figures 1 to 6 - · pdf filedrilling (d) - channel (c) selected drilling results over core...
TRANSCRIPT
!
!
73
72
71
60 61 62636465
66, 67
68
69
70
5958
57
56
54
5352
5150
49
48
55
Access road
Tonalite
JT Prospect1.33 g/t Au / 7.5 m (D)1.54 g/t Au / 5.7 m (D)5.33 g/t Au / 8.0 m (C)1.50 g/t Au / 16.0 m (C)
500 m
Prospective Corridor Eleonore South Property(Azimut-Eastmain-Goldcorp JV)
Moni Prospect79.6 g/t Au / 4.25 m (C)79.5 g/t Au / 5.87 m (C)8.88 g/t Au / 2.50 m (D)
Cheechoo DiscoveryMain drilled area
Tonalite
Tonalite
Metasediments
Metasediments
Prospective Corridor
CHEECHOO PROPERTY (Sirios)ELEONORE SOUTH PROPERTY(Azimut / Eastmain / Goldcorp)
See close-upFigures 3, 4 and 5
435,000
438,000
5,829,00
0
2016 - 2017 drill holelocationHistorical drill holelocation! Prospective corridorincl. Moni Trend
Tonalite / metasedimentcontact
Figure 2 - Press release dated November 16, 2017
Trench Prospect76.1 g/t Au / 1.55 m (D)1,500 g/t Au (boulder)247.0 g/t Au (boulder)
Hole ES17-600.65 g/t Au / 144.0 mincl. 5.6 g/t Au / 1.5 m 1.9 g/t Au / 22.5 m 16.4 g/t Au / 1.5 m
Drilling (D) - Channel (C)Selected drilling results over core lengths (true widths unknown)
Tonalite
Metasediments
Hole ES17-643.0 g/t Au / 77.3 mincl. 4.9 g/t Au / 45.0 m
101 Prospect101.0 g/t Au (outcrop)67.2 g/t Au (boulder)26.1 g/t Au (outcrop)
Current drilling program(pending results)AA
Moni Trend
2.92 g/t Au over 1.5 m1.14 g/t Au over 6.0 m1.41 g/t Au over 3.0 m0.51 g/t Au over 37.5 mincl. 1.23 g/t Au over 6.0 m 1.40 g/t Au over 4.5 m
1.20 g/t Au over 6.0 m0.54 g/t Au over 3.0 m
0.50 g/t Au over 3.0 m
6.61 g/t Au over 3.0 mincl. 13.03 g/t Au over 1.5 m0.84 g/t Au over 3.0 m
1.07 g/t Au over 1.1 m
3.65 g/t Au (b)2.88 g/t Au (b)1.335 g/t Au (b)1.305 g/t Au (b)
73
72
71
6667
68
69
70
57
54
49
48
Access road
200 m
Prospective Corridor Eleonore South Property(Azimut-Eastmain-Goldcorp JV)Figure 3 - Press release dated November 16, 2017
Cheechoo Property (Sirios)
101 g/t Au (oc)67.2 g/t Au (b)26.1 g/t Au (oc)23.5 g/t Au (oc) 15.2 g/t Au (oc)1,500 g/t Au (b)992 g/t Au (b)952 g/t Au (b)833 g/t Au (b)247 g/t Au (b)76.1 g/t Au over 1.55 m (D)4.97 g/t Au over 1.5 m (D)1.38 g/t Au over 6.4 m (D)4.47 g/t Au (b)3.78 g/t Au (b)2.43 g/t Au (b)Moni Tre
nd 8.88 g/t Au over 2.5 m (D)1.01 g/t Au over 2.9 m (D)1.12 g/t Au over 1.5 m (D)24.2 g/t Au over 3.80 m (C)79.5 g/t Au over 5.87 m (C)7.85 g/t Au over 3.40 m (C)51.4 g/t Au over 5.30 m (C)53.8 g/t Au over 4.55 m (C)40.0 g/t Au over 1.85 m (C)13.5 g/t Au over 4.80 m (C)79.6 g/t Au over 4.25 m (C)28.1 g/t Au over 2.95 m (C)26.40 g/t Au over 0.90 m (C)12.70 g/t Au over 0.90 m (C)12.95 g/t Au over 0.60 m (C)16.60 g/t Au over 0.75 m (C)49.2 g/t Au over 4.00 m (C)47.1 g/t Au over 7.70 m (C)50.37 g/t Au over 3.50 m (C)35.6 g/t Au over 1.35 m (C)
Moni Prospect
101 ProspectTrench Prospect
LegendDrilling (D)Channel (C)Outcrop or Subcrop (oc)Boulder (b)Selected drilling results over core lengths (true widths unknown)Selected rock sample results from outcrops and boulders
Soil geochemistryGold content
100%99%96% - 98%91% - 95%86% - 90%81% - 85%71% - 80%61% - 70%51% - 60%1% - 50%
0.086 - 0.930.051 - 0.0860.028 - 0.0510.016 - 0.0280.011 - 0.0160.009 - 0.0110.007 - 0.0090.006 - 0.0070.005 - 0.0060 - 0.005
ppm - percentiles
! Surface sampling locationDrill hole location
A
436,500
437,000
437,5005,82
9,500
5,829,75
0Eleonore South Property (Azimut - Eastmain - Goldcorp JV)
2.92 g/t Au over 1.5 m1.14 g/t Au over 6.0 m1.41 g/t Au over 3.0 m0.51 g/t Au over 37.5 mincl. 1.23 g/t Au over 6.0 m 1.40 g/t Au over 4.5 m
1.20 g/t Au over 6.0 m0.54 g/t Au over 3.0 m
0.50 g/t Au over 3.0 m
6.61 g/t Au over 3.0 mincl. 13.03 g/t Au over 1.5 m0.84 g/t Au over 3.0 m
1.07 g/t Au over 1.1 m
3.65 g/t Au (b)2.88 g/t Au (b)1.335 g/t Au (b)1.305 g/t Au (b)
73
72
71
6667
68
69
70
57
54
49
48
Access road
200 m
Prospective Corridor Eleonore South Property(Azimut-Eastmain-Goldcorp JV)Figure 4 - Press release dated November 16, 2017
Cheechoo Property (Sirios)
101 g/t Au (oc)67.2 g/t Au (b)26.1 g/t Au (oc)23.5 g/t Au (oc) 15.2 g/t Au (oc)1,500 g/t Au (b)992 g/t Au (b)952 g/t Au (b)833 g/t Au (b)247 g/t Au (b)76.1 g/t Au over 1.55 m (D)4.97 g/t Au over 1.5 m (D)1.38 g/t Au over 6.4 m (D)4.47 g/t Au (b)3.78 g/t Au (b)2.43 g/t Au (b)Moni Tre
nd 8.88 g/t Au over 2.5 m (D)1.01 g/t Au over 2.9 m (D)1.12 g/t Au over 1.5 m (D)24.2 g/t Au over 3.80 m (C)79.5 g/t Au over 5.87 m (C)7.85 g/t Au over 3.40 m (C)51.4 g/t Au over 5.30 m (C)53.8 g/t Au over 4.55 m (C)40.0 g/t Au over 1.85 m (C)13.5 g/t Au over 4.80 m (C)79.6 g/t Au over 4.25 m (C)28.1 g/t Au over 2.95 m (C)26.40 g/t Au over 0.90 m (C)12.70 g/t Au over 0.90 m (C)12.95 g/t Au over 0.60 m (C)16.60 g/t Au over 0.75 m (C)49.2 g/t Au over 4.00 m (C)47.1 g/t Au over 7.70 m (C)50.37 g/t Au over 3.50 m (C)35.6 g/t Au over 1.35 m (C)
Moni Prospect
101 ProspectTrench Prospect
LegendDrilling (D)Channel (C)Outcrop or Subcrop (oc)Boulder (b)Selected drilling results over core lengths (true widths unknown)Selected rock sample results from outcrops and boulders
Soil geochemistryArsenic content
73.31 - 929.3553.68 - 73.331.34 - 53.6821.02 - 31.3415.97 - 21.0212.81 - 15.979.11 - 12.816.92 - 9.115.41 - 6.92
ppm - percentiles
! Surface sampling locationDrill hole location
A
436,500
437,000
437,5005,82
9,500
5,829,75
0Eleonore South Property (Azimut - Eastmain - Goldcorp JV)
100%99%96% - 98%91% - 95%86% - 90%81% - 85%71% - 80%61% - 70%51% - 60%1% - 50%
2.92 g/t Au over 1.5 m1.14 g/t Au over 6.0 m1.41 g/t Au over 3.0 m0.51 g/t Au over 37.5 mincl. 1.23 g/t Au over 6.0 m 1.40 g/t Au over 4.5 m
1.20 g/t Au over 6.0 m0.54 g/t Au over 3.0 m
0.50 g/t Au over 3.0 m
6.61 g/t Au over 3.0 mincl. 13.03 g/t Au over 1.5 m0.84 g/t Au over 3.0 m
1.07 g/t Au over 1.1 m
3.65 g/t Au (b)2.88 g/t Au (b)1.335 g/t Au (b)1.305 g/t Au (b)
73
72
71
6667
68
69
70
57
54
49
48
Access road
200 m
Prospective Corridor Eleonore South Property(Azimut-Eastmain-Goldcorp JV)Figure 5 - Press release dated November 16, 2017
Cheechoo Property (Sirios)
101 g/t Au (oc)67.2 g/t Au (b)26.1 g/t Au (oc)23.5 g/t Au (oc) 15.2 g/t Au (oc)1,500 g/t Au (b)992 g/t Au (b)952 g/t Au (b)833 g/t Au (b)247 g/t Au (b)76.1 g/t Au over 1.55 m (D)4.97 g/t Au over 1.5 m (D)1.38 g/t Au over 6.4 m (D)4.47 g/t Au (b)3.78 g/t Au (b)2.43 g/t Au (b)Moni Tre
nd 8.88 g/t Au over 2.5 m (D)1.01 g/t Au over 2.9 m (D)1.12 g/t Au over 1.5 m (D)24.2 g/t Au over 3.80 m (C)79.5 g/t Au over 5.87 m (C)7.85 g/t Au over 3.40 m (C)51.4 g/t Au over 5.30 m (C)53.8 g/t Au over 4.55 m (C)40.0 g/t Au over 1.85 m (C)13.5 g/t Au over 4.80 m (C)79.6 g/t Au over 4.25 m (C)28.1 g/t Au over 2.95 m (C)26.40 g/t Au over 0.90 m (C)12.70 g/t Au over 0.90 m (C)12.95 g/t Au over 0.60 m (C)16.60 g/t Au over 0.75 m (C)49.2 g/t Au over 4.00 m (C)47.1 g/t Au over 7.70 m (C)50.37 g/t Au over 3.50 m (C)35.6 g/t Au over 1.35 m (C)
Moni Prospect
101 ProspectTrench Prospect
LegendDrilling (D)Channel (C)Outcrop or Subcrop (oc)Boulder (b)Selected drilling results over core lengths (true widths unknown)Selected rock sample results from outcrops and boulders
Magnetic verticalgradient! Surface sampling location
Drill hole locationA
436,500
437,000
437,5005,82
9,500
5,829,75
0Eleonore South Property (Azimut - Eastmain - Goldcorp JV)
1st
50th
100th
Eleonore South Property(Azimut-Eastmain-Goldcorp JV)
Figure 6 - Press release dated November 16, 2017
Trench Prospect : 1,500 g/t Au in quartz-feldspar pegmatite (Sample S657741)
Trench Prospect : 992 g/t Au in quartz-feldspar pegmatite (Sample S657743)