RALPH L. CARR COLORADO JUDICIAL COMPLEX
and
HISTORY COLORADO CENTER
February 2, 2010
-
8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)
2/14
2
E x i s t i n g B u i l d i n g s - L o o k i n g S W f r o m C a p i t o l
-
8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)
3/14
3
ue
ue
ue
A e r i a l
Lincoln
14th
Aven
13
th
AvenCapitol
12th
Aven
Colfax
Ralph L Carr
Colorado
Judicial Complex
History
Colorado
CenterParking
Garage
Broadway
te SiteSite
Library
Civic Cente
-
8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)
4/144
State Projects Overview th th
Relocate History Center to Civic Center Cultural District site adjacent to Public
Parking
Museum 190,000 SF; $111 Million
Consolidate 7 Judicial-related agencies from 10 locations save lease & operatingcosts
Judicial 600,000 SF; $258 Million including new parking facility (325 spaces)
Financing July, 2009: $39M Tax-Exempt COP and $300M Taxable Build America. ,
service
Saved over $200M (26%) in financing cost over Legislatures approval (SB08-206)
($5M+/year) and $77M savings over tax-exempt issuance
Approximately 2,000 direct jobs created
-
8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)
5/145
Project Timeline
er July 2008:
SB08-206 SignedJune 2009:
Complete 100% DD
February 2010:
Begin TemporarySeptember 2011:
TCO and History Center2000:
New Vision Plan
ry
Cent Tryba Architects
Contract
Documents
Close Land
July 2009: Sell COPs ($345M)
Relocation
May 2010:
Complete TemporaryRelocation
Begin Move-In
Fall 2011:
August 2008:
Hensel PhelpsSelected
Hist
Site Selected
November 2008:
Complete 100%Schematic Design
Block
Project CompleteAugust 2009: Start Construction
plex July 2008:
SB08-206 SignedJune 2009:
Select Fentress Architects Select Mortenson
January 2010:
Complete Schematic DesignDecember 2012:
Temporary Certificate ofOccupancy
January 2013:
2005:
ULI Report
-re
February 2010:
ticeCo July 2009:
Sell COPs ($345M) Begin Conceptual Design
Begin Move In
February 2013:
Justice Relocated
:
Trammell Crow Selected asProgram Manager
Feasibility Report Issued
May 2010:
Complete Temp Relocation Begin Demo of Block
July 2010:
Ju Spring 2013:
Just ice Complex
Project Complete
September 2010:
Start Construction
omp e e ocumen s
-
8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)
6/146
History Colorado Center
-
8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)
7/147
History Colorado Center
-
8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)
8/148
M a s s i n g S t u d y R e s p e c t i n g V i e w P l a n e s
Schematic Design J anuary 2010
-
8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)
9/149
Lincoln
A c c e s sP a t h s
h
Avenu
h
Avenu
1
4t
1
3t
Broadway
Schematic Design J anuary 2010
-
8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)
10/1410
A e r i a l
Schematic Design J anuary 2010
-
8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)
11/1411
P r o p o s e d B u i l d i n g - L o o k i n g S W f r o m C a p i t o l
Schematic Design J anuary 2010
-
8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)
12/1412
P r o p o s e d B u i l d i n g - L o o k i n g S E f r o m C i v i cC e n t e r
Schematic Design J anuary 2010
-
8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)
13/14
13
P r o p o s e d B u i l d i n g - L o o k i n g N E f r o m A r tM u s e u m
Schematic Design J anuary 2010
-
8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)
14/14
14
A t r i u m
Schematic Design J anuary 2010