Fermilab

Booster Cavity TemperatureMeasurements – 15Hz Operation

January 28, 2015

January 28, 2015J. Reid 1

Page 2: Fermilab Booster Cavity Temperature Measurements – 15Hz Operation January 28, 2015 J. Reid 1

Fermilab

Booster RF Cavity

January 28, 2015J. Reid 2

Page 3: Fermilab Booster Cavity Temperature Measurements – 15Hz Operation January 28, 2015 J. Reid 1

Fermilab

Cavity

January 28, 2015J. Reid 3

Page 4: Fermilab Booster Cavity Temperature Measurements – 15Hz Operation January 28, 2015 J. Reid 1

Fermilab

Blocking Capacitor

January 28, 2015J. Reid 4

Page 5: Fermilab Booster Cavity Temperature Measurements – 15Hz Operation January 28, 2015 J. Reid 1

Fermilab

RF Waveforms

January 28, 2015J. Reid 5

Page 6: Fermilab Booster Cavity Temperature Measurements – 15Hz Operation January 28, 2015 J. Reid 1

Fermilab

S/N 1002 Heating to LCW

January 28, 2015J. Reid 6

Cavity S/N 1002 Jan-15Power measurements for Cavity / Tuner heat removed by the LCWOperating conditions

RF Gap Voltage 47.3kVModulator Vout 22.5kVCenter Casting delta T 0.99 CCenter Casting Flow 1.04 gpmCenter Casting heat removed by LCW - Avg 0.273 kWCenter Casting heat removed by LCW - during RF Pulse 0.59kW

Back Tuner Cone Cooling US delta T 0.33 CBack Tuner Cone Cooling US Flow 1.44 gpmBack Tuner Cone Cooling US heat removed by LCW - Avg 0.125kWBack Tuner Cone Cooling US heat removed by LCW - RF Pulse 0.274kWBack Tuner Cone Cooling DS delta T 0.27 CBack Tuner Cone Cooling DS Flow 1.62 gpmBack Tuner Cone Cooling DS heat removed by LCW - Avg 0.116kWBack Tuner Cone Cooling DS heat removed by LCW - RF Pulse 0.253 kW

Back Tuner Cone + Ferrite for 1/2 tuner US delta T 3.85 CBack Tuner Cone + Ferrite for 1/2 tuner US Flow 1.44 gpmBack Tuner Cone + Ferrite for 1/2 tuner US heat removed by LCW - AVG 1.46kWBack Tuner Cone + Ferrite for 1/2 tuner US heat removed by LCW - RF Pulse 3.2kW

Tuner heat removed by LCW for 3 tuners - Avg 8.78kWTuner heat removed by LCW for 3 tuners - During RF Pulse 19.19kW

Page 7: Fermilab Booster Cavity Temperature Measurements – 15Hz Operation January 28, 2015 J. Reid 1

Fermilab

January 28, 2015J. Reid 7

Cavity Temperature Rise

Page 8: Fermilab Booster Cavity Temperature Measurements – 15Hz Operation January 28, 2015 J. Reid 1

Fermilab

Al Cone with Cooling

January 28, 2015J. Reid 8

Page 9: Fermilab Booster Cavity Temperature Measurements – 15Hz Operation January 28, 2015 J. Reid 1

Fermilab

Tuner Cone End View

January 28, 2015J. Reid 9

Page 10: Fermilab Booster Cavity Temperature Measurements – 15Hz Operation January 28, 2015 J. Reid 1

Fermilab

Tuner Cone with Skin Installed

January 28,2015J. Reid 10

Page 11: Fermilab Booster Cavity Temperature Measurements – 15Hz Operation January 28, 2015 J. Reid 1

Fermilab

Tuner End View

January 28, 2015J. Reid 11

Page 12: Fermilab Booster Cavity Temperature Measurements – 15Hz Operation January 28, 2015 J. Reid 1

Fermilab

Tuner Outer Cooling

January 28, 2015J. Reid 12

Page 13: Fermilab Booster Cavity Temperature Measurements – 15Hz Operation January 28, 2015 J. Reid 1

Fermilab

East Gallery Operating Temps

January 28, 2015J. Reid 13

Booster East Gallery operating 15 Hz