ffl 218 - westdevon.gov.uk 10 227.636 rg rg mh lp 222.35 mh 222.52 bol mh bol 222.48 mh 222.36 mkrs...
TRANSCRIPT
223.00
BUSINESSCENTRE
TP
MKR
DR
MH
LP
225.79
LPLP LP
LPLP LP
IC
MH
RG
225.69
LP
DRDR
DR
LP
LP
LP
Wind Turbine
DR
LP
RG
RG
RG
RG
IC
LP
LP
NP
MKR
RG
MH 227.55
LP
RG
PGM 10227.636
RG
RG
MHLP
222.35
MH222.52
BolMH
Bol
222.48
MH222.36
MKRs
MH223.05
MH222.58
MH225.83
MH225.51
MH
MH
224.36
MH
225.67
225.65
Bollards
Bunker
P O N D
concrete
concrete
MH210.53
450mm PipeInv 209 .26
MH210.54
450mm PipeInv 208 .78
MH211.03
MH207.58
MH211.32
MKRHY
MH214.31
MH214.37
MH214.39
RG
RG
RG
LP
RG
RG
RG
PGM 1215.387
Gate
Borehole213.10
Gate
PostPost
Gate
Post
RG
RG
RS
RG
RG
MH227.72
MH
RG
227.90
LP
RS
RG
HY
RG
BT
RG
RG
MH225.79
LPBT
SV
MH225.47
WO
MKR
RG
RG
PGM 3225.621
MH
MH
219.91
219.71
LP
RG
RG
RSBTWO
MKRLP
RG
RG
MH220.87
RG
RS
MH220.50
MH222.29
MH222.48
RG
WM
MH222.74
LP
SV
SVRG
RG
MH
BT
220.26
RG
MH219.98
MH
RG
219.04
LP MH218.47
RG
PGM 2221.147
MAST
Post
MH210.82
RG
DR
LP
RG
NP
SV
SV
RG
MH214.19
PGM 14212.991
NPMH211.43
RG
RG
MH
LP
209.86
RG
RGBT
SV
MH
LP
208.74RG
SV
BT
RGMH207.81
RG
LP
LP
Marker
PGM 13209.056
IC207.50
MKR
Pipe
Inv 206 .99
IC207.30
Greaser
Greaser
PGM 12207.937
95350N 95350N
95400N 95400N
95450N 95450N
Higher Stockley Mead
Pond
Warehouses
MP 196
Ponds
ESS
Mast (Telecommunication)
Wind Turbine
Compacted gravel areas: Note cherry picker access routes for maintenance to have sub-base suitable for load.
Soft Landscaping - By Others. Note: Pre-commencement planning issue.
Site Boundary
Structure Planting in Accordance with Approved Landscape Masterplan and LEMP - By Others. Note: Pre-commence-ment planning issue.
Proposed Surface Water Drainage tobe Attenuated Onsite and Connected
to Existing SUDs Basins
Tarmac surface & kerbs to SE information. Parking spaces to be demarked with suitable paint where not done by kerbs.
Concrete Surface & kerbs to SE information.
2.4m High Security Fencing
FFL 218.00
Deliveries &Dispatch
Office &Visitor
Parking
LorryWaiting
Area
Key Safe Box with code pad access for WPD 24/7 access to Switchgear building
Oil
Engineer'sCompound
StaffParking
Zone ForFuture
Expansion
Security Fencing:- Heras Pallas Xtra or similar
Datum at MH224.36
HGV Access:- 20M clearance to allow vehicles to pull off road with gate closed,- Access road width: 7.5M,- Manual locking gate to match fencing. Gate to have wheels with track to leading edges to adequately support wide gate.- Allow for future Day time automatic lift-up barrier linked to main office incl. intercom.- For CCTV see M&E Engineer's information.
Cycle Stands for 10 bicycles:5no. Stainless steel Sheffield bike stands. (Planning)
Possible TelecomsMast Location
7877
7675
7473
7069
68
67
66
65
5554
56
44
5758
5960
6162
6364
79
80
81
82
83
84
85
86
87 (dis)
12
34
56
78
910
111213
14
15
16
17 21
3839
37
40
41
42
43
4746
26
32
3635
22
1918
20
2324
3334
25
5049
48
5352
51
27
3031
29
28
88 (dis)
72
45
71
Structural Planting to banking to provide screening to develpment to soften the visual impact from the north. Planting by others. Note: Planning Condition.
88 parking spaces total (2 for disabled use.)
Drainage & levels see SE information
Post and rail fencingto be provided by the
client.
Path round building:- Width & loading to suit cherry picker for building maintenance. See SE information.
For turning circle requirements see SE information.
Attenuation tank:See SE information
Armco type traffic protection & 900mm high galv. steel bollards to escape exits
Freezer future expansion
Area for factory plant.
Height of guarding to loading dock ramp: 1100mm tbc.
Vehicular Access (Staff & Visitors)Lockable manual lift-up barrier. Allow for future linking to main office incl. intercom.
WPD Switchgear Room:- Proprietary GRP building (subject to Planning)- Internal floor area: 5000mm x 3000mm - 2no. Doors clear width: 2000mm.Note: All dimensions tbc. by WPD.
Oil tanks location, size of concrete plinth & drainage requirements tbc.
Area for ancillary plant/ storage etc. incl. waste water tanks. Scope for works tbc.
Scale: 1:500 @ A1 (1:1000 @ A3)
Drawing No: 1176 / Rev
The Boat Shed, Michael Browning WayExeter EX2 8DD01392 438051 [email protected]
Forthglade Factory,OkehamptonforForthglade Foods Ltd
Site PlanPROPOSED
050
Dimensions are not to be scaled from this drawing
H
Rev Date Description Author
-A
19 Jan 17 First issue. Forthglade Board Report ah
CONTRACT
20 Jan 17 Issued for draft issue for pricing. jw30 Jan 17 Issued for pricing purposes only.
Updated to show changes agreed at mtg 25/1/17.
spB
09 May 17 Issued for Client approval (VE). Updated to show changes agreed at mtg 21/4/17.
spC
12 May 17 Issued for Client approval (VE). Updated to show changes as requested in email dated 10/5/17.
spD
12 May 17 Issued for Contract. spE07 June 17 Updated to show changes agreed at
mtg 07/6/17.haF
28 June 17 Issued for Contract. Updated northern boundary co-ordinates . Email dated 27/6/17. Switchgear size & location revised. Notes updated.
dmG
07 Jul 17 Revised contract issue jwH
0 10m 20m 30m
Notes:
1. Levels subject to SE investigations.2. Services information indicative only. See M&E information for detailed services design.3. Subject to Building Regulations & Fire Officer's review & recommendations4. Subject to licensing authority review & approval.