final expedied soil cleanup at ehs presentation 2017-05-22
TRANSCRIPT
![Page 1: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/1.jpg)
1
May 22, 2017
![Page 2: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/2.jpg)
2
New York State Department of Environmental Conservation
&Department of Health Representatives
Bernette Schilling P.E., NYSDEC HWR Engineer
Tim Schneider P.E., NYSDEC Project Manager
Dawn Hettrick P.E., NYSDOH Project Manager
Unisys CorporationKevin Krueger, Director of Global Environmental, Safety, Health
and Security
Paul Brookner, Geosyntec Consultants
![Page 3: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/3.jpg)
3
Introduction
The Involved Parties: NYS Department of Environmental Conservation
Environmental Regulatory Agency Division of Environmental Remediation
NYS Department of Health Public Health Regulatory Agency
Bureau of Environmental Exposure Assessment
Unisys Corporation Corporate Successor to Remington Rand Corporation
Elmira City School District Environmental Management and Facilities Maintenance
![Page 4: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/4.jpg)
4
Meeting Agenda• Introduction• Historic Background• Ongoing Environmental Studies at EHS – NYSDEC• Site Characterization and Soil Cleanup – Unisys/Geosyntec• Health Overview – NYSDOH• Next Steps – NYSDEC• Other Environmental Studies - NYSDEC• Questions and Answers - All
![Page 5: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/5.jpg)
5
Historic Background of Industrial Site UseMorrow Manufacturing Co. from 1909-1935
Post Card rendering circa 1916Post Card rendering circa 1930
![Page 6: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/6.jpg)
6
Remington Rand Corp. from 1936-1972
Photo circa 1944-48
Historic Background of Industrial Site Use
![Page 7: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/7.jpg)
7
Elmira High School circa 1979
Southern Tier Commerce Center
Current Configuration
![Page 8: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/8.jpg)
8
• DEC Identified 17 Areas of Environmental Concern
Environmental Studies & Response Actionsat Sperry Remington- North Portion #808022
Former Industrial SewersFormer Oil SkimmersFormer DrywellsFormer Plating, Degreasing & Painting AreasFormer Waste AreasBelow Ground Soil and Groundwater Contamination Soil Vapor Contamination
![Page 9: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/9.jpg)
9
• 2017 – Data Collected for Majority of 17 Areas of Concern
Ongoing Environmental Studiesat Sperry Remington- North Portion #808022
Former Industrial SewersFormer Oil SkimmersFormer DrywellsFormer Plating, Degreasing & Painting AreasFormer Waste AreasBelow Ground Soil and Groundwater Contamination Soil Vapor Contamination
![Page 10: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/10.jpg)
10
• 2017 – Primary Contaminant of Concern – PCBs
Ongoing Environmental Studiesat Sperry Remington- North Portion #808022
PCBsin soil
PCBsin soil
PCBsin soil
2017 EHS Capital Improvements
![Page 11: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/11.jpg)
11
• 2017 – Expedited Soil Cleanup Areas
Ongoing Environmental Studiesat Sperry Remington- North Portion #C808022
2017 EHS Capital Improvements
Soil Cleanup
AreaSoil Cleanup Area
![Page 12: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/12.jpg)
Environmental Site Activities 2015-2017
Elmira High School (EHS) BCP Site ID #C808022Site Characterization
Expedited Soil Cleanup
May 22, 2017
![Page 13: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/13.jpg)
Introduction
• Site Characterization (SC) Activities– Draft SC Report (May 2017) available at Chemung Co. Library
• Interim Remedial Measures– Expedited Soil Cleanup– Subslab Depressurization Systems
• Future Investigation– Elmira High School– Southern Tier Commerce Center– Coldbrook Creek
![Page 14: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/14.jpg)
Site Characterization of Soils
• Surface Soils (0-2 in bgs) – public health exposure• Shallow Subsurface Soils (0-2 ft bgs) – soil cover
system• Subsurface Soils (> 2ft bgs) – below soil cover
system– Sampling of 2 ft intervals (e.g., 2‐4’; 4‐6’…16‐18’)
![Page 15: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/15.jpg)
Soil Investigation – Sample Locations
![Page 16: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/16.jpg)
Constituents of Concern
• Analyzed for suite of compounds• Primary COC are PCBs• What are PCBs?
– Historically used in hydraulic oils, cutting oils & cooling oils– Stable compound– Don’t readily mix with water / Migration is limited in water
![Page 17: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/17.jpg)
Extent of COPCs in Surface Soil
PCB SCO ExceedancePAH SCO Exceedance
![Page 18: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/18.jpg)
Short Term Response Actions
• Precautionary measure for areas with:– Vegetative cover (i.e., grass)– PCBs > 1 ppm in surface soil (0‐2 in)– PCBs > 10 ppm in shallow subsurface soil (0‐2 ft)
• Actions:– Inspect turf cover areas– Restrict access until turf cover established
– Temporary cover installation• Hardwood mulch and geotextile w/wood frames
![Page 19: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/19.jpg)
Extent of COPCs in Shallow Subsurface Soil
³
L d
PCB SCO ExceedancePAH SCO ExceedanceMetals SCO Exceedance
![Page 20: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/20.jpg)
Extent of PCBs in Subsurface Soil
2‐4 ft bgs
4‐6 ft bgs
6‐8ft bgs
8‐10 ft bgs
10‐12 ft bgs
12‐14 ft bgs
14‐16 ft bgs
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
PCB > 10 ppm
![Page 21: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/21.jpg)
Extent of PCBs in Subsurface Soil near Water Table
16 ‐18 ft bgs 18 ‐ 20 ft bgs
![Page 22: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/22.jpg)
Extent of COPCs in Groundwater
PCB TOGS ExceedancePAH TOGS Exceedance
VOC TOGS Exceedance
![Page 23: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/23.jpg)
Former Combined Industrial Sewer
Former Sewer Line –Collapsed Sections
PCB SGV ExceedancePAH SGV ExceedancePCB/Metal SGV Exceedance
![Page 24: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/24.jpg)
IRM Sub-slab Depressurization System (SSDS)
• EHS installed SSDS for Cafeteria/Gym additions• F-Wing Installed & operational in August 2014• Operating as intended/protective
![Page 25: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/25.jpg)
IRM Objectives
• Removal of soils that exceed cleanup goals for PCBs in two areas that affect 2017 Capital Improvements at EHS tennis courts and main (visitors) parking lot– Soil Cover (0 to 2 ft bgs): 1 ppm (Restricted Residential SCO)
– Below Soil Cover (>2 ft bgs): 10 ppm– Water Table: 3.2 ppm (Protection of Groundwater SCO)
• 1 part per million (ppm): 1 inch in 15.7 miles• NYS Soil Cleanup Objectives (SCOs) – 6 NYCRR
Subpart 375 – Protection of public health– Protection of groundwater
![Page 26: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/26.jpg)
IRM Overview – Summer 2017
MainParking Lot
AreaTennisCourtArea
![Page 27: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/27.jpg)
What will be done?
• Tennis Courts– Excavation Area: 17,400 SF– Excavation Depth: 2 ft– 52 soil borings (79 samples)
• Main Parking Lot– Excavation Area: 40,300 SF– Excavation Depth: up to 17 ft– 232 soil borings (647 samples)
![Page 28: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/28.jpg)
What to Expect - Excavation
• Soil Excavation / Regrading / Restoration• Soil > standards: to approved, licensed landfills
![Page 29: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/29.jpg)
Protection Programs
• Dust control program• Truck Decon• Community air monitoring• Storm water controls
![Page 30: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/30.jpg)
What to Expect – Truck Traffic
Tennis Court Area / Parking Lot Area soil removal, staging and off‐site transportation:
Expected Truck Traffic at 20‐40 per day to approximately mid‐August
All Trucks will be decontaminated before leaving the Site.
![Page 31: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/31.jpg)
2017 EHS Soil Removal Schedule
• North Area (tennis courts) – June: Excavation, backfill & topsoil placement
• South Area (parking lot)– June to mid‐August: Excavation, backfill, utility restoration, topsoil placement & hardscape replacement
• Soil Staging Area (non-EHS property)– August/September: proper disposition of soil, removal of staging area infrastructure & closure
![Page 32: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/32.jpg)
Future Remedial Measures
• Future Remedial Measures – EHS– Coordinated with future EHS construction plans to minimize disruption to school activities
• South Parking Lot – Summer 2018• Football Field – Pending EHS construction plans
![Page 33: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/33.jpg)
Role in Elmira High SchoolAssess how people can be exposed to contamination at the site and assess ways to prevent that exposure.
![Page 34: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/34.jpg)
34
Potential Exposure Pathways–Direct contact – Contamination has been found in soil.
–Ingestion of Groundwater - Public water is supplied to the surrounding area.
–Inhalation of Indoor Air - Soil vapor intrusion (also know as SVI) is the way contaminants may migrate into indoor air.
![Page 35: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/35.jpg)
35
To prevent exposure:• To control soil vapor intrusion:
• Sub-slab depressurization system has been installed in the school building.
• The school has an Environmental Management Plan, which includes a Soil Management Plan.
![Page 36: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/36.jpg)
36
Long‐term• The proposed interim remedial measure will remove
contaminated soil in the areas identified near the parking lot and the tennis courts.
• The Environmental Management Plan will still be in effect.
![Page 37: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/37.jpg)
37
During construction?• A Community Air Monitoring Plan will implemented
during construction to prevent the community from being exposed to contaminated soil that is removed.
• Additional remedial measure will be needed in other areas around the school property.
![Page 38: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/38.jpg)
38
After this?• Additional remedial measures will be needed in other
areas around the school property.
• Operation of the sub-slab depressurization system in the school will continue.
![Page 39: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/39.jpg)
39
Contact informationDawn Hettrick, P.E.Public Health EngineerNew York State Department of HealthBureau of Environmental Exposure InvestigationEmpire State Plaza - Corning Tower Room 1787Albany, NY 12237(518) 402-7860
![Page 40: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/40.jpg)
40
Soil Vapor Intrusion
![Page 41: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/41.jpg)
41
INDOOR AIR CONCENTRATION of COMPOUND (mcg/m3)SUB-SLAB VAPORCONCENTRATION ofCOMPOUND (mcg/m3) < 0.25 0.25 to < 1 1 to < 5.0 5.0 and above
< 5 1. No further action 2. Take reasonable andpractical actions toidentify source(s) andreduce exposures
3. Take reasonable andpractical actions toidentify source(s) andreduce exposures
4. Take reasonableand practical actionsto identify source(s)and reduce exposures
5 to < 50 5. No further action 6. MONITOR 7. MONITOR 8. MITIGATE
50 to < 250 9. MONITOR 10. MONITOR /MITIGATE
11. MITIGATE 12. MITIGATE
250 and above 13. MITIGATE 14. MITIGATE 15. MITIGATE 16. MITIGATE
Evaluation of TCE
![Page 42: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/42.jpg)
42
INDOOR AIR CONCENTRATION of COMPOUND (mcg/m3)SUB-SLAB VAPORCONCENTRATION ofCOMPOUND (mcg/m3)
< 3 3 to < 30 30 to < 100 100 and above
< 100 1. No further action 2. Take reasonable andpractical actions toidentify source(s) andreduce exposures
3. Take reasonable andpractical actions toidentify source(s) andreduce exposures
4. Take reasonable andpractical actions toidentify source(s) andreduce exposures
100 to < 1,000 5. MONITOR 6. MONITOR /MITIGATE
7. MITIGATE 8. MITIGATE
1,000 and above 9. MITIGATE 10. MITIGATE 11. MITIGATE 12. MITIGATE
Evaluation of PCE
![Page 43: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/43.jpg)
43
How can exposure via soil vapor intrusion be mitigated in buildings?
![Page 44: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/44.jpg)
44
Next StepsInterim Remedial Measures Work Plan• DEC approves soil cleanup work plan• Summer 2017 Cleanup Work : Starts in June and will be completed by end of August DEC will provide general oversight of activities Unisys will have full-time qualified environmental staff on-site to:
• Manage site soil excavation, storage, disposal and restoration• Monitor dust / air quality and take actions to mitigate sources• Manage health and safety protocols to reduce the risk of exposure
Remedial Investigation• Unisys will continue to:
• delineate the extent of contamination in soil and groundwater• complete the investigation of former sub-surface industrial infrastructure• complete response actions to reduce the risk of potential exposure to
contaminants where necessary
![Page 45: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/45.jpg)
45
Other Environmental StudiesFormer Sperry Remington Site #808043 – Remedial Investigation
Industrial pipe discharge to offsite waterwaysPrimary contaminants of concern are PCBs and Metals • downstream extent of impacts have been determined• additional delineation of impacts is needed in backwater
areas
Unisys will prepare a Remedial Investigation Report • including a Fish and Wildlife Impact Analysis • the public will be informed of the investigation results
![Page 46: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/46.jpg)
46
Other Environmental StudiesFormer Scott Technologies Site #808049 – Site Characterization
Primary contaminants of concern are PCBs, PAHs & Metals • minor areas of impacted soils and sediments• additional delineation of impacts is underway
Unisys will prepare a Site Characterization Report • documenting the findings• recommending next course of action
• remedial investigation• remedial cleanup
![Page 47: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/47.jpg)
47
To Stay InformedList-Serv Signup
www.dec.ny.gov/chemical/61092.html
Document RepositoryElmira Steele Memorial Library101 East Church StreetElmira, NY 14901Phone (607) 733-9175
![Page 48: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/48.jpg)
48
CONTACT INFORMATIONTim Schneider, NYSDEC
6274 East Avon-Lima RoadAvon, New York 14414
585-226-5480
Dawn Hettrick, NYSDOHNYSDOH
Empire State Plaza, Corning Tower Rm #1787Albany, NY 12237
518-402-7860
![Page 50: Final Expedied Soil Cleanup at EHS Presentation 2017-05-22](https://reader031.vdocuments.net/reader031/viewer/2022040808/624d9d626589a815ec508684/html5/thumbnails/50.jpg)
50
QUESTIONS?