final combined chc cjc legislative update 2 2 10 fentress-tryba (3)

Upload: mmasich

Post on 30-May-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)

    1/14

    1

    RALPH L. CARR COLORADO JUDICIAL COMPLEX

    and

    HISTORY COLORADO CENTER

    February 2, 2010

  • 8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)

    2/14

    2

    E x i s t i n g B u i l d i n g s - L o o k i n g S W f r o m C a p i t o l

  • 8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)

    3/14

    3

    ue

    ue

    ue

    A e r i a l

    Lincoln

    14th

    Aven

    13

    th

    AvenCapitol

    12th

    Aven

    Colfax

    Ralph L Carr

    Colorado

    Judicial Complex

    History

    Colorado

    CenterParking

    Garage

    Broadway

    te SiteSite

    Library

    Civic Cente

  • 8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)

    4/144

    State Projects Overview th th

    Relocate History Center to Civic Center Cultural District site adjacent to Public

    Parking

    Museum 190,000 SF; $111 Million

    Consolidate 7 Judicial-related agencies from 10 locations save lease & operatingcosts

    Judicial 600,000 SF; $258 Million including new parking facility (325 spaces)

    Financing July, 2009: $39M Tax-Exempt COP and $300M Taxable Build America. ,

    service

    Saved over $200M (26%) in financing cost over Legislatures approval (SB08-206)

    ($5M+/year) and $77M savings over tax-exempt issuance

    Approximately 2,000 direct jobs created

  • 8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)

    5/145

    Project Timeline

    er July 2008:

    SB08-206 SignedJune 2009:

    Complete 100% DD

    February 2010:

    Begin TemporarySeptember 2011:

    TCO and History Center2000:

    New Vision Plan

    ry

    Cent Tryba Architects

    Contract

    Documents

    Close Land

    July 2009: Sell COPs ($345M)

    Relocation

    May 2010:

    Complete TemporaryRelocation

    Begin Move-In

    Fall 2011:

    August 2008:

    Hensel PhelpsSelected

    Hist

    Site Selected

    November 2008:

    Complete 100%Schematic Design

    Block

    Project CompleteAugust 2009: Start Construction

    plex July 2008:

    SB08-206 SignedJune 2009:

    Select Fentress Architects Select Mortenson

    January 2010:

    Complete Schematic DesignDecember 2012:

    Temporary Certificate ofOccupancy

    January 2013:

    2005:

    ULI Report

    -re

    February 2010:

    ticeCo July 2009:

    Sell COPs ($345M) Begin Conceptual Design

    Begin Move In

    February 2013:

    Justice Relocated

    :

    Trammell Crow Selected asProgram Manager

    Feasibility Report Issued

    May 2010:

    Complete Temp Relocation Begin Demo of Block

    July 2010:

    Ju Spring 2013:

    Just ice Complex

    Project Complete

    September 2010:

    Start Construction

    omp e e ocumen s

  • 8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)

    6/146

    History Colorado Center

  • 8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)

    7/147

    History Colorado Center

  • 8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)

    8/148

    M a s s i n g S t u d y R e s p e c t i n g V i e w P l a n e s

    Schematic Design J anuary 2010

  • 8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)

    9/149

    Lincoln

    A c c e s sP a t h s

    h

    Avenu

    h

    Avenu

    1

    4t

    1

    3t

    Broadway

    Schematic Design J anuary 2010

  • 8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)

    10/1410

    A e r i a l

    Schematic Design J anuary 2010

  • 8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)

    11/1411

    P r o p o s e d B u i l d i n g - L o o k i n g S W f r o m C a p i t o l

    Schematic Design J anuary 2010

  • 8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)

    12/1412

    P r o p o s e d B u i l d i n g - L o o k i n g S E f r o m C i v i cC e n t e r

    Schematic Design J anuary 2010

  • 8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)

    13/14

    13

    P r o p o s e d B u i l d i n g - L o o k i n g N E f r o m A r tM u s e u m

    Schematic Design J anuary 2010

  • 8/14/2019 FINAL COMBINED CHC CJC Legislative Update 2 2 10 Fentress-Tryba (3)

    14/14

    14

    A t r i u m

    Schematic Design J anuary 2010