CASEY FIELDS SOUTH PRECINCT STRUCTURE PLAN
Service Feasibility Report
April 2013
Beveridge Williams Melbourne Office 1 Glenferrie Road Malvern VIC 3144
PO Box 61 Malvern 3144
Tel: (03) 9524 8888 Fax: (03) 9524 8899
www.beveridgewilliams.com.au
DOCUMENT CONTROL DATA
Beveridge Williams
Melbourne Office
1 Glenferrie Road
Malvern VIC 3144
PO Box 61
Malvern VIC 3144
Tel: (03) 9524 8888
Fax: (03) 9524 8899
www.beveridgewilliams.com.au
Title Servicing Feasibility Report – Casey Fields South Precinct Structure Plan
Author Jake Talbot
Checked
Project Manager
Mark Walker
Synopsis Report into the serviceability of the proposed Precinct Structure Plan at Casey Fields South.
Reference: 1201026
Client: Newland Developers
Revision Table
Ver Description Date Authorised
A Service Feasibility Report 12.11.2012 M. Walker
B Added reference to Neil Craigie report 16.04.2013 M. Walker
Distribution Table
Date Version Distribution
12.11.2012 A Steven Jennings, Newland Developers
16.04.2013 B Steven Jennings, Newland Developers
Copyright Notice
© Copyright – Beveridge Williams & Co P/L
Users of this document are reminded that it is subject to copyright. This document should not be reproduced, except in full and with the permission of Beveridge Williams & Co Pty Ltd.
Beveridge Williams 1
CONTENTS
1 EXECUTIVE SUMMARY ......................................................................................... 2
1.1 FINDINGS .................................................................................................................. 2
2 INTRODUCTION ................................................................................................... 3
2.1 INTRODUCTION ........................................................................................................ 3
2.2 SITE LOCATION ......................................................................................................... 3
2.3 ASSUMPTIONS AND LIMITATIONS ............................................................................ 4
3 SERVICES ............................................................................................................. 6
3.1 INVESTIGATION ........................................................................................................ 6
3.2 ROAD ........................................................................................................................ 6
3.3 SEWER ....................................................................................................................... 6
3.4 ELECTRICITY .............................................................................................................. 7
3.5 GAS ........................................................................................................................... 7
3.6 TELECOMMUNICATIONS (FIBRE OPTIC) ................................................................... 7
3.7 WATER ...................................................................................................................... 8
3.8 RECYCLED WATER ..................................................................................................... 8
3.9 STORMWATER DRAINAGE ........................................................................................ 8
4 CONCLUSION ..................................................................................................... 10
APPENDICES
APPENDIX A. ROAD NETWORK LAYOUT
APPENDIX B. INDICATIVE SEWER OUTFALL LAYOUT
APPENDIX C. SOUTH EAST WATER LAND SERVICING ADVICE
APPENDIX D. SP AUSNET ASSET MAP
APPENDIX E. MELBOURNE WATER CATCHMENT PLAN
APPENDIX F. COLLISON ROAD DSS FEASIBILITY REPORT
APPENDIX G. URBAN GROWTH BOUNDARY FEASIBILITY REPORT
Beveridge Williams 2
1 EXECUTIVE SUMMARY
This report discusses the availability of services to the proposed Precinct Structure Plan preliminarily known as Casey Fields South PSP.
1.1 Findings
Road Available
It is anticipated that Ballarto Road will be upgraded to urban standard and an interim intersection of Ballarto Road and Morison Road will be required. An interim roundabout intersection will be constructed at the intersection of Ballarto Road and Clyde‐ Five Ways Road.
Sewer
(South East Water)
Available although limited
SEW indicate that the catchment will discharge to future treatment plant / pumping station approximately 6.7km south of the subject site. There are no immediate plans for construction.
An alternative option is the construction of a sewer pump station and rising main discharging at the proposed 300mm gravity sewer at Blue Hills Rise.
Electricity
(SP Ausnet) Available SP Ausnet has determined that the current supply in the
area will be sufficient to support the development.
Gas
(Envestra/APA Group) Available
Envestra/APA Group has advised that gas supply is available to this area.
Telecommunications
(NBN) Available The subject site is within the NBN Co footprint
Potable Water
(South East Water) Not Available
SEW indicate that the site can be served via the 1150mm dia Melbourne Water transfer pipeline in South Gippsland Highway. This will require the construction of a pump relief station and a 600mm outlet main.
Alternative option is the 450mm dia SEW main located in Ballarto Road.
Re‐use Water
(South East Water) Not Available
The proposed development is within the mandated recycled area. An allowance should be made for the construction of a recycled water reticulated system within the development.
Main Drainage
(Melbourne Water)
Available although limited
Part of the subject site located within active Melbourne Water Collison Road Developer Services Scheme (DSS)
Remainder of the site identified as forming part of future DSS’s in conjunction with future PSP’s.
Beveridge Williams 3
2 INTRODUCTION
2.1 Introduction
Beveridge Williams has been engaged to provide preliminary engineering advice with respect the provision of the necessary infrastructure required to service the proposed development.
An aerial photograph of the site is shown in Figure 1.
2.2 Site Location
The site consists of six adjoining properties, these are 1345, 1365, 1385, 1405, 1425 Ballarto Road and 355 Clyde‐Five Ways Road, Cranbourne East. The properties are bounded by Ballarto Road to the south, Clyde‐Five Ways Road to the east and Casey Fields and the existing railway line to the North. The site is approximately 50 kilometres south‐east of the Melbourne CBD.
The site is located within an area being developed from agricultural/rural uses to medium density residential dwellings. The site is located within the area identified as Precinct Structure Plan (PSP) 1057 – Casey Fields South. It should be noted that the PSP boundaries and names are preliminary at this stage and subject to change. The subject area borders the completed and approved Cranbourne East PSP to the north and west while the land to the south and east of the subject area has been included in future PSP’s awaiting completion.
The site is approximately 107.67 ha in size, however in addition to this approximately 9.88 ha of the property at 1425 Ballarto Road has been zoned as conventional and medium density housing under the Cranbourne East PSP. The land identified under the Casey Fields South PSP is currently used for agricultural purposes and encompasses a small number of residential dwelling and farm sheds as well as a dam covering 2.5 ha.
The topography of the site would be described as flat to gently rolling with a series of peaks located within the site creating a natural ridge line. The central portion of the site falls towards a low point along Ballarto Road in the vicinity of the existing dam while the remainder of the site falls towards the site boundaries.
Beveridge Williams 4
Figure 1 ‐ Site location plan
There are a number of nearby developments to the north which are mentioned within the following report.
Villawood Properties Pasadena
Blue Hills Pasadena
Blue Hills Rise
2.3 Assumptions and Limitations
This project has been scoped and undertaken as a desktop study to provide preliminary advice on the servicing works at the proposed site. There are limitations to the level of detail provided given the nature of this review. Desktop studies are reliant upon information made available from service authorities; with assumptions of the accuracy and completeness of the information provided. Further assessment and confirmation of details provided will be necessary during the planning and design stages.
Beveridge Williams 5
There is currently no proposal for development of the site, but it is assumed for the purposes of this report that Casey Fields South PSP will follow the guidelines set out in the Cranbourne East PSP with regards land zoning and identification of major infrastructure required. The Cranbourne East PSP describes the basic land use for the majority of the parcels as conventional residential, with an average of 13 dwellings per developable hectare.
Beveridge Williams 6
3 SERVICES
3.1 Investigation
Our investigation into the availability of services included obtaining written and verbal information relating to existing services in the area along with requirements to service the site. A number of service authority responses have been received however due to the status of the proposed PSP’s in the area the advice received has been of a preliminary nature. Our servicing advice is based on our knowledge of the region and likely requirements of authorities.
3.2 Road
The upgrade of the existing road reserve along Ballarto Road to urban standard between South Gippsland Highway and the Urban Growth Boundary (UGB) has been identified as part of the Cranbourne East PSP along with a land provision to enable widening to a 34m road reserve in the ultimate scenario. It is assumed that as part of the Casey Fields South PSP Ballarto Road would be upgraded to the same standard between the UGB and Clyde‐Five Ways Road. An interim roundabout intersection will be introduced at the intersection of Ballarto Road and Clyde‐Five Ways Road.
DCP Project no RD03 within the Cranbourne East PSP proposes a signalised intersection between Berwick – Cranbourne Road and Morison Road. Morison Road, classified as a residential connector street, is shown to continue south and terminate at the UGB. It is assumed that this road will continue and provide the main north–south connector street within Casey Fields South PSP and intersect with the proposed upgrade of Ballarto Road. An interim intersection will be required at this location.
It is assumed that the road upgrade of Ballarto Road above along with accompanied interim roundabout intersection works and the interim intersection between Ballarto Road and Morison Road will be included within the Developer Contributions Plan for Casey Fields South PSP. The proposed future widening of Ballarto Road reserve to 34m is not included as part of this development but is expected to be part of the ultimate scenario.
Refer to Appendix A for the indicative road network layout.
3.3 Sewer
South East Water (SEW) is the responsible authority for sewer services in the area. SEW have responded to the request for land servicing advice and indicated that they foresee the catchment discharging into a future treatment plant or pumping station preliminarily located at the intersection of Manks Road and Yallambee Road (Option 1) to the south of the proposed development site. This proposal would be dependant on the construction of approximately 6.7km of external gravity sewer along with the construction of either a wastewater treatment works or a pumping station and this could be dependent on the completion of a number of surrounding PSP’s to warrant development of this scale.
An alternative sewer outfall option has been identified in the event that Casey Fields South PSP is developed and completed prior to any of the surrounding PSP’s. This alternative option (Option 2) is outlined below.
Beveridge Williams 7
A 300mm diameter sewer currently runs along Berwick Cranbourne Rd. A future branch sewer being constructed as part of Blue Hills Rise and Blue Hills Pasadena is to connect to the 300mm diameter sewer and bring the sewer to within 525m of the northern boundary of the site. The natural topography of the proposed site falls towards a low point along the southern boundary of the site in the vicinity of the existing dam. The internal reticulation sewer will be designed to fall towards this location and sewer pumping station will be constructed. Approximately 1450m of sewer rising main will be constructed to connect the sewer pumping station to the proposed 300mm gravity sewer located at Blue Hills Rise.
Refer to Appendix B for the indicative sewer outfall layout and Appendix C for South East Water’s land servicing advice.
3.4 Electricity
SP Ausnet has determined that the current supply in the area will be sufficient to support the development. The cables along Clyde Five Ways Rd are good conductors and the Developer will have no problem supplying the estate from that road. The cables along Ballarto Rd are lighter and although they can sustain some growth, may need to be upgraded at a later date.
Under SP Ausnet’s supply policy guidelines, the Developer will be required to pay for the cost of extending/upgrading the power supply if required. SP Ausnet currently rebate the developer contribution for low voltage (LV) works at a rate of $980 per lot while the rebate available for high voltage (HV) works correlates directly to the construction costs incurred. There are existing assets on the properties that will need to be removed at the Developers expense.
To develop the site, SP Ausnet would require the developer to provide a number of electrical substations requiring reserves to accommodate the infrastructure. The cost of the sub stations and internal high voltage works will be reimbursable, within the HV rebate, but the provision of land for sub‐station reserves is not.
Refer to Appendix D for the associated SP Ausnet asset plan.
3.5 Gas
Envestra/APA Group has advised that gas supply is available to this area but will be subject to an evaluation once a formal application has been received. The servicing strategy for Envestra/APA Group will be dependent upon where the Development starts.
Gas mains may be extended by nearby developments, and depending on the timing of development, the gas mains may have to be extended to the site.
3.6 Telecommunications (Fibre Optic)
Telecommunications could be provided by NBN Co. The site is within the NBN Co servicing footprint, and the number of lots within the development exceeds the minimum number for which NBN Co. will service.
Alternatively, the developer may wish to supply telecommunications via another provider. That is a feasible option for the developer, which will require a commercial decision to be made at the time of development.
Beveridge Williams 8
3.7 Water
South East Water is the responsible authority for water assets in the area and they have responded to the land servicing advice request to indicate that water supply could be provided from an 1150mm diameter Melbourne Water transfer pipeline located within South Gippsland Highway. A pressure reducing station and 600mm outlet main will need to be constructed by South East Water; details of this will not be available until the Casey Fields South PSP for the area is completed. We would expect that any proposed shared assets, including the pressure reducing station, involved in the supply of water to the site would be reimbursable but this would be dependent on Essential Services Commission (ESC) policy at the time.
An alternative option is available to serve the proposed site. From the South East Water Asset Web Map a 450mm diameter water main is located along the length of the southern boundary of the site along Ballarto Road and would provide reasonably straightforward water supply to the site. This option would require further discussion with SEW to ensure that the proposed demand could be met using this asset.
Refer to Appendix C for South East Water’s land servicing advice.
3.8 Recycled Water
South East Water has not provided servicing advice for recycled water but the proposed development is within the mandated recycled area. Consequently an allowance should be made for the construction of a recycled water reticulated system within the development.
Prior to recycled water being available, recycled water mains are to be 'charged' with potable water. Water restrictions in place for potable water will also apply to recycled water until such time recycled water is provided.
Refer to Appendix C for South East Water’s land servicing advice.
3.9 Stormwater Drainage
Melbourne Water is the catchment management authority for the subject site and the properties within the site transverse several active and proposed Melbourne Water Development Services Schemes, including:
Active o Collison Road DSS (10.75 ha)
Proposed (within the Urban Growth Boundary area) o Western Outfall Drain (29.08 ha) o Moores Road Catchment (59.47 ha) o Wylies Drain Catchment (8.37 ha)
Refer to Appendix E for the Melbourne Water layout indicating the different catchments within the site.
Melbourne Water has undertaken two feasibility reports for the subject area; refer to Appendix F for the Collison Road DSS (active) Feasibility Report and refer to Appendix G for the other Urban Growth Boundary areas Feasibility Report.
Beveridge Williams 9
The active Collison Road DSS has strategies to service the catchments within the site and infrastructure is to be built as development requires. The proposed schemes are created to align with the development of precinct structure plans.
Neil Craigie has prepared a stormwater management strategy for PSP 1057 which provides detail on how the PSP is to address stormwater management.
Beveridge Williams 10
4 CONCLUSION
The subject site is located within the Urban Growth Boundary as of September 2012 and has been preliminarily identified as part of the Casey Fields South PSP 1057. Beveridge Williams confirm that the extension of all services can be achieved through known and proven techniques and standard agreements with service opportunities and recommend that the Casey Fields South PSP site is suitable for development as proposed from a servicing perspective.
Beveridge Williams 11
APPENDIX A. Road Network Layout
RISE
BLUE HILLS
PASADENA
BLUE HILLS
PASADENA
RAILW
AY LINE
CASEY FIELDS
BALLARTO ROAD
CL
YD
E-FIV
E W
AY
S R
OA
D
12.0
0
12.0
0
El.
El.
Emt.
Emt.
RC
A 5457
VG
G 21
August 19
85 p86
CLYDE RECREATION RESERVE
12.00Trans
missio
nSupplyE
2.0
0
E
2.00
S
E
D
2.0
0
3.00
D
S
E
MUNICIPAL RESERVE
D
E
E
E
E
E
E
E
E
S
D
S
S
S
D
D
S
S
SS
3.00
3.0
0
3.00
3.0
0
2.00
2.0
0
2.00
2.0
0
3.00 DE 2.00 S E
2.0
0S
E3.0
0D
ES
ELECRES
E
S
2.0
0
E
C/
W
CL
CL
S
E
2.0
0
E
3.00D
S
3.0
0
D
S
E
3.00
D
S
E
3.00
D
S
E
3.0
0
D
E
2.0
0
E
S
S
E
E
E
S
S
S
D
E
SD
E
E
ES
SD
D
E
S
2.0
0
ESDES2.00
3.00
3.00
2.00
2.00
2.00
2.0
0
3.0
0
3.00
4.00
3.00DSE
SD
S
3.0
0
S
ES
E
E
ED
E
ES
SD
ESD3.00
3.0
02.0
0
2.00
3.00
2.00
EE
SD
S2.0
03.0
0
E
S2.00
ELECRES
3.00
E
S
3.00
3.00
D
E
S
S
E
E
E
D
S
3.00
D
S
E
3.00
3.00
D
D
S
S
E
E
ED
2.00
D
E
2.0
0S
E
EL
EC
RE
S
MUNICIPAL RESERVE
2.0
0
2.4
0
D
S
E
DE
D
SE
D
S
E
5.00
E
D
SE
DRAINAGE
EASEMENT
ST
ST
RD
4.02
4.0
2
4.0
2
4.0
2
D
D
D
D
E
E
E
E
E
Parish of CranbourneParish of Sherwood
2.0
1
D
E
2.01
E
MUNICIPAL RESERVE
MUNICIPAL RESERVE
2.0
0
PIP
ELIN
E
E
34.0
0
C/
W
RE
SE
RV
E
MU
NICIP
AL
MU
NICIP
AL
MU
NICIP
AL
MU
NICIP
AL
RE
SE
RV
E
RE
SE
RV
ERE
SE
RV
E
MUNICIPAL RESERVE
RES
ELEC
34.0
0C/
WA
Y
E
MUNICIPAL RESERVE
3.00
S
S
E
3.0
0
S
E
E
E
E
E
E
ES
S
S
SD
E
E
E
E
E
S
S
S
D
D
D
D
D
D
2.0
0D
D
3.0
0
2.0
0
2.00
3.0
03.0
0
3.00
2.0
0
2.0
0
2.0
0
2.0
0
DE
E
E
SE
EE
E
EE
SSSS
S
S
D
D
D
D
E
E
E
E
E
E
ES
S
S
S
S
S
SD
2.0
0
D
2.0
0
3.0
0
DD
E
E
S
SD3.00
2.0
0
2.00
3.00
3.0
0
3.00
3.00
3.0
0
3.00
2.0
0
2.00
2.00
2.00
2.0
0
2.0
0
STANDARD ROAD RESERVE TO URBAN
PROPOSED UPGRADE OF 22m
INTERSECTIONPROPOSED INTERIM
INTERSECTIONROUNDABOUT PROPOSED INTERIM
N
NOT FOR CONSTRUCTIONPRELIMINARY PRINT
0 6030 300240180120
App
Project Ref
No unauthorised copying is permitted.
Beveridge Williams & Co. Pty Ltd has granted a licence to the principal to use this document for its intended purpose.
COPYRIGHT All rights reserved. '
ByDateDescriptionRev
Drawing No Rev
AppByDateDescriptionRev
Project
Drawing
Title
Drawn
Designed
Date
Approved
Date Stage No
PS Number
Beveridge Williamsdevelopment & environment consultants
Details - Revised.cel
K:\BW-MS\Sheets\TitleBlock Cell\TitleBlock
Scale
APPDT
10100 P0
APP
ph: 03 9524 8888
1201026
1 Glenferrie Road
Malvern VIC 3144
PS
www.beveridgewilliams.com.au
CITY OF CASEY
SR
BALLARTO RD, CRANBOURNE E/CLYDE
METRICON
1:3500 @ A1C.KIRKCALDY
R.HANNIGAN
07.11.12
ROAD NETWORK LAYOUT
Beveridge Williams 12
APPENDIX B. Indicative Sewer Outfall Layout
RISE
BLUE HILLS
PASADENA
BLUE HILLS
PASADENA
RAILW
AY LINE
CASEY FIELDS
BALLARTO ROAD
CL
YD
E-FIV
E W
AY
S R
OA
D
12.0
0
12.0
0
El.
El.
Emt.
Emt.
RC
A 5457
VG
G 21
August 19
85 p86
CLYDE RECREATION RESERVE
12.00Trans
missio
nSupplyE
2.0
0
E
2.00
S
E
D
2.0
0
3.00
D
S
E
MUNICIPAL RESERVE
D
E
E
E
E
E
E
E
E
S
D
S
S
S
D
D
S
S
SS
3.00
3.0
0
3.00
3.0
0
2.00
2.0
0
2.00
2.0
0
3.00 DE 2.00 S E
2.0
0S
E3.0
0D
ES
ELECRES
E
S
2.0
0
E
C/
W
CL
CL
S
E
2.0
0
E
3.00D
S
3.0
0
D
S
E
3.00
D
S
E
3.00
D
S
E
3.0
0
D
E
2.0
0
E
S
S
E
E
E
S
S
S
D
E
SD
E
E
ES
SD
D
E
S
2.0
0
ESDES2.00
3.00
3.00
2.00
2.00
2.00
2.0
0
3.0
0
3.00
4.00
3.00DSE
SD
S
3.0
0
S
ES
E
E
ED
E
ES
SD
ESD3.00
3.0
02.0
0
2.00
3.00
2.00
EE
SD
S2.0
03.0
0
E
S2.00
ELECRES
3.00
E
S
3.00
3.00
D
E
S
S
E
E
E
D
S
3.00
D
S
E
3.00
3.00
D
D
S
S
E
E
ED
2.00
D
E
2.0
0S
E
EL
EC
RE
S
MUNICIPAL RESERVE
2.0
0
2.4
0
D
S
E
DE
D
SE
D
S
E
5.00
E
D
SE
DRAINAGE
EASEMENT
ST
ST
RD
4.02
4.0
2
4.0
2
4.0
2
D
D
D
D
E
E
E
E
E
Parish of CranbourneParish of Sherwood
2.0
1
D
E
2.01
E
MUNICIPAL RESERVE
MUNICIPAL RESERVE
2.0
0
PIP
ELIN
E
E
34.0
0
C/
W
RE
SE
RV
E
MU
NICIP
AL
MU
NICIP
AL
MU
NICIP
AL
MU
NICIP
AL
RE
SE
RV
E
RE
SE
RV
ERE
SE
RV
E
MUNICIPAL RESERVE
RES
ELEC
34.0
0C/
WA
Y
E
MUNICIPAL RESERVE
3.00
S
S
E
3.0
0
S
E
E
E
E
E
E
ES
S
S
SD
E
E
E
E
E
S
S
S
D
D
D
D
D
D
2.0
0D
D
3.0
0
2.0
0
2.00
3.0
03.0
0
3.00
2.0
0
2.0
0
2.0
0
2.0
0
DE
E
E
SE
EE
E
EE
SSSS
S
S
D
D
D
D
E
E
E
E
E
E
ES
S
S
S
S
S
SD
2.0
0
D
2.0
0
3.0
0
DD
E
E
S
SD3.00
2.0
0
2.00
3.00
3.0
0
3.00
3.00
3.0
0
3.00
2.0
0
2.00
2.00
2.00
2.0
0
2.0
0
RISE DEVELOPMENTSEWER AT BLUE HILLS PROPOSED 300ł GRAVITY CONNECTION TO
PUMPING STATIONPROPOSED SEWER
SEWER OPTION 1
(OPTION 2)PROPOSED RISING MAIN
NOT FOR CONSTRUCTIONPRELIMINARY PRINT
N0 6030 300240180120
App
Project Ref
No unauthorised copying is permitted.
Beveridge Williams & Co. Pty Ltd has granted a licence to the principal to use this document for its intended purpose.
COPYRIGHT All rights reserved. '
ByDateDescriptionRev
Drawing No Rev
AppByDateDescriptionRev
Project
Drawing
Title
Drawn
Designed
Date
Approved
Date Stage No
PS Number
Beveridge Williamsdevelopment & environment consultants
Details - Revised.cel
K:\BW-MS\Sheets\TitleBlock Cell\TitleBlock
Scale
APPDT
10200 P0
APP
ph: 03 9524 8888
1201026
1 Glenferrie Road
Malvern VIC 3144
PS
www.beveridgewilliams.com.au
CITY OF CASEY
SR
BALLARTO RD, CRANBOURNE E/CLYDE
METRICON
1:3500 @ A1C.KIRKCALDY
R.HANNIGAN
07.11.12
SEWER PLAN
VALLEY WATER SERVICING ADVICEFOR FULL SEWER ALIGNMENT SEE YARRA
Beveridge Williams 13
APPENDIX C. South East Water Land Servicing Advice
South East Water Corporation ABN 89 066 902 547Locked Bag 1, Moorabbin, Vic 3189Fax (03) 9552 3001Internet www.southeastwater.com.au/ice
DV_FEASIBILITY
01 NOVEMBER 2012
Mr M WalkerEngineering General ManagerBEVERIDGE WILLIAMS & COPO BOX 61MALVERN VIC 3144Email: [email protected]
Dear Mr Walker,
LAND SERVICING ADVICERe: 355 Clyde Fiveways Road, ClydeOur Reference: Case Number 19500138 File 08PD9798
I refer to your email dated 04 October 2012 requesting for Land Servicing Advice for the provision ofSouth East Water’s potable water, recycled water and sewerage facilities to the above property. We areable to provide you with the following general servicing advice for the proposed development based onthe information provided.
The GAA (Growth Area Authority) has recently indicated that there is no growth anticipated for thisprecinct in the short term and that the PSP (Precinct Structure Plan) for this area is not likely to bedeveloped further surrounding PSPs are completed.
South East Water has not completed or obtained formal approval for the strategy for servicing the area,however, please find below South East Water’s preliminary strategy to be adopted for discussionpurposes only.
Preliminary investigations indicate that the supply for potable water for the proposed developmentcould be sourced from Melbourne Water’s 1150mm diameter transfer pipeline located within SouthGippsland Highway subject to an agreement reached with Melbourne Water. A Pressure ReducingStation and 600mm outlet main will be required to be installed at the off take.
The proposed development is likely to be within the mandated recycled water area, therefore anallowance should be made for the construction of a reticulated recycled water system (third pipe).
In regards to sewerage, the proposed development is divided into two catchments as shown on theattached ‘Sewer Plan’.
Catchment ‘A’Catchment ‘A’ is to discharge into the proposed Bimberry Circuit Pumping Station within PasdenaClyde Estate.
Catchment ‘B’Catchment ‘B’ is to discharge into the future Treatment Plant or Pumping Station as shown on theattached ‘Sewer Plan’.
South East Water Corporation ABN 89 066 902 547Locked Bag 1, Moorabbin, Vic 3189Fax (03) 9552 3001Internet www.southeastwater.com.au/ice
DV_FEASIBILITY
This land servicing advice has been prepared based on the information available at the time, howeverwe reserve the right to vary this advice in the future as circumstances change without furthernotification.
If you require further information, please contact Patrick Soong on 9552 3738.
Yours sincerely
Giuliano GavaMANAGER LAND DEVELOPMENT
Beveridge Williams 14
APPENDIX D. SP Ausnet Asset Map
K
K
K
K
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
ED
ED
ED
ED
BA
AR
RC
ED
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
ED
OPEN
2 40s
a
240A
l24
0Al
240Al
4-6/1/.118
3-6/.186
4-6 /
1 /.1
1 8
3 -6 /
1 /. 1
4 4
3-7/4.75
3-6/1/.144
3-6/1/.118
2-6/1/.118
2-6/1/.118
2 -7 /
4 .7 5
2 -7 /
4 .7 5
3-6/1/.118
4TW
3-7/4.75+SW
4-19/3
.25
3-7/4.75+SW
4-6/.186+SW
3-7/.080
4 -6 /
.18 6
4-19/3.
25
4-6/.186+SW
3-6/.186
3-6/1/.118
4-19/3.25
4-6/.186+SW
4-6/.186+SW
4-19/3.25
3-6/1/.118
3-6/1/.118
240sa
240s
a
240sa
185sa
1 85 s
a
240sa
1 85 s
a
185sa
2 40 s
a
240sa
240 sa
1 85 s
a
240sa
240sa
2 40 s
a
240sa
240sa
240sa
2 40 s
a
240sa
240s
a
240sa
2 40s
a
2 40 s
a
2 40s
a
240sa
240sa
2 40 s
a
2 40s
a
2 40 s
a
240Al
16C
u
35C
u
1-6/1/.144
1 -6 /
1 /. 1
1 8
1-7/3.75
1-6/1/.118
1 -7 /
3 .7 5
1-7/
3.75
1-7/3.75
1-7/3.75
1-6/1/.144
1-6/1/.093
185Al
3-3/2.75
185Al
3-7/.064
3-19
/3. 2
5
3-19/3.25
35Al
35Al
35Al
2-3/
2 .75
3-6/
4.75
3-6/4.75
3-3/
2 .7 5
3-6/4.75
3- 3/2.75
3-6/4.75
3-3/2.
75
3-3/2.75
3-3/
2.75
3-7/4.75
3-3/2.75
3-6/4.75
3-7/4.75
3-6/4.75
3-19
/3. 2
5
3-19
/3. 2
5
3-7/
2.75
3 -1 9
/3. 2
5
3-6/4.75
3-7/
.064
3-3/12
185A
l
185Al
185A
l18
5Al
185Al
35 Al
35Al
35Al
185Al
V E8 /
8 12 7
V E5 /
742 8
3 76 6
/1
VE5/74318422/1
VE5/74283767/1
VE5/74360920/1
VE5/
7 428
376 8
/ 1
VE5/74295666/1
V E8/
103 4
6 /1
VE5/74318422/1
VE5/74283766/1
VE5 /
7 42 8
3 768
/1
VE5/74283768/1
V E5 /
7 43 1
8422
/1
VE5 /
7 42 9
5 666
/1
VE5/74295666/1
VE5/74302862/1
VE5/
7430
2862
/1
V E5/
7430
2 86 2
/ 1
VE5/74057626/2
VE5 /740 5762 6/1
VE5/74057626/2
VE5/74228844/3
VE5 /
7 42 2
8 844
/3
V E5 /
7 422
884 4
/ 3
V E5/
7 431
750 7
/ 1
VE5/74317507/1
VE5/74228844/3
VE5 /
7 431
7 50 7
/1
VE5/74317507/1
VE5 /
18/2 3
10
V E5 /
1 8/ 32
1 6
VE8/
12/3
425/
S4
VE8/
3 75 6
VE8/12/3425/S5
VE5/18/2061
VE5/18/903 VE8/12/3425/S1
VE5/18/1267
VE5/18/3376
VE8/
12/3
4 25/S
3
V E5/
18/1
935
V E5 /
7 421
413 6
VE8/1166 0
VE8/11660
VE8/12/1307/S1
VE8/12/1307/S2
VE5/18/499
VE5/18 /315
VE8/3425
VE5/18/904
VE8/12/1307/S3
VE5/74302862/1
VE5/74343460/1
VE8/12/4189/S1
VE5/74343460/1
V E5 /
1 8/7
27
V E7/ B
F D/3
100 5
VE8/
BFD/
3100
5
VE5 /
1 8/2
100
V E5 /
18/1
268
VE8/3641
VE8/12/3641/S1
VE5/74107610
VE8/74000718
VE5/18/1879
VE8 /3
6 41
VE8/3641
VE8/74000718
VE5/18/1878
VE7/8131
VE5/18/549
VE5/18/3854
VE8/3425
VE8/3262
VE7/8131
VE8/8132
V E5 /
7 428
072 3
/ 1
VE5/18/3853
VE5/18/968
VE8/8131
VE5/18/333
VE8 /
7 40 3
8 91 6
V E8/
7 403
891 6
VE5/74128698
VE8/3425
V E8/
1034
6 /1
V E8 /
8 132
VE5/18/3375
VE8/10876
VE5/18/3692
VE5/18/2393
VE5/18/1431
V E5/
1 8/81
5
VE5/
18/7
0
VE8/8132
V/74
0 18 3
4 4
V E5 /
1 8/3
5 22
8592
8681
8591
8535
8634
8633
5757
862
5 757
872
5757874
5757873
5757877
5765
481
5765
483
5765
48457
6548
6
8309
523761
5764
790
5757
860 57
5786
3
5757
859
5757858
5757857
8310
8311
20828
575 7
856
576 4
737
20827
20826
20825
5765
487
5765
485
5765491
5765482
5757876
5765490
576 5
489
5765
4 88
5757
875
5757852
5757854
5764736
5757
855
5764
738
5764
739
57654925757853
5 765
494
5765493
5764
7 40
5764741
5765
495
5764742 5764
743
5764
750
5764748
5764749
576 4
744
5764
7 55
5 764
756
5764757
5764758
5764751
5764752
5764753
5763906
5763909
5763
907
5763
9 11
5763910
5763912
5764203
5 763
9 13
5763
898
5764204
5763908
5 763
8 99
5763900
5764211
5764
210
5764
2 09
576 4
214
5764212
5764213
5764205
5764206
5764
208
5764
215
5764207
19126
19128
19127
19129
19135
19134
19133
19132
19112
19111
19131
19138
1914019139
19141
19113
19124
1914
5
19144
19146
19142
19143
19136
19103 19104
19105
19107
19108
19106
19110
19109
519130
5764
754
5775
388
5775
389
5775
390
5775
391
5775392
2083
1
2082
9
2083
0
577539520824
5775
393
5775
394
20823
20822
2082120961
20820
20819
21006
20960
unset
20818
21009
21008
595959
21005
21045
21046
2104721007
unset
2100221148
21058
21016
21017
21015
21014
21013
21012
21011
21004
21003
21018
21019
21020
210275782
747
2102
8
229 5
0
2 102
9
21079
2107021
147
2107221071
unset
unset
2107
3
21074
21076
21077
2107
5
21149
21078
21272
20817
20816
191 5
1
1915
2
20815
20933
1914
8
1915
0
1914
9
19181
19182
1914
7
21043
21044
21042
21041
21040
21039
21038
2102
2
21049
21048
2102
1
21037
21010
21069
21024
21036
210682106721066
2105
7
2102
3
21065
2106
42106
3
21026
21025
1918320932
20931
20930
STOCKS
PATTERSONS 3
BULLER
GRAMPIAN
CASEY4
BERWICK CRANB
CASEY2
BERWICK CRANB
CASEY3
BERWICK CRANB
BOLCH
BALLARTO
BRIGGS
BALLARTO 2
BA
L LA
RTO
RIC
HA
RD
S
BA
LLA
RT
O
P19
CL
YDE
BALLARTO
LAMATTINA
BA
LLA
RT
O
NE
LSO
N
MAGIAS BALLARTO
LAM
ATT
INA
2 C
LYD
E
LA
MA
TTI
NA
1 C
LYD
E
CLYDE 5 WAYS TWYFORD
CRADLE
WINHAM
TWYF
ORD P
5
SCHREU
RS
CLYDE
P4 OROYA
SCHREURS
2 TWYFORD
SCHREURS
1 TWYFORD
OROYA
RAILWAY
TWYFORD
YALLAM
BEE
BA
LL
AR
TO
RI D
GE
WA
Y
YALLAMBEE
BALLARTO 1
BA
LL A
RT
O
CL Y
DE
VALETTA RAILW
AY
OIRSCHOT
BALLARTO
CLYDE
BEECHERS 2
848819
BW235
57579
82
5765
688
BW
136
5 75 7
8 68
BW095
5765496
5765497
5764745
5764747
5 76 4
7 46
5764763
5764762
5764216
576 4
217
BW410
BW
483
BW35
4
BW315
BW
3 17
BW098
BW1045
BW
7 34
BW098B
CLYDE RECREATION RESERVE
ELECRES
RESEL
MUNICIPAL RESERVE
MU
NIC
I PA
LR
ES
ER
VE
MU
NIC
IPA
LR
ES
ER
VE
RE
SE
RV
E
MU
NIC
I PA
L
MUNICIPAL RESERVE
MUNICIPAL RESERVE
MUNICIPAL RESERVE
MUNICIPAL RESERVE
ELE
CR
ES
MUNICIPAL RESERVE
CL
CL
CL
SCENIC CA
NY
ON
PA
SA
DE
NA
CC
T
GREEN GULLY
AV
RD
AV
RD
BU
LLE
R
WAY
AVBULLER
ST
CR
AV
TEVIOT
PE
LIO
N
RD
GREEN GULLYRD
KO
SC
IUS
KO
RD
ST
BV
D
GRAMPIAN
PA
SA
DE
NA
PY
RE
NE
ES
TRICKETT
RD
DR
PYRENEES
OSSA
HI L
L FA
RM
MO
RIS
ON
DR
ELMSLIE
DR
HOLT
MC
EW
AN
LA
CA
SE
Y F
I EL D
S
ST
ST
NE
LSO
N
RD
BALLARTO
CLY
DE
-
FI V
EW
AY
S
TWYFORD
RD
RAILWAY
RD
GV
RD
RD
RD
RD
YALLAMBEE
ST
VA
LETT
A
OROYA
RID
GW
AY
CLY
DE
-
FIV
EW
AY
SE
2.00
S
2.0 0
2.0 0
2.0 0
2 .40
E
2.0
0
S
E
ES
DE
3 .00
S
S
E
2 .0 0
E
ES2.00
E
C/W
4.00SE
3.0 0
DE
S2
.00
ES
D3.00
2.00S
E
2.00
ES
E
E
E
D
SD
E D3 .
00
SE
S2.00
2. 0
0
2.0
0
3.00
D
3.00
SE 2.00E
S
E
D
SD
3.00
3.0
0E
S
DS
E
E 3.00
ES
D3.
0 0E
EE S2.00
S2
.00
SD3.00ESD3.00
S2
.00
3.00 D
2.00
E
D
2.0
0
ES
D
3.003 .00
ES
2.0
0
3.0 0
S
S
E
E
2.00 S
D
S
34.0
0
34.00
E
E
C/W
AY
EP
IPE
L IN
E
D
E
E
D
4 .02
4. 02
D
E
E
4.02
2 .01
E
D
D
4 .0
2
2.0
0
E
2.0
1
E
E
2.0 1
2.01
E
E
2.01
D
D
2.01
Em
t.
El .
12.0 0
El.
Em
t.
12.0
0
E
Supp
ly
Tran
smis
sion
12.0
0
70
4
10
1
68
12
14
9
11
13
15
17
70S
75
85S
77
450
13
22
7
119
2018
1214
16
2
10
4644
50 48
54 52
5856
2
4
6
8
10
10E
1315
1012
11
1816
20
15
6
3
410
410
73
16
1214
119
13
69
71
2
4
6
8
1
3
5
7
10
9
11
1
810
46
35
7
16
19
21
23
1825
27
29
31
33
35
64
2
37
32
8
2422
1917
30
2
2826
2321
4
25
14
16
18
13
15
34
17
19
21
1
6
3
5
7
222420
9
8
10
12
11
13
15
415S
14
1214
10
16
8
5
1311
97
2P
5I
2
1
8
1I
2
4
5S
1P
345I
365I
162
11
7
6
5
4
3
1
164
1385
1385
1370
1365
1370
1360
1360
1405
1405
1410
1430
1450
1450
1425
1425
13051305
1320
X
X
1325
1330
1340
1340
1330
1345
400
400
385
385
30
90
350
355
36
34
X
30
28
150
26
24
22
X
20
18
162A
1
3
810
21
17
12
14
10
8
X
6
X
4
2
1
8
6
42
57
3
10
1513
119
12
1595
1585
2
2
1564
4
1570
4
6
8
X
2
X
X
1490
1470
1470
X
40
14
12
10
8
5
11
6
4
9
14
16
75
12
1921
17
14
23
16
20
18
13
1531
X
18
280
1
3
5
9
30
285
275
1
205
114
20 4
207206
115
11 6
105
10 6
1 07
1 08
1 09
D
1142
E
1143
215
214
218217
R1216
213212
209210
211
219
208
324325
327 326
329 328
331 330
323
322
32 1
32 0
315
319
318332
316317
409410
408
411
427
428
2
1141
1144
11461145
1131 1130
1132
R1
B
1140
1139
1 13 8
113
7
110 1
11 0
21 1
0 3
R1
1 13 6
113 5
1133
1 10 4
110 5
1 106
1126
11471149
11481134
11271128
1129
1 17
3 01
3 02
3 03
R1
304
3 05
30 6
307
3 08
30 9
313312
311
3 10
314
407406
413412
402
403
R1
416
404405
415414
1 125
1 12
41
123
11 0
71
1 08
401
1 10
91 1
1 01 1
11
R1
111
2
417
111
3
418
419
111
41
115
11201122 1121
111
6
420
421
434
111
711
18
111
9
D
435
424423
425
422
432433
426
429
431430
PtC.P
R1
180
181
177
178
1 79
D
RE
S2
2
17
26
1 6
2 7
15
14
4
6
2
5
4
1
2
1
2
28
11
10
29
9
4
1
1
1
1
C.A.2008
Pt C
.P
1
Pt C.A.38
1
1
2
1
5
2
2
C.A.53A
7
8
1
2
C.A.P38
1
12
2
40
41
3837
36
35
13
14
15
16
C.A.P38
17
18
1
20
2
1
39
2223
21
5
2726
2425
6
1
21
3
2
20
19
181
7
1
C.A.2022
C.A
.2023
1
1
3
1
49
4 84
746
1
4 5
1
2
2
32
33
4342
34
3029
28
7
31
8
10
9
Pt C
A 3
8
Pt C.A.38
11
1
2
1213
16
23
2
3
TP939261
PS637234
PS
6 26
415
PS
701
114 PS
626
415
PS62641
5
PS700450
PS701118
PS701118
PS701118
PS700450
PS
7004
50
PS701116
PS
7011
16
PS
701
1 16
PS701116
PS637234
PS637234
PS637234
PS637234
PS637235
PS637235
PS
637
235
PS
637
235
PS637235
PS641259
PS641259
LP
209
371
PS
701
116
PS
7011
16
PS700450
PS700450
PS
701
116
PS
701
116
PS701116
PS
7011
16
PS
701
116
PS701116
PS
6412
75
PS700450
PS
7004
50
PS
700
450
PS
700
450
PS700450
PS700450
PS
637
235
PS
637
235
PS637235
PS
637
235
PS641259
PS641259
PS
7004
50
PS
700
450
PS641259
PS
648
086
PS
641
259
PS701116PS700450
PS
6480
86
PS641259
PS
6445
60P
S64
1259
PS641259
PS641259
PS641259
PS641259
PS644560
PS644560
PS
644
560
PS644560
PS
644
560
PS
644560
PS644560
PS
644
560
PS
6445
60
PS
644
560
PS635283
PS635283
PS
635
283
PS635283
PS
6446
93
PS
6446
93
PS
644
693
PS
635283
PS
648
264
PS644693
PS644693
PS644693
PS644693
PS644693
PS644693
PS
644
693
PS
6446
94
PS644694
PS
644
693
PS
6446
93
PS
644
693
PS
644
693
PS644693
PS
6446
94
PS644694
PS644694
PS
648264
PS
6446
94
PS
6446
94
PS644694
PS644694
PS
644
694
PS
6446
94
PS644694
PS
6446
9 4P
S64
9 47 4
PS644694
PS644694
PS644694
PS
644694
PS
6446
94
PS
644
694
PS644694
PS644694
PS644684
LP
531
66
LP
5186
6
PS618611
PS618611
LP63967
4
LP205490
LP205490
LP134739
LP54058
PS618610
LP66390
PS644560
PS701113
PS701113
PS701113
PS701113
PS701113
TP548555
PS701113
PS701113
PS701113
PS701113
PS701113
PT37
TP
4190
81
LP145584
PS318331
PT53
PS339215
PS318331
PS540430
LP14
2718
PS339215
2
LP81164
TP649
LP20
2374
TP649
LP3632
TP649
TP203603
S-1291
LP5176PS504632
LP3632
LP3632
LP3632
LP96868
TP623500
TP623500
LP36228
PT38
1
LP3632
49
LP3 6
32
L P3 0
2 10
L P3
0 21 0
L P12
52 7
0
LP3632
LP3632
PT38
LP5176
L P82
4 27
LP
121
4 79
CP
1 08
206
LP1 1
8 60 2
10713
13A
10 8
107
A
15
10 8
A
15A
17
64
CC
TR1
18
66
KO
SC
I US
ZK
O
19
68
WAY
20
70
2322
76 74 72
21
2S
G
CC
T
NEBO
8684
82
29
28
88
2625
80
24
7827
KO
SC
IUS
ZK
O
RD
13171
1316
A
X
3
AV
13 1
6 B
F87S
E
GREEN GULLY
1331
83
1332
85 1330
81
SE
D
E
3.00
SE
E 415S
132
9
4
132
8
6
S
5
1318
1 31
9 7
1320 9
R1
1321 11
TEVIOT
1 31
1 13
ST
E
S
131
2 15
D
8 132
7
1326
10
13 2
5
12
132
4
14
132 3
16
18
E
132
2R
ES
1
20E
13 3
4 B
S
X
3 .0 0
E
S2.00
2.0
0S
E
2.00
1333
42
1334APYRENEES
1313 17
ILLA
WA
RR
A
40
381314
D
S
3. 0
0
ED3.00
1301
AV
13 0
7
4
130
8
6
E
130
9 B
S2 .
0 0
X
1 30
2 5
130
3 7
PE
LIO
N321309A
1315
36
S2.00
E
1310
34
1305
1304
30
RD
3
2628
1306
DR
E
16601
602 18
6 03
SE
2 .10
2. 0
0S
22
604
20
HILL FARM
HIL
L FA
RM
32608
30607
28606
2624
605
R1
612
611
2725
613
23610
29
E
AV
6144
3.00
SD
E
3
609
DR
S
D
3.0
0
6 15
6
CR
AD
LE
616
8
617
10
D
E
2.00
E
3. 00
D
3 .00
S
11
13
DRAINAGE
EASEMENT
2
6354
E
634
CC
T
63 6
63 3
632
6
63 78
S
6 38
10
12 6 39
64014
5
6 31 7
630
BI M
BE
RR
Y
9
629BIM
BERRY
641
16
642
182.0
0
E
2.0
0
EE
W/S
S
2.00
4.00
2106
8 211
DR
2 12
10
2 1312
209 5
ED
2 .0
0S
E2.
0 0
208 7
MACPHERSON
217 9
E2 .
00D 218
4
ES
2.0
0
11
214
14
R1
216
16 21 5
23418
LA
BV
D
202
13
201
15
CCT
HO
LTC
CT
22 212
5
206207
3
119
205
7
204203
E
220221
10
219
68
S
3.00D
SD
3.0
0
14
16
SE
E
2.0
0
227
22
22518
226
20
CCT
2826
229
230
228
24
245244
2 23
2 24
MA
CP
HE
RS
ON
337360
338362
364 33 9
CA
SE
Y F
I ELD
S
366 34 0
2523
246
21
S
D3.00
247
19 ES
D3
. 00
E
ES
13
336
2. 0
0
97
11
335
333334
235
20
23 622
23 724
23 8
26
233 13
232 15
2 31
ES
D3 .
0 0
MACPHERSON
243
27
E
17
1924 2
MC
EW
AN
239
21
24 1
240 23
3.00
301
E
30S
D
S E
ES
D2 .
00
3.0
0
2.00
ESD
5
332
3
331
DR
1
330
HEALES
28
30
30232
303
34
36 304
BV
D
38 3 05
40 30 6
42 3 07
308 R144
46 309
27
2.00
329
8
343
6
342
E
341
4
S
ES
3.00D
S2.00
E
29328
31
327
D3 .
00
D3.00
ES
31
326
SCULLIN
325
3B
4
35635
324
57
354355 9
353
358
X
357
68
D
S
2.00
3 23 37 E
S2.
00
2.00
E
39322
S2.00ESD
48 3 10
50 311
312
52
313
54
3.00
56 314
58 315
12
345
10
344
RD
ES
D
368 346
370
347
3 .00
ES
E
S
R1
34 8
34 9
25S
F
ST
CA
SE
Y FIE
LDS
11
352 1513
351350
2.0 0
372
374
ST
14 3 61
16 362
18
10
359
12
360
ES
2.0
0E
SD
3.0
0
E
E
D3.00
1315
365
366
11
367
363
E
SC
ULL
IN
S
17
36419I
RES1
20
37 1
RD
60 3 16
62 3 17
1
321
CORTULA
MC
EW
AN 43319
64 318
35
370
320
9
368
7
369
G
4S
ED
2 .0 0
20
D
3.00
628
CCT
643
644
22 645
24
646
26
647
28
3.00
E
S
S
3.00
ED
E
627
15
D
17
624A
X
625
19
624B
X
D
626
BIMBERRY
648
30
650
649
32
34
36
23
623
622
S
651
652
38R1
653
40
654
42
D
D
27
25
S
E
X
619A
X
33
621
29
620
619B
655
44
656
46
657
48
658
50
618
CCT E
35
665
E
D
ST
S
FRE
NC
HDE
3.000.10
S E
0.10
S
F
415S
CC
T
E
3.00
D
E
659
A
49
S
661
43662
41
660
45
S
47
659B
E
RES2
62E
D
DE
5.00
E
S
EE
37
664663
39
RES1
BIMBERRY
52I
S S
D
E
Parish of Sherwood
Parish of Cranbourne
RC
A 5457
VGG 21 August 1985 p86
RCA 5457
Parish of CranbourneParish of Sherwood
540 m0
5777624 N
3510
10 E
3540
76 E
5779328 N
Melway 134 G10Vic Roads 95 G3ESMAP 766 C11
Carrum 2,500/23.15
H
5
4
3
2
1
BA DC E GF
Directory Reference
04/10/2012
Beveridge Williams 15
APPENDIX E. Melbourne Water Catchment Plan
RISE
BLUE HILLS
PASADENA
BLUE HILLS
PASADENA
RAILW
AY LINE
CASEY FIELDS
BALLARTO ROAD
CL
YD
E-FIV
E W
AY
S R
OA
D
12.0
0
12.0
0
El.
El.
Emt.
Emt.
RC
A 5457
VG
G 21
August 19
85 p86
CLYDE RECREATION RESERVE
12.00Trans
missio
nSupplyE
2.0
0
E
2.00
S
E
D
2.0
0
3.00
D
S
E
MUNICIPAL RESERVE
D
E
E
E
E
E
E
E
E
S
D
S
S
S
D
D
S
S
SS
3.00
3.0
0
3.00
3.0
0
2.00
2.0
0
2.00
2.0
0
3.00 DE 2.00 S E
2.0
0S
E3.0
0D
ES
ELECRES
E
S
2.0
0
E
C/
W
CL
CL
S
E
2.0
0
E
3.00D
S
3.0
0
D
S
E
3.00
D
S
E
3.00
D
S
E
3.0
0
D
E
2.0
0
E
S
S
E
E
E
S
S
S
D
E
SD
E
E
ES
SD
D
E
S
2.0
0
ESDES2.00
3.00
3.00
2.00
2.00
2.00
2.0
0
3.0
0
3.00
4.00
3.00DSE
SD
S
3.0
0
S
ES
E
E
ED
E
ES
SD
ESD3.00
3.0
02.0
0
2.00
3.00
2.00
EE
SD
S2.0
03.0
0
E
S2.00
ELECRES
3.00
E
S
3.00
3.00
D
E
S
S
E
E
E
D
S
3.00
D
S
E
3.00
3.00
D
D
S
S
E
E
ED
2.00
D
E
2.0
0S
E
EL
EC
RE
S
MUNICIPAL RESERVE
2.0
0
2.4
0
D
S
E
DE
D
SE
D
S
E
5.00
E
D
SE
DRAINAGE
EASEMENT
ST
ST
RD
4.02
4.0
2
4.0
2
4.0
2
D
D
D
D
E
E
E
E
E
Parish of CranbourneParish of Sherwood
2.0
1
D
E
2.01
E
MUNICIPAL RESERVE
MUNICIPAL RESERVE
2.0
0
PIP
ELIN
E
E
34.0
0
C/
W
RE
SE
RV
E
MU
NICIP
AL
MU
NICIP
AL
MU
NICIP
AL
MU
NICIP
AL
RE
SE
RV
E
RE
SE
RV
ERE
SE
RV
E
MUNICIPAL RESERVE
RES
ELEC
34.0
0C/
WA
Y
E
MUNICIPAL RESERVE
3.00
S
S
E
3.0
0
S
E
E
E
E
E
E
ES
S
S
SD
E
E
E
E
E
S
S
S
D
D
D
D
D
D
2.0
0D
D
3.0
0
2.0
0
2.00
3.0
03.0
0
3.00
2.0
0
2.0
0
2.0
0
2.0
0
DE
E
E
SE
EE
E
EE
SSSS
S
S
D
D
D
D
E
E
E
E
E
E
ES
S
S
S
S
S
SD
2.0
0
D
2.0
0
3.0
0
DD
E
E
S
SD3.00
2.0
0
2.00
3.00
3.0
0
3.00
3.00
3.0
0
3.00
2.0
0
2.00
2.00
2.00
2.0
0
2.0
0
NOT FOR CONSTRUCTIONPRELIMINARY PRINT
N0 6030 300240180120
App
Project Ref
No unauthorised copying is permitted.
Beveridge Williams & Co. Pty Ltd has granted a licence to the principal to use this document for its intended purpose.
COPYRIGHT All rights reserved. '
ByDateDescriptionRev
Drawing No Rev
AppByDateDescriptionRev
Project
Drawing
Title
Drawn
Designed
Date
Approved
Date Stage No
PS Number
Beveridge Williamsdevelopment & environment consultants
Details - Revised.cel
K:\BW-MS\Sheets\TitleBlock Cell\TitleBlock
Scale
APPDT
10300 P0
APP
ph: 03 9524 8888
1201026
1 Glenferrie Road
Malvern VIC 3144
PS
www.beveridgewilliams.com.au
CITY OF CASEY1:3500 @ A1
C.KIRKCALDY
R.HANNIGAN
07.11.12
SR
BALLARTO RD, CRANBOURNE E/CLYDE
METRICON
MELBOURNE WATER CATCHMENT
& DSS PLAN
WESTERN OUTFALL DRAIN DSS
MOORES ROAD CATCHMENT DSS
COLLISON ROAD DSS
WYLIES DRAIN CATCHMENT DSS
Beveridge Williams 16
APPENDIX F. Collison Road DSS Feasibility Report
Version 2.7 1 of 4
19 October 2012 Mr Mark Walker Beveridge Williams 1 Glenferrie Road Malvern, VIC, 3144 Dear Mr Mark Walker Property: Proposed Development Sites
355 Clyde-Five Ways Road Clyde, 3978, VIC
Thank you for your email of 4/10/12 requesting Developer Services Scheme information for the above mentioned property. Melbourne Water has the following comments to make regarding the provision of surface water management infrastructure and contributions for this property in the areas shown on the layout as Collison Road DSS. Drainage Agreement: Prior to the issue of a Statement of Compliance, the Owner will need to enter into and comply with an agreement with Melbourne Water Corporation, under the Water Act 1989, for the provision of drainage works and the acceptance of surface and storm water from the subject land directly or indirectly into Melbourne Water’s drainage system. The agreement may include the following components. Drainage Contributions: A drainage agreement usually includes the payment of drainage contributions, where a property is being developed. These contributions are used to recover the cost of constructing drainage works such as main drains, retarding basins, waterway improvements and flood mitigation works that service properties such as your clients. The contributions are based on the increased load on the drainage system created by the development.
Melbourne Water Ref: 214479
Version 2.7 2 of 4
The property in question is contained within Melbourne Water’s Collison Road Drainage Scheme. Melbourne Water advises that the residential contribution rate is $68,199/Ha, comprising of a hydraulic charge of $64,234/Ha and a stormwater quality charge of $3,965/Ha. The stormwater quality charge can be reduced or removed by on-site treatment works, in-line with Melbourne Water’s ‘Stormwater Quality Offset Policy’, which is discussed under the heading ‘Stormwater Quality’ below. Please note that contribution rates are subject to periodical review and hence the future contribution rate may be higher than the current. For registered users, two months notice of any change in rates, will be provided on Melbourne Water’s Land Development Manual website, http://ldm.melbournewater.com.au/. Contributions payable for this property will be calculated upon receipt of an application for ‘Conditions of Agreement for the Provision of Drainage Facilities’ and a subdivisional plan. Stormwater Quality: The Urban Stormwater Best Practice Environmental Management Guidelines require that runoff from all new developments (including redevelopments) be treated to comply with the following, ‘Best Practice’ standards criteria: Removal of 80% of the suspended solid annual load, 45% of total phosphorus and 45% of total nitrogen annual loads. As of the 1st of September 2005, Melbourne Water will be introducing a ‘Stormwater Quality Offset Strategy’ to consistently and equitably apply stormwater quality standards to all developments greater than 0.4Ha. This strategy allows the following two options for any new development. 1. Compliance with Best Practice objectives through on-site treatment works
will reduce the stormwater quality charge component of the drainage contributions. The works must satisfy Melbourne Water’s standards and must be designed with the software package ‘MUSIC’ (Model for Urban Stormwater Improvement Conceptualisation), or alternatively through the use of the ‘WSUD Engineering Procedures Manual’ available on the Melbourne Water’s website http://wsud.melbournewater.com.au which provides the procedures for the design of various treatment measures.
2. Non- compliance with Best Practice objectives will require the payment of
the stormwater quality component of the drainage contributions. This money will help fund water quality works, elsewhere in the catchment.
For further information on the strategy, please refer to Melbourne Water’s Land Development Manual website. Drainage Scheme Works A drainage agreement usually requires the construction of permanent works in conjunction with the development as outlined by the appropriate drainage scheme. A review of the Collison Road Drainage Scheme has identified that there are permanent Melbourne Water works to be constructed on this property.
Version 2.7 3 of 4
Such works may require that several surveys be undertaken to determine the most efficient and environmentally friendly design outcomes. These may include, but are not limited to, a ‘Flora & Fauna’ assessment and an ‘Archaeological’ investigation, which would all guide the most appropriate design. Design approval from Melbourne Water and any other relevant authorities may be required prior to commencement of the drainage works. To achieve appropriate outfall for this development, temporary works may be required as part of the drainage agreement. If the development proceeds out of sequence then the developer will need to fund the costs of these temporary works. The developer will need to negotiate these temporary works with the downstream landowners to obtain a free draining solution through their properties. Approval will need to be granted and forwarded to Melbourne Water before construction of the drainage works begins. Please be advised that this information may be refined and/or modified upon any application for a drainage offer/agreement. Overland Flow Paths Melbourne Water expects that upon any application for certification of any subdivision plan associated with the property, due consideration will be given to the alignment of roads and reserves with any adjoining estates, to ensure continuity and provide uninterrupted conveyance of overland flows. These overland flow paths will need to be designed in accordance with the safety criteria outlined in Appendix G of Melbourne Water’s Land Development Manual found on the website http://ldm.melbournewater.com.au/ Before starting works separate application, direct to Melbourne Water, must be made for any new or modified storm water connection to Melbourne Water’s drains or watercourses. Before accepting an application, evidence must be provided demonstrating that Council has considered that it is not feasible to connect to the local drainage system. Water Sensitive Urban Design WSUD is a design process that enables localised collection and treatment of stormwater runoff. Melbourne Water acknowledges the potential for Water Sensitive Urban Design to be incorporated into the development to enable sustainable management of stormwater across the property and to compliment the social and environmental values of the area. Melbourne Water recommends that initiatives such as sediment ponds, bio-filtration systems, grassed swales, grey water re-use, rainwater tanks and porous soils be considered in the design of the complex. Stormwater runoff from paved areas can also be a valuable resource for irrigating trees, grassed areas and landscaped garden beds.
Version 2.7 4 of 4
Please contact Melbourne Water to discuss how WSUD principles will enhance the proposed development or visit our website at www.melbournewater.com.au Offer Application Prior to any application for an offer of drainage contributions, Melbourne Water requests that you forward a drainage strategy demonstrating that the proposed drainage for the property coincides with the intent of Melbourne Water’s Collison Road Drainage Scheme. The following information should be included within the strategy:
General site information Options for the proposed drainage of the property Consideration for Water Sensitive Urban Design
Melbourne Water look forward to further discussion on the above and advise that this information is only preliminary and forms no contractual agreement between your company and Melbourne Water. Melbourne Water reserves the right to alter any or all of this information at any time. If you have any enquiries, please contact me on telephone number 9679 6762 or via email at [email protected] Yours sincerely
SHANE KELLY DEVELOPER WORKS
Beveridge Williams 17
APPENDIX G. Urban Growth Boundary Feasibility Report
1 of 5
19 October 2012 Mr Mark Walker Beveridge Williams 1 Glenferrie Road Malvern, VIC, 3144 Dear Mr Mark Walker Property: Proposed Development Sites
355 Clyde-Five Ways Road Clyde, 3978, VIC
Thank you for your email of 4/10/12 requesting Developer Services Scheme information for the above mentioned property. Melbourne Water has the following comments to make regarding the provision of surface water management infrastructure and contributions for this property in the areas shown on the layout as Moores Road Catchment DSS, Wylies Drain Catchment DSS and Western outfall DSS. Servicing new growth areas Since the announcement of the VC68 Amendment on 29th July 2010, and the extension of Melbourne’s Urban Growth Boundary, Melbourne Water has been working with the Growth Areas Authority to understand their priorities, timeframes and information requirements for preparing Growth Area Framework Plans and subsequent Precinct Structure Plans. Melbourne Water does not yet have servicing advice prepared for the areas comprising the extended UGB. We will be preparing Schemes in conjunction with the GAA Growth Area Framework Planning and Precinct Structure Planning process for these areas, with priorities and timeframes for Scheme preparation being dictated by GAA priorities. In the meantime, we will require the consultants working for clients interested in developing parcels of land in this area ahead of GAA timeframes to prepare Surface Water Management Strategies (SWMS) in consultation with Melbourne Water and the relevant authorities. The SWMS will need to cover all aspects of drainage, flood, waterway and water quality management for the parcel of land in question. Servicing existing growth areas
Melbourne Water Ref: 214479 Applicant Ref: N/A
2 of 5
All existing growth areas have Melbourne Water Schemes prepared that are being incorporated into Precinct Structure Plans. Servicing advice can readily be provided for these areas. Development Services Agreement Prior to the issue of a Statement of Compliance, the Owner will need to enter into and comply with an agreement with Melbourne Water Corporation, under the Water Act 1989, for the provision of drainage works and the acceptance of surface and storm water from the subject land directly or indirectly into Melbourne Water’s drainage system. The agreement may include the following components. A drainage agreement usually includes the payment of drainage contributions, where a property is being developed. These contributions are used to recover the cost of constructing drainage works such as main drains, retarding basins, waterway improvements and flood mitigation works that service properties such as your clients. The contributions are based on the increased impact on the drainage system created development. Please note that any contribution rates are subject to periodical review and hence the future contribution rates may be higher than the current published rates. Two months notice of any change in rates, will be provided on Melbourne Water’s Land Development Manual website, http://ldm.melbournewater.com.au/. Contributions payable for this property will be calculated upon receipt of an application for ‘Conditions of Agreement for the Provision of Drainage Facilities’ and a subdivisional plan. Development Services Scheme/ Strategy All proposed development must be in line with the future Growth Areas Authority Precent Structure Plan for the area. A development services strategy is likely for the area. The scheme/strategy will be finalised in line with the timing of the PSP and rezoning. Melbourne Water will communicate the scheme/strategy to all the landowners once the scheme has been initiated. Development Services Works The developer may need to negotiate temporary works with the downstream landowners to obtain a free draining solution through their properties. Approval will need to be granted and forwarded to Melbourne Water before construction of the drainage works begins.
3 of 5
Drainage Options should be presented for the proposed drainage of the development for the 5 (Residential) 10 (Industrial) year & 100 year systems. This includes utilisation of proposed road and drainage, pipelines and existing or constructed waterways. Water Sensitive Urban Design WSUD is a design process that enables localised collection and treatment of stormwater runoff. Melbourne Water acknowledges the potential for Water Sensitive Urban Design to be incorporated into the development to enable sustainable management of stormwater across the property and to compliment the social and environmental values of the area. Melbourne Water recommends that initiatives such as sediment ponds, bio-filtration systems, grassed swales, grey water re-use, rainwater tanks and porous soils be considered in the design of the development. Stormwater runoff from paved areas can also be a valuable resource for irrigating trees, grassed areas and landscaped garden beds. Please contact Melbourne Water to discuss how WSUD principles will enhance the proposed development or visit our website at www.melbournewater.com.au Stormwater Quality The Urban Stormwater Best Practice Environmental Management Guidelines require that runoff from all new developments (including redevelopments) be treated to comply with the following, ‘Best Practice’ standards criteria: Removal of 80% of the suspended solid annual load, 45% of total phosphorus and 45% of total nitrogen annual loads. Stormwater Quantity Should we put in anything about the little used 1.5year ARI requirement from the USQBMP guidelines or anything about considerations to minimising the impact of stormwater quantity on receiving waterways through any of the new research on geomorphic flow objectives and flow frequency objectives? Overland Flow Paths Melbourne Water expects that upon any application for certification of any subdivision plan associated with the property, due consideration will be given to the alignment of roads and reserves with any adjoining estates, to ensure continuity
4 of 5
and provide uninterrupted conveyance of overland flows. These overland flow paths will need to be designed in accordance with the safety criteria outlined in the Melbourne Water’s Land Development Manual found on the website http://ldm.melbournewater.com.au/ Connecting to Melbourne Water Assets Before starting works separate application, direct to Melbourne Water, must be made for any new or modified storm water connection to Melbourne Water’s drains or watercourses. Before accepting an application, evidence must be provided demonstrating that Council has considered that it is not feasible to connect to the local drainage system. Special Conditions Should permanent Melbourne Water works be required on site, prior to submitting a planning permit a flora & fauna or archaeological survey may be required. Melbourne Water may request for more information at the planning permit stage to ensure the development meets all environmental, heritage and drainage requirements. Design approval from Melbourne Water and any other relevant authorities may be required prior to commencement of the drainage works. As part of the planning permit submission Melbourne Water requests that a drainage strategy be submitted demonstrating the proposed drainage for the development. All new lots must achieve appropriate freeboard in relation to local overland flow paths to Council’s satisfaction. All new lots must achieve appropriate freeboard in relation to any local Melbourne Water Assets. No fill is to be placed within an existing floodplain without the prior consent of Melbourne Water. Further information Melbourne Water looks forward to further discussion on the above and advise that this information is only preliminary and forms no contractual agreement between your company and Melbourne Water. Melbourne Water reserves the right to alter any or all of this information at any time.
5 of 5
Please be advised that this information may be refined and/or modified upon any application for a Development Services Agreement and/or upon the preparation and completion of a Development Services Scheme/Strategy. If you have any enquiries, please contact me on telephone number 9679 6862 or via email at [email protected] Yours sincerely
SHANE KELLY DEVELOPER WORKS