File Name & Location

18/04/23, Page 1

STATUS OF F/A - 18 E/F NLG RIG TESTING

File Name & Location

18/04/23, Page 2

EXAMPLE

• F/A 18 E/F NLG FOR HCAT.

File Name & Location

18/04/23, Page 3

List of WC-Co-Cr coated parts in NLG F/A-18E/F

• Drag Brace Assembly• 74A430503-2001 Pin Drag Brace, Shock Strut• 74A430802-2003 Pin Trunnion, Drag Brace• 74A430804-2007 Piston Drag Brace• 74A430809-2007 Piston Head Drag Brace• NLG Assembly• 74A430601-2003 Cylinder Assembly Shock Strut• 74A430602-2003 Piston Shock Strut• 74A430603-2001 Pin, Torque Arm Apex Shock Strut• 74A430607-2005 Pin, Torque Arm• 74A430609-2001 Pin-Trunion, Shock Strut

File Name & Location

18/04/23, Page 4

EXAMPLE

• F/A 18 E/F NLG DRAG BRACE (74A430804)

File Name & Location

18/04/23, Page 5 EXAMPLE

F/A 18 E/F PISTON HEAD DRAG BRACE ( P/N 74A430809)

File Name & Location

18/04/23, Page 6

STATUS OF OF F/A-18E/F NLG RIG TESTING

ID Task Name Duration Start % Complete Finish

1 CHCAT F/A-18E/F NLG Test Program 805 days Fri 5/12/00 60% Thu 6/12/03

2 F/A-18E/F Drag Brace Testing 691 days Fri 5/12/00 58% Fri 1/3/03

3 Receive Test Article 0 days Mon 12/18/00 0% Mon 12/18/00

4 Test Procedures 0 days Fri 8/11/00 100% Fri 8/11/00

5 Purchase & Install Control System 16 wks Fri 5/12/00 100% Thu 8/31/00

6 Test Set Up for Fatigue Axial Load 3 wks Tue 12/12/00 100% Mon 1/1/01

7 Calibration of Instrumentation 12 days Tue 1/2/01 100% Wed 1/17/01

8 Instrumentation Setup 3 wks Thu 1/18/01 100% Wed 2/7/01

9 Perform 20% Fatigue 3 wks Thu 2/8/01 100% Wed 2/28/01

10 Strip, Inspect, ATP 2 wks Thu 3/1/01 100% Wed 3/14/01

11 Perform 20% Endurance 3 wks Thu 3/15/01 100% Wed 4/4/01

12 Strip, Inspect, ATP 2 wks Mon 5/28/01 100% Fri 6/8/01

13 First Life Completion 32 wks Mon 6/11/01 100% Fri 1/18/02

14 Strip inspection 6 wks Mon 1/21/02 0% Fri 3/1/02

15 Second Life Completion 40 wks Thu 4/19/01 10% Fri 11/8/02

16 Test Report 8 wks Mon 11/11/02 0% Fri 1/3/03

Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 32000 2001 2002

File Name & Location

18/04/23, Page 7

STATUS OF F/A - 18 E/F NLG RIG TESTING

ID Task Name Duration Start % Complete Finish

17 F-18 E/F Full Scale Fatigue Test 739 days Mon 8/14/00 62% Thu 6/12/03

18 Test Procedures 0 days Wed 8/30/00 100% Wed 8/30/00

19 Purchase & Install Control System 16 wks Mon 8/14/00 100% Fri 12/1/00

20 Purchase Loading Actuators 12 wks Fri 12/15/00 100% Thu 3/8/01

21 Purchase Servo Valves 12 wks Fri 12/15/00 100% Thu 3/8/01

22 Purchase Load Cells 12 wks Fri 12/15/00 100% Thu 3/8/01

23 Design Test Rig Frame Assembly 7 wks Mon 11/13/00 100% Fri 12/29/00

24 Manufacture of Test Frame 12 wks Mon 1/1/01 100% Fri 3/23/01

25 Manufacture of Bed Plate 12 wks Thu 11/30/00 100% Wed 2/21/01

26 Design Test Rig Dummy Wheels 6 wks Mon 1/1/01 100% Fri 2/9/01

27 Manufacture of Dummy Wheels 13.8 wks Mon 2/12/01 100% Thu 5/17/01

28 Receive Test Article 0 days Wed 8/15/01 100% Wed 8/15/01

29 Test Rig Set-Up 12 days Fri 12/21/01 90% Mon 1/7/02

30 Control System Set Up 3 wks Fri 1/11/02 80% Thu 1/31/02

31 Instrumentation and Calibrations 3 wks Fri 2/1/02 100% Thu 2/21/02

32 Fatigue Testing 20% 8 wks Fri 2/22/02 0% Thu 4/18/02

33 Inspection 4 wks Fri 4/19/02 0% Thu 5/16/02

34 Fatigue Testing 40% 8 wks Fri 5/17/02 0% Thu 7/11/02

35 Inspection 4 wks Fri 7/12/02 0% Thu 8/8/02

36 Fatigue Testing 60% 8 wks Fri 8/9/02 0% Thu 10/3/02

37 Inspection 4 wks Fri 10/4/02 0% Thu 10/31/02

38 Fatigue Testing 80% 8 wks Fri 11/1/02 0% Thu 12/26/02

39 Inspection 4 wks Fri 12/27/02 0% Thu 1/23/03

40 Fatigue Testing 100% 8 wks Fri 1/24/03 0% Thu 3/20/03

41 Inspection 4 wks Fri 3/21/03 0% Thu 4/17/03

42 Report 8 wks Fri 4/18/03 0% Thu 6/12/03

Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4

0 2001 2002

File Name & Location

18/04/23, Page 8

Drag Brace Assembly Test

• Retract - Extend Endurance

• Ground Load Fatigue

File Name & Location

18/04/23, Page 9 Drag Brace Assembly Test

Retract - Extend Endurance

0

5000

10000

15000

20000

25000

30000

Accumulated noof cycles 14950

Required no ofcycles 29880

File Name & Location

18/04/23, Page 10 Drag Brace Assembly TestGround Load Fatigue

0

2000

4000

6000

8000

10000

12000

Accumulated no ofcycles 6000

Required no ofcycles 12000

File Name & Location

18/04/23, Page 11

NLG Fatigue Test

• test frame installation ongoing

• test gear assembly completed

File Name & Location

18/04/23, Page 12 FLIGHT TRIALS IN EXISTING DESIGN

File Name & Location

18/04/23, Page 13

EXAMPLE

• CL601 MLG SHOCK STRUT PISTON (17114) AND ATTACHMENT PINS(P/N17207)

File Name & Location

18/04/23, Page 14 EXAMPLE

• BOMBARDIER CL601RJ MAIN LANDING GEAR PISTON P/N 17114 BEFORE INSTALLATION

File Name & Location

18/04/23, Page 15 EXAMPLE

• BOMBARDIER CL601RJ MAIN LANDING GEAR PISTON P/N 17114 AFTER 1764 CYCLES / 2203 HRS

File Name & Location

18/04/23, Page 16

VISUAL INSPECTION RESULTS

• No evidence of seal leakage• HVOF coating in good condition with slight

discoloration at wow static sealing circumference• There was no abnormal bearing wear• Rod seal indicates some wear (TBD)

File Name & Location

18/04/23, Page 17

Attachment pin chrome plated P/N 17207-1

File Name & Location

18/04/23, Page 18

Attachment pin after first “A”check 500hrsP/N 17207-1 HVOF coated

File Name & Location

18/04/23, Page 19 Visual inspection of attachment pin after first “A”check 500hrs

P/N 17207-1 HVOF coated

• Some evidence of material transfer from mating bushing (Be-Cu)

• Dry film lube worn off indicating lack of lubrication

• There was no indication of coating wear or distress

File Name & Location

18/04/23, Page 20

Attachment pin after 1764 cycles and 2203 hrsP/N 17207-1 HVOF coated

File Name & Location

18/04/23, Page 21 Visual inspection of attachment pin after 1764 cycles and 2203 hrsP/N 17207-1 HVOF coated

• Coating shows slight wear marks which can be cleaned up within drawing requirements

• There was some material transfer from mating spherical bushing (Be-Cu)

• Dry film lubricant partially worn off• No evidence of corrosion or pitting

File Name & Location

18/04/23, Page 22 CF-18A/B MLG AXLE LEVER ASSEMBLYnew applications

File Name & Location

18/04/23, Page 23

CF-18A/B MLG AXLE LEVER ASSEMBLYP/N 74A410509-2004 - new application

File Name & Location

18/04/23, Page 24

CF-18A/B MLG AXLE LEVER ASSEMBLYP/N 74A410509-2004 - new application