fiismart manufacturing center bid package #04 –interior ... release - bid pack 04 - f… ·...

2
BID RELEASE Fii Smart Manufacturing Center Bid Package #04 – Interior Finishes The Interior Finishes Bid Package #04 for the Fii Smart Manufacturing Center is now available. BID PACKAGE #04 Contract No. 29 Acoustical Ceilings Contract No. 30 Casework – Supply Contract No. 31 Interior Glazing Contract No. 32 Hard Tile Contract No. 33 Paint and Wall Covering Contract No. 34 Flooring Contract No. 35 ESD Flooring and Polished Concrete Contract No. 36 Toilet Partitions Contract No. 37 Specialties Contract No. 38 Landscaping Contract No. 39 Operable Partitions Contract No. 40 Wall Protection Contract No. 41 Green/Live Wall

Upload: others

Post on 18-Jun-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FiiSmart Manufacturing Center Bid Package #04 –Interior ... Release - Bid Pack 04 - F… · Center. This includes core and shell and interiors. Procurement of Subcontractors, Suppliers,

BID RELEASE

Fii Smart Manufacturing CenterBid Package #04 – Interior Finishes

The Interior Finishes Bid Package #04 for the Fii Smart

Manufacturing Center is now available.

BID PACKAGE #04

Contract No. 29 Acoustical Ceilings

Contract No. 30 Casework – Supply

Contract No. 31 Interior Glazing

Contract No. 32 Hard Tile

Contract No. 33 Paint and Wall Covering

Contract No. 34 Flooring

Contract No. 35 ESD Flooring and Polished Concrete

Contract No. 36 Toilet Partitions

Contract No. 37 Specialties

Contract No. 38 Landscaping

Contract No. 39 Operable Partitions

Contract No. 40 Wall Protection

Contract No. 41 Green/Live Wall

Page 2: FiiSmart Manufacturing Center Bid Package #04 –Interior ... Release - Bid Pack 04 - F… · Center. This includes core and shell and interiors. Procurement of Subcontractors, Suppliers,

BID RELEASE

Fii Smart Manufacturing CenterBid Package #04 – Interior Finishes

Non-Disclosure Agreement – NDA:

The Mortenson NDA must be signed and returned to Mortenson to participate in this

bid invitation and to attend the pre-bid meeting. The NDA will be issued through our

Building Connected website after any firm registers through the link provided below.

About the Project:

The project consists of construction of the 230,000 SF Fii Smart Manufacturing

Center. This includes core and shell and interiors.

Procurement of Subcontractors, Suppliers, Vendors, and Professional Services will

follow the clear and detailed process of the Wisconsin First program.

Registration and Bid Information:

To receive project information, please register via the link below:https://bit.ly/2k9Qn5V

After your firm has registered, a Building Connected invitation will be emailed to the

email address provided within one business day. If you do not receive the invitation

or have trouble, please email [email protected].

A prebid meeting will be held on TBD. The NDA must be executed to attend. More

information on the pre-bid is posted on Building Connected

Information and Resources:

Wisconvalley.wi.gov