Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company NLD Final Inspection Report 050409.doc Page 1 of 3 Final Inspection Report For Nassau Lake Dam Project Towns of Schodack & Nassau, New York Prepared by Kyle F. Swierski, P.E., LLC 41 Boll Drive Elma, New York 14059 (716) 655-6722 [email protected] For General Electric Company 320 Great Oaks Office Park Suite 319 Albany, New York 12203 (518) 862-2700 May 04, 2009

Upload: others

Post on 27-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection Report 050409.doc Page 1 of 3

Final Inspection Report

For

Nassau Lake Dam Project Towns of Schodack & Nassau, New York

Prepared by

Kyle F. Swierski, P.E., LLC 41 Boll Drive

Elma, New York 14059 (716) 655-6722

[email protected]

For

General Electric Company 320 Great Oaks Office Park

Suite 319 Albany, New York 12203

(518) 862-2700

May 04, 2009

Page 2: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection Report 050409.doc Page 2 of 3

Table of Contents

1. Introduction 2. Site Visit Attendees 3. KFS Final Inspection Notes

Appendix A NLD Site Photographs 05-01-09 Appendix B NLD Final Completion Certificate 05-04-09

------------------------------------------------------------------------------------------

1. Introduction

Alpine Construction LLC (Alpine) completed the construction activities for the Nassau Lake Dam (NLD) rehabilitation on May 01, 2009. This Final Inspection Report has been prepared by Kyle F. Swierski, PE, LLC (KFS) to document the NLD site conditions observed on May 01, 2009. This Final Inspection Report represents the culmination of the Construction Progress Reports, prepared and distributed by Alpine in the regularly scheduled NLD progress meetings. The KFS final inspection confirms that the construction for the NLD rehabilitation project has been completed in accordance with the documents approved by the NYSDEC.

2. Site Visit Attendees

The following representatives visited the NLD site on May 01, 2009:

Kyle F. Swierski PE, LLC (KFS) Kyle F. Swierski, PE – Principal

General Electric Company (GE) Lewis S. Streeter - Project Manager

Alpine Construction LLC (Alpine) William P. Patenaude - Principal Guy Henke - Construction Superintendent

Nassau Lake Park Improvement Association (NLPIA) (part-time visitors) Thomas Tobia - President Robert Zimmerman – Trustee

New York State Department of Environmental Conservation (NYSDEC) Division of Environmental Remediation Section A (part-time visitors)

Jeffery E. Trad, PE - Project Manager, Remedial Bureau E George W. Harris, PE - Section Chief, Remedial Bureau E Robert C. Knizek, PE - Bureau Director, Remedial Bureau E

Page 3: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection Report 050409.doc Page 3 of 3

3. KFS Final Inspection Notes o Final Inspection Site Photographs taken by KFS on May 01, 2009 are

provided in Appendix A.

o During the KFS final inspection, Alpine was completing the seeding operations for the restoration of the construction easement area and performing final cleanup & demobilization.

o KFS observed the field construction for the NLD rehabilitation to be

complete, including the punchlist items identified during the previous substantial completion inspection on March 12, 2009. There were no outstanding work items noted by KFS, or other site visit attendees. The NLD Final Completion Certificate prepared by KFS is provided in Appendix B.

o Alpine, on behalf of GE, delivered the following to the NLPIA:

o Two identical gate operator handwheels (one is a spare) o Two spare signs each of Type A, B & C (design drawing 008 sheet 3)

o Alpine, as a courtesy, also provided the NLPIA with two timber bulkheads

which Alpine installed in the gate chamber inlets for dewatering. Should the gate chamber require dewatering in the future, NLPIA's contractor should verify the adequacy of the timber bulkheads.

Page 4: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 1 of 29

Appendix A Nassau Lake Dam Upgrade

Final Inspection Report Site Photographs 05-01-09

By KFS PE LLC

Page 5: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 2 of 29

Photo 1 – West Bank Looking N (jpg 36)

Photo 2 – NLD Looking NE (jpg 37)

Page 6: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 3 of 29

Photo 3 – NLD Looking NE (jpg 38)

Photo 4 – NLD Looking NE (jpg 39)

Page 7: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 4 of 29

Photo 5 – West Abutment Looking N (jpg 40)

Photo 6 – NLD Looking NE (jpg 41)

Page 8: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 5 of 29

Photo 7 – West Abutment Looking N (jpg 42)

Photo 8 – NLD Looking N (jpg 43)

Page 9: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 6 of 29

Photo 9 – NLD Looking NE (jpg 44)

Photo 10 – West Abutment Looking N (jpg 45)

Page 10: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 7 of 29

Photo 11 – Downstream Reach Looking S (jpg 46)

Photo 12 – Gate Chamber Looking E (jpg) 47

Page 11: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 8 of 29

Photo 13 – West Bank Survey marker SM3 Looking N (jpg 48)

Photo 14 – Nassau Lake/NLD Looking E (jpg 49)

Page 12: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 9 of 29

Photo 15 – Nassau Lake/NLD Looking SE (jpg 50)

Photo 16 – West Wall Survey Marker SM1 Looking E (jpg 51)

Page 13: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 10 of 29

Photo 17 – Downstream Reach Looking S (jpg 52)

Photo 18 – West Abutment Looking W (jpg 53)

Page 14: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 11 of 29

Photo 19 – West Abutment Looking NW (jpg 54)

Photo 20 – East Abutment Looking NE (jpg 55)

Page 15: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 12 of 29

Photo 21 – NLD Looking E (jpg 56)

Photo 22 – Gate Chamber East Trashrack Looking Down (jpg 57)

Page 16: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 13 of 29

Photo 23 – Gate Chamber Looking S (jpg 58)

Photo 24 – High Level Sluice Chamber Looking S (jpg 59)

Page 17: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 14 of 29

Photo 25 – West Abutment Looking S (jpg 60)

Photo 26 – West Abutment Looking SW (jpg 61)

Page 18: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 15 of 29

Photo 27 – HWL Gage Looking W (jpg 61)

Photo 28 – Gate Chamber Access Ladder Looking W (jpg 62)

Page 19: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 16 of 29

Photo 29 – Monitoring Well MW1 Looking E (jpg 63)

Photo 30 – Downstream Reach Looking S (jpg 64)

Page 20: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 17 of 29

Photo 31 – NLD Looking NE (jpg 65)

Photo 32 – NLD Looking E (jpg 66)

Page 21: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 18 of 29

Photo 33 – NLD Looking SE (jpg 67)

Photo 34 – Downstream Reach Looking SW (jpg 68)

Page 22: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 19 of 29

Photo 35 – NLD Looking W (jpg 69)

Photo 36 – NLD Looking W (jpg 70)

Page 23: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 20 of 29

Photo 37 – NLD Looking NW (jpg 71)

Photo 38 – East Abutment Looking NW (jpg 72)

Page 24: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 21 of 29

Photo 39 – East Abutment Looking N (jpg 73)

Photo 40 – East Abutment Looking SW (jpg 74)

Page 25: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 22 of 29

Photo 41 – NLD Looking W (jpg 75)

Photo 42 – East Abutment Looking NW (jpg 76)

Page 26: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 23 of 29

Photo 43 – East Abutment Looking S (jpg 77)

Photo 44 – NLD Looking SW (jpg 78)

Page 27: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 24 of 29

Photo 45 – NLD/Nassau Lake Looking W (jpg 45)

Photo 46 – NLD From Easement Area Looking N (jpg 80)

Page 28: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 25 of 29

Photo 47 – Easement Restoration Looking SE (jpg 81)

Photo 48 – Easement Restoration Looking S (jpg 82)

Page 29: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 26 of 29

Photo 49 – Easement Restoration Looking S (jpg 83)

Photo 50 – Easement Restoration Looking SE (jpg 84)

Page 30: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 27 of 29

Photo 51 – Easement Restoration Looking N (jpg 85)

Photo 52 – Easement Restoration Looking E (jpg 86)

Page 31: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 28 of 29

Photo 53 – Easement Restoration Looking S (jpg 87)

Photo 54 – Easement Restoration Looking N (jpg 88)

Page 32: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppA 050409.doc Page 29 of 29

Photo 55 – Easement Restoration Looking NE (jpg 89)

Page 33: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed

Nassau Lake Dam Project – Towns of Schodack & Nassau, New York Final Inspection Report for Dam Upgrade Prepared by: Kyle F. Swierski, P.E., LLC Date: May 04, 2009 For: General Electric Company

NLD Final Inspection AppB 050409.doc Page 1 of 2

Appendix B Nassau Lake Dam Upgrade

Final Inspection Report Professional Engineer Certification

for Final Completion By KFS PE LLC

Page 34: Final Inspection Report For Nassau Lake Dam Project Lake Dam... · Appendix B NLD Final Completion Certificate 05-04-09 ----- 1. Introduction Alpine Construction LLC (Alpine) completed