 4422 SA
5339 Region 11 / HIRTA 5989 Light Duty Bus (138" wb) Total 91,473Capital VSS FA 77,752Replacement Unit #: 5521 SA
5339 Region 11 / HIRTA 5990 Light Duty Bus (138" wb) Total 91,473Capital VSS FA 77,752Replacement Unit #: 5523 SA
5339 Region 11 / HIRTA 5991 Light Duty Bus (138" wb) Total 91,473Capital VSS FA 77,752Replacement Unit #: 5522 SA
5339 Region 11 / HIRTA 5992 Minivan Total 56,564Capital VSS FA 48,080Replacement Unit #: 6526 SA
5339 Region 11 / HIRTA 5980 Light Duty Bus (176" wb) Total 99,197Capital VSS FA 84,318Replacement Unit #: 1147 SA
5339 Region 11 / HIRTA 4446 Light Duty Bus (176" wb) Total 99,197Capital VSS FA 84,318Replacement Unit #: 1150 SA
5339 Region 11 / HIRTA 6063 Light Duty Bus (176" wb) Total 156,000Capital UFRC, VSS, Low Floor FA 124,800Expansion SA
5339 Region 11 / HIRTA 5993 Light Duty Bus (176" wb) Total 99,197Capital VSS FA 84,318Replacement Unit #: 8725 SA
5339 Region 11 / HIRTA 5994 Light Duty Bus (138" wb) Total 91,473Capital VSS FA 77,752Replacement Unit #: 8728 SA
5339 Region 11 / HIRTA 5995 Light Duty Bus (158" wb) Total 93,636Capital VSS FA 79,591Replacement Unit #: 8729 SA
341
RPA-12 (26 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
STA, 5311 Region 12 / WITS 1585 Operations/Maintenance/Administration Total 2,607,004 2,650,000 2,625,500 2,636,000Operations FA 705,647 710,000 715,000 720,000Misc SA 435,757 440,000 410,000 415,000
5311 Region 12 / WITS 1599 RPA Transportation Planning Total 32,237 31,875 31,875 31,875Planning FA 25,789 25,500 25,500 25,500Misc SA
5339 Region 12 / WITS 4623 Light Duty Bus (176" wb) Total 96,500Capital VSS FA 82,025Replacement Unit #: 1008 SA
5339 Region 12 / WITS 4961 Light Duty Bus (176" wb) Total 96,500Capital VSS FA 82,025Replacement Unit #: 1009 SA
5339 Region 12 / WITS 4963 Light Duty Bus (176" wb) Total 96,500Capital VSS FA 82,025Replacement Unit #: 0902 SA
5339 Region 12 / WITS 5356 Conversion Van Total 57,100Capital VSS FA 48,535Replacement Unit #: 1206 SA
5339 Region 12 / WITS 5357 Conversion Van Total 57,100Capital VSS FA 48,535Replacement Unit #: 1205 SA
5339 Region 12 / WITS 5879 Light Duty Bus (176" wb) Total 96,500Capital VSS FA 82,025Replacement Unit #: 1001 SA
5339 Region 12 / WITS 5880 Light Duty Bus (176" wb) Total 96,500Capital VSS FA 82,025Replacement Unit #: 0903 SA
5339 Region 12 / WITS 5881 Conversion Van Total 57,100Capital VSS FA 48,535Replacement Unit #: 1203 SA
5339 Region 12 / WITS 5882 Conversion Van Total 57,100Capital VSS FA 48,535Replacement Unit #: JJ01 SA
5339 Region 12 / WITS 5883 Light Duty Bus (176" wb) Total 96,500Capital VSS FA 82,025Replacement Unit #: A-4 SA
5339 Region 12 / WITS 5358 Conversion Van Total 58,728Capital VSS FA 49,918Replacement Unit #: JJ03 SA
5339 Region 12 / WITS 5359 Light Duty Bus (176" wb) Total 99,198Capital VSS FA 84,318Replacement Unit #: 1101 SA
5339 Region 12 / WITS 5360 Light Duty Bus (176" wb) Total 99,198Capital VSS FA 84,318Replacement Unit #: 1102 SA
342
RPA-12 (26 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Region 12 / WITS 5361 Light Duty Bus (176" wb) Total 99,198Capital VSS FA 84,318Replacement Unit #: 0901 SA
5339 Region 12 / WITS 5362 Light Duty Bus (176" wb) Total 99,198Capital VSS FA 84,318Replacement Unit #: 1007 SA
5339 Region 12 / WITS 5364 Light Duty Bus (176" wb) Total 99,198Capital VSS FA 84,318Replacement Unit #: 1201 SA
5339 Region 12 / WITS 5363 Light Duty Bus (176" wb) Total 114,078Capital VSS FA 99,198Replacement Unit #: JJ02 SA
5339 Region 12 / WITS 5365 Light Duty Bus (176" wb) Total 99,198Capital VSS FA 84,318Replacement Unit #: 1301 SA
5339 Region 12 / WITS 5366 Light Duty Bus (176" wb) Total 99,198Capital VSS FA 84,318Replacement Unit #: 1302 SA
5339 Region 12 / WITS 5884 Conversion Van Total 58,728Capital VSS FA 49,918Replacement Unit #: 1502 SA
5339 Region 12 / WITS 5885 Conversion Van Total 58,728Capital VSS FA 49,918Replacement Unit #: 1504 SA
5339 Region 12 / WITS 5886 Conversion Van Total 58,728Capital FA 49,918Replacement Unit #: 1402 SA
5339 Region 12 / WITS 5887 Conversion Van Total 58,728Capital VSS FA 49,918Replacement Unit #: 1401 SA
5339 Region 12 / WITS 5367 Conversion Van Total 58,728Capital VSS FA 49,918Replacement Unit #: JJ04 SA
343
RPA-14 (32 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Region 14 / SIT 5933 Minivan Total 55,000Capital VSS FA 46,750Replacement Unit #: S-13 SA
5339 Region 14 / SIT 5713 Minivan Total 55,000Capital VSS FA 46,750Replacement Unit #: 93-B SA
STA, 5311 Region 14 / SIT 5625 General Operations-Southern Iowa Trolley Total 762,882Operations FA 411,572Other SA 351,310
5339 Region 14 / SIT 2745 Light Duty Bus (176" wb) Total 98,120Capital VSS FA 83,402Replacement Unit #: S-14 SA
5339 Region 14 / SIT 2326 Light Duty Bus (176" wb) Total 98,120Capital VSS FA 83,402Replacement Unit #: 94 SA
5339 Region 14 / SIT 2747 Light Duty Bus (176" wb) Total 98,120Capital VSS FA 83,402Replacement Unit #: S-15 SA
5339 Region 14 / SIT 2749 Light Duty Bus (176" wb) Total 98,120Capital VSS FA 83,402Replacement Unit #: S-17 SA
5339 Region 14 / SIT 2750 Light Duty Bus (176" wb) Total 100,926Capital VSS FA 85,787Replacement Unit #: S-18 SA
5339 Region 14 / SIT 2751 Light Duty Bus (176" wb) Total 100,926Capital VSS FA 85,787Replacement Unit #: S-19 SA
5339 Region 14 / SIT 2752 Light Duty Bus (176" wb) Total 100,926Capital VSS FA 85,787Replacement Unit #: S-20 SA
5339 Region 14 / SIT 3248 Minivan Total 58,727Capital VSS FA 49,918Replacement Unit #: 24-S SA
5339 Region 14 / SIT 5718 New Project Total 100,926Capital VSS FA 85,787Replacement Unit #: S-16 SA
5339 Region 14 / SIT 3249 Light Duty Bus (176" wb) Total 104,803Capital VSS FA 89,083Replacement Unit #: S-26 SA
5339 Region 14 / SIT 3771 Minivan Total 61,555Capital VSS FA 52,322Replacement Unit #: 28-S SA
5339 Region 14 / SIT 4139 Conversion Van Total 63,316Capital VSS FA 53,819Replacement Unit #: 29S SA
344
RPA-14 (32 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Region 14 / SIT 3245 Light Duty Bus (176" wb) Total 104,803Capital VSS FA 89,083Replacement Unit #: 22-S SA
5339 Region 14 / SIT 3246 Light Duty Bus (176" wb) Total 104,803Capital VSS FA 89,083Replacement Unit #: 23-S SA
5339 Region 14 / SIT 2746 Light Duty Bus (176" wb) Total 104,803Capital VSS FA 89,083Replacement Unit #: 21-S SA
5339 Region 14 / SIT 5332 Light Duty Bus (176" wb) Total 108,835Capital VSS FA 92,510Replacement Unit #: 107 SA
5339 Region 14 / SIT 5333 New Project Total 108,835Capital VSS FA 92,510Replacement Unit #: 105 SA
5339 Region 14 / SIT 5334 New Project Total 108,835Capital VSS FA 92,510Replacement Unit #: 106 SA
5339 Region 14 / SIT 5335 New Project Total 63,315Capital VSS FA 53,818Replacement Unit #: 30-S SA
5339 Region 14 / SIT 5336 New Project Total 63,315Capital VSS FA 53,818Replacement Unit #: 31-S SA
5339 Region 14 / SIT 5337 New Project Total 63,315Capital VSS FA 53,818Replacement Unit #: 32-S SA
5339 Region 14 / SIT 5338 New Project Total 63,315Capital VSS FA 53,818Replacement Unit #: 33-S SA
5339 Region 14 / SIT 3250 Light Duty Bus (176" wb) Total 108,835Capital VSS FA 92,510Replacement Unit #: S-27 SA
5339 Region 14 / SIT 4138 Light Duty Bus (176" wb) Total 108,835Capital VSS FA 92,510Replacement Unit #: 101 SA
5339 Region 14 / SIT 4629 Light Duty Bus (176" wb) Total 108,835Capital VSS FA 92,510Replacement Unit #: 102 SA
5339 Region 14 / SIT 4630 Light Duty Bus (176" wb) Total 108,835Capital VSS FA 92,510Replacement Unit #: 103 SA
5339 Region 14 / SIT 4631 Light Duty Bus (176" wb) Total 108,835Capital VSS FA 92,510Replacement Unit #: 104 SA
345
RPA-14 (32 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
PTIG Region 14 / SIT 2330 Transit Facility Total 1,500,000Capital FAOther SA 600,000
Region 14 / SIT 5716 New Project Total 108,835Capital VSS FA 92,510Replacement Unit #: 108 SA
346
RPA-15 (21 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
STA, 5311 Region 15 / 10-15Transit
1721 General Operations/Maintenance/Administration Total 3,634,317 3,500,000 3,500,000 3,500,000Operations FA 1,072,313 1,000,000 1,000,000 1,000,000Misc SA 562,004 500,000 500,000 500,000
STP Region 15 / 10-15Transit
5670 Minivan Total 55,000Capital VSS FA 44,000Replacement Unit #: 102 SA
STP Region 15 / 10-15Transit
6052 Light Duty Bus (176" wb) Total 55,000Capital FA 44,000Replacement Unit #: 151 SA
STP Region 15 / 10-15Transit
6053 Light Duty Bus (176" wb) Total 55,000Capital VSS FA 44,000Replacement Unit #: 152 SA
STP Region 15 / 10-15Transit
6054 Light Duty Bus (176" wb) Total 55,000Capital VSS FA 44,000Replacement Unit #: 156 SA
STA, 5311 Region 15 / 10-15Transit
6055 General Operations/Maintenance/Administration FIXED ROUTE Total 650,230 600,000 600,000 600,000Operations FA 387,264 350,000 350,000 350,000Other SA 212,966 200,000 200,000 200,000
5311 RPA-15 6051 RPA Transportation Planning Total 32,263Operations FA 25,810Other SA
5339 Region 15 / 10-15Transit
6065 Minivan Total 56,500Capital VSS FA 48,025Replacement Unit #: 153 SA
5339 Region 15 / 10-15Transit
6066 Minivan Total 56,500Capital VSS FA 48,025Replacement Unit #: 154 SA
5339 Region 15 / 10-15Transit
6067 Minivan Total 56,500Capital VSS FA 48,025Replacement Unit #: 155 SA
5339 Region 15 / 10-15Transit
6068 Minivan Total 56,500Capital VSS FA 48,025Replacement Unit #: 157 SA
5339 Region 15 / 10-15Transit
6069 Light Duty Bus (176" wb) Total 97,200Capital VSS FA 82,620Replacement Unit #: 161 SA
5339 Region 15 / 10-15Transit
6070 Light Duty Bus (176" wb) Total 97,200Capital VSS FA 82,620Replacement Unit #: 165 SA
5339 Region 15 / 10-15Transit
6071 Minivan Total 56,500Capital VSS FA 48,025Replacement Unit #: 162 SA
5339 Region 15 / 10-15Transit
6072 Minivan Total 56,500Capital VSS FA 48,025Replacement Unit #: 163 SA
347
RPA-15 (21 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Region 15 / 10-15Transit
6073 Minivan Total 56,500Capital VSS FA 48,025Replacement Unit #: 164 SA
5339 Region 15 / 10-15Transit
6074 Minivan Total 56,500Capital VSS FA 48,025Replacement Unit #: 166 SA
5339 Region 15 / 10-15Transit
6075 Minivan Total 56,500Capital VSS FA 48,025Replacement Unit #: 167 SA
5339 Region 15 / 10-15Transit
6076 Medium Duty Bus (29-32 ft.) Total 196,249Capital VSS FA 166,812Replacement Unit #: 169A SA
5339 Region 15 / 10-15Transit
6077 Medium Duty Bus (29-32 ft.) Total 196,249Capital VSS FA 166,812Replacement Unit #: 169B SA
5339 Region 15 / 10-15Transit
6078 Light Duty Bus (176" wb) Total 97,200Capital VSS FA 82,620Replacement Unit #: 168 SA
348
RPA-16 (13 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5339 Burlington 5727 Light Duty Bus (138" wb) Total 98,474Capital UFRC, VSS FA 83,702Replacement Unit #: 723b SA
STA, 5311 Burlington 1670 General Operations/Maintenance/Administration Total 1,101,401 1,101,401 1,101,401 1,101,401Operations FA 469,665 469,665 469,665 469,665Misc SA 256,978 256,978 256,978 256,978
STA, 5311 Region 16 / SEIBUS 1675 General Operations/Maintenance/Administration Total 1,303,651 1,303,651 1,303,651 1,303,651Operations FA 367,814 367,814 367,814 367,814Misc SA 359,627 359,627 359,627 359,627
5339 Region 16 / SEIBUS 5395 Light Duty Bus (176" wb) Total 101,198Capital VSS FA 86,018Replacement Unit #: 095 SA
5339 Region 16 / SEIBUS 5396 Light Duty Bus (176" wb) Total 101,197Capital VSS FA 86,018Replacement Unit #: 094 SA
5339 Region 16 / SEIBUS 5855 Light Duty Bus (176" wb) Total 101,197Capital Low Floor FA 86,018Replacement Unit #: 112 SA
5339 Region 16 / SEIBUS 5856 Conversion Van Total 56,228Capital FA 47,793Replacement Unit #: 021 SA
5339 Region 16 / SEIBUS 5857 Medium Duty Bus (to 28 ft.) Total 192,740Capital Diesel, Low Floor FA 163,829Replacement Unit #: 953 SA
PTIG Region 16 / SEIBUS 5858 Bus Storage Facility Total 500,000Capital FAMisc SA 400,000
5311 RPA-16 1694 RPA Transportation Planning Total 31,994 31,994 31,994 31,994Planning FA 25,595 25,595 25,595 25,595Misc SA
5339 Burlington 5728 Medium Duty Bus (29-32 ft.) Total 205,249Capital UFRC, VSS FA 174,461Replacement Unit #: 728 SA
5339 Burlington 5729 Medium Duty Bus (29-32 ft.) Total 205,249Capital UFRC, VSS FA 174,461Replacement Unit #: 729 SA
5339 Burlington 5730 Medium Duty Bus (29-32 ft.) Total 205,249Capital UFRC, VSS FA 174,461Replacement Unit #: 731 SA
349
RPA-17 (8 Projects)Fund Sponsor Transit #
Expense ClassProject Type
Desc / Add Ons / Addnl Info FY21 FY22 FY23 FY24
5311 RPA-17 1702 RPA Transportation Planning Total 37,500 37,500 37,500Planning FA 37,500 37,500 37,500Misc SA
STA Region 15 / 10-15Transit
5859 Minivan Total 55,000Capital VSS FAExpansion SA 44,000
STA Region 15 / 10-15Transit
5860 Minivan Total 55,000Capital VSS FAExpansion SA 44,000
STA Region 15 / 10-15Transit
5861 Minivan Total 55,000Capital VSS FAExpansion SA 44,000
STA Region 15 / 10-15Transit
5862 Minivan Total 55,000Capital VSS FAExpansion SA 44,000
STA Region 15 / 10-15Transit
5863 Minivan Total 55,000Capital VSS FAExpansion SA 44,000
STA Region 15 / 10-15Transit
5864 Minivan Total 55,000Capital VSS FAExpansion SA 44,000
STA Region 15 / 10-15Transit
5865 Minivan Total 55,000Capital VSS FAExpansion SA 44,000
350