Ferndale City Council REQUEST FOR COUNCIL ACTION Department Prepared By: CITY CLERK’S OFFICE AGENDA BILL #18-09-009 TITLE: Ordinance Resolution Motion Info Only Discussion Date Council Action Requested: September 17, 2018 Prepared by: Susan Duncan, City Clerk Reviewed By: Date: 9/12/2018 SUBJECT: Engineering Services Contract WWTP Upgrade Committee: P&LU PW&U F&A Mayor X City Administrator X City Clerk’s Office X Community Development Dept Public Works Department X City Attorney’s Office Finance Department X Police Department Board/Commission Hearings Examiner ACTION REQUESTED: VOTE NEEDED TO PASS: SUMMARY: Please see staff report. DISCUSSION/ANALYSIS/ISSUES: Public Works & Utilities Committee members unanimously forwarded this item to the full Council for further discussion. RECOMMENDATIONS: Approval of AB #18-09-009 ATTACHMENTS: Staff Report Contract I 101

Upload: others

Post on 23-May-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Ferndale City Council REQUEST FOR COUNCIL ACTION

Ferndale City Council

REQUEST FOR COUNCIL ACTION Department Prepared By: CITY CLERK’S OFFICE

AGENDA BILL #18-09-009

TITLE:

Ordinance Resolution Motion Info Only Discussion Date Council Action Requested: September 17, 2018 Prepared by: Susan Duncan, City Clerk Reviewed By: Date: 9/12/2018

SUBJECT: Engineering Services Contract – WWTP Upgrade

Committee: P&LU PW&U F&A

Mayor X

City Administrator X

City Clerk’s Office X

Community Development Dept

Public Works Department X

City Attorney’s Office

Finance Department X

Police Department

Board/Commission

Hearings Examiner ACTION REQUESTED: VOTE NEEDED TO PASS:

SUMMARY: Please see staff report.

DISCUSSION/ANALYSIS/ISSUES: Public Works & Utilities Committee members unanimously forwarded this item to the full Council for further discussion. RECOMMENDATIONS: Approval of AB #18-09-009 ATTACHMENTS: Staff Report Contract

I

101

Page 2: Ferndale City Council REQUEST FOR COUNCIL ACTION

City of Ferndale

CITY COUNCIL STAFF REPORT

MEETING DATE: __________ AGENDA BILL #__________

SUBJECT: Water Treatment Plant Upgrade DATE: September 12, 2018 FROM: Mike Olinger, Public Utilities Superintendent PRESENTATION BY: Kevin Renz, Public Works Director & Mike Olinger

RECOMMENDATIONS: That City Council award the bid for engineering services to Wilson Engineering for the amount of $296,000 for these professional services with a 10% contingency. BACKGROUND: The work constitutes services to be provided by Wilson Engineering and its subconsultants K Engineers and GeoEngineers. This scope of services covers design and bidding phase services for the proposed Water Treatment Plant Upgrade Project. This phase of the project will include developing a project report per DOH requirements, pilot study, plans, specifications, bid documents, and bidding the project. This includes all work associated with the construction of a building addition; two additional reverse osmosis treatment units; remineralization system; anti-scalant addition system; new/modified piping, electrical, and controls; and lifting systems (e.g., jib cranes).

ANALYSIS: ALTERNATIVES CONSIDERED: The Council has the following alternatives

1) Award the contract as recommended. 2) Take no action at this time. 3) Direct staff to proceed in another direction.

FISCAL REVIEW: Funding is available in the Water fund to cover this work. LEGAL REVIEW: N/A CONCLUSION: Staff recommends APPROVAL of the contract for Wilson Engineering to provide engineering services.

102

Page 3: Ferndale City Council REQUEST FOR COUNCIL ACTION

AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES FOR

CITY OF FERNDALE

Preparation of Bid Documents for Water Treatment Plant Upgrade Project

THIS AGREEMENT is made by and between City of Ferndale, a municipal corporation of the State of

Washington, hereinafter referred to as "City," and Wilson Engineering, LLC, Consulting Engineers and

Surveyors, hereinafter referred to as the "Engineer," for the purpose of providing engineering services for

Preparation of Bid Documents for Water Treatment Plant Upgrade Project for the drinking water

treatment plant.

SECTION I: RELATIONSHIP OF THE PARTIES

City desires to retain the services of an engineer as consultant and engineer for planning and engineering

matters related to the City’s business and hereby employs Wilson Engineering, LLC to perform the

engineering work described herein for the planning, design, and construction of projects contemplated by

the City. All work will be done under the supervision of the Public Works Director.

The Parties to this Agreement, to the extent permitted by law, each bind themselves, their successors,

executors, administrators, and assigns to the other party to this Agreement and to the successors,

executors, administrators, and assigns of such other party in respect to all covenants to this Agreement.

The Parties intend that this Agreement shall create an independent contractor relationship between the

Engineer and the City. No agent, employee, servant, or representative of the Engineer will be deemed to be

an employee, agent, servant, or representative of the City for any purpose whatsoever, and no employee of

the Engineer will be entitled to any benefits of City employment. The Engineer will solely and entirely be

responsible for its acts and for the acts of its agents, employees, servants, and/or subcontractors during the

term of this Agreement.

SECTION II: SCOPE OF SERVICES

SCHEDULE AND BUDGET Bid documents will be completed by January 31, 2019. The attached Exhibit A (spreadsheet) gives the basis for the not-to-exceed estimate of $296,000 for these professional services. All work will be performed on a time and materials basis at the personnel and expense rates shown in Exhibit B.

SCOPE OF WORK The work described above and in the following sections constitutes services to be provided by Wilson Engineering and its subconsultants K Engineers and GeoEngineers. This scope of services covers design and bidding phase services for the proposed Water Treatment Plant Upgrade Project. This phase of the project will include developing a project report per DOH requirements, plans, specifications, bid documents, and bidding the project. The scope of work includes the following task and assumes that the following facilities will be designed and built. I. WATER TREATMENT PLANT UPGRADE PROJECT This includes all work associated with the construction of a building addition; two additional reverse osmosis treatment units; remineralization system; anti-scalant addition system; new/modified piping, electrical, and controls; lifting systems (e.g., jib cranes), new flow meter, and added clearwell volume. Detailed description of facilities:

103

Page 4: Ferndale City Council REQUEST FOR COUNCIL ACTION

Building addition to water treatment plant

• Size approximately 1,500-2,000 SF

• Construction similar to existing (except it will be slab on grade)

• Lighting, plumbing, HVAC Feed pumping for each RO Unit

• vertical inline 60-75 HP, capacity 500 gpm @ 150 psi, VFD

• pre-filter

• conductivity meter RO system (3 units) (feed water flow, temperature and pH meter; pressure safety valve)

• Stage 1 – 11 FRP vessels, with 6, 8” x 40” membranes elements

• Stage 2 – 6 FRP vessels, with 6, 8” x 40” membrane elements

• Stage 3 – 3 FRP vessels, with 6, 8” x 40” membrane elements

• Each stage and vessel can be isolated and maintained independently

• Flow through vessels will be di-directional to reduce fouling

• Throttling valve for concentrate to waste

• Permeate throttling

• Direct reading rotameter for each concentrate and permeate stream.

• Permeate discharge check valve

• Automatic concentrate purge control and solenoid valve Permeate flush system

• Extend piping to new RO Units Clean in Place (CIP) system

• Extend piping to new RO Units Remineralization system

• Capacity = 3,000-3,500 GPM minimum (includes bypass if any)

• Alternative 1: replace greensand with calcite (reuse tanks, backwash and piping system)

• Alternative 2: Demolish greensand tanks and replace with commercial calcite contact tanks including backwash system

• Cranes for loading calcite into tanks

• Discharge piping from calcite tanks to clear well

• Bypass piping

• Isolation valves, throttling valves Anti-scalant Systems (3 additional units)

• Dosing pump with calibration column and multifunction valve, and injection ports (capacity of 0.01 GPH to 0.1 GPH @25 psi).

• Integration with SCADA Chlorination

• Modify chlorine injection with design of remineralization system. Miscellaneous Equipment

• Jib cranes (3) for hoisting RO pumps, equipment Instrumentation

• Feed o Pressure, Pressure transducer and indicators (4) o pH/temp, sensor/transmitter (1) o Flow, Magnetic flow meter (1) o Conductivity transmitter (1)

• Permeate, each unit o Pressure, Pressure transducer and indicators (1) o pH, sensor/transmitter (1) o Flow, direct reading Rotameters (3) o Conductivity transmitter (1)

• Concentrate, each unit o Pressure transducer and indicators (1)

104

Page 5: Ferndale City Council REQUEST FOR COUNCIL ACTION

o Waste Flow: Magnetic flow meter (1)

• Integration with SCADA Electrical and controls integration:

• 3-phase 460V power o Feed Pumps: 3 x 60-75 HP

• 1-phase 110V power: o Valves, instrumentation, lighting o Anti-scalant pumps (3) o Outlets o Overhead Door o Jib cranes

• PLC for fully automatic operation (e.g., Allen Bradley MicroLogix with Panelview 1000 HMI)

• MCC Panel

• SCADA integration

• New generator and transfer for water treatment plant

• Replace booster pumps insertion meter with mag-meter o New Vault o New 12-inch flow meter with 12”-20” reducers and spools

• Convert Raw Water Basin at WTP to additional Clearwell volume o Install new submerged piping through wall from existing Clearwell o Install submerged manifold outlets in converted Raw Water Basin o Install connection between existing Clearwell and Raw Water Basin

II. PROJECT REPORT

Sub-Task 1. Communications

a. Communications and review sessions with City staff.

b. Communications and submittals to DOH.

c. Prepare for and attend public meetings.

a. Manage project delivery and schedule.

Sub-Task 2. Preparation of Project Report

Prepare a Project Report for the Reverse Osmosis Treatment System and remineralization that meets all

of the requirements for approval by Washington State Department of Health (the following ‘Task 2’

numbering corresponds with DOH report preparation criteria numbering).

2.2.1 Project Description

a. A description of the problem or problems being addressed and why the project is proposed.

b. A summary of the recommended alternative, proposed construction schedule, estimated project

cost, and financing method.

c. The relationship of the project to other water system components.

d. A statement of change in the physical capacity of the water system and its ability to serve

customers, if applicable.

e. Explanation of why the State Environmental Policy Act (SEPA) does not apply to the project.

f. Summary of source development.

g. Description of water treatment system.

105

Page 6: Ferndale City Council REQUEST FOR COUNCIL ACTION

2.2.2 Planning

Water System Plan amendment: Provide text, figures, and tables to incorporate into a Water System

Plan amendment to be prepared by others.

2.2.3 Analysis of Alternatives

A comparison of alternative solutions and the rationale for selecting a proposed alternative is required for

all types of projects (WAC 246-290-110(4)(c)). The comparison will include life-cycle cost evaluations

(initial costs plus on-going operations and maintenance costs).

2.2.4 Water Quality

Review of water quality as it relates to the purpose of the proposed project, including results of raw- and

finished-water quality analyses.

2.2.5 Water Quantity and Water Rights

This project report will reference the existing water rights and water rights application

2.2.6 Engineering Calculations

Describe how the project complies with design considerations in Section 2.2.7. The project report or DOH-

approved WSP must include the physical capacity analysis, hydraulic analysis, and sizing justification

(WAC 246-290-110(4)(f)). Includes relevant technical considerations necessary to support the project.

Prepare a treatment capacity analysis to determine whether the installed treatment processes limit the

water system’s source production capacity. The water system must have sufficient treatment capacity

together with storage, to provide a reliable supply of treated water equal to or exceeding the MDD.

2.2.7 Design Criteria

These criteria include:

a. Design and construction standards, including performance standards, construction materials and

methods, and sizing criteria, as applicable.

b. Locally adopted design standards relevant to the project.

c. Process design concepts and calculations: Detailed narrative of design concepts, design

calculations, and supporting information for the treatment process(es), process piping and

equipment, process control, and waste disposal.

d. Other project design elements: Outline the general design aspects, such as siting issues, ingress

or egress access, roads, sidewalks, parking, earthwork, drainage facilities, building layout and

design, special structural requirements or constraints, heating, ventilation, fire suppression

features, general utilities, electrical supply, and safety.

2.2.8 Legal Considerations

This section will require minimal work.

106

Page 7: Ferndale City Council REQUEST FOR COUNCIL ACTION

2.2.9 Operations and Maintenance Considerations

If the following elements are not in a DOH-approved WSP, include them in the project report for all projects

that add considerably to the operational and maintenance needs of the water system (such as storage

tanks, booster pump facilities, source of supply, and water quality treatment):

a. Describe the routine operations tasks and frequencies.

b. Describe the preventive maintenance tasks and frequencies.

c. Discuss the estimated operations and maintenance costs related to the project.

2.2.10 Start-up, Testing, and Operations

Describe the general methods and schedules for start-up, testing and operations. Methods should identify

specific standards and the persons involved.

2.2.11 Operations Program

Prepare a Preliminary Operations Program for the water treatment system that describes:

a. Procedures used to determine chemical rates.

b. Operations and maintenance for each unit process.

c. Treatment plant performance monitoring.

d. Laboratory procedures.

e. An overall schematic of the treatment process.

f. Process and instrumentation diagrams for the treatment facility.

2.2.12 Training Requirements

The project report will specify applicable operator training requirements, specific training the equipment

supplier(s) will provide, and related schedules. The final Operations Program and equipment-specific

operations and maintenance manuals should be available during the operator training sessions.

2.2.13 Treatment System Reliability

Describe treatment system reliability. “Treatment reliability” means the failure of any single component

will not prevent a treatment facility from meeting drinking water standards. Information on treatment-

process reliability is in the Preface of this manual and other design references (AWWA 1998d; Ten State

Standards 2007).

2.2.14 Chemical Overfeed and Backflow Prevention

Describe methods for prevention of chemical overfeed and backflow prevention.

2.2.14 Chemical Overfeed and Backflow Prevention

Describe methods for prevention of chemical overfeed and backflow prevention.

2.2.15 Pilot Study Results

Summary of all relevant Pilot Study Results (Pilot Study Preliminary Report by Vendor to be included as

appendix).

107

Page 8: Ferndale City Council REQUEST FOR COUNCIL ACTION

2.2.16 Summary

Summary of alternatives analysis, selected treatment system, costs, implementation, and schedule.

III. PILOT STUDY Complete a Pilot Study of the Reverse Osmosis System and remineralization system using the new

source blended with the existing source. This work includes:

• Preliminary design of system configuration – that meets a minimum of 87% source water

recovery.

• Selection of pilot testing equipment, supplies, and pretreatment chemicals.

• Protocol for pilot study: methods, schedule, testing, and criteria for success (the vendor will

provide input to preparation of protocol)

• Coordination with DOH.

• Coordination with pilot equipment supplier and with treatment plant staff.

• Assistance with setup and operation of pilot equipment.

• Coordination with laboratory testing (the City will be responsible for collection and laboratory

analysis of water samples).

The vendor will provide all equipment and all chemicals needed for the pilot testing. The city will provide

well water trucked onto site and a storage tank on site for blending the well water.

The City will be responsible for collecting and laboratory analysis of water samples at regular intervals.

The results of these samples will be provided to the vendor for use in preparing their pilot study reports.

The City will also be responsible for keeping a daily log of system readings, which will be provided to the

Vendor and Wilson Engineering for use in reports.

IV. PILOT STUDY REPORT

Complete a pilot study report that includes:

• Tabular data for each measured parameter. The vendor will provide daily data and normalized

data as shown below.

• Graphical data showing relationships between measured parameters.

• Narrative on the relationships between measured parameters.

• Cost projections for full-scale operation (yearly, monthly, and per customer).

• Final design and operational parameters.

• Recommendations for full-scale implementation.

• Comparison of recommended design and operational parameters to design goals, water quality

goals, and other performance benchmarks.

The vendor will provide a preliminary and comprehensive report of the pilot testing.

OVERALL PROJECT TASKS

Task 1 Provide overall management of projects including budgets, scheduling, billing, and contracting.

108

Page 9: Ferndale City Council REQUEST FOR COUNCIL ACTION

Task 2 Present project information at one public meeting.

Task 3 Develop Operating Strategy Work with City staff for developing an operating strategy for using the three different source wells and the treatment system in an efficient, effective and flexible manner.

Task 4 Conceptual Layouts Prepare conceptual layout of the building addition and locations of RO units and remineralization units.

Task 5 Preliminary Engineering & Background Data Collection Compile data for the new RO units and remineralization units and associated systems. Flows, water chemistry, and system operation needs.

Task 6 Design Phase - Calculations, Evaluation, Equip. Selection Provide sizing calculations, hydraulic calculations, treatment modeling, and materials quantities. Work with vendors to select appropriate equipment and obtain drawings, specifications and costs. Task 7 60% Design Plans (General, Structural, Mechanical, Electrical, & Controls) and specifications. Documents will include bid forms, contract forms, general specifications, and Division 1 though Division 16 special provisions.

Task 8 90% Design Plans (General, Structural, Mechanical, Electrical, & Controls) and specifications. Documents will include bid forms, contract forms, general specifications, and Division 1 though Division 16 special provisions.

Task 9 100% Design Plans (General, Structural, Mechanical, Electrical, & Controls) and specifications. Documents will include bid forms, contract forms, general specifications, and Division 1 though Division 16 special provisions.

Task 10 Cost Estimates - 60%,90%,100% Prepare construction cost estimates. Task 11 Bid Phase Assist with bidding by answering questions during bidding and providing addenda.

Task 12 Geotechnical Explorations, Report Assist with bidding by answering questions during bidding and providing addenda.

Task 13 Permitting Assist with bidding by answering questions during bidding and providing addenda.

Task 14 Topographic / Boundary Survey Assist with bidding by answering questions during bidding and providing addenda.

109

Page 10: Ferndale City Council REQUEST FOR COUNCIL ACTION

Task 15 Pilot Study Design Pilot study design.

Task 16 Pilot Study Procurement Identify vendors and obtain quotes.

Task 17 Pilot Study Protocol Verify protocols for vendor to follow in implementation.

Task 18 Pilot Study Implementation Provide oversight for implementation.

Task 19 Pilot Study Report Review and comment on pilot study report.

Task 20 Interim Project Report Prepare interim project report for review.

Task 21 Draft Project Report Prepare draft project report for review.

Task 22 Final Project Report Prepare interim project report for submittal to DOH.

Task 23 Pilot Study Contingency

DELIVERABLES FOR SCOPE OF WORK:

1. Public Meetings (1) 2. Conceptual layouts 3. 60% Plans, Specifications and Cost Estimates 4. 90% Plans, Specifications and Cost Estimates 5. 100% (bid-ready) Plans, Specifications and Cost Estimates 6. Geotechnical report 7. Permit applications and exhibits 8. Pilot Study Design 9. Pilot Study Report 10. Interim Project Report 11. Final Project Report 12. Addenda

110

Page 11: Ferndale City Council REQUEST FOR COUNCIL ACTION

B. ESTIMATED BUDGETS

The estimated budget for completing the scope of work is included as Exhibit A. The Scope of Work is

based on the best information available at the time regarding the anticipated and recommended work

requirements. The Engineer will not incur costs to the City beyond such budgeted amount without City’s

prior approval; and at such times as it appears to the Engineer that the total costs to perform the Scope of

Work for a specific budgeted project will exceed the agreed upon budget, Engineer will notify the City in

writing. The City and Engineer then shall consider whether some work should be deleted or the budgeted

amount should be increased. If, after such notification, additional funds are not allotted or agreed to be

provided, the Engineer shall not be obligated to continue performance that would incur costs in excess of

the aforementioned sum.

C. ASSIGNMENT AND/OR SUBCONTRACTING:

The Engineer shall not assign or subcontract any portion of the services provided within the terms of this

Agreement without obtaining prior written approval of the City. All terms and conditions of this Agreement

shall apply to approved subcontracts or assignments related to this Agreement. Engineer shall be

responsible for all payments to subcontractors and shall prevent, or promptly remove any and all liens

against the project arising from the work of any subcontractor, supplier, or employee.

SECTION III: PAYMENT FOR ENGINEERING SERVICES

A. BASIS OF COMPENSATION

Payment to the Engineer for services set forth in Section II shall be based on actual work performed at the

personnel rates defined by the Engineer’s then current fee schedule (Exhibit B included for January 1 –

December 31, 2018). It is anticipated that the fee schedule will be adjusted annually on January 1, and any

such annual adjustments will be subject to the approval of the City.

In addition, the Engineer shall be reimbursed for all subcontractor costs at the rate of cost plus 8.0%. The

Engineer shall also be reimbursed for out-of-pocket expenses incurred in the direct performance of the

consulting services or attributable to a specific project at actual invoice charge. Out-of-pocket expenses are

defined as all costs, other than payroll costs, which are directly attributable to a specific project. They shall

include items such as directly applicable technical expenses, postage, permit application fees, and such

other items of expense incurred in the direct performance of the consulting services or attributable to a

specific project. Payment shall be made monthly upon receipt and approval of the Engineer’s invoice.

B. TIMELINESS OF PAYMENT

The City agrees promptly to make payments, as invoiced, for services and costs to be furnished and incurred

under this Agreement. In the event an invoice remains unpaid for more than 60 days from date of invoice,

the City shall pay interest at the rate of one percent per month until full payment is made on the past due

amount, unless otherwise provided for in this Agreement. In the event that an invoice for payment remains

unpaid for more than 90 days from date of invoice, the Engineer shall not be obligated to continue with the

performance of the services described and contracted for herein. The Engineer will not incur any liability for

damages due to delay of the project as a result of stopping performance of services due to the failure of the

City to pay for services rendered.

111

Page 12: Ferndale City Council REQUEST FOR COUNCIL ACTION

SECTION IV: STANDARD PROVISIONS A. PROFESSIONAL SERVICES

The Engineer shall be consultant and advisor to the City and shall not be agent or representative of the City,

except as may specifically be authorized in writing by the City in respect to particular scope(s) of services

relating to the project. The Engineer represents that the studies, projections, plans, reports, designs,

drawings, specifications, cost estimates, and all other engineering, consulting, and analytical services

furnished under this Contract will be in accordance with generally accepted professional practices. The

Engineer makes no other representation or warranty, express or implied.

B. CLAIMS AND DISPUTES OF OTHER PARTIES

The Engineer will assist the City in reviewing and evaluating claims and disputes, preparing information for

the City’s legal counsel, providing services as witness in litigation, arbitration, or mediation to which the City

is a party, and providing other services in connection with actual or potential claims or disputes arising out

of the project, regardless of whether or not the Engineer is named in such legal action. The Engineer will

be compensated for providing such assistance in accordance with Section III of this Agreement.

C. RESPONSIBILITY OF ENGINEER

1. The Engineer shall perform such professional services as may be necessary to accomplish

the work required to be performed under the terms of this contract agreement including, but

not limited to, assisting the City in obtaining all necessary approvals from local, state and

federal reviewing agencies. The Engineer does not guarantee that permits and approvals

for City projects can be obtained.

2. The Engineer shall be responsible for the professional quality, technical adequacy and

accuracy, timely completion, and the coordination of all designs, drawings, specifications,

contract documents, reports, and other services furnished by the Engineer under the terms

of this contract agreement.

3. The Engineer shall, without additional compensation, correct or otherwise revise any errors,

omissions, or other deficiencies in the design, drawings, specifications, reports, and other

similar documents/data prepared or furnished by the Engineer.

4. Approval by the City or by the State of Washington or any of their departments, agencies, or

employees of any construction phase designs, drawings, specifications, reports, and

incidental engineering work or materials furnished shall not relieve the Engineer of the

responsibility for the technical adequacy and accuracy of this work.

5. Neither the City's review, approval or acceptance of, nor payment for, any of the Engineer's

services shall be construed as a waiver of any rights under this contract agreement or any

cause of action arising out of the performance of this contract agreement.

6. During the construction phase (if included in the scope of work), the Engineer shall make

on-site observation of the work in progress and checks of material and equipment as

required, and report observed deficiencies in the work. The Engineer is not responsible for

the safety of persons on and about the construction site. In connection with construction

work, the Engineer is not and does not purport to be a safety engineer and is not engaged

in that capacity by this contract, and shall have neither authority not responsibility to enforce

construction safety laws, rules, regulations, or procedures. Responsibility, if any, of the City

for monitoring or enforcement of laws, rules, regulations or procedures relating to safety in

112

Page 13: Ferndale City Council REQUEST FOR COUNCIL ACTION

connection with construction of the project shall be discharged by the City in such a manner

as the City may elect. Furnishings by the Engineer of resident or periodic project

representation shall not make the Engineer responsible for construction means, methods,

techniques, sequences, or procedures, nor for the contractor’s failure to perform the

construction work in accordance with safety laws and/or the contract documents.

D. RESPONSIBILITY OF THE CITY FOR PERMITS

The Engineer will assist the City in obtaining and maintaining permits (if any) as requested. However, the

City retains sole responsibility for obtaining and complying with the terms and conditions of any and all

permits necessary for the operations of its facilities.

E. ESTIMATED CONSTRUCTION COSTS

The Engineer's cost estimates (if any) for construction work (if any) contemplated by the City are to be made

on the basis of experience and qualifications and represent best judgment as design professionals familiar

with the construction industry. The Engineer cannot and does not guarantee that proposals, bids, or the

project construction costs will not vary from cost estimates prepared by Engineer. City acknowledges that

the Engineer has no control over a contractor’s methods of determining prices, or over competitive bidding

or market conditions.

F. INSURANCE

The Engineer agrees to obtain and maintain, at its expense, such insurance as will protect the Engineer

from claims under the Workmen's Compensation Act and such comprehensive general liability insurance in

an amount of not less than $1,000,000.00 per occurrence as will protect the City and the Engineer from all

claims for bodily injury, death, or property damage which may arise from the performance of the Engineer's

functions and services required under this Agreement, by the Engineer or by the Engineer's employees. In

addition, the Engineer shall obtain and maintain in force a policy of Architects and Engineers Professional

Liability Insurance, with a limit of not less than $1,000,000, to protect the Engineer from professional liability

claims arising out of the performance of this Agreement.

All insurance policies shall be issued by companies authorized to do business under the laws of the State

in which the work or any portion of the work is performed, shall be in form satisfactory to the City and

Engineer and shall contain a provision prohibiting cancellation, termination or modification except upon at

least 30 days prior written notice to the City. Certified copies of said policies or certificates evidencing such

insurance shall be filed with the City before any payments are made to the Engineer. Said professional

liability policy shall be maintained in force at Engineer's expense for one year following completion of work

covered by this agreement.

G. INDEMNITY

The Engineer shall indemnify and hold the City harmless for all claims arising out of the Engineer's negligent

performance of the professional services as set forth under this Agreement.

H. NON-DISCRIMINATION CLAUSE

The parties hereto agree to abide by all federal, state, and county laws prohibiting discrimination with regard

to employment and provision of services. The Engineer shall not discriminate against any employee or

applicant for employment because of race, color, religion, sex, national origin, creed, marital status, physical,

mental, or other sensory handicap, or age, except where such constitutes a bona fide occupational

qualification.

113

Page 14: Ferndale City Council REQUEST FOR COUNCIL ACTION

I. LICENSING

The Engineer agrees to comply with all applicable federal, state, county, or municipal standards for licensing,

certification, and operation of facilities and programs, and accreditation and licensing of individuals. The

Engineering firm hereby certifies that it is authorized to do business in the State of Washington and that it is

in full compliance with the requirements of the Board of Professional Registration.

J. SUSPENSION/TERMINATION

This Agreement may be terminated, in whole or in part, by either party hereto upon thirty (30) days advance

written notice sent by registered mail to the other party at its usual place of business. In the event this

Agreement is terminated, the City will pay the Engineer for the services performed to the time of such

termination in accordance with the Engineer's then current fee schedule. In addition, the Engineer shall be

reimbursed for all direct out-of-pocket expenses incurred in the direct interests of the work.

K. SEVERABILITY

It is understood and agreed by the parties hereto that if any part of this Agreement is determined to be illegal,

the validity of the remaining portions shall not be affected and the rights and obligations of the parties shall

be construed as if the Agreement did not contain the particular illegal part.

L. DISPUTE RESOLUTION

If a dispute arises out of or relates to this contract, or the breach thereof, and if said dispute cannot be settled

through negotiation, the parties agree first to try in good faith to settle the dispute by mediation administered

by the American Arbitration Association under its Construction Industry Mediation Rules before resorting to

arbitration. Any such dispute not resolved by mediation shall be settled by arbitration administered by the

American Arbitration Association under its Construction Industry Arbitration Rules if the Engineer’s

professional liability insurer agrees to that course of action, and judgment on the award rendered by the

arbitrator(s) may be entered in any court having jurisdiction thereof.

M. LIMITATION OF LIABILITY

In recognition of the relative risks and benefits of the project to both City and Engineer, to the maximum extent permitted by law, the City. Notwithstanding any other provision of this Agreement, and to the fullest extent permitted by law, the total liability, in the aggregate, of Engineer and Engineer’s officers, directors, partners, employees, agents, and Engineer’s Consultants, and any of them, to City and anyone claiming by, through, or under City for any and all claims, losses, costs, or damages whatsoever arising out of, resulting from or in any way related to the Project or the Agreement from any cause or causes, including but not limited to the negligence, professional errors or omissions, strict liability or breach of contract, or warranty express or implied, of Engineer or Engineer’s officers, directors, partners, employees, agents, or Engineer’s Consultants, or any of them (hereafter “City’s Claims”), shall not exceed the total insurance proceeds paid on behalf of or to Engineer by Engineer’s insurers in settlement or satisfaction of City’s Claims under the terms and conditions of Engineer’s insurance policies applicable thereto (excluding fees, costs and expenses of investigation, claims adjustment, defense, and appeal). If no such insurance coverage is provided with respect to City’s Claims, then the total liability, in the aggregate, of Engineer and Engineer’s officers, directors, partners, employees, agents, and Engineer’s Consultants, and any of them to City and anyone claiming by, through, or under City for any and all such uninsured City’s claims shall not exceed $200,000.00 or the Engineer’s total fee for services rendered on the project, whichever is greater. This limitation shall apply regardless of the cause of action or legal theory pled or asserted.

114

Page 15: Ferndale City Council REQUEST FOR COUNCIL ACTION

N. THIRD - PARTY BENEFICIARY CLAUSE

Where State of Washington funds may be used to pay for particular services of the Engineer, all parties

agree that the State of Washington shall, upon occasion, be named in writing as an express third party

beneficiary of this contract agreement, with full rights as such.

This agreement is made entirely for the benefit of the City and the Engineer and successors in interest. No

third party (save specific State of Washington exception above) shall have any rights hereunder, whether

by agency or as a third party beneficiary or otherwise.

O. GOVERNMENT INTEREST EXCLUSION CLAUSE

It is anticipated that certain projects may be funded in part by the Washington State Department of Ecology

Centennial Clean Water Fund or State Revolving Fund, the Washington State Department of Health Drinking

Water State Revolving Fund, the federal Rural Utility Service, the State Community Trade and Economic

Development department, the Public Works Board’s Public Works Trust Fund, and other such public funding

mechanisms. Neither the Federal Government nor the State of Washington nor any of its agencies,

departments, or employees are, or shall be, a party to this contract agreement or any subcontract.

P. AUDITS: ACCESS TO RECORDS AND INSPECTION CLAUSES

1. Where Federal or State of Washington funding is provided for engineering and surveying

services provided under this agreement, the federal or state government and any of its

departments or authorized representatives, shall have the right of access to any books,

documents, papers, or other records pertinent to the services in order to make audits,

inspections, examinations, excerpts, transcripts and copies. Such right of access is limited

to the retention periods required by the specific funding programs.

2. The Engineer shall maintain books, records, documents, and other evidence directly

pertinent to the work performed under this contract agreement in accordance with generally

accepted accounting principles and funding program requirements that may be specifically

identified. The Engineer shall also maintain the financial information and data used by the

Engineer in the preparation or support of public loan or grant documentation prepared in

behalf of the City.

Q. EQUAL EMPLOYMENT OPPORTUNITY

The Engineer shall comply with Executive Order 11246, entitled "Equal Employment Opportunity," as

amended by Executive Order 11375, and as supplemented in Department of Labor regulations 41 CAR part

60.

R. SMALL, MINORITY, AND WOMEN'S BUSINESSES

The Engineer agrees to take affirmative steps to assure that small, minority, and women's businesses are

utilized when possible as sources of supplies, equipment, construction, and services. Affirmative steps shall

include:

1. Including qualified small, minority, and women's businesses on solicitation lists.

2. Assuring that small, minority and women's businesses are solicited whenever they are

potential sources.

3. When economically feasible, dividing total requirements into smaller tasks or quantities so

115

Page 16: Ferndale City Council REQUEST FOR COUNCIL ACTION

as to permit maximum small, minority and women's businesses participation.

4. Where the requirement permits, establishing delivery schedules which will encourage

participation by small, minority, and women's businesses.

5. Using the services and assistance of the Small Business Administration and the Minority

Business Development Agency of the Dept. of Commerce.

IN WITNESS WHEREOF, the parties hereto have executed this Agreement in duplicate on this ________

day of _______________________, 2018.

Wilson Engineering, LLC

805 Dupont, Suite 7

Bellingham, Washington 98225

By:______________________________

Andrew Law, Managing Principal

City of Ferndale

2095 Main Street

Ferndale, WA 98248 Departmental Approval:

_______________________________ ___________________________

City Administrator Department Head

Attachments: Exhibit A Budget Estimate

Exhibit B Billing Rates

116

Page 17: Ferndale City Council REQUEST FOR COUNCIL ACTION

EXHIBIT A

Proposal for Water Treatment Plant Upgrade Project

Task ID Task

Direct Costs

or

Subconsultant

Senior

Eng.

Senior

Structural

Eng.

Project

Eng.

Senior

CAD

Eng.

Tech

Survey

Crew

Task

Estimated

Cost

Total Est.

Hours

1 152$ 152$ 138$ $ 96 122$ 190$

1 Project Management 5,000$ 30 15 11,630$

2 Public Meetings 10 10 4 3,284$

3 Develop Operating Strategy 10 4 2,072$

4 Conceptual Layouts 6 6 12 2,892$

5 Preliminary Engineering & Background Data 32 4 44 10 12,504$

6 Design Phase - Calcs, Eval, Equip. Selection 30 12 60 10 15,884$

7 60% Design

60% General Plans (est. 4 sheets) 2 15 20 4,294$

60% Structural Plans (est. 4 sheets) 1 44 28 9,528$

60% Mechanical Plans (est. 12 sheets) 14 105 75 23,818$

60% Electrical Plans (est. 9 sheets) 12,500$ 1 12,652$

60% Controls Plans (est. 4 sheets) 5,500$ 2 5,804$

60% Specifications and Contract Documents 2,500$ 10 8 45 11,446$

8 90% Design

90% General Plans (est. 4 sheets) 2 15 16 3,910$

90% Structural Plans (est. 4 sheets) 1 24 18 5,528$

90% Mechanical Plans (est. 12 sheets) 6 74 48 15,732$

90% Electrical Plans (est. 9 sheets) 8,200$ 2 8,504$

90% Controls Plans (est. 4 sheets) 3,000$ 2 3,304$

90% Specifications and Contract Documents 1,000$ 12 6 48 10,360$

9 100% Design

100% General Plans (est. 4 sheets) 1 8 8 1 2,146$

100% Structural Plans (est. 4 sheets) 1 12 8 2 2,988$

100% Mechanical Plans (est. 12 sheets) 6 36 26 4 8,864$

100% Electrical Plans (est. 9 sheets) 5,200$ 2 4 5,992$

100% Controls Plans (est. 4 sheets) 2,300$ 2 2 2,848$

100% Specifications and Contract Documents 1,000$ 6 2 20 10 6,196$

10 Cost Estimates - 60%,90%,100% 950$ 1 5 18 4,346$

11 Bid Phase 800$ 10 32 4 7,224$

12 Geotechnical Explorations, Report 10,000$ 2 4 1 10,978$

13 Permitting 10,000$ 2 4 1 10,978$

14 Topographic / Boundary Survey 2 2 52 10,460$

15 Pilot Study Design 10 30 5,660$

16 Pilot Study Procurement 8 4 1,704$

17 Pilot Study Protocol 10 1,520$

18 Pilot Study Implementation 30 20 7,320$

19 Pilot Study Report 10 5 2,210$

20 Intermin Project Report 30 15 20 16 10,502$

21 Draft Project Report 2,000$ 30 10 20 20 12,300$

22 Final Project Report 1,000$ 25 20 8 4 8,816$

23 Pilot Study Contingency 20 40 10 9,780$

SUBTOTAL 70,950$ 375 123 705 321 93 52 295,978$ 1617

295,978$ TOTAL ESTIMATE

117

Page 18: Ferndale City Council REQUEST FOR COUNCIL ACTION

EXHIBIT B

Billing rates for work performed January 1 - December 31, 2018:

Principal Engineer $168

Senior Project Engineer $152

Project Engineer $138

Engineer II $122

Engineer I (EIT) $112

Environmental Specialist $86

Senior CAD Design Technician $96

CAD Design Technician $82

Inspector $86

Clerical $70

Senior Professional Land Surveyor $150

Hydrographer $160

Professional Land Surveyor $142

Senior Survey Technician $110

Survey Technician $86

1-Person Survey Crew* $130

2-Person Survey Crew* $190

3-Person Survey Crew* $240

3-D Scanning Survey Crew $245

Hydrographic Survey Crew $285

* Rates may be adjusted when prevailing wage rates apply

Sub-consultants – reimbursed at cost plus 8% Reimbursable direct expenses – reimbursed at cost plus 8% - include (but are not limited to) the following:

Project application fees and project permit fees Publication of notices Reproduction of drawings and construction documents Postage and shipping Direct expenses for travel, meals and lodging outside of Whatcom and Skagit Counties Mileage at project-current IRS mileage rate Specialized Equipment Rental, at rental rate

(Submission of the above personnel rates should not be construed as a proposal to perform a set scope of

work for a particular monetary sum unless accompanied by a detailed estimate of personnel time by

discipline which would be required to perform said work.)

118