Names, Roles and Email addresses of Systems Analysts

Financial Analyst: Chou, Ying-Chung ([email protected])Infrastructure Analyst: Corey, Jeremy ([email protected])Systems Analyst: Davis, Desiree ([email protected])Systems Analyst: Driscoll, Adam ([email protected])Project Sponsor: Durgam, Jacinth ([email protected])Information Coordinator: Geisler, Robert ([email protected])Project Manager: Geist, Jason ([email protected])

Description of Organization

Our project team proposes to improve the discussions forum1 software system

hosted online by the Law Offices of Rajiv S. Khanna, PC. The law firm practices U.S

Immigration and Nationality Laws in all 50 states and abroad. The firm provides specific

emphasis on business and professional immigration matters. They are located at 5225 N.

Wilson Blvd. Arlington, VA 22205, with a staff of roughly 40 people. They help provide

clients with obtaining permanent residence through professional labor certifications. The

firm assists clients with complex immigration related cases. Their clientele ranges from

individuals to large corporations. The Law Office boasts an incredible winning ratio;

having only lost 4 cases in the last decade. Other business functions include providing

legal advice to high-technology companies when hiring foreign personnel.

The Law firm currently hosts the following two websites:

http://www.immigration.com

http://www.immigrationportal.com

1 www.immigrationportal.com

2

Page 3: Final Project Compilation before Document Formatting

According to www.Alexa.com, a popular web traffic rating system --

Immigration.com has been rated as the top most popular visited sites in “Immigration”

categories.

Our project team has contact to Rajiv Khanna from the law office, through our

team member, Jacinth Durgam. Jacinth has been employed in the IT department of the

law office as an intern. She has been associated with the firm for the past year. We have

the ability to set-up meetings in person and through speakerphone, which gives our team

flexibility.

Problem

The law firm offers online forums for discussion, a place where people can only

leave messages for each other. Individuals usually share their personal experiences

related to immigration. Other than participating in discussions, the purpose of the forums

is to gather people online and undertake activities by creating petitions2 and issues3 as a

group to influence Senators and Members of the House of Representatives.

Currently, the law firm can have only one active petition at a time. The forum

lacks the feature to create and send petitions electronically to congress and other political

offices. The lawyer of the firm writes up a petition and publishes it online; all those who

are interested in the petition have to electronically sign the petition with their email

addresses. The petition is then manually submitted by the law firm to congress and other

political offices to be processed depending on the number of signatures signed by the

2 A formal request to an agency or legislature to affect some change 3 Any matter that affects the community members

3

Page 4: Final Project Compilation before Document Formatting

members of the community. Once a petition is being processed, there is no method of

tracking the status of each petition. Individuals involved in the petition have to wait for a

long period of time until the law firm provides a brief review on the status of the petition;

this long waiting time usually causes the members to lose interest in participating as a

community and to follow up with the petition. The current system also lacks the ability

to allow members involved to assign different tasks to each other. The employees of the

law firm perform most of the tasks, which also include the necessary follow up on each

petition. The firm needs more interaction and the ability to have more petitions active;

they need to involve the members of the community during the process of every petition.

The existing implementation of the system is specifically built for discussion, not

for advocacy purposes. Our project team believes that we can deliver a system, which

will meet and exceed the expectations of the law office.

4

Page 5: Final Project Compilation before Document Formatting

IFSM 436 Group No.3

Prepared for Dr. Norcio10/08/2003

5

Page 6: Final Project Compilation before Document Formatting

Description of the Current System

ImmigrationPortal.com discussions forum is a free service that is being provided

by the Law offices of Rajiv Khanna, PC. This web site is specifically developed to

enhance the access of information to the public and to keep them updated with the latest

news on immigration. Hosted by Immigration.com, the discussion forum creates an

online community where immigrants can post topics and respond to others.

After performing a preliminary analysis on the existing system, our team was able

to further understand the current system. The existing system provides the users with an

environment to participate, discuss their personal experiences, and share their knowledge

related to immigration. It is like a normal community discussion system.

There are about 67,000 registered users and about 80,000 guest users. A person

who is not registered can only view the topics for discussion, while those registered have

the privilege to create a special account that would help them keep track of all those who

are involved in their issues and also maintains a record of all the people who have replied

to their queries. The system offers certain features such as “discussion threads” --- users

can organize discussions in the form of a thread, this gives them the flexibility to quickly

read the thread that is of interest to them. Members have the ability to participate in chat

sessions with other members online. The system offers a search feature but it is poorly

designed as it brings numerous results, including results that are not relevant to what we

are looking for. The users have also experienced difficulty in getting to know the current

system because the system lacks a “help” feature.

6

Page 7: Final Project Compilation before Document Formatting

Currently, there can be one petition4 active at a time. A petition is created only

when a lawyer of the firm receives numerous requests and emails through their existing

clients and other members of the community agreeing to participate on an issue5. The

community members submit an issue to the law firm; the firm reviews the issue and

agrees to proceed with the petition depending on the necessity of the issue. A formal

petition is written through the law firm and published online; people interested in

participating can electronically sign the petitions with their email addresses. The

employees of the firm can obtain the necessary contact information of the current

senators and congressman. Through an unorganized method, the firm tries to keep track

of all the senators and congressman concerned with their issue. The firm then gathers the

online signatures and submits the petition to the senators or members of the congress.

The employees of the firm begin to monitor the status of the petition by periodically

checking the website or by calling Congress. They also try to monitor who is talking to

whom among the senators. In each Senator’s office there are 10 – 12 office staff

members. These members may be in favor or not in favor of the issue the petition is

raising. The employees of law firm try to keep track of who’s interested in supporting

the petition and those who are not. This entire process is done manually. Finally, after

waiting for many months or sometimes even years, the results of the submitted petition

are announced.

4 A formal request to an agency or legislature to affect some change5 Any matter that affects the community members

7

Page 8: Final Project Compilation before Document Formatting

Problems with the Current System

The firm intends to help people focus their issues in a language that regulators can

understand. They do not want to be able to take the entire responsibility of monitoring

almost every step in the process of a petition. The current system does not have the

capability to support several features that the organization considers as business needs.

Following is a list of problems with the present system our project team will address:

1. System design:

System design was poorly conducted upon the initial creation of

Immigrationportal.com. Disregarding any basic web-design rules, several links lead the

user to more links, making it difficult for the user to find the desired page. The lack of

uniformity concerning the layout of each web page on the site creates a cumbersome

effort in navigation. There is no “help” feature that could assist the users to direct them

through their destination. Although the site contains a great deal of information, all of it

is poorly categorized and hard to follow.

2. Unstable system hardware:

Sometimes there could be 1000 users online at the same time for which the system

cannot hold such a heavy load of users to be online at the same time. The current system

is not designed for high volume of traffic.

3. Inefficient search engine:

The search engine brings up numerous results, sometimes information that is not

related to what we are looking for. Thus, there is tendency for people to focus on

8

Page 9: Final Project Compilation before Document Formatting

secondary issues rather than focusing on primary issues. Getting to the necessary

messages is difficult. There is no a systematic way of finding the necessary information.

4. Inability for members to assign and monitor tasks:

Users are never involved throughout the entire process of submitting the petition,

other than electronically signing on the petitions. There is no organized method of

assigning tasks to members who are involved in the issue. Members have experienced

difficulty in monitoring the status of every petition.

General goals:

The Law Firm is trying to expand their goals by providing a structured and more

stable system, which not only contains enormous amounts of information but also

provides an easy and effective way to access the information. The firm strongly believes

that providing plenty of relevant information on immigration to people online could

reduce the chances of foreign students and non-immigrants from being abused by certain

misleading sources. With the ability to customize new software and upgrade or replace

certain features, these goals are easily obtainable.

9

Page 10: Final Project Compilation before Document Formatting

The following are some of the basic features the firm expects to see in their future

system:

Facility for members to create issues

Facility for members to vote internally

Members should be able to choose a group leader for every issue

Group leaders should be allowed to assign tasks to sub teams

A facility to monitor all the tasks

10

Page 11: Final Project Compilation before Document Formatting

IFSM 436 Group No. 3

Prepared for Dr. Norcio

11

Page 12: Final Project Compilation before Document Formatting

October 1, 2003

12

Page 13: Final Project Compilation before Document Formatting

Scope

The scope of the project determines how much of the organization is affected by

the system. Immigrationportal.com is a sub-site of Immigration.com. The Law Office of

Rajiv S. Khanna, PC provides Immigrationportal.com as a free service to those interested

in immigration issues. The sub-site is more or less dependent on Immgration.com and

not heavily relied on by the internal employees of the law firm. The law office does not

consider Immigrationportal.com as one of its primary sources to attract clientele either.

The sub-site would mainly affect external users interested in discussing immigration

issues online and voicing their opinions. If this sub-site were to shut unexpectedly, the

law firm would not suffer from direct loses in revenue.

13

Page 14: Final Project Compilation before Document Formatting

Operational Feasibility

This part of the feasibility analysis will determine whether the problem with

Immigrationportal.com is worth solving. It will also determine the urgency of this

problem and the effectiveness of a solution.

Performance:

Overall the current system does not have adequate throughput and response time

the Law Office of Rajiv S. Khanna, PC, wants to provide. Denial or lack of service

because of inadequate hardware to handle the volume of users trying to register or log on

reduces prospective clientele. The complicated organization of the site makes navigation

difficult for the common user. These and other related problems provide our project team

sufficient reason to propose a solution that will give the Law Office of Rajiv S. Khanna

the service it wants, to attract a larger customer base.

Information:

The current system provides a place for users to discuss immigration issues and

obtain information regarding immigration policies. The Law Office of Rajiv S. Khanna

wants to enhance the ability users have of not just discussing their opinions but taking the

next step to making that issue official. Discussion boards are maintained by moderators

for validity purposes but all many users want to be able to create their own petitions

based so that other’s who agree can sign these petitions. The current implementation

doesn’t allow for registered users to do more than discuss their opinions and majority of

visitors are using immigrationportal.com as an informative site. Besides the discussion

boards, immigrationportal.com provides valid information on forms required for

14

Page 15: Final Project Compilation before Document Formatting

immigrant visas. Users would like to see a tracker incorporated into the site which would

show the status of petitions and where they lay in the approval process.

Economy:

The Law Office of Rajiv S. Khanna does not gain tangible benefits other than

name recognition through indirect referrals. The law office is providing this service free

of charge in hopes of helping those that need it. Customer satisfaction is their main goal.

The current system offers customer satisfaction but not at the extent in which the law

office would prefer.

Control:

Upon loading the homepage of immigrationportal.com, a disclaimer states, “We

take no responsibility for accuracy of information provided. Please use at your own

risk.” The current system does not provide adequate controls against fraud other than a

simple online registration in order to post topics. If a new system was implemented that

would allow users to take a more interactive approach of creating an official petition,

certain security issues need to be addressed in securing data and information.

Efficiency:

The current system does not make maximum use of available resources because

the current hardware can not handle the volume of visitors to the website. Although there

is minimum processing when posting a thread, the flow of threads is difficult to navigate.

Services:

The current implementation serves the purpose of providing a location where

people can discuss their issues about immigration, but does not provide the service the

Law Office of Rajiv S. Khanna is aiming for. With a newer system, scalability or

15

Page 16: Final Project Compilation before Document Formatting

flexibility won’t be a problem. With the evolution and widespread deployment of the

World Wide Web (WWW), accelerated by the rapid adoption of web browsers, web-

based applications have been developed for a variety of applications in online discussion

and group management software. Our project team can provide a feasible and effective

solution to this problem.

Technical Feasibility

The law office of Rajiv S. Khanna, PC new system is feasible technically,

although there is some risk.

Law Firm’s risk regarding familiarity with applications is low The IT department already is familiar with system we are just upgrading. With new system we will have a help feature for the users.

Law Firm’s risk regarding familiarity with the technology is low IT department is a very advanced team that works well, but there will be some

new hardware implemented that could lead to some risk. Not much new hardware will be implemented into the new system.

The project size is considered medium risk The project team will consist of seven people. User involvement will be required. The project timeline cannot exceed three months (end of semester).

The compatibility with Law Firms existing technical infrastructure should be good The current system is web-based and will stay web-based with more organization. The current internet infrastructure already in place will be upgraded for

scalability.

16

Page 17: Final Project Compilation before Document Formatting

Economic Feasibility

Cost and Benefits:

Benefits Increased sales 90,000 Increased customer satisfaction 30,000 Stronger name recognition 500,000Total benefits 620,000

Development costs 2 servers @ $110,000 220,000 Software licenses 30,000 Server software 10,000 Development labor 800,000Total development costs 1,060,000

Operation costs Hardware 20,000

2 Dell 2650 PowerEdge Servers Software 10,000

1 Site license - Strategies Group Management Software Operational labor 200,000Total operational costs 230,000

Cost-Benefit Analysis:

2003 2004 2005 TotalTotal development costs: 1,060,000 0 0 Hardware 20,000 20,000 20,000 Software 10,000 10,000 10,000 Operational labor 200,000 210,000 220,500Total Operation Costs: 230,000 240,000 250,500

Total Costs: 1,290,000 240,000 250,500PV of Costs: 1,277,227 235,271 243,132 1,755,630PV of All Costs: 1,277,227 1,512,498 1,755,630

Increased sales 90,000 94,500 99,225Reduction on customer calls 30,000 30,000 30,000Reduced on advertising costs 500,000 500,000 500,000

Total Benefits: 620,000 624,500 629,225PV of Benefits: 613,861 612,194 610,719 1,836,774PV of All Benefits: 613,861 1,226,055 1,836,774

17

Page 18: Final Project Compilation before Document Formatting

Total Project Cost Less Benefits: (670,000) 384,500 378,725

Yearly NPV: (663,366) 376,923 367,587 81,144Cumulative NPV: (663,366) (286,443) 81,144

Return on Investment: 4.62% (81,144 / 1,755,630)Break-ever Point: 3.78 years (367587-81144) / 367587

Based on the cost and benefit analysis we performed above, it shows the project

to be doable.

Schedule Feasibility

Though our research we have come to the conclusion that the deadlines of this

project are reasonable and the project team has the ability to meet each one

Wednesday, September 17, 2003 Project Proposal(Complete) Wednesday, September 24, 2003 Preliminary Analysis(Complete) Wednesday, October 01, 2003 Feasibility Analysis(Complete) Wednesday, October 08, 2003 Requirements Analysis(Complete) Wednesday, October 29, 2003 System Analysis Report Wednesday, November 12, 2003 System Design Report Thursday, December 18, 2003 System Installation Thursday, January 08, 2003 Post-implementation Audit Report

The Feasibility Analysis, Requirements Analysis, System Analysis Report,

System Design Report are all mandatory deadlines. Both the System Installation and

Post-implementation Audit Report are desirable deadlines.

Political and Legal Feasibility

A disclaimer will be posted on the site so the law firm will not be liable for any

statements that are made on the website. A disclaimer will also have to be agreed upon

registering every new user. A disclaimer will also be in the mission statement of the site

viewable from a link located on every footer of every page.

18

Page 19: Final Project Compilation before Document Formatting

IFSM 436 Group No. 3

Prepared for Dr. NorcioOctober 8, 2003

19

Page 20: Final Project Compilation before Document Formatting

Requirements Analysis

This document will provide an outline of the requirements for the system. It will

also provide a measure of the current project status. Tables and charts are included to

visually illustrate the status. A brief overview of our team member’s tasks and

responsibilities ensures that all members are contributing to the success of the project.

Non-Functional Requirements1. Operational Requirements

1.1 The system will operate in the Linux, Apache, MySQL, and PHP environments

1.2 The system will integrate users from the previous system. Inactive accounts will be deleted

2. Performance Requirements2.1 The system will be able to handle more than 1000 simultaneous user

connections

3 Security Requirements3.1 The member’s personal information can only be accessed by employees of the

law firm

4 Cultural and Political Requirements4.1 The system will provide a disclaimer regarding the firm’s liability related to

the information provided by the system and its members

Functional Requirements1. Registering a Member

1.1 User must agree to consent form1.2 User is required to select a User Name and password1.3 User is required to enter a valid e-mail address1.4 User may enter optional information including

1.4.1 User Homepage1.4.2 Birthday1.4.3 Location1.4.4 Occupation

1.5 User may customize his/her preferences including1.5.1 E-mail notification1.5.2 Private Messaging1.5.3 Automatic Logon

1.6 After Submitting, User receives e-mail confirmation1.7 E-mail Confirmation, user clicks link to activate account

20

Page 21: Final Project Compilation before Document Formatting

2. Browsing the Forums2.1 User does not have to be registered in order to view threads on the forums.2.2 User must be registered in order to post a message to the thread.2.3 User must be able to receive private messages from other users2.4 New threads will be a different color than threads the user has already seen

3. Posting a message3.1 User must be able to format the text, and perform functions such as Cut, Copy

and Paste3.2 User must be able to edit their message after it has been posted to the thread3.3 User may be able to include a “signature” appended to the bottom of each of

their messages

4. Searching the Forum4.1 User must be able to perform a search using keywords4.2 User must be able to perform a search using a range of dates4.3 User must be able to perform a search based on user names4.4 Results must provide a direct link to the original thread4.5 User must be able to use logical operators for a search (i.e. And, Not, Or)

5. Signing a Petition5.1 User must be able to view the petition in its entirety5.2 User must be able to digitally sign the petition5.3 Duplicate signatures will be detected and disregarded5.4 Confirmation of the petition signature must be provided

5.4.1 Failure to confirm will disregard the signature5.5 Users may be able to view the signatures that the petition has received

6. Group Leader Functions6.1 Users must be able to assign a specific group leader to a community issues6.2 Group leader must be able to assign task to other users

6.2.1 Tasks may be assigned through e-mail6.2.2 Tasks may be assigned through the community forum6.2.3 Tasks may be assigned through private messaging

6.3 Assigned Tasks must be available to be viewed by all users6.4 Group leader must be able to track completion status of current tasks

21

Page 22: Final Project Compilation before Document Formatting

Team Member Responsibilities and Tasks

Our project on immigrationportal.com discussion forum system is a collaboration

of efforts by Ying-Chung Chou, Jeremy Corey, Desiree Davis, Jacinth Durgam, Adam

Driscoll, Robert Geisler and Jason Geist. As a team, we designated all our analysts’

positions in general to work resourcefully. Jacinth Durgam, who works for the Law

Offices of Rajiv S. Khanna, PC as an intern, initiated the project. She will be the Project

Sponsor and is the primary point of contact for the project. Our team unanimously

selected Jason Geist to be the Project Manager. Ying-Chung Chou will be the Financial

Analyst, Jeremy Corey will be the Infrastructure Analyst, Robert Geisler will be the

Information Coordinator; Adam Driscoll and Desiree Davis will be the Systems Analysts.

All the tasks that we have performed so far have been a team effort. Jacinth helped us

to get a brief interview with the lawyer of the firm, which gave our team a better

understanding of the problems with the current system and requirements for the future

system. She also participated in performing the Preliminary analysis of the system.

Jason Geist was in-charge in organizing all our group meetings. He participated in

researching the technical feasibility for the system and was also part of the interview

conducted with the lawyer of the firm. Ying-Chung Chou performed a research in

determining the economic feasibility for the future system. He conducted the cost and

benefit analysis for system. Jeremy Corey performed a study on the current system and

determined the operational feasibility. Robert Geisler participated in researching the

schedule feasibility of the system; he was also responsible for collecting and maintaining

a record of all the deliverables for our project. Desiree Davis and Adam Driscoll were

22

Page 23: Final Project Compilation before Document Formatting

responsible for taking notes during our team discussions. They also participated in

researching the Feasibility analysis of the system.

Future tasks will continue to be a team effort. The system analysis report has many

segments which our team members have been working on. Ying-Chung Chou will be

determining business rules. Desiree Davis will assist Ying-Chung, as well as conduct

information gathering. Adam Driscoll will be handling the entity-relationship diagrams.

Jeremy Corey will use those ER diagrams to help in the creation of data flow diagrams.

Robert Geisler will be supporting both Adam and Jeremy in the creation of the diagrams.

Jason Geist and Jacinth Durgam will be involved in information gathering.

23

Page 24: Final Project Compilation before Document Formatting

Task Completion

Start project CompletedInitiation Task Initial meeting with team members 100% Get team members contact information 100% Choose an organization 100% Choose Project 100% Set date and time to meet team member 100% Selecting the contact person 100% Talking to stakeholders 80% Draft project requirements 100% Selecting the problems associated with it 100% Develop a team proposal 100%Planning Task Conduct the feasibility study of the project 100% Develop cost benefit analysis 100%Requirement Task Assigning group members with a task 100% Decided the estimated time 80%Analysis Task Developing diagrams (ER, DFD, Network) 0% Diagram of the current system 35% Information gathering techniques 15% Interviews, questionnaires, surveys 50% Preliminary Analysis 100% Develop requirement analysis 100%Design Task Determine alternative solutions 0% Develop web-based design 0% System design report 0%Final Task Prepare for project report 0% Prepare for presentation 0% Presentation 0%

24

Page 25: Final Project Compilation before Document Formatting

28 Sep 05 Oct 12 Oct 19 Oct 26 Oct 02 Nov 09 Nov 16 Nov 23 Nov 30 Nov 07 Dec 14 Dec

Analyze Phase

Gather Requirements

Requirements Analysis

Indepth Analysis of System

Systems Analysis Report

Design Phase

Develop web-based design

System Design Report

Implementation

Final Project

Project Legend

Completed part of task

Overdue part of task

Uncompleted part of task

Milestone

c

25

Page 26: Final Project Compilation before Document Formatting

IFSM 436 Group No. 3

Prepared for Dr. NorcioOctober 29, 2003

26

Page 27: Final Project Compilation before Document Formatting

Information Gathering:

We have used two techniques in gathering information about our current system. We did an interview with Rajiv Khanna and we also conducted a survey. The interview with Rajiv Khanna was conducted over a speakerphone and lasted about an hour and fifteen minutes. Our group members were able to ask direct questions about the operation of the law firm. Mr. Khanna was very open about his law firm and provided our group great insight. We administered the survey online at ImmigrationPortal.com. We did this so users could reply to the survey just like they would on any other thread. This would be the best way to get the most feedback from the users. The survey mostly closed open questions so we could attract more users to take the survey. We did have one open ended question which helped give us great ideas for things to fix. Both methods used help gain great detail about the current system.

Survey:1) How often do you visit the site www.immigrationportal.com on a scale of 1-10? 10 being the highest

2) When visiting the website, do you find it easy to browse through the forums?

3) Would you like the ability to be able to post petitions?

4) Would you like to see some kind of help option when you are browsing the website?

5) On a scale of 1-10 how would you rate this website? 10 being the highest

6) Do you ever notice the website being bogged down or slow at times?

7) If there was any changes that you would like to see done on immigrationportal.com what would they be?

Results gained from Survey: 103 people took the surveyQuestion 1: Average was 8.89Question 2: 93 No’s and 10 YesQuestion 3: 100 Yes and 3 No’sQuestion 4: 92 Yes and 11 No’sQuestion 5: Average was 2.14Question 6: 60 Yes and 43 No

From question 7 we have a lot of answers which all seemed to be good suggestions:1) Have a better search feature, so when you search something it is actually related. 2) Have the website be more organized so they can understand where they are going. 3) Have a help button so if anyone has any questions they can go to the help feature.4) Get rid of the duplicate information on the same page.

27

Page 28: Final Project Compilation before Document Formatting

Interview Transcript

Jason: We need a description of your ImmigrationPortal.com. What your site is trying to achieve and the way it works currently.

Rajiv: So essentially what your question is “what software are we currently deploying to achieve the purpose that we wish to achieve the future software. Is that your question?

Jason: Just a description of the current system, so that can include what software you are using and what type of features it has.

Rajiv: Let me explain in hopefully a very summarized manner what the difference in the two software’s is. Let’s say you are using a project management software. Like for example MS Project. What we have in place is merely a chat system. We have no other features except a facility where people can leave messages for each other. And participate in discussions that a threaded. So in a nutshell, we have a system currently off the shelf. Nothing customized about it. We have some features customized a little bit but most of it is off the shelf and it only does one-fortieth or one-hundredth of what we want it to do.

Jason: So, what off-the-shelf software are you using?

Rajiv: It’s called VBulletin.

Jason: Is that free, or did you purchase it?

Rajiv: Ahh, It’s close to free. It only costs a couple hundred bucks. And then another couple hundred bucks for us to take the emblem or icons off. You know how it says “this is the software we are running.” Well, we’ve taken it off. It’s a really cheap software. The software we had before that was called Web-X. That software used to cost us $24,000 a year in licensing. Okay. It only had the capability to have 60 people online at a time. This software (VBulletin) with some good hardware costs only $400 and we can have unlimited number of people online at a time. Normally we have anywhere from 400- to 800 people on at the same time.

Jason: Pretty good numbers.

Rajiv: Yes, the only thing it needs is solid hardware, dual processors.

Jason: What kind of hardware do you have supporting?

Rajiv: Like I said, we have dual processor computers with gigabyte level ram. I think its 2-gigabyte at the moment. The fastest hard-drives we could buy. I think they are SCSI. And they are all running Raid-5.

28

Page 29: Final Project Compilation before Document Formatting

Jason: Are there any problems with the system, other than it doesn’t have the features you need?

Rajiv: Yeah, Basically we have an air pistol to do the job of a bazooka. To understand what we are trying to accomplish you need to understand how advocacy works. If you as a person woke in the morning and said “you know what I don’t like X thing in the education system. I want to get that change to Congress.” What would you do? Well, first thing you would do would be pick up the phone and call a few people. And see if you can locate who in Congress is concerned with education. Example, you would find out there must be an education sub-committee on the Senate-side as well as the House-side. You would find out who the congress people are. And first you would find out who the staffers are. Because first you have to start with the staffers. You have to find out who on the staff deals with the education issues. Then you have to cultivate a relationship. You got to go meet them 12 or 15 times. Take your problems to them. There is a whole level of things you have to do. Then if the bill does come into play and you see it move the various stages of becoming a law, you have to follow through with every senator and staffer as possible. You need to know who our friends are and who our foes are. If you’ve got a team of 30 people work on it, who is doing what. So we need a very sophisticated project management software that is intimately connected to the process of a bill. That understands how grassroots activism works. So you need vertical knowledge of the business process.

Jason: It seems like an awful long process and certainly becomes time-consuming. Is there benefits to your company running this service? Are you making any type of profit from it? We kind of have the understanding that you weren’t at the moment

Rajiv: No, there is no direct profit to the company at the moment. We don’t have a revenue model and I’ll explain to you why. Somebody many years ago mentioned to us that we run Immigration.com and ImmigrationPortal.com as basically an ad for our firm. They said “basically this is nothing but an ad for your firm.” And I said I agree with you. Why do have these websites up? Because we get name recognition. Why do these companies like Colgate and you know all these companies spend billions of dollars on ad revenues? The reason for that is they put money out for the ads so that they can get name recognition. But the difference between Immigration.com and the Yellow Pages is that you don’t have 500,000 people a year or a million people a year just reading Yellow Pages. People are reading Immigration or ImmigrationPortal.com because we are providing a very useful service which is information. And incidentally our name gets floated along with it. So the most important indirect benefit of any website we sponsor is our name gets before the community of our potential customers in a very targeted and very creative constructive way. At a moral level, we are giving something before we get something. And at an advertising level, this is the best possible ad that you could think of.

Jason: So in essence you are getting name recognition while providing a service.

29

Page 30: Final Project Compilation before Document Formatting

Rajiv: Immigration.com used to be just a 3 page website in 1993 when people haven’t even heard of the world-wide-web. I was the one did all the programming. In those days you had to hand code all the HTML. We only use the Linux –ux platform. We do not touch Windows. I tried Windows for about six months and never went back to it again. I can’t stand Windows on a commercial website. So anyhow, we started off with a 3 page website and the basic function of the entire website was “what can we as a law firm give away, not what can we get, but what can we give away?” And before you know it our own firm expanded from a one-person operation to today about 40 people. It has been a slow, well, I wouldn’t say slow, but a gradual increase in our own size. And our the reason for that is contrary to what most firms do which is before you talk to them you have to pay up. Read what we have, if you like us, hire us, if you don’t like us don’t hire us. At least you got something out of it. There we took it one step further. Immigration.com if you look at it is a one to many information dissemination platform. Our firm supplies information to many people who come to visit. ImmigrationPortal.com is a many to many dissemination format. Many people provide information to many other people. The community is based upon a group of volunteers. We invited people who have posted more than a 1000 messages to come and become volunteer moderators. They are not getting paid a penny. We don’t pay them. Basically they are doing it because they like doing it. So it’s a community that is truly run as a community. We try not to take credit for anything. We try to stay in the background. We only come in the foreground when any legal questions need to be resolved which is a problem of the masses. In fact we did a cross-section lawsuit a couple of months ago. Another indirect benefit. The legal fees for a very little amount of work where we didn’t even go to court. We won the case without going to court. And the legal fees for what it was, was $50,000. So you can think of it as many many indirect benefits flow from it. Also that’s not we focus on it. We focus on it as something good for the community. And then money just comes from it.

Jason: So What was this cross-section lawsuit? How was that spawned? Does that increase revenue for you?

Rajiv: Somebody on the newsgroup that we have on ImmigrationPortal.com mentioned that the Social Security Administration was giving them a lot problems to give drivers license to dependents of legally present non-immigrants in the US. For examples students. Because an F-2 visa holder cannot get a social security number they can not get a drivers license. That’s ridiculous. You know someone with an F-2 visa could be here for 6 years and his wife could not drive the kids to school. We have the same problem with H-4 visas, same problem with L-2. These are all long-term non-immigrants. People who stay an average of 5 or 6 years. So we took the Social Security Administration to court and said “you can’t do that.” And the court agreed with us. They said “You can’t do that.” Although things are not quite the way we want them to be but the court did throw out the proposed regulation of the Social Security Administration. And in part of that deal the court said you have to pay them whatever is the attorneys fees. So they called and said “how much do you want to get paid.” And we said “we think $50,000 is fair.” Like I said the amount of work involved was negligible. It wasn’t a lot of work, because we didn’t go to court. The judge basically threw out the case of the Social

30

Page 31: Final Project Compilation before Document Formatting

Security Administration on the paperwork alone. This is just an example of an incident benefit.

Jason: We are trying to get some kind of idea.

Rajiv: I would said a direct benefit is name recognition which is like advertising. A lot of indirect benefits flow from it. Such as a lawsuit that I just gave you an example of. To know what the community wants truly helps us understand where we need to focus our efforts as a law firm. Is it Immigration? Is it transactional practice? Where do we need to go to next? Do need to become all of the sudden lobbyists instead of lawyers?

Jason: I think Jacinth was talking about that you only have 1 petition at a time.

Rajiv: You see, the petition is at the beginning of activism. Petition is just basically knocking at the door.

Jason: You wanted to expand to have more than one petition at the same time?

Rajiv: We are doing a lot more than that because the high level specs that you saw basically conceive of this software as a one stop portal/project management for issue formation through the law formation entire lifecycle. We start with an issue. It becomes a community issue. We design a team. We designate tasks to the team. We got a team leader or group of team leaders. And then you start making lists. We have a huge fount of knowledge about who to contact, who is a good guy, who is on our side, phone numbers. We are acquiring an institution of knowledge here. Which means it’s not a short term thing. Like you know, I want my problem resolved in 3 months… It’s not gonna happen.

Jason: It definitely seems like a long term issue. We were definitely trying to figure out the costs and the revenues involved.

Rajiv: See we don’t mind the costs. And I’ll tell you why we don’t mind the costs. Every law firm in this country, because it is legal to advertise, devotes X percentage of their firms revenue to advertising. You know how the tax system works. If I make $100,000 profit, I get taxed 48% of that. Uncle Sam takes almost 50% of my money. If I take that same money and I put it into something like advertising, it is a tax write off for me. So $100,000 of advertising only costs $50,000. In other words, the tax laws of the United States of America are heavily titled towards building up a company, instead of taking money out of the company. So 98% of the law firms that I know, or have worked for had ad revenue up to 30% of their budgets. Even if we were to assume 30% as a good figure for our firm to sort of put into development. It is a very constructive, creative, even moral way of business development. You are helping millions of people. If you were to put that figure into business development revenue it would translate easily into less than we would have to pay for the system. And we do not place any ads. In 12 years of my practice, we have never placed a single ad. I have not spent a dollar on an ad.

31

Page 32: Final Project Compilation before Document Formatting

That is way we are relatively unknown. We are heavily focused on a special interest group. People who know us, come to us only 100% through word of mouth.

Jason: So your advertising revenue is used to support this?

Rajiv: Yeah, we could easily spend between 60 and 100 thousand dollars on advertising, if we were to take the revenue model approach. (Pause) Wait, no, I have the wrong figure. 30% Oh my what am I saying? That would be $600,000. So we could develop with $600,000 a year on this kind of advertising.

Jason: You are saying that kind of money could possible be used to take the issue to the community issue, to the petition and support that long process?

Rajiv: Absolutely, We do not intend to support the entire lifecycle with our money. We tend to provide the software which will then help provide focus the money that they have and focus they effort they are willing to put in. We are not talking about putting money into it. We are putting money into developing the software which will create a meeting place for people. Once the meeting place is created, we are out of it. We are not putting any of our money into it, except into software maintenance and enhancement. And the hardware and software, that is all we will do. The rest is up to the community. If they want to spend a million dollars, collect money and do things, it is up to them. I’m not going to get involved with that.

Jason: I guess that was a confusion. We thought that because the petitions were on your site, that you were helping. Other than you provide the software, that you were helping with legal advice/counsel.

Rajiv: Yes, we do. That we do and we will continue to do that. We don’t have any problem with that. But we are not shelling out any more money from out pocket, unless we see a cause in which we are personally concerned.

Jason: Obviously there would be cost in paperwork or other type of filing that you would need to do.

Rajiv: You would be amazed how much money I have thrown away in the last 3 years. People have called me and said we can raise $50,000 overnight if you want. And I have said no thank you. We are a grass roots movement. I am not going to go spend money on political committees. I am member of a couple of pacts. Very powerful pacts, but I will not spend a dollar. I only give them the 5 or 10 thousand dollars a year that they charge. I don’t put any money up as a contribution to a political cause. I think people should count. I don’t believe in putting money into democracy. I don’t think that is the way it should work. So what we are doing with the petitions is helping the people focus their issues in a language that the regulators can understand.

Jacinth: So you guide them through the process?

32

Page 33: Final Project Compilation before Document Formatting

Rajiv: We just guide them through the process. We tell them this is where to go next. This is a free community. If they let an issue die, that is their problem. They are not babies. I’m not going to hand-hold them.

Jason: That was my misunderstanding. Just from the information we received. I think a few of us though that this is the issues, and that you were helping them along, and that you were more involved than just the facilitator. Is Immigration.com or ImmigrationPortal.com your only method of revenue?

Rajiv: That is our only method. We don’t go knocking on any doors. We let people come to us.

Jason: Well, Rajiv, Thank you very much. I need to be wrapping things up, I appreciate your time.

Rajiv: Jason, you are quite welcome. Good Luck with your project.

33

Page 34: Final Project Compilation before Document Formatting

34

Page 35: Final Project Compilation before Document Formatting

35

Page 36: Final Project Compilation before Document Formatting

Business Rules

A user is any person who goes onto the website and views, browses or searches through different threads. Each instance of user information is defined by an email address, other attributes of this entity include: first name, last name, address and birth date. A user can either be registered or unregistered.

The unregistered users are able to view and browse through the forums archive. An unregistered user is also allowed to sign a petition in the Petition Archive.

The registered user has all the abilities that an unregistered user has plus the permission to post a message in the forums archive. The registered user can also search through both a petition archive and user’s interests. A registered user ID is the one attribute that differentiates the two types of users. Related constraints include:

- one or more unregistered or registered users can browse the forum archives at a time

- one or more unregistered or registered users can view a forum at a time- one or more unregistered or registered users can sign a petition from the petition

archive- one or more registered users are allowed to search through the petitions archive- one or more registered users are allowed to post a message in the forum archive

The forums archive separates the forums into different categories such as: “Employment Information”, “Education in the USA”, and “Changes in the USA after the Terrorist Attacks”. Each forum is uniquely identified by a forum ID. A related constraint is:

- a registered user can post only one message at a time in the forum archive

The petition archive is a lot like the forum archive but with petitions. A petition can be signed online by any user. Each petition is identified by a petition ID. Some related constraints are:

- both types of users can only sign one petition at a time- users can only sign a petition once

Each petition signature if verified through signature information. Signature information is verified so one user doesn’t sign same petition multiple times. Signature information contains a verified signature list, a user name and an email address. Some related constraints are:

- one or more signatures can be verified at a time- one or more petitions can verify a signature at a time

Registered users can search through a list of topics in the user’s interest entity. Total interest can be derived from user’s interest. Some related constraints are:

- only one user’s interest can be searched at a time- one or more user’s interest can search for threads

36

Page 37: Final Project Compilation before Document Formatting

The threads entity contains a list of threads that can be searched by user’s interest. Each thread is identified by a thread ID. A related constraint is:

- one or more threads can be searched through user’s interest

37

Page 38: Final Project Compilation before Document Formatting

38

Page 39: Final Project Compilation before Document Formatting

39

Page 40: Final Project Compilation before Document Formatting

40

Page 41: Final Project Compilation before Document Formatting

41

Page 42: Final Project Compilation before Document Formatting

42

Page 43: Final Project Compilation before Document Formatting

43

Page 44: Final Project Compilation before Document Formatting

44

Page 45: Final Project Compilation before Document Formatting

45

Page 46: Final Project Compilation before Document Formatting

IFSM 436 Group No. 3

Prepared for Dr. NorcioNovember 12, 2003

46

Page 47: Final Project Compilation before Document Formatting

System Alternatives

Our project team has performed a wide-range of analysis on the current

hardware and software used on Immigrationportal.com. We have performed a detailed

study on every aspect of the system and have further considered the different feasibility

analysis for the future system. Our project team has come up with four different

alternatives based on extensive research and careful analyzing of business operations in

the current system. Below is a brief summary of the alternatives and the following pages

will provide details to each of those alternatives.

The first alternative would be to keep the current system the same. The

advantage with this alternative is that the users are already familiar with the current

system and if a new system were implemented, the users would have to be trained on

how to use the system. The second alternative will be to purchase a commercial off the

shelf software called PHProjekt (http://www.phprojekt.com). This software has almost

all the essential features required by Immigrationportal.com. The third alternative will be

to purchase another off the shelf software called A.C.E Project Management and Intranet

(http://www.ace-solution.com). A.C.E PM & I is a fully downloadable PHP source

project management tool, which includes all the necessary project management features

to replace or add-on to the current system. The fourth alternative will be to build an

entirely new system. A key advantage with this alternative is the ability to build a new,

customizable system from the ground up. This option would require hiring programmers

to develop a new system that would meet the specific needs of the law office. All the

above-mentioned alternatives have been further evaluated and discussed in this report

including the essential feasibility analysis for each option.

47

Page 48: Final Project Compilation before Document Formatting

First Alternative

The first alternative would be to keep the current system the same. The

main advantage with this alternative is the users will not have to be trained because they

are familiar working with the current system. Other advantages include lower spending

costs since no upgrades or changes are being made. However, a major disadvantage is

the problems with the current system will continue to exist. Maintaining a legacy system

will only save the organization money in the short term. While the current system

continues to age, the requirements for new software will need to be tailored for

compatibility issues which will increase labor cost.

The following is a discussion on the various feasibility analysis if this

alternative were to be implemented.

Feasibility Analysis:

Economic Feasibility: In regard to cost and benefit analysis, there will be no extra cost

for keeping the system the same in the short term but there will also be no benefit of an

enhanced and a better functioning system. Long term costs will be for maintaining the

legacy system.

Technical Feasibility: Considering this feasibility, the law firm would not require any

added technical resources or expertise to maintain the current system. The firm has an in-

house programmer responsible for monitoring the data stores and data flows of the

petition system while manually checking the status of every petition. The firm also has

48

Page 49: Final Project Compilation before Document Formatting

system administrators to maintain the Immigrationportal.com website and its various

functions.

Operational Feasibility: This feasibility is a measure of how end-users and management

feel about the system. If this alternative were to be implemented, the end-users would

still experience difficulty navigating through the system because of its complicated

layout. The performance and efficiency of the system will still be inadequate fail to

address the issues of providing a structured and a stable system outlined by the law firm.

Schedule Feasibility: This is the measure of how reasonable the project timetable is.

This feasibility will not apply to this alternative because the systems analysts will not

change any characteristics of the current system.

49

Page 50: Final Project Compilation before Document Formatting

Second Alternative

The second alternative would be to purchase a commercial off the shelf software,

called PHProjekt (http://www.phprojekt.com). PHProjekt is an open source

groupware suite; it is free software that can be distributed under the terms of the GNU

General Public License as published by the Free Software Foundation. This software has

almost all the essential features required by the immigration portal website. The

components of PHProjekt are Project management, Group calendar, Time card system,

Chat, Forum, Request Tracker, Voting system, Search system, Administration utilities etc.

All the above-mentioned built in components could be easily customized to the law

firm’s needs.

Feasibility Analysis:

Economic Feasibility: This is free software that can be downloaded online from its

website http://www.phprojekt.com. The advantage with this alternative is that it is cost

effective. PHProjekt requires a typical LAMP/WAMP (Linux or Windows/ Apache/

MySQL/ PHP) system environment. The current system has already been configured to

the LAMP environment, thus eliminating the need to purchase additional software. There

could be recurring costs for further customization and support depending on the user

number of installation. By implementing this alternative the law firm will gain increased

customer satisfaction and stronger name recognition.

Technical Feasibility: If this alternative were to be implemented, the law firm need not

necessarily have to hire additional technical expertise because this software is easy to

50

Page 51: Final Project Compilation before Document Formatting

install. The free, limited-technical assistance is provided online through email allowing

support at anytime. If the firm were not satisfied with the built-in components of this

software there would arise a need to hire additional technical expertise to create modules

that would suit the firm’s needs by modifying the source code that comes along with the

software. Also, PHProjekt can be easily upgraded with the current system, cutting costs

by not having to completely eliminate the current system

Operational Feasibility: Implementation of this alternative would comparatively increase

the performance and efficiency of the current system. The software uses a favorably

pleasing graphical user interface, which will make navigation simple and effortless.

Users will be able to perform their activities quickly and accurately. This software

provides several features that are of direct benefit to the law firm such as the voting

system, search feature, request-tracker etc. There is also a feature in this software that

allows members to be able to assign access control levels to other team members. This

alternative would greatly reduce all the problems faced by the current system.

Schedule Feasibility: From all the information and analysis that has been collected

during our research, our team will be able to implement programs for the input screen

design and the output report design. We will present written documentation of the

available solutions along with the conversion, training and maintenance plans to the law

firm.

51

Page 52: Final Project Compilation before Document Formatting

Third Alternative

The third alternative would be to purchase another off the shelf software, called

A.C.E Project Management and Intranet (http://www.ace-solution.com).

A.C.E PM & I is a fully downloadable PHP source project management tool, which

requires PHP and MySQL to run on the server. This software also contains most of the

features that are needed for the discussions board on Immigrationportal.com. This

alternative would be advantageous because the software includes all the necessary project

management features that the company is looking for such as, Project coordination tools,

Management tools, Communication tools, Individual tools and Time management tools.

The Project coordination tools will allow the users to create multiple projects and assign

different tasks to each other. Users will be able to view project team members and allow

each member to communicate with each other, create issues and enquire about the current

stage of petitions.

Feasibility Analysis:

Economic Feasibility: In regard to cost and benefit analysis, implementation of this

alternative is relatively expensive to PHProjekt. A one-time purchase cost of this

software would be $695.95. This quote includes free upgrades. A.C.E PM & I software

also requires PHP and MySQL to run on the server. Since the current system has already

been configured to the LAMP (Linux/Apache/MySQL/PHP) environment there will be

no additional expenditure on the software. There could arise a need for recurring costs if

the law office were to implement PHP Live Support hosted by Osicodes. PHP Live

52

Page 53: Final Project Compilation before Document Formatting

Support can be hosted or downloaded on ImmigrationPortal.com servers. PHP Live

Support provides live technical and customer service 24/7 on PHP servers. If the law

firm were to employ PHP Live Support’s Hosted solution for corporate users, it would

cost them $299.95 per year. If the law firm were to download PHP Live support source

code on the immigrationportal.com server, it would cost $149.95 with an annual license

renewal of $74.95 (as found on http://www.phplivesupport.com/purchase_s.php).

Implementation of this software would be advantageous to the law firm because of the

built-in features that comes with this software that can be easily customized to the law

firm’s requirements.

Operational Feasibility: Similar to the previous alternative, this solution provides the

user with a well layed out graphical interface for navigation. The time management tools

has a special feature that will allow the administrator or any moderator of the site to

layout time lines and proposed schedules for petitions, issues and dated material in a

calendar view. Each team can perform different administration tasks, allowing access

control and security.

Technical Feasibility: This alternative will probably entail hiring additional technical

expertise; persons familiar with MySQL and PHP coding could modify the software to

better suit the law firm’s needs. PHP is a script language and interpreter that is used

primarily on Linux web servers.

53

Page 54: Final Project Compilation before Document Formatting

Schedule Feasibility: From all the information and analysis that has been collected

during our research, our team will be able to implement programs for the input screen

design and the output report design. We will present written documentation of the

available solutions along with the conversion, training and maintenance plans to the law

firm.

54

Page 55: Final Project Compilation before Document Formatting

Fourth Alternative

The fourth alternative would be to build an entirely new system. The new

system will bring in new hardware and software. The advantages with this alternative

would be that the system will not only fix all the problems with the current system but

will also allow developers/programmers to be flexible and creative in the way they solve

the problem. The disadvantage is that there could be a possibility that the new system

would be missing elements or would be difficult to implement or maintain.

Feasibility Analysis:

Economic Feasibility: Applying this alternative to cost and benefit analysis, the cost of

developing a new system would most likely outweigh the potential benefit. It would also

be very expensive and time consuming to develop a brand new system from scratch.

Since Immigrationportal.com doesn’t generate revenue directly, but through indirect

referrals, the costs for a new system can not be justified to spend on a system that is

providing a free, informational web-based service.

Operational Feasibility: Implementation of this alternative would be advantageous

because we will be able to fix all the problems associated with the performance and

efficiency of the current system; however a disadvantage would be that the users will

need to be trained extensively to use the new system and to perform at a desired level.

There is a possibility that users might not be satisfied with the system’s user interfaces.

55

Page 56: Final Project Compilation before Document Formatting

Technical Feasibility: Building a new system will require a lot of technical expertise and

functional knowledge within the company. This would also entail hiring programmers to

develop a new system that would meet the specific needs of the user.

Schedule Feasibility: From all the information and analysis that has been collected

during our research, our team will be able to implement programs for the input screen

design and the output report design. We will present written documentation of the

available solutions along with the conversion, training and maintenance plans to the law

firm.

56

Page 57: Final Project Compilation before Document Formatting

Alternative Comparison Chart

  Alternative Advantages Disadvantages1 Maintain the

Current System• No training required• Users familiar to the system• No immediate spending

• Current problems continue to exist• Maintaining legacy system• Short term gains cause long term losses

2 PHProjekt • Free groupware• Same features as current system• Cost effective• Compatible with current systems

• Doesn’t eliminate legacy hardware• Free without maintenance contract

3 A.C.E. Project Management and Intranet

• Matches all requirements• Includes project management tools• Reliability

• Will need to hire PHP expert• Most expensive alternative• Requires new hardware

4 Develop a New System In-House

• Allows for complete customization• Built from ground-up

• Not the best resources from within• Not cost effective• Longer developing time

57

Page 58: Final Project Compilation before Document Formatting

System Analysts’ Recommendation

After outlining the possible alternatives to the discussion board software on the

Immigration Portal web site, our team suggests the law firm to use PHProjekt

(http://www.phprojekt.com). PHProjekt software will provide the Law offices of Rajiv

Khanna with one of the simplest and most flexible group management systems. It is a

modular application built for the coordination of group activities and to share information

and document via intranet and Internet. PHProjekt is an open source groupware suite that

can be distributed for free under the terms of GNU general public license. One of the

major advantages with this product is that it provides the flexibility to add features

depending on the company’s requirements by modifying the source code.

The following is a list of all the features offered by PHProjekt: Project

Management, Group Calendar, Time Card System, Chat, Forum, Request Tracker,

Voting System, Search System, Administration Utilities etc. The Forum option enables

users to view available threads in a tree structure, which gives users the flexibility to

participate in discussions of their choice. The Chat feature allows users to communicate

with members online, this also allows the discussions to be saved in a file so that they can

refer back to them at anytime in future. The Voting system feature allows members to

select individual persons to vote for a particular issue by electronically signing on an

issue; depending on the number of votes received by the members a petition will be

published. Members can view the voting in the form of a table showing all current and

past voting. The Project Management feature allows users to divide projects into several

subprojects with unlimited depth. This feature enables users to create issues, assign a

58

Page 59: Final Project Compilation before Document Formatting

project leader, track the status of an issue maintained by a project leader, assign tasks to

different members of the team and finally check the statistics results that describe who

worked on which part of the project. The Search feature allows users to search for a full

text search in a single module or a complete site search. Most of the admin tasks can be

accomplished through the Administration feature, which will allow members to manage

groups, users, projects, and create access levels to project members and other users. The

Request Tracker feature is sort of like a help desk or trouble ticket system, which answers

any technical questions regarding the software. There is also a searchable knowledge

base for solved requests. A special add-on feature is included with the software, which

gives us the flexibility to add different features to the program by modifying the source

code. The advantages of this alternative are that it will be relatively lower in cost

compared to implementing an entire new system and the transition for users would be

easier because this program uses user-friendly GUI’s that makes navigation effortless and

easily understandable.

The PHProjekt software is completely compatible with the Immigration Portal’s

current hardware. PHProjekt works on various operating systems such as Linux, UNIX,

Windows, OS/2, and Solaris etc and is compatible with many web servers like Apache

and Samba. Immigration Portal, however, does not currently have backup system. Our

implementation will add a second Dell Power Edge 2650 server. That server will be a

clone of the main web server for redundancy. A Dell 130T Tape library will also be

added to the network design. The tape library is a fully automated tape backup system

which does incremental backups daily. And it will perform a full backup every Sunday

evening.

59

Page 60: Final Project Compilation before Document Formatting

Hardware: 2 Servers: PowerEdge 2650, Intel Xeon 2.4GHz w/512K CacheAdditional Processors: Dual Processor Intel® Xeon 2.4GHz w/512K CacheHard Drive: 36GB 10K RPM Ultra 320 SCSI DriveRouter: Cisco 6509 CatalystBackup: Dell 130T Tape Library Software:

Operating System: LinuxFirewall: Raptor Firewall version .9Web Server: Apache version 1.3.27Application Server: PHP version 4.3.0Database: MySQLApplication: PHProjekt version 4.0.4

After evaluating the various advantages and disadvantages of the suggested

alternative solutions, our systems analysts’ team recommends the law firm to implement

PHProjekt as their best choice in every way. This option will not only prove to be cost

effective but it will also accomplish the law firm’s desire to expand their goals by

providing a structured and a much more stable discussions board system that contains

enormous amount of information but would provide an easy and an effective way to

access information.

60

Page 61: Final Project Compilation before Document Formatting

Start project CompletedInitiation Task Initial meeting with team members 100% Get team members contact information Choose an organization

100%100%

61

Page 62: Final Project Compilation before Document Formatting

Choose Project 100% Set date and time to meet team member 100% Selecting the contact person Talking to stakeholders Draft project requirements Selecting the problems associated with it

100%80%100%100%

Develop a team proposal 100%Planning Task Conduct the feasibility study of the project

100%

Develop cost benefit analysis 100%Requirement Task Assigning group members with a task Decided the estimated time

100%80%

Analysis Task Developing diagrams (ER, DFD, Network) Diagram of the current system Information gathering techniques Interviews, questionnaires, surveys. Preliminary Analysis

100%100%100%100%100%

Develop requirement analysis 100%Design Task Determine alternative solutions 100% Discuss feasibility of the solutions 100% Decide on appropriate solution 100% Discuss specific hardware/software needed 100% Design Network Layout 100% System design report 100%Final Task Prepare for project report 25% Training Plans 25% Maintenance Plans 50% Conversion Plans 25% Prepare for presentation 25% Presentation 0% Project assessment 0%

Project Completion Plans

The project is currently on schedule and will be completed soon. The work left to

be completed includes the conversion plans, maintenance plans, and training plans. The

project team will also be preparing a presentation which will be given on December 1 st.

The conversion plans are being developed by Desiree Davis. Robert Geisler is managing

62

Page 63: Final Project Compilation before Document Formatting

the implementation of the training plans. And Ying-Chung Chou is working on the

maintenance plans. The other members of the group will provide editing for the plans.

Jeremy Corey will spearhead the team’s project assessment, but will receive input from

all group members. The project presentation will be a collaborative effort between the

group members. The work has been divided and the team has committed to an aggressive

schedule for the project’s completion. There is no doubt that it will be completed

successfully and on-time.

63

Page 64: Final Project Compilation before Document Formatting

Normalized Database Tables

User_InfoField Name Field Type Field Size

E-mail Text 35First_Name Text 25Last_Name Text 25Address Memo 32 kb Memory LimitBirthday Date/Time N/AUser_Type Text 1

Forums_ArchiveField Name Field Type Field Size

Forum_ID Text 35Discussion List Memo 32 kb Memory Limit

Signature_InfoField Name Field Type Field Size

User_E-mail Text 35Verified_Signature_List Memo 32 kb Memory Limit

Petition_ArchiveField Name Field Type Field Size

Petition_ID Text 35Petition_List Memo 32 kb Memory Limit

User_InterestField Name Field Type Field Size

Topics Text 35Total_Interests Number 6

ThreadsField Name Field Type Field Size

Thread_ID Text 35Keywords Memo 32 kb LimitThread_List Memo 32 kb Limit

*Database Names, Type and Field Size are based on Microsoft Access 2003

64

Page 65: Final Project Compilation before Document Formatting

IFSM 436 Group No. 3

Prepared for Dr. NorcioDecember 1, 2003

65

Page 66: Final Project Compilation before Document Formatting

Screen Design

Figure 1 - Summary Window

The Summary Window provides the user with an overview of current events. It notifies of the user of new postings, new votes, new files, and other things that have occurred since the user’s last visit.

66

Page 67: Final Project Compilation before Document Formatting

Figure 2 - Calendar Function

The calendar provides complete functionality of schedule and keeping track of personal activities. It includes the ability to create group events also, which will appear on the calendar of each group member.

67

Page 68: Final Project Compilation before Document Formatting

Figure 3 - Contacts Function

The contacts tab allows user to keep an address book to manage personal information of friends and business partners. It includes a feature to export the address book to XML.

68

Page 69: Final Project Compilation before Document Formatting

Figure 4 - Chat Screen

The chat tab allows all online users to communicate with each other in real-time. It is useful for long-distance group meetings.

69

Page 70: Final Project Compilation before Document Formatting

Figure 5 - Forum Screen

The forum allows users to post topics of conversation which other users will read and respond to. It includes features to sort the threads in a variety of ways.

70

Page 71: Final Project Compilation before Document Formatting

Figure 6 - File Exchange

The file exchange allows users to submit files to the website which then other users can download the files. This is a useful feature when exchange large files.

71

Page 72: Final Project Compilation before Document Formatting

Figure 7 - Project Planning

The project planning is an excellent feature which allows a user or group of users to create a work breakdown structure. It includes timeframes and completion status. It also allows tasks to be assigned to users.

72

Page 73: Final Project Compilation before Document Formatting

Figure 8 - To-Do List

The To-Do List allows a user to create a list of items that need to be completed. This is a powerful feature when combined with the project planning and calendar features.

73

Page 74: Final Project Compilation before Document Formatting

Figure 9 - Voting System

The voting system allows users to create issues to be voted on. It keeps track of the number of voters, percentage of votes of each choice, and a participation percentage which is based on the number of users out of the all users to have voted.

74

Page 75: Final Project Compilation before Document Formatting

Conversion Plans:

Once the new system has been tested and assured that there are no bugs or

glitches, we will need to choose the best conversion strategy. When determining the best

conversion strategy we had to keep in mind three things, the risk associated with each

style, the cost and the time. The two styles that we are choosing from are parallel

conversion and direct conversion.

Direct conversion is implemented by turning off the old system, and replacing it

with the new system. This strategy is a high risk since there may be bugs in the system

that may have went undetected and the old system will not be there to convert back to.

Also the users are not given anytime time to practice and get used to the new system

before the old one is turned off. It is the least expensive and it is the fastest when it

comes to implementing the new system and getting the users working with it.

Parallel conversion is where both the systems would be running simultaneously.

This system has the least amount of risk. If any bugs are detected while running the new

system, they can be worked on and the users can continue to work on the old system until

the problems are solved. Parallel conversion gives the users some time to get used to the

new system before the old one is turned off, for good. This strategy is very expensive. It

will be very costly to maintain two systems because you will need to have someone there

to make sure that all the information that is being inputted is the same on both systems.

The conversion style that best fits our system is the direct conversion strategy.

Since the system we plan to implement is web-based, we do not want to run the new

system in parallel to the old one. This would be too costly to maintain since there would

have to be two websites. There would also be too much time spent trying to maintain

75

Page 76: Final Project Compilation before Document Formatting

consistency among the data from both the sites. Since we will be changing the system

over directly if the users have any problems navigating the site there will be online

support offered and a help option that can walk them through anything.

76

Page 77: Final Project Compilation before Document Formatting

Training Plans:

Training on how to work with PHProjekt will only pertain to the in house

programmer and the various system administrators for immigrationportal.com. Training

will involve a combination of one-on-one and classroom training; this is viable option

because of how small the group is. A specialist will fly in from California on January 4 th

and the classroom session will begin on Monday the 5th. On Monday morning a

classroom training session will be held, it will only last a half a day and will introduce the

in house programmer and system administrator to different aspects of PHProjekt. The

specialist will spend the rest of the day with the in house programmer, focusing on the

specific issues a programmer using PHProjekt has to deal with. The next day, Tuesday,

will be devoted entirely to the system administrators. Most of Tuesday will be in a

classroom because there are too many administrators to work with one-on-one. The

specialist will go over the administration functions of PHProjekt and other special topics.

The specialist will be available for one more day, Wednesday. The programmer and

administrators will go about their daily routine but will use PHProjekt, the specialist will

be around to help anyone if they need it.

77

Page 78: Final Project Compilation before Document Formatting

Maintenance Plans

The maintenance plan included in the PHProjekt package covers any problems with installation and setup, training, hardware, software and system customization. Technical support provided is available online and over the telephone 24-hours a day. The warranty includes 1 full year of technical support from the date or purchase.

Installation:Installation and setup problems can be troubleshooted using the following steps:

The Administrator’s Manual will be mailed to the law firm that contains a frequently asked question (FAQ) section, basic troubleshooting and user friendly guides to simple operating procedures.

A file included in the software download called FAQ-install.html is provided along with PHProjekt with updates to the Administrator’s Manual and common problems relating to specific types of systems that PHProjekt has been used with.

The Installation Forum is located at http://www.phprojekt.com/support/forum/ that allows system administrators and users to write in their opinions or problems they are experiencing with the software.

Telephone support is available 24-hours a day, 7 days a week for technical assistance. If PHProjekt is unable to assist you over the phone, they are willing to help find a certified technician to come on site.

Training:A week long training program is provided to system administrators of the site. In this program, they will be provided materials and skills to allow them to assist their end-users. This lowers cost of off-site assistance.

Hardware:Daily checks of server and network devices are conducted furnishing a Daily System Status report (DSS) which is electronically mailed to system administrators. The e-mail can be customized in format as well as to who will receive the report.

Yearly evaluations of hardware performance will be compared. Any hardware updates or upgrades will be conducted Sunday night and

notification will be published ahead of time on the website.

Software:Self-manageable software checks the BugTracker® for new updates or fixes. BugTracker® lists all bugs and fixes that have been reported.

BugTracker® sends out weekly reports to selected system administrators of any software malfunctions in the system.

New versions of PHProjekt are usually available after 1-3 months. New versions are considered beta until further evaluated and can be downloaded for site testing at system administrator’s choice.

78

Page 79: Final Project Compilation before Document Formatting

Customizing:The ability to modify, enhance, create, and adapt new features or processes.

Modify the existing modules to our needs. Enhance with new features to what we want. Creating new modules. Adapting and integrating your existing applications.

Note: Modifications can be sent to PHProjekt for a quote request. Under agreement, no modifications can be done without project management approval.

79

Page 80: Final Project Compilation before Document Formatting

Project Assessment:

Through the span of the semester, our project team worked efficiently and

effectively to meet requirements and deadlines. Every team member contributed their

ideas and suggestions to each deliverable. Communication played a large role in

coordinating what tasks went to which person. On several occasions, a team member

could not attend a meeting but was always sure to notify the group. If a team member

had a lot of work to do, others were not afraid to offer their help. There were no group

issues that had a significant impact on performance. Personality conflicts were irrelevant

if they existed and team members concentrated on the focus of the project.

The ability to coordinate everyone’s schedule was the hardest part. Every team

member had a different schedule and therefore made it difficult to have everyone attend

in each meeting. This is where communication played a vital role, because someone who

attended the meeting would notify the absent team member of what was discussed and

what work was completed. It’s strongly recommended that from the first day a project

team is put together, establish a set schedule of when everyone can meet and make that

meeting time consistent through the weeks ahead. This makes it easier on everybody and

creates weekly deadlines for tasks that need to be completed for the deliverables. These

weekly deadlines provide a timeline the group can follow in order to achieve the best

grade possible. Sticking to the schedule prevents the group from falling behind.

80