feedback infra pvt.limited

18
MADIIYA PRADESH PASCHIM KSHETRA VIDYUT VITRAN COMPANY LIMITED (A FULLY OWI\ED COMPANY OF GOYERNMENT OF MADHYA PRADESH) GPH COMPOUND, POLO GROUND, INDORE - 452003 Phone: 0731-2426141; Fax: 0731 -2423300.2426146 No. MD/WZI DDU GIY/PMA/AWARD/Ord- 9 | I 17 | 0 6 To. lWs Feedback Infra Pvt., Ltd., l5th Floor, Tower 98, DLF Cyber City,.Phase-III, Gurgaon, Haryana. Email: [email protected] [email protected] Ph No.+91-124-416-9100 / 91s5 Indore. Dated 22109 l20l 5 SUB:- Award for Project management Agency (PMA) for Monitoring, Supervision & Quality Control Consultancy Services for construction of New 33/l I KV S/s, Aug. of Power Transformer capacity, Installation of Additional Power Transformer, Renovation of 33/11 KV S/s, New 33 KV & I lKV, Aug. of Conductor capacity of 33 KV & 1 1 KV line, New LT lines, Conversion of Bare conductor LT Line into LT AB Cable line, New DTR S/s, Aug. of DTR Capacity and New Service connections, meterization and other related works under DDUGJY & IPDS Schemes of Districts Ujjain, Dewas, Shajapur, Mandsaur, Neemuch and Ratlam, of WEST DISCOM as per guidelines of DDUGJY and IPDS schemes issued by MoP Govt. of India. Ref: - (i) NIT No.MD/WZIPDIDDUGJY & IPDS/I5-1 6IPMA/0211|922, Indore Dt.04/0112015 (ii) Your offer letter No.NIL,Dt.07108/2015 (iiD T.O. letter No.MDAVZ/PD/ DDUGJY & IPDS/ I 5- I 6/PMA/Q I & Q2, Indore Dr.06/08/20 I 5 (iv) T.O. mail onDt.07/08/2015 & Dt.09/0812015 (v) T.O. letter No.MD/WZIRGGVY/Ql, Indore Dt.l0/08/2015 t<t {<*i<t(* Dear Sirs, Considering your above offer against the NIT under reference and correspondence thereon cited above, we are pleased to place this award on you for "Project management Agency (PMA) for Monitoring, Supervision & Quality Control Consultancy Services for construction of New 33/11 KV S/s, Aug. of Power Transformer capacity, Installation of Additional Power Transformer, Renovation of 33lll KV S/s, New 33 KV & I lKV, Aug. of Conductor capacity of 33 KV & I I KV line, New LT lines, Conversion of Bare conductor LT Line into LT AB Cable line, New DTR S1s, Aug. of DTR Capacity and New Service connections, meterization and other related works under DDUGJY & IPDS Schemes of Districts Ujjain, Dewas, Shajapur, Mandsaur, Neemuch and Ratlam of WEST DISCOM as per guidelines of DDUGJY and IPDS schemes issued by MoP Govt. of India", The award is subject to the terms and conditions, as stipulated in the subject Tender Specification No. MDIWZIPD/.DDUGJY & IPDS/l5- 16lPMN02lI1922,Indore Dt.04107'12015. Any clause / condition or terms, in your offer or in any letter which is repugnant to or ipconsistent with the terms and conditions of this award and Annexures attached hereto, shall be void and of no force and effect unless, specifrc approval is given by the MPPKVVCL in writing to such conditions. Assist arfd4agri66r ( RG GVy) A I c e.D. t..'.--, G'-r\') l'"4 PPKVVCL \ n') Nodal gSJgerTRGG\ryt Cc:F.-'-- Otf rce -Ld.P.P.KrV.t "uc, .l-1d., INUORIF

Upload: ngohanh

Post on 10-Feb-2017

217 views

Category:

Documents


0 download

TRANSCRIPT

MADIIYA PRADESH PASCHIM KSHETRA VIDYUT VITRAN COMPANY LIMITED(A FULLY OWI\ED COMPANY OF GOYERNMENT OF MADHYA PRADESH)

GPH COMPOUND, POLO GROUND, INDORE - 452003Phone: 0731-2426141; Fax: 0731 -2423300.2426146

No. MD/WZI DDU GIY/PMA/AWARD/Ord- 9 | I 17 | 0 6

To.

lWs Feedback Infra Pvt., Ltd.,l5th Floor, Tower 98,DLF Cyber City,.Phase-III,Gurgaon, Haryana.

Email: [email protected]@feedbackinfra.comPh No.+91-124-416-9100 / 91s5

Indore. Dated 22109 l20l 5

SUB:- Award for Project management Agency (PMA) for Monitoring, Supervision & QualityControl Consultancy Services for construction of New 33/l I KV S/s, Aug. of Power Transformercapacity, Installation of Additional Power Transformer, Renovation of 33/11 KV S/s, New 33

KV & I lKV, Aug. of Conductor capacity of 33 KV & 1 1 KV line, New LT lines, Conversion ofBare conductor LT Line into LT AB Cable line, New DTR S/s, Aug. of DTR Capacity and NewService connections, meterization and other related works under DDUGJY & IPDS Schemes ofDistricts Ujjain, Dewas, Shajapur, Mandsaur, Neemuch and Ratlam, of WEST DISCOM as perguidelines of DDUGJY and IPDS schemes issued by MoP Govt. of India.Ref: - (i) NIT No.MD/WZIPDIDDUGJY & IPDS/I5-1 6IPMA/0211|922, Indore Dt.04/0112015

(ii) Your offer letter No.NIL,Dt.07108/2015(iiD T.O. letter No.MDAVZ/PD/ DDUGJY & IPDS/ I 5- I 6/PMA/Q I & Q2, Indore Dr.06/08/20 I 5(iv) T.O. mail onDt.07/08/2015 & Dt.09/0812015(v) T.O. letter No.MD/WZIRGGVY/Ql, Indore Dt.l0/08/2015

t<t {<*i<t(*

Dear Sirs,Considering your above offer against the NIT under reference and correspondence

thereon cited above, we are pleased to place this award on you for "Project management Agency(PMA) for Monitoring, Supervision & Quality Control Consultancy Services for construction ofNew 33/11 KV S/s, Aug. of Power Transformer capacity, Installation of Additional PowerTransformer, Renovation of 33lll KV S/s, New 33 KV & I lKV, Aug. of Conductor capacity of33 KV & I I KV line, New LT lines, Conversion of Bare conductor LT Line into LT AB Cableline, New DTR S1s, Aug. of DTR Capacity and New Service connections, meterization and otherrelated works under DDUGJY & IPDS Schemes of Districts Ujjain, Dewas, Shajapur,Mandsaur, Neemuch and Ratlam of WEST DISCOM as per guidelines of DDUGJY and IPDSschemes issued by MoP Govt. of India", The award is subject to the terms and conditions, asstipulated in the subject Tender Specification No. MDIWZIPD/.DDUGJY & IPDS/l5-16lPMN02lI1922,Indore Dt.04107'12015. Any clause / condition or terms, in your offer or in anyletter which is repugnant to or ipconsistent with the terms and conditions of this award andAnnexures attached hereto, shall be void and of no force and effect unless, specifrc approval isgiven by the MPPKVVCL in writing to such conditions.

Assist arfd4agri66r ( RG GVy)A I c e.D. t..'.--, G'-r\') l'"4 PPKVVCL

\n')

Nodal gSJgerTRGG\rytCc:F.-'-- Otf rce

-Ld.P.P.KrV.t "uc, .l-1d., INUORIF

l.

O/o MD (WZ), MPPKVVCL Indore

Award No. MDIWZIDDUGJY/PMA/AWARD/Ord-9lil7l06 indoie,Dt.22l}9l20l5 To lws Feedback InfraPvt. Ltd.' Grfrgaon- i

SCOPE OF WORK:-The consultant shall assist to, supervise the works, assurance quality of material and

workmanship. The work may invoive construction of New 33lll KV S/s, Aug. of Power

iransformer capacity, Instaliation of Additional Power Transformer, Renovation of 33lllKV S/s, New j: KV & 1lKV, Aug. of Conductor capacity of 33 KV & 11 KV line' New

LT lines, Conversion of Bare conductor LT Line into LT AB Cable line, New DTR S/s,

Aug. of DTR Capacity and New Service connections, meterizalion and other related

*oik, under DDUGJY& IPDS Schemes of Districts Ujjain, Dewas, Shajapur' M*€uq,Neemuch and Ratlam, of WEST DISCOM as per guidelines of DDUGJY and IPDS

schemes issued by MoP Gor"t. of India.

The proposed Construction/Renovation works shall be executed through- .a

contractor, on *tto. award for execution of works will be given on turnkey basis. This

will include Site survey also jointly.

The Consultant shall make quality surveillance of all activities from Engineering,

survey, erection, construction up to final testing and commissioning during execution of

the works. The Consultant wili also ensure quality of MateriallEquipment used in the

work. If the quality of Material/Equipment is suspected to be inferior, it will be reported

to the all conceming officers lilie Project director (DDUGJY & IPDS), CEO

Superintending EngineJr(O&M) of the circle and Nodal Offrer (DDUGJY & IPDS), AE

fnbUCly A1ll5;, wiro, in tum, shall get the testing done at any of the recognized

iesting laboratory in presence ofcontractor / vendore'

Keeping in view the duration of construction, it is expected that more concerted

effoits will be required either at one front by deploying adequate manpower

including more number of shifts etc. or alternatively by opening more than one

frontagJsimultaneously in order to superviseo consultants should study the scope of

work, can discuss with the c.E. & Projecr Director(DDUGJY & IPDS)'

MppKVVCL, Indore as they are expected to reflect the above requirement in their

technical and financial proposal adequately besides dealing the project management

aspect in their proposed methodology.

a.6'

DETAIL oF WORK |N€LUDED lN DPR OF DpUGJY (,Uijain Resig

Particulars/Districtname Dewas Mandsaur Neemuch Ratlam Shajapur Ujjain

Total

RE COMPONENT

Un-electrifiedVillages 0 0 0 0 0 0

0

Intensive Villages 1051 906 674 1053 1058 1096 5858

11 KV (Kms) 4.5 723.3 198 223.O3 284.r 388.9 t22L.83

DTR 409 126 240 499 181 778 2233

LT Line on AB

Cable L079 563.4 364 298.74 1280.9 52L4L07.04

BPL 35069 11546 2343 2753 18503 0 70214

St. Lieht (Kms.) 0 0 0 0 0 0 0

Reno. DTR Earthing 0 0 0 0 0 0 0

FEEDER

SEPRATION

0'

rE. ! i;,giirser iI.lGGVYlL - 1,r - . ." ; fu'l IT PKVVCL

N t ffieerJPGGVY}4- cffice

Page2 of 12

Olo rI.r r.iL,ffE Mg,eKv.v.gp. Ltqr lllDoBB

O/o MD (WZ), MPPKVVCL IndoreAward No. MD/WA DDUGJY/PMA/AWARD/Ord-91/17106 Indore, Dl221092015 To IWs Feedback Infra Pvt. Ltd., Gurgaon

11KV Line (Km.) 2L9,6 82.9 5.1 43 278 18 646.6

DTR (Nos.) 268 272 4 66 300 5 915

11 Bay (Nos.) 2 0 0 0 0 0 2

SYSTEM

STRNGTHNING

33 KV Line 61 81 44 1.t7 75 38 416

New 33/11 KV S/s 8 6 3 4 L1 5 37

AddI PTR 3 3 T 3 5 5 20

Aus. of PTR 9 11 4 5 22 10 6L

33 KV Bay WithVCB 1, 0 4 9 0 5

19

33 KV VCB with CT -

Panel 4 5 5 18 2L 457

33 KV AB Switch 5 1, 88 42 7 7 150

L1 KV Line 138 496 181 469.8 179 389 1852.8

11 KV Bay WithVCB 8 13 0 1 0 tI 33

11 KV VCB with CT

Panel 19 2I t4 0 48 27129

11 KV AB Switch 16 0 195 U 22 43 276

Fault Passage

lndicator t2 1L L3 11. 5 1365

Remote ControlSystem for Feeder 0 76 57 54 0 52

239

R&MS/s 28 2t 24 58 37 28 196

METERING

Feeder Meterins

33 KV 18 26 0 0 0 U 44

11 KV 126 51 32 43 81 .+ 337

ConsumerMetering

0

Sinele Phase 51155 10277 21305 14286 45605 61865 204493

Three Phase 967 0 0 0 0 137 r104

Amount (ln Lacs) 9795.23 6178.25 3991.62 6021,.54 10854.r7 8081.32 44922.1.3

Amount DUGJY (Rs

Crs.)97.95 61.78 39.92 60.22 108.54 80.81 449.22

Sanction Cost ofIPDS Scheme ( ln

Crs.)

38.75 t4.35 24.82 30.91 27.47 43.60 179.90

Total(DDUGJY+IPDS) (ln

Crs.)

136.70 76.L3 64.74 91.13 136.01 t24.4L 629.L2

cL/-'

Assistant Engineer i nGGVY)O/o P.D. lriGGVY; I,TPPKVVCL

tNpoEE

\i! I

ri!/"

Nodal Affifir (RGGqfDco:pf?H?J 6ffic.e

M.P.P.IC.V.Y.Co. Lrd., INDOBE

O/o MD (WZ), MPPKVVCL lndoreAward No MDIWl.l DDTJCJY/PMA/AWARD/Ord-91/17106 lndore,Dt.22l09/2015 To Ws Feedback Infrahrr

DETAII OF WORK |NCLUDED tN the DpR of tpDS (Ujjain Reeion)S.No. Scope of Works Unit Ujjain Dewas Shajapur Ratlam Mandsaur Neemuch Total UR

I ?3/rLKv S/S: New Nos 1 0 0 0 0 0 1

233/U KV S/S r Transformer capacity

enhancementNos. 10 0 0 0 0 0 10

3Renovation& Modernisatlon ol 331 ll

KV SsNos. t4 0 0 0 0 0 t4

4New 33 KV new feeders/Bifurcation of

feeders:Kms 20 0 0 0 0 0 20

533 kV line Bay Extension at EHV

stationNos 4 0 0 0 0 0 4

611 kV Line : New Feeder/ Feeder

BifurcationKms 54 67 58 4t 15 51 285

711 kV line :

Augmentation/ReconductorinsKms 9 63 0 60 0 l5 t47

8 Arial Bunched Cable- Kms t2t 234 230 t47 110 L29 9709 UG Cable Kms 4 2 0 4 0 0 10

10lnstallation of Distribution

TransformerNos. t27 161 53 4l 1t2 59 553

1l Capacity enhancement of LT sub-station

Nos. 35 98 35 70 39 t07 385

L2LT Line : New Feeder/ Feeder

BifurcationKms 23 31 8 62 0 36 160

13[T line :

Ausmentation/ReconductorineKms 15 7 0 119 0 t22 263

t4 Metering Nos. 2792 7565 15169 4226 2777 9598 42L2815 Provisionine of Solar Panel Lot 2 I 1 I l 1 716 Others Lot 113 7 0 334 2t 0 475

Total Cost lRs. [acs) 4360 3875 2147 3091 1435 2482 17990

l.l Construction Supervision :-

To supervise and Monitor that the construction works are in accordance with the approveddrawings, technical specifications, environmental Management Plan and other stipulations ofconhact Documents. The Construction methods proposed are in compliance with the stipulationparticularly, in relation to the construction equipments and other resource deployment.

Supervise the Conhact in all matters concerning safety and care of the work includingenvironmental aspects and labour welfare keeping in view the relevant Acts.

Inspect the Works on substantial Completion before taking over and indicate to the C.E.O.OF WORK PROJECT, MPPKWCL INDOR-E/ Project Director (DDUGJY & IPDS) anyimportant work to be caried out by the Contractor during the Defect Liability period.

The consultant's Resident Engineer and Field Engineers shall assist the Field Engineers ofMPPKWCL Indore, responsible for verifoing turn key constnrction contractor's bills in makingfield measurement of all items of works and of quantities of materials incorporated in the workand maintaining up to date books containing such computations or other information concerningthe use of construction materials, properly segregated in to sections of construction. Theconsulatant Resident Engineer and Field Enginners shall verifu thE pole schedules of thecompleted works and record certification therof.

b.

c.

d.

All measurement of all items of works willMPPKVVCL Indore in the Measurement Book aswould assist in takine such measurements

be recorded by Field Engineers ofper provisions and rules. Consultantsif ^requested by concerned field

A"6y--; ;-, c, r,eer i pGGVyr

Q1o'i'.1;. 1H..i -.'.r ri lrrlppKVVCl' I,SOOI€

(RGG\l'tll)::i;:crete Office

Page 4 of 12

|lrrrr,r4qv,co, Lrq, INDO83

Award No. MD/wzl DDUGTy/pMA/AwAR o,o,o-nflliff? \Y!l;"Yi5Wfrf,T*?" M/s Feedback rnfra pvt ,,0 . oo,nuon

engineers.Following measurements shall be done by the team members of the consultant.

By Team Leader 15 %ByRE 25%By FE 100%

These measurements shall be made on the works of each District, block and Town in the-Sive1

percentage and should cover all-important items/components of work. Consultant willbe fully responsible for all measurements checked by his staff. percentage checking ofmeasurements prescribed for Team Leader is for other than those checked by RE. But this doesnot prohibit Team Leader from checking the measurement of the part checked by RE howeverthis shall be in addition to the prescribed percentage

f. To perform repeat tests or check measurements, if directed by the C.E.O./project Director.These repeat tests or measurements may be conducted in the presence of C.p.O.lprojectDirector or their representatives as may be directed.

1.2 Following field checks are in the scope of the consultant:-

a' Detailed inspection & Supervision of 50 Yo of total Villages in the scope of the executingcontractor/contractors on random sampling basis for which, I00% verification of Bpiconnections, 100% Distribution Transformer Substations, 100% LT Lines and 100% ofthe 1lKV lines attributed to the village (emanating from cut-point/grid substation) as wellas the 11 KV line laid within the village, verification of enirgisaiion of village & BpLbeneficiaries, installation of service connections in public plac-es, hours of sup-pty in thevillage, time taken by DISCOM to raise first energy-Uitt itr favor of beneficiaries are to beinspected in 50o/o villages of the project.

Stages and Scope of Inspection.1- lst Stage- Inspection shall be carried out as per FQP on the start of work in

villages.(i) All districts and all turnkey contractors shall be covered.(ii) Electrified as well as un-electrified villages will be covered.(iii) Inspection shall begin and end when the physical progress in the

project is completedir-l0% and 30 yo of villag.s r"sp."tirrely. Five(5) nos. of villages in a project are to be thoroughly inspected at thevery beginning when the same is completed in the project. Thesevillages after rectification of defects will become moial qualityvillage. The findings of inspection of these five villages ,t at uLused as training resource and necessary improv"..ni in euality

2. :*^*61]13::'*-oletion of works in the viuage, as notified by thePQCC. Inspection shall be carried out as per Fep.(i) 50% randomly selected villages as per Fep, jnclu ding l0% villages

inspected..in the lst stage, inspection shali begin and end when thephysical progress in the project is completed in so% and 90 zo of vilragesrespectively.

(ii) All districts and alr turnkey contractors shail be covered.(iii) Electrified as well as un-electrified villages will be covered

\ ..-

-,assi#\6,g ineer''!c cvyfcl" ".r-/,,.,. .'\, .,1 -r-i(vvctli\l/rritC

ltfi.?r:i),-K;.\-" 9"J*<>" Ltd.,. li'lD$ R'B

O/o MD (WZ), MPPKWCL IndreAward No. MD/WZI DDUGJY/PMA/AWARD/Ord-91117106 lndore,Dt.22l09l20l5 T.. \ts :=*.sk hfia Pvt. Ltd., Gurgaon

b. Detailed inspection & supervision of 100% New 33,'ll K\- Ss- 100% Additional PTRInsttallation works and 100% Aug. of PTR Capacity works including lit{li o renovation works of33/11 KV S/s as per MQP/Drawings/Technical Specifications and norlss in the field as per FQP inrespect of DDUGJY and IPDS works.

c. Detailed inspection & supervision of atleast 50% Qtycontractor on random sampling basis including 11

mentioned in PARA 1.2(a) of this award.

d. Quality Assurance shall be undertaken in the following areas of the project impiementation:-

i. Quality of material/equipment being supplied.

ii. Quality of works in the field-Workmanship of Contractor.

e. Proper records shall be maintained at field office of PIA, PMA and turn-kel Contrastor tbr all the

checks and tgsts made by the PIA and PMA.

f. Wherever works carried out are found unsatisfactory by PMA, compliance s'ith r*pect torectification shall be submitted by turn-key contractor to PMA and PIA and the same ma) be re-

inspected by PMA and PIA, if required. Recurrent adverse reports about qualiq' of rvorlis in anr'project will entail withholding of release of funds.

g. The turn-key contractor shall make necessary arrangements at site for checkin,e of earth-resistance, conductor size, route-length etc. and provide it to PMA, if required.

CONSULTANTS TEAM INPUTS:The consultant will engage the minimum staff as detailed in Table-l.The qualification,experience and task assignment of the staff will be as per Annexure-2 of tenderdocument.The team given in Technical Proposal will have to be employed on thework.The implementation of the Work Project is organized in terms of multi ConstructionPackage.

Table 1 Supervision Team Composition

Team Comnosition NumbersTeam Leader One

Resident Engineer Four

Field Ensineer Twenty Four

Junior & AdministrationStaff

(As required)

Consultant is supposed to deploy staff as given in Table 1 above. However if proportionateprogress of work is less than 50% of the planned works, field staff may be reducedproportionately, in consultation with Project Director.

During rainy season when progress of work is normally very poor, consultant will have to deployfollowins minimum staff-

of all other s'oiL; erecutEd b1' the turnkeyKV lines. LT lfures - DTRs other than

1.3

Team LeaderREField Engineer-

1

2

T2

Asr;is: , -; -01e ',. lf,7-u, 'RGGypl. \ vv...

I t.1. ,t tvtppl{1yg2l*se€f

I:Page 6 of l2 -'1

ri* **,,,o "*o .,u1, J -ci\.3

O/o MD (WZ), MPPKWCL Indore

AwardNo. MD/WZIDDUGJY/PMA/AWARD/Ord-91/17106 indori,Dt.22/0gl2ol5 To M/s Feedback lnfra Pvt' Ltd ' Gurgaon

circumstances after due aPProval

fixed by Team Leader with the

Indore.

The Consultant shall have the complete responsibilify for the timely completion of works and no

additional fee on any account shall be paid.ihe composition of team will be as per Table I above'

However, the consultant will be free to engage more personnel, if required' subject to the

conditions of agreement.

I.4 FACILITIES TO BE PROVIDED BY THE CONSULTANTThe consultants shall make their own arrangements for transport (Vehicle) at the

work project site-. The consultant shall compulsorily provide transport facility to team

members as below: -

Normally change of anY team

members will be allowed onlY

Team LeaderResident EngineersField Engineer

Team LeaderREField Engineer-

member will not be allowed. However, the changes of team

to the extent of 25oh of the team strength in exceptional

of Project Director. Headquarters of the RE and FE shall be

approval of Project DirectorAlodal Officer MPPKVVCL

- I Jeep/ Car- I Jeep to each.

- Motorcvcle to each

The consultant,s firm shall depute some Sr. Engineer of Management level when called for, but at

least once, in a months, to discuss the progr.rr, performance of the team and other issues with

rurD f proj.ct Director / Nodal officer ut ttapprvvCl Indore headquarter. Failure to do so will

entail a penalty of Rs. 10,000/- for each such failureThe consultant is ,equired to provide the Key Personnel with qualification and experience

according to Table-l ubou. and the team will have to be employed on the work. If services of

required-staff are not made available at required/proper time and in the specified number,

deduction at the following rate shall be made'

Rs.1500/- per dayRs. 800/- per dayRs. 800/- per day per Engineer

In addition action under other clauses

termination of the contract may be taken.of the contract which may ultimately result in the

2. CONTRACT PRICE

The contract price for the above work shall be 0.42oh (Zero Point Four Two Percent) of

sanctioned cost of work to be done by tumkey contracts under DDUGJY & IPDS, plus service

tax & educational cess as applicable at the time of billing under the DDUGJY & IPDS works'

The total tentative cost of sanctioned work as on date arrived to Rs.@!!Crs. The cost.of

consultancy work is (629.12X0,420/o\=2,642 Crs inclusive of all taxes & duties but exclusive

of service tax &..r, ih.r.on, subject to revision (if any) of cost of projects of Ujjain' Dewas,

Shajapur, Mandsaur, Neemuch and Ratlam Districts of West Discom as per actual survey & field

requirements and accordingly the'cost of consultancy will also changel

,assirffif.s,ns'O/o P,D. (fr ..,, ',,''.

li\k ! .it,

hl\tl -.'-'Atl -/'

Noddltfficer (RGG\rFl

CoiPor :'ta'jffiCber or-i,

trrt P.P.KI\w.Co. LI''J" i;sl"OFI G6VY)

l* .r,1ilyCl

Oio MD (WZ), MPPKVVCL lndore

Award No. MDN/ZI DDUCJY/PMA/AWARD/Ord-9 t /l 7 I 06 lndore , Dt.2210912015 To lvvs Feedback lnfia Pvt. Ltd., Gurgaon

2.1 Taxes and DutiesThe consultants and the personnel shall pay the taxes, duties, fees, levies and other impositions

levied under the existing, amended or enacted laws during life of the agreement and the Client

shall perform such duties in regard to the deduction of such tax as may be la*firlly imposed.

price is inclusive of all taxes and duties (except service tax & education cess on such service tax)

levy-able in relation to this contract. The applicable Service Tax (along-with Education Cess on

suci service tax) shall be claimed over and above the contract price by the consultant and paid by

him to the appropriate govemment timely and in proper maruler as may be prescribed by law.

Further, the consultant is required to produce documents regarding payment of Service Tax time

to time. If he fails to produce such document, his subsequent bills may be withheld for payment.

3. PAYMENTth. puyilillf tttE fees to the consultant in consideration of the services rendered by him shall

be made in following manner:-

(i) Fixed Part of the Fees: 25 % (Twenty five percent) of the fee quoted by consultant shall

Ue nreA portion of total fee and shall be payable in monthly equal installments as calculated in

following manner:-

6,29,12,00,000 x (0.42) x 0.25

Monthly fixed part of Fees :(ln Rs) 27 Xl00

(ii) Fixed part of the fees shall be payable for a perio d of 27 months only. However, ifcontract is cancelled, terminated or otherwise made ineffective for any reason what so evert

payment of fixed part of fee shall be stopped on the date of such cancellation / termination

etc.

(iii) Variable part of the Fees: 65 % (Sixty five percent) of the fee quoted by consultant shall

be variable portion of total fees of the consultant, and shall be payable on prorata basis as per the

work progr.rr, u, calculated in following manner. The work/part of the work shall only be treated

as complJted only when the Consultant's personnel have submitted all reports relating to the said

work as per scope of the services and as mentioned in TOR.

Cost of works certified as Completed X 0.65 X0.42

Variable part of Fees :(ln Rs) 100

(iv) Remaining 10% shall be released after 03 months of completion of works and acceptance

of closure proposal of turnkey contractor by the REC/PFC and release of final insttalment

of grant to the utilitY.

(v) Normally the payment of fees as above would be made within 30 calendar days and 45

calendar duys for fixed part of fee and variable part of fee respeciively from the date ofsubmission of bills. The amount as per the statutory requirement and/or as provided in the

contract award shall be deducted from the bill of consultant. The M.P.P.K.V.V. Co. Ltd,

lndore shall not be liable for any interest on account of any delay in payment.

^ esgisH'r.5 i n eer t RG G Vy)

O/o P.i. i,,',,\,,.i,r MppKVVCt'fEii085

\I-i\l$rodlrfrr.-' d8$f&f'

' -'lice$.tf uf"'su i'o !.*** Lt'd,, INDORB

AwardNo. MDMZ/DDUcry/pMA/AwARo,o,o-r,71?,Tf !yf"';5r:;ffih,To"'i" M/s F'eedback Inrra pvt. t.td., Gurgaon

(vi) The cost of works for which consultancy to be provided has been estimated to be Rs

629.12 crore (approx) at present, on the basis of which, fixed part of the fees has been

arrived. During execution of project, actual cost of works supervised may be more or lesser

not undergo any revision.

4. CURRENCY OF PAYMENT

Except as may be otherwise agreed between the Client and the Consultants allpayments under this award shall be made in Rupees only. The payments shall be made by

Cheques or RTGS.

4.

The billing and payment in respect of services shall be made as follows:

As soon as practicable and not later than the fifteen (15) days after the end of each

calendar month, during the period of services, the consultant shall submit to Clientin duplicate itemized statements.

The Client shall cause the payment of the consultants periodically as given above

within thirty (30) days after the receipt by the Client of bills with supporting

documents. Only such portion of a monthly statement/bill that is not satisfactorilysupported may be withheld from payment. Should any discrepancy be found to exist

between actual payment and cost authorized to be incuned by the consultants, the

Client may add or subtract the difference from any subsequent payments.

The final payment under this clause shall be made only after fulfillment of clause

No.3.(iii) (Variable Part of the Fees). The services shall be deemed completed and

finally accepted by the Client and the Closure report shall be deemed approved bythe Client as satisfactory, ninety (90) calendar days after receipt of the closure report

by the Client unless the Client, within such ninety (90) days period, gives writtennotice to the consultants specifying in detail deficiencies in the services, the Closurereport. The consultants shall thereupon promptly make any necessary corrections,and upon completion of such corrections, the foregoing process shall be repeated.

Any amount which the Client has paid or caused to be paid in accordance with thisclause in excess of the amounts actually payable in accordance with the provisionsof this agreement shall be reimbursed by the consultants to the Client within thirty(30) days after receipt by the consultants of notice thereof. Any such claim by theClient for payment must be made within six (6) calendar months after receipt by the

Client of a final report and a final statement approved by the Client in accordance

with the above.

All payments under this agreement shall be made through account payee cheque orRTGS.

5. RECOVERY

Any sum falling due or any loss caused against this award shall be recoverable by the client fromthe consultant as if it were arrears of land revenue.

a)

b)

c)

d)

1l-----'ASsistijr f r,n,ncer TFGGVYt

Olo e,D. iire ,.i,'Y. i,''i,KVVCLlir i;'-' fi E

Nodal r fp./Clbstr?Tr 12

than Rs 629.12 Crore. ln such event, the fixed part of the fees payable to consultant shall

M.P.P.&V.V.Co. Lld', II"IIIORB

O/o MD (WZ), MPPKVVCL lndore

Award No. MDIWZI DDUGJY/PMA/AWARD/Ord-91/17106 tndore,Dt.22l09l20l5 To lvVs Feedback Infra Pvt. Ltd., Gu:gaon

6. AGBEE,UENT

You will have to execute an agreement on Non Judicial stamp paper worth

Rs.1000/- with MPPKVVCL, Indore in the prescribed format given in Annexure-Ill within aperiod of 15 days from the issuance of this award. Execution of w'ork shall be governed by the

terms and conditions mentioned in the agreement, this award and the tender document against

which this award is olaced.

9. PERFORMANCESECURJTYThe amount of security deposit in the form of Bank Guarantee (in the format given in

Annexure-Il) shall be 10% of the estimated consultancy fee. The validity of the Bank

Guarantee(s) shall cover entire duration of consultancy period plus 3 months. The Bank

Guarantee(s) shall be released after satisfactory completion of the assignment.

10. PENALTIESa. Without prejudice to other provisions of this award, in case any delay occurs insatisfactory completion of the project for any reason(s) attributable to the consultant, the

consultant shall be liable to pay penalty @ 0.05% of the cost of such delayed portion of the

project (as may be decided by client), per calendar day of delay, subject to a maximwn of 2.5o/o

(two and half percent) of the contract sum. For the purpose oflhis clause, contract sum means the

Estimated Cost of Works to be supervised (as per contract awarded to contractor) X percentage

rate quoted by the consultants in their financial offer.

b. For delays in satisfactory completion of work beyond 3 (three) months, the amount ofperformance security in part or full as decided by MPPKWCL INDORE' is liable to be

forfeited.

c. ln the event any material or item of work is found to be substandard and unacceptable,

the Consultant shall intimate to C.E.O./Project Director for initiating actions so that such cases do

not recur. During the inspection of the Client or officers deputed by the Client/ ProjectDirectorA{odal Officer, if it is noticed that sub-standard work has been allowed (whetherpaid or not) by the consultant, l-112 (one and a half) times of the consultancy fee payable to

the consultant, for that particular work, will be recovered from him. However consultantswill not be discharged of his responsibilify to get the defects rectified by the contractor.

I1. TIME FRAME

The term of appointment of the PMA shall be for (24+3=27) months i.e. 24 months forcompletion of works under the scheme and 3 months for associated activities after completion ofworks. The Zero date for a particular project shall be the date of agreement after award with the

PMA, if not conveyed in project wise manner by the utility. In case of execution of works under

the project beyond 24 months, the services of PMA shall be suitably extended time to time on

same terms and conditions. The consultancy services for a particular project/ Packages shall be

discontinued as and when the work of that particular project/package will be physically

completed including submission of closure proposal

^ lsslstant Fngineer {RGGV?t

Olo e.{:. 1r.;g,jVyl l\tFpKVVCl

l,'{009€?Rdef$

C,i.r::,:'-.te CffiCe

-$frfSiUV.Co, Ltd,, INDO&B

Award No. MD/wzlDDUcry/pMA/AWARD/ord-e'7i;'Tr" iffiLH,:;lvol;h,To"'i" M/s Feedback rnrra pvt, r-td.. cursaon

12. REPORTSAll reports and documents prepared by the Inspecting Agency shall be professionally precise andobjective. The report formats shall be finalized in Consultation with the Employer's officials. Thereport should be as per clause 9 of Terms of Reference of bid document.The progress report shallhave to be submitted fonnightly in the format prescribed by the PD(DDUGJY & tfos; anomodified as when required.

13. LIABILITY FOR ACCIDENTS AND DAMAGESUnder the contract, you shall be responsible for loss or damage to the plant/equipment/

lines/ works until the successful completion of commissioning as defined else where in the biddocument.

14. pEFENCE OF SUrEIf any action_in court is brought against the Employer or CEO or an officer or agent of the

Employer' for the failure, omission or_neglect on tlte part of the pMA to perform-any acts,matters, covenants or things under the Contract, or for damage or injury caused by the attegeOomission or negligence on the part of the PMA, his agents, representatives or his sub-consultint,or in connection with any claim based on lawful demands of sub-consultant, workmen, suppliersor employees, the PMA shall in all such cases indemnify and keep the Employer, and the-CgOand / or his representative, harmless from all losses, damages, expenses or decrees arising of suchaction.

15. FORCE MAJEURE(a) For the purposes of this agreement, "Force Majeure" means an event which is

beyond the reasonable control of a party, and which makes a party's performance of itsobligations hereunder impossible or so-impractical as reasonably to be considered impossible inthe circumstances, and includes, war, riot. Civil disorder, earthquake, fire, explosion, storm, floodor other adverse weather conditions, strikes, lockouts or other industrial action are within thepower of the pany invoking force majeure to prevent, confiscation or any other action byGovernment agencies.

(b) Force Majeure shall not include(D - Any event which is caused by the negligence or intentional action of a party orsuch party's sub-consultant or agent or employe.r, noi -(ii) Any event which a diligent party could reasonably have been expected to both (A)take into account at the time of the conclusion of this Agreement and (B) avoid or overcome inthe carrying out of its obligations hereunder.

(c) Force Majeure shall not include insufficiency of funds or failure to make any paymentrequired hereunder.

16, MODIFICATIONModifications of the terms and conditions of this agreement, including any modification of thescope of the services, may only be made by written agreement between the parties. pursuant toClause 7 '2 of general conditions of agreement given in tender document hereof, however, eachParty shall give due consideration to any proposuls for modification made by the other party.

Nodal( fiG GVyf

"'i( '.i Vet {-..' :

-e" /*lffior,,

O/o MD (WZ), MPPKVVCL lndore

Award No, MDlwzlDDUCJy/pMA/AWARD/ord-9 lll7106 'lndo;e'Dt.22/O9l2ol5 To lws Feedback lnfra Pvt Ltd

' Gurgaon

17, TERMINATIONTermination of the agreement shall be governed by the clause 2'9 of the general

conditions of agreement given in tender document'

I8. ARSITRATIONIt is specifically agreed that all disputes or differences, whatsoever, arising out of this

contract between the parties whether d*idth. pro_gress of the work or after its completion, shall

be settled by Mp Arbitration Tribunal, Goit. of MP in accordance MP Madhyastham Adhikaran

Abhiniyam 1983'

19. DISPUTESThe raws appricabre to the contract shan be the laws in force in India. Any dispute or

differences arising- uno.i, out of or in connection with this contract shall be subject to

.*.ru.in. jurisOiction oi.o*p.tent court situated at Indore only'

20. All the terms and conditions given in bid document are also applicable with the terms and

conditions given in this award'Please acknowledge the receipt of this Award and take immediate action to

implement the same on the terms and conditions enumerated above'

Detail Scope of Work of Contractor

Form of BG for Performance Security

Format for Agreement.

O/o MD (WZ), MPPKVVCL'Indore

No.MD/WZIDDUGIY/PMA/AWARD/Ord-90/17105 Indore'Dated22l09l20l5

Copy to:-(i) rhe ED (UR) MPPK)/]|CL'- Ujjain

iiil rhe ctrief rinancial officer MPPKVVCL' Indore

(iii)TheS.E'toarvrlMPPKVVC-LUjjain,DewaqShajapur,Mandsaur,NeemuchandRatlamii"i The cPB cell MPPKVVCL Indore

Encl:-(i) Annexure-l :

(ii) Annexure-ll :

(iii) Annexure-lll :

u-

Yours faithfullY,

rector (DDUGJY)MD (wz), MPPKWCL'

lndore

Page l2 of 12

Y

O/o MD (WZ), MPPKVVCL IndoreAward No, MD/WZ DDUGJY/PMA/AWARD/Ord-91/17106 Indore, Dt.22l09/2015 To M/s Feedback Infra Pvt, Ltd., Gurgaon

A!!NEXURE-I

DETAILS OF DDaGJY & IPDS PROJECTS UNDER Ujjain, Dewas, Shajapurn Mandsaur,Neemuch and Ratlam DISTRICTS

DETAILS OF SANCTIONED PROJECTS SANCTIONED UNDER DDUGJY & IPDSSCHEME IN UJJAIN REGION OF WEST DISCOM, INDORE

Nodal

DETAIL OF WORK INCTUDED IN DPR OF DDUGJY (UJJain Region)

Particulars/Districtname Dewas Mandsaur Neemuch Ratlam Shajapur Uiiain

Total

RE COMPONENT

Un-electrifiedVillaees 0 0 0 n 0

0

Intensive Villages 1051 906 674 1053 1068 1095 5858

11 KV (Kms) 4.5 123.3 198 223.03 284.L 388.9 1,227,83

DTR 409 126 z4v 499 181 778 2233

LT Line on AB

Cable r079 563,4 364 298.74 1280.9 5214L07.04

BPL 3s069 7L546 2343 2753 18s03 0 70214

St. Light (Kms.) 0 0 0 0 0 0 0

Reno. DTR Earthine 0 0 0 0 0 0 0

FEEDER

SEPRATION0

11 KV Line (Km.) 219,6 82.9 5.1 43 278 18 646.6

DTR (Nos.) 268 272 4 66 300 5 915

11 Bav (Nos.) 2 0 0 0 0 0.'

SYSTEM

STRNGTHNING

33 KV Line 61 8L 44 1.17 75 38 416

New 33/11 KV S/s 8 6 3 4 11 5 37

AddI PTR 3 3 'J. ? 5 5 20

Aue. of PTR 9 11 4 5 22 10 b1

33 KV Bay WithVCB 1 0 4 9 0 5

t9

33 KV VCB with CT

Panel 4 5 5 18 2t 457

33 KV AB Switch 5 t 88 42 7 150

11 KV Line L38 496 181 469.8 IIY 389 1852.8

11 KV Bay WithVCB 8 13 0 L 0 11.

33

-n/-

" f"-:'tjefnrineer ( RGGVyTv/o t'.), r?.i,.:yy1 l,4ef 6yyqg

i" , .'.fiF*,r,*Hro: t'6' r't'r"'

-;{i;sBB

Page I of 3

O/o MD (WZ)' MPPKWCL lndore

Award No. MDtwLtDDUcJy/pMA/AWARD/Ord-gl/l?106 Indore 'Dt.22l0gl20ls

ro M/s Feedback lnfrr Pvt' Ltd.' Gurgaon

11 KV VCB with C-r

Panel 19 2T t4 0 48 27t29

11 KV AB Switch T6 n 195 0 22 43 276

Fault Passage

lndicator L2 11 13 11 5 1365

Remote Control

Svstem for Feeder 0 76 51 54 0 52239

R&MS/s 28 2t 24 58 37 28 196

METERING

Feeder Metering

33 KV 18 26 0 0 0 0 44

11 KV 126 51 32 43 81 4 337

ConsumerMetering

0

Sinele Phase 51155 10277 21305 r4286 4s605 61865 204493

Three Phase 967 0 0 0 0 L37 1104

Amount (ln Lacs) 9795.23 6178,25 399r.62 6027.54 10854.77 8081.32 44922.13

Amount DUGJY {Rs

Crs.)97.9s 61.78 39.92 60.22 108.54 80.81 449.22

Sanction Cost ofIPDS Scheme ( In

Crs.)

38.75 14.35 24.82 30.91 27,47 43.60 179.90

Total(DDUGJY+IPDS) {ln

Crs.)

136.70 76.13 64.74 91.13 136.01 L24.41 629.L2

ffi tN the DPR of IPDS (.ujjain ReFion)

S.No. Scope of Works Unit Ujjain Dewas Shajapur Ratlam Mandsaur Neemuch Total UR

L 33/11 KV S/S: New Nos T 0 0 0 0 0 1

233/11 Kv S/S : Transformer caPacitY

enhancementNos, 10 0 0 0 0 0 10

3Renovation& Modernisation ol 33ltt

KV SsNos. 14 0 0 0 0 0 L4

4New 33 KV new feeders/Bifurcation of

feederslKms 20 0 0 0 0 0 20

533 kV Line Bay Extension at EHV

stationNos 4 0 0 0 0 0 4

511 kV Line : New Feederl Feeder

BifurcationKms 54 67 58 41 15 51 285

7u kV Line I

r,dmahi.ti^n /RccnnductorinPKms 9 63 0 60 0 15 t47

8 Arial Bunched Cable Kms rzt 234 230 t47 110 L29 970

9 UG Cable Kms 4 2 0 4 0 0 10

10lnstallation of Distribution

TransformerNos. L27 161 53 4t Lt2 59 553

\n"t/ A

^esiiYr?t €ngi6sg7 {RGcvyr - )41o/;; ;:, ; :l'Jfi1ll,:,il:i *?,#::: $fr.:w

MrFrP,KsV,VCo, Ltd,, INDORT

Page 2 of 3

11Capacity enhancement of LT sub-

station Nos. 35 98 36 70 39 to7 385

t2 LT Line : New Feeder/ FeederBifurcation Kms 23 31 8 62 0 36 160

13 LT Line :

Augmentation/Reconductorins Kms 15 7 0 119 0 L22 263.14 Metering Nos. 2792 7566 15169 4226 2777 9598 4212815 Provisioning of Solar Panel Lot 2 1 I 1 1 1 716 Others Lot u3 7 0 334 2t 0 475

Total Cost {Rs. Lacs) 4350 3875 2747 3091 t435 2482 t7990

O/o MD (WZ), MppKVVCL IndoreAward No. MDnvz DDUGJY/PMA/AwARDlOrd-9ltl7l06 Indore, Dt.22l09/2015 To M/s Feedback Infra pvr. Lrd., Gurgaon

Assisr SktFtrgifieer ( RG GVVI

0/o , r- 'V'/r MPPKVVCL

il':- utlEi'{".P"F.i(;ii

" j,.eo" ;-;ri., iii:,CRts

Page 3 of 3

IAward No. MDrwztDDUGJy/pMA/AwARD/or3-/eorfi[yi]#:.:5rYrH!,|[il"

'r'o M/s Feerrback Inrra pvr. t,td., Gurgaon

ANNEXUry-II

Form of Bank Guarantee cor Per{ormance Securitv

(To be used by approved scheduled banks)

l. In consideration of the Project Director (DDUCJY & IPDS) Madhya Pradesh Paschim Kshetra

Viayut Vitran Co. Ltd (A companyincorporated under the companies Act 1956 and having its Registered

office at GpH Compound, polo ground, lndore), (hereinafter c-alled "the Authority) having agteed to

exempt lWs... ......... (Herein after called "the said consultant(s)") from

the demand, under the terms and conditions of an Agreement dated. made between

" And "(hereinafter called "the said

Agreement,,) for performance/security deposit for the due fulfillment by the said consultant(s) of the

terms and conditions contained in the said agleement on production of Bank Guarantee for

(Rupees.. ....onlY). We...."the Bank") do iiereby undertake to pay to Authority an amount-- not exceeding

Rs....... ........' ....'. Against any loss or damage caused to or suffered or would be

caused to or suffered by the Authority by rJson of any breach by the said Contractor (s) of any terms and

conditions contained in the said agreement'

2 We. ..'..'.Bank Limited, do hereby undertake to pay the amount due and

payable under this guarantee without any demure merely on a demand from the Authority stafting that the

amount claimed is due by way of loss oi damage caused to or suffered by the Authority by reason of any

breach by said consultant(s) of any of the terms or conditions contained in the said agreement or by

reason of the Consuftantfsj iuilur" io perform the said agreement. Any such demand made on the bank

shall be conclusive as regards the amount due and payable by the Bank under this guarantee' However'

our liability under this guutunt.. shall be restricted to an amount not exceeding Rs.

3. We... ... Bank Limited further agree that the guarantee herein contained shall

remain in full force and effect during the period that would be taken for the performance of the said

agreement and that it shall continue to be enforceable till all dues of the Authority under or by virtue of

tlie said Agreement have been fully paid and its claim satisfied or till Authority certifies that the terms of

the said u!..n1.nt have been fuliy and properly carrieci out by the said Contractor(s) and accordingly

discharges the guarantee. Unless a demand or claim under this guarantee is nrade on in writing on or

beforethe ..... ...... we shallbe discharged from all liability underthis guarantee thereafter.

4. We.... ......Bank l-imited f'r,rrther agree with the Authority that the

Authority that the Authority shall have the fullest liberty without our consent and without effecting in any

manner obligations her under or very any of the terms and condition of the said agteement or to extend

time of p.rfo.rnun.. by the said coniractor(s) from time to time or to postpone fbr any time or from time

to time any of the powers exercisable by the Authority against the said contractor (s) and to fbrce-bear or

enforce any of the terms and conditions relating to the said Agreement and we shall not be relieved from

our liabilities by reasons of any such variation of extension having granted to the said contractor (s) for

any forbearance act, or commission on the part of the Authority or any indulgence by the Authority of the

said contractor (s) or by any such matter or thing whatsoever which under the law relating to sureties

would but for this provision have effect of so relieving us'

5. We bank hereby also undertake to have the signature of Branch Manager issuing

the Bank Guarantee verified from the local branch of the bank in M.P.

6. We... ..Bank Limited Lastly undertake to not to revoke.this guarantee during its

currency except with the previous consent of the Authority in writing.

Dated the 'daY of. ' " "'20"""'For .., ,...... Bank l.imited.

- l::.t, -," .: ri@-l^n* {RGGVy}C,1,., ., MnpKVVCf

,'.iiicc\ry,

lYlPrP.Kll .'r,.Co. Lti,.

Page 1 of I

Award No' MD^vz DDUGTy/pMA/AwARD/o.3fi fi Jyiilfi:5#:;il;t!.. To M/s Feedback tnfra pv1. lJd., Curgaon

/'ANNEXURE.III

AGREEMENTThis AGREEMENT is made on this day of ----_=---, 20--_ between the proiect Director

to as the o'Client") which expression shall where the context so admits, includes'his administrators,successors' executos and permitted assign in office and assigns on the one poft, and(hereinafter called the ,,Consultanti"; *hi.hexpression shall

permitted assignwhere the context so admits, iniluoes his administrators, ,r.r"rrori'.*;;';;;

in office and assigns on the other part.

(b) The client has requested the consultants to provide certain supervision and consultingservices required for the work project as cJefined in the ceneral conditions of agreementattached to this agreement (hereinafier cailed the ,,Services");

(c) The consultants, having represented to the client that they have the required professionalskills, personnel and technical resources, have agreed to piovide the services on the termsand conditions set forlh in the Agreement;(d) The client has received funds from.virrious agencies (hereinafter called AGENCIES) forconstruction of Sub-transmission and Distributlon system in its jurisdiction in the area of.Indore commissionary of the State of Madhya Pradesh. The works and services shall besubject to the guidelines of the schemes of the Agencies

Now THEREFORE the parties hereto hereby agree as foilows: -

The following documents attached hereto shall be deemed to form an integral pan of this agreement:

(a) The Generar conditions of Agreement (hereinafter cailed .,GC,,);(ul The Special conditions of Agreement (hereinafter called the ,,SC,');(c) Letter of invitation and its oinr*",lOl Form of Bank Guarantee for performance Security.(e) The following Appendices / Annexure:

Annexure l: Terms of Reference(TOR)/Scope of Lltorks)Annexure 2: Task assignment antd qualifiiing criteria of key personnelAnnexure 3: Formatfor CV of key'peri"omitAnnexure 4: Formatforfinancial'proposalAppendix I: Information of Bidder.

If any conflict arises at/on qny terms and conductions specified either in General conditions ofAgreement or in special conditions of Agreemenl or nI{u*hrro in the hid clctcuments, the termsadvantageous to the MppKWCL Indori sniu be appricabre.

The mutual rights and obligations of the client and the consurtants shall be set forth in the agreement; inparticular:

WHEREAS

(a) The Client inrends to carrysystem in its jurisdiction inthe "Work project,');

out work of construction of Sub-transmission and Distributionthe area of Indore commissionary as defined (hereinafter called

MJTP.KTVJ,CQ. l"i-uu i-i::CRB

Page t af 2

\i.-..Awrrd No. MDNaDDUcTy/pMA/AwARD/orl-fifi{y?}#'::f,Yrirt"lt*"' ro rws Feedback rnrra pvr Ltd., Gurgaon

(a) The consultant shall carry out the services in accordance with the provisions of theagreement; and

(b) The Client shall make payments to the consultant in accordance with the provisions of theagreement.

IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be signed in theirrespective names as of the day and the year written.

Witness

I

Asslstant Engtneer liGGVyfO/o !.D. IRGGVy; MePKVVCI

tNoolf

FOR AND ON BEHALF OF Madhya pradesh paschimKshetra Vidyut Viran Co. Ltd., Indore

By .,

(A uthori sed Representative)

FOR AND ON BEHALF OF (NAME OFCONSULTANT)

By...... ....

(A uthori sed Representative)

(Note: If the consultant consist of more than one entity alt of these entities shouldSignatories e.g. in the following manner)

FOR AND ON BEHALF OF EACH OF THE MEMBERS OFCONSULTANT

(Name of the member)

By.....

(Authorised Representati ve)

Nodd (RGG\nO

appear as

CorPomte Office

![.P]P"Srv:v.co. Lt4, INDoBt

Page 2 of 2