  • Presentation for the Honorable Minister Irrigation, Khyber Pakhtunkhwa08-05-2013

  • Shakardara TownGumbat/ KhushalgarhKDALachi Tehsil:KOHATDistrict HanguOrakzai AgencyNowsheraDistrict KarakPunjab

    N

    W E

    S

    District Kohat

    District Kohat

  • DISTRICT KOHAT

    Total area of Kohat District: 2545 Sq: KM

    North:Orakzai Agency & Tribal areas adjoining Kohat & Peshawar & Nowshera districtWest:Hangu district & Orakzai Agency of FATAEast:Mianwali & KarakSouth:Attock

    Topography: The mountains and the tall hills; Northwest: Ranges of lower MiranzaiNorth West:ShewakiSouth West:Adam Khel hills Eastern boundary: River Indus

    The district Kohat has been divided into two Tehsils i.e. Kohat and Lachi08-05-2013District Kohat

    District Kohat

  • DISTRICT KOHATLanguage.The predominant mother tongue Pashto is spoken by 77.54%. Urdu, Punjabi, Saraiki, Hindko are also spoken by some of the population.

    Major Tribes.Two major tribes:Khattaks and Bangash.

    Climate of District Kohat.Climate of Kohat:Hot from May to Sept & Pleasant from Oct to Feb.

    08-05-2013District Kohat

    District Kohat

  • Total No. of Union CouncilTehsil Kohat= 22 Teshil Lachi= 11 =======================Total= 33

    Besides 04 Afghan Refugee Camps (Ghulam Banda, Gamkol, Ublan and Shahpur)08-05-2013District Kohat

    District Kohat

  • Population:The population of District has increased nearly four times since 1951. The population has increased 72.26% during 1981-1998 at an average annual growth rate of 3.25%.

    COMPOSITION:Almost 99.10% are Muslims.0.46% Christians0.11% Hindus0.30% Qadianis / Ahmadisreside mostly in urban areas of Kohat.08-05-2013District Kohat

    PopulationCurrent population approx:Population density per sq. kmGrowth rate198119981981-98326617562644800,000 approx:2213.25

    District Kohat

  • District Administration Structure08-05-2013District Kohat

    DC/Distt: Collector/Administrator Distt: Council

    CCO, Distt: CouncilAdll: Deputy Commissioner

    DO(F&P)Asstt: Commissioner,Kohat/Lachi

    DO(Health)AAC (Rev)

    DO(M) & (F) Edu:AAC-I

    DO(Agri:)AAC-II

    XEN(W&S)AAC-III

    DO(Community)

    DO(Industries)XEN(PHED)

    CMO, Kohat/LachiDistrict Sports Officer

    PD(KDA)Civil Defence Officer

    District Kohat

  • Besides, 02 reserved seats for women i.e. 01 for MNA and 01 for MPA Constituency-wise voters details (as per General Elections 2013) 08-05-2013District Kohat

    ConstituencyNo. of polling stationsRegistered voters TotalNo. of contesting candidatesMaleFemaleNA-1437323300117237240537323PK 37114776635612413378717PK 38140868116462615143726PK 39119819214903813095923

    District Kohat

  • Education SectorPost Grad:/Degree Colleges01 (Male) 01 (Female)Degree Colleges02 (Male) 02 (Female)Technical College01Commerce College01Cadet Colleges 02Higher Secondary Schools 16 [10 (M) 06 (F)]High Schools 64 [44 (M) 20 (F)]Middle Schools 80 [45 (M) 35 (F)]Primary Schools 641 [378 (M) 263 (F)]08-05-2013District Kohat

    District Kohat

  • HEALTH SECTORHospitals02 [01 (M) 01 (F)]RHCs 04BHU21Civil Dispensary09SHUs03MCH0208-05-2013District Kohat

    District Kohat

  • COMMUNICATION Sector B/T roads200 KMs.Shingled roads55 KMs.PHED SectorWater Supply Schemes108.Irrigation Schemes108.IRRIGATION SectorDams06Tanda DamKandar DamDarwazai DamGandyali DamGhuzandi Dam6)Darmalak dam is under construction08-05-2013District Kohat

    District Kohat

  • Agriculture SectorTotal Geographical area295054Hectares

    ii)Cultivated area74459HectaresIrrigated area15572HectaresUn-irrigated area58897Hectares

    Un-cultivated 220585HectaresForest area:5701HectaresBarren land30031HectaresUn-cultivated area184853HectaresLive Stock & Dairy Dev: SectorVeterinary Hospitals04Veterinary Dispensaries13Veterinary Centers04Artificial Insemination Centers08

    08-05-2013District Kohat

    District Kohat

  • POWER Sector Grid Stations04.Kohat Cantt: 66 K.VPindi Road Kohat 132 K.VGumbat 132 K.VLachi 132 K.V(Shakardarra Grid station is in pipeline)Telecommunication SectorTelephone Exchange21.POSTAL ServicesGeneral Post Office01.Post Offices (Urban)17.Post Offices (Rural)17.

    08-05-2013District Kohat

    District Kohat

  • Revenue SectorTotal no. of Patwar Halqas 44Total no. of Girdawar Circles04Total no. of Patwaris50

    State Land:Mouza Jerma4519AcresMouza Chambai2621AcresMouza Gandyali2399AcresMouza Togh/Babri Banda288AcresMouza Shahpur5325AcresMouza Boraka13240AcresMouza Khwaja Khizr70AcresMouza Rukhtoppi6853Acres

    08-05-2013District Kohat

    District Kohat

  • District Food Deptt:Total No. of godowns =02 (capacity 11100 Mts)Pindi road (capacity 4500 Mts)Billitang (capacity 6600 Mts)

    Total No. of Flour Mills=08

    08-05-2013District Kohat

    District Kohat

  • Poling Station Categories:

    Normal 110

    Sensitive 164

    Very Sensitive 99

    Total 373

    Source: security plan 2013 chalked out by DPO. ELECTION2013:08-05-2013District Kohat

    District Kohat

  • Preparedness:Security Plan has been chalked out by the district police.Vehicles have been provided to the DRO/ROs.Vehicles along with POL and camera have been provided to the monitoring officers. Focal person from each line deptt: has been nominated.Security measures have been enhanced around the District Courts especially for the offices of the DRO/ROs.Election material has been received by the Deputy Election Commissioner and put into safe custody.Duties have been assigned to the concerned staff. Training of election staff has been conducted.

    08-05-2013District Kohat

    District Kohat

  • LAW & ORDER SITUATION

    Election-201308-05-2013District Kohat

    District Kohat

  • District PoliceStrength of district police: 1397Strength of FRP:101101 FC platoon placed at the disposal of district police.Total Police Stations:11DSPs (04 i.e. HQ, City Saddar, Lachi).FC forts (02 i.e. Oblan and Kachai).

    08-05-2013District Kohat

    District Kohat

  • Law & Order situation/threat perception:Terrorist/sabotage activities by militants targeting election activities and general public.

    Infiltration of terrorist from adjoining tribal areas.

    Threat to vital installations like Indus highway, Kohat tunnel, Khushal Garh bridge, oil installations and foreigners working there.

    Specific threat by Taliban to ANP and PP and general threat to other political parties.

    Threats of target killing of Elite and political leaders including candidates.

    Targeting LEAs to lower their morale and subvert the election process.

    Threat to election commission staff, returning officer and polling staff and NGOs covering election activities.

    Threat of sectarian clash in Hangu and Kohat.

    Clashes between workers of rival political parties and groups. 08-05-2013District Kohat

    District Kohat

  • Objectives:To implement code of conduct issued by Election Commission of Pakistan.

    To secure peace and order during the elections.

    To arrange security of ballot papers and other allied material.

    To ensure security of polling station.

    To protect the contesting candidates.

    Free access to the polling station of voters.

    To ensure complete neutrality of the district police.

    To ensure security of the vital installations, police establishments etc.08-05-2013District Kohat

    District Kohat

  • Method to achieve objectives:Meeting with candidates.

    Collect, collate and disseminate intelligence.

    Surveillance over political, sectarian, religious gatherings.

    Deployment of police and other Law Enforcing Agencies (LEAs).08-05-2013District Kohat

    District Kohat

  • GOVERNMENT OF KHYBER PAKHTUNKHWA

    Khyber PakhtunkhwaCOMMUNICATION & WORKS DEPARTMENTKHYBER PAKHTUNKHWA08-05-2013District Kohat

    District Kohat

  • GENERAL ABSTRACT C&W DEPARTMENT

    TOTAL ADP SECTOR : 32PRESENTLY WORKING SECTOR :12

    TOTAL ALLOCATION/RELEASES : 487.864M IN DISTRICT KOHAT08-05-2013District Kohat

    District Kohat

  • SCHEMES DUE FOR COMPLETION DURING 2012-13

    S.NoName of Sector Total Number of Scheme Scheme due for completion in JuneIncomplete Scheme due to litigation1.Elementary & Secondary Education 2511-2.Higher Education 0501-3.Health 0501-4Auqaf, Hajj, Religious Affair 0101-5Road05--6Building 03--7Agriculture 0201-8Sports, Culture & Tourism 0301019Industries 0401-10Regional dvelopment0101-11Food 01--12Home0302-

  • EXECUTING AGENCIES C & W Kohat Division PHED Deptt: Kohat TMA Kohat TMA Lachi Irrigation Deptt: Kohat

    08-05-2013District Kohat

    District Kohat

  • CONSTITUENCIESNA- 14NA- 324 (WRS)PK- 37PK- 38PK- 39MPA (WRS)

    08-05-2013District Kohat

    District Kohat

  • SOURCE OF FUNDS FOR THE EXECUTION OF DEVELOPMENT SCHEMES IN DISTRICT KOHATDistrict ADP under PFC awardProvincial ADPTameer-e-Khyber Pakhtunkhwa ProgrammeChief Ministers Directives/Spl: PackageRoyalty on Oil & Gas.Peoples Works Programme-I (MNAs Regular ADP).Peoples Works Programme-II (Prime Ministers Directives)Production Bonus, Provided by oil & gas exploring / producing companies08-05-2013District Kohat

    District Kohat

  • DEVELOPMENT ACTIVITIIES IN DISTRICT KOHATFinancial year 2012-13 for month of April, 2013 (Rs. In Million)

    S#Name of ProgrammeE/AgenciesNo. of SchemesSchemes completedApproved CostTotal Expdt:Physical ProgressRemarks.1District MC KohatPHED /SW16---31.9510.1718%Schemes approved in DDC but approval from LG awaited. 2Tameer-e-KP ProgrammeMC KohatMC Lachi796778.5063.96885%3CMs Directives / Spl: PackageMC KohatMC Lachi& PESCO8771120.0088.34883%45% Royalty of Oil & GasMC Kohat,MC Lachi, C&W & PHED20785569.06387.63575%5Peoples Works Programme PWP-IMC Kohat 06----17.909.1270%6Prime Ministers Directives PWP-II.MC KohatMC LachiPHED / C&W147104330.00202.62061%7Production Bonus (MOL Pakistan).MC Kohat,MC Lachi, C&W & PHED060130.67519.99350%G. Total5483371178.086788.67472%

  • STATEMENT SHOWING DETAIL OF ADP WORKS IN KOHAT IRRIGATION DIVN: KOHATDistrict Kohat

    ADP No.Code/Scheme NameNo. of schemeCompletedApproved costProgressRemarksA-On going Schemes (2011-12)403Cnst: of small ponds in various district of KP445.018100405Const: of bridges & culverts in KP223.393100406-100034Const: of new FPW & extension/Imp: of existing FPW in KP555.021100407-100039Restoration/Rehabilitation of Irrig: schemes in Civil Khattas in KP778.0135100416-110008Const: of small Irrig: schemes in KP333.00100417-110009Const: of CPR in KP229.00100B- New Schemes (2012-13)452-Const: of Irrig: T/Well in KP3-12.0030Work not completed due to non availability of funds in time453Const: of crossing facilities on different canals system in KP8-3.01475454Imp: of Irrig: facilities by providng smal ponds in KP1-0.9595470Const: of Protection structure & vulnerable location in KP3--5.022570

    District Kohat

  • DEVELOPMENTAL SCHEMES IN RESPECT OF PHE DIVISION KOHAT (ADP 2012-13)08-05-2013District Kohat

    S#ADPName of SchemeTotal CostExpdt:Physical progress Remarks.1184/100100Reh: of Exiting Old/VDO W.S.S in Khyber Pakhtunkhwa 43.52935.08690Scheme is due to completion.2.190/100104Construction of water supply schemes based on outlet from Dams constructed by Small Dams Organization irrigation Deptt:. Drinking Water Supply Scheme Darmalak Dam to Sodal and adjoining villages in PK-39 District Kohat.74.98153.23279Work in Progress 3.191/100108Construction of 100 Nos Drinking Water supply schemes in Khyber Pakhtunkhwa.73.31263.35193Scheme is due to completion.4192/120610Replacement of Old/Rusted pipes in different WSS Khyber Pakhtunkhwa.16.2863.72925Work in progress5.193/120611Construction of WSS in Khyber Pakhtunkhwa.63.99018.12722do

    District Kohat

  • PROBLEMS

    Non-Utilization of Funds:

    The funds under District ADP (2012-13) un-utilized due to ambiguity in procedure of approval by LG & RDD KP Peshawar.

    As per policy the schemes identified by 03 regular MPAS & one elder of the area were approved in DDC meeting & forwarded to the LG & RDD KP Peshawar for further approval but approval not accorded.

    08-05-2013District Kohat

    District Kohat

  • The LG & RDD KP Peshawar issued other directions to 07 Districts of KP to utilize the funds of District ADP for improvement of municipal services.

    The proposals received from the MC Kohat & MC Lachi were discussed in a meeting of committee constituted by LG & RDD KP Peshawar for the purpose and forwarded to LG & RDD KP Peshawar for approval which is awaited.

    08-05-2013District Kohat

    District Kohat

  • Later; LG & RDD KP Peshawar directed this office to utilize the funds of districts ADP (2012-13), on the schemes identified by the MNA NA 324(WRS).

    In this regard LG & RDD KP Peshawar was requested to advise this office as to whether the identification of EX-MNA NA 324 after dissolution of assemblies is intact or otherwise but reply is still awaited.

    08-05-2013District Kohat

    District Kohat

  • Non-completion of important schemes, such as WSS Schemes, construction of Hostel building etc due to non-revival of federal Govt funds.

    3. Non-identification of schemes, under production bonus due to a committee introduced by Chief Secretary and dissolution of assemblies/MNA (Chairman of PSDC).

    08-05-2013District Kohat

    District Kohat

  • THANK U08-05-2013District Kohat