final tender drawings 24.10 - coffey...f fabric to be selected by designer image reference: fabric...

13
LONG ROOM DIRECTORS OFFICE SSU RECEPTION IT & PROGRAME OFFICE EXAMINATION & ASSESSMENT OFFICE drawing schedule POLA D E S I G N S JOINERY DRAWINGS 3D PLAN SCALE : NTS ELECTRICAL DRAWINGS E1 - POWER LAYOUT PLAN J9 - J8 - J7 - J6 - IT & PROGRAME OFFICE INTERNAL ELEVATIONS & DETAILS J5 - J4 - J3 - J2 - J1 - J0 - JOINERY LAYOUT PLAN RECEPTION COUNTER & TYPICAL WORKSTATION 1 PLAN, ELEVATION & SECTION WORKSTATION 3 PLAN & FILLING UNIT DETAILS JOINERY DETAILS IT & PROGRAME OFFICE INTERNAL ELEVATIONS & DETAILS ENLARGED JOINERY LAYOUT PLAN & ELEVATIONS - SSU ENLARGED DIRECTORS OFFICE LAYOUT PLAN & DETAILS IT & PROGRAME OFFICE INTERNAL ELEVATIONS IT & PROGRAME OFFICE INTERNAL ELEVATION OFFICE FURNITURE/JOINERY FOR DEPARTMENT OF EDUCATION, MINISTRY OF EDUCATION YOUTH AND SPORT FUNAFUTI , TUVALU SITE PICTURES

Upload: others

Post on 20-May-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Final Tender Drawings 24.10 - Coffey...F Fabric to be selected by Designer IMAGE REFERENCE: Fabric Image - natural Potatoes Sack Texture 7 16 CPU Holder PH.- 3316 101 , M. - 923 8860

LONG ROOM

DIRECTORS OFFICESSU

RECEPTION

IT & PROGRAMEOFFICE

EXAMINATION &ASSESSMENT OFFICE

draw

ing

sch

edu

le

POLAD E S I G N S

JOINERY DRAWINGS

3D PLANSCALE : NTS

ELECTRICAL DRAWINGSE1 - POWER LAYOUT PLAN

J9 -

J8 -

J7 -

J6 - IT & PROGRAME OFFICE INTERNAL ELEVATIONS & DETAILS

J5 -

J4 -

J3 -

J2 -

J1 -J0 - JOINERY LAYOUT PLAN

RECEPTION COUNTER & TYPICAL WORKSTATION 1 PLAN, ELEVATION & SECTIONWORKSTATION 3 PLAN & FILLING UNIT DETAILS

JOINERY DETAILS

IT & PROGRAME OFFICE INTERNAL ELEVATIONS & DETAILS

ENLARGED JOINERY LAYOUT PLAN & ELEVATIONS - SSU

ENLARGED DIRECTORS OFFICE LAYOUT PLAN & DETAILS

IT & PROGRAME OFFICE INTERNAL ELEVATIONS

IT & PROGRAME OFFICE INTERNAL ELEVATION

OFFICE FURNITURE/JOINERY FOR DEPARTMENT OF EDUCATION, MINISTRY OF EDUCATION YOUTH AND SPORT FUNAFUTI , TUVALU

SITE PICTURES

Page 2: Final Tender Drawings 24.10 - Coffey...F Fabric to be selected by Designer IMAGE REFERENCE: Fabric Image - natural Potatoes Sack Texture 7 16 CPU Holder PH.- 3316 101 , M. - 923 8860

PROPOSED JOINERY LAYOUT PLANSCALE 1:75

3570

2

2420

3

7005

4

1

2

5490

337026

74

900

900

1220

400

1 2 2 2

5

4400

1820

400

1690 620

2420

LONG ROOM

RECEPTION

EXAMINATION &ASSESSMENT OFFICE

DIRECTORSOFFICE

IT & PROGRAMEOFFICE

SSU

3

900

600

2710

600 2480 1220 1590 1220 1580 1220 1860 600

1090 400

4550800

1220

1220

1580

1220

1165

400

400

1120

600670 1060 1820 400

1265

1220

1820

600

2420

1670

600

B

2240

C

1000

D

4752

E

6003

FA

4750 6000

4

2

2

2

2

4 4 4 4 4 4

3

3

444

5

5

5

4

6

6

4

4 7

7

7

7

7

7

58

8

8

9

10

4

3415

6805

Copyright reserved in all drawings and thework excuted from them. Figured dimensionsshall be read in preferance. Largest scaleddrawings shall take precedence. Check alldimensions on site. All discrepancies shallbe reported to the DESIGN CONSULTANT immediately. :

:

:

:SHEET TITLE DESIGN

DRAWN

DATE

SCALE

M . L PROJECT NO.

SHEET NO.

REV.

PROJECT

AS SHOWN

J0018-152

15.10.19

OFFICE FURNITURE/JOINERY FOR DEPARTMENT OF EDUCATION, MINISTRY OF EDUCATION YOUTH AND SPORT FUNAFUTI , TUVALU

JOINERY LAYOUT PLANPOLAD E S I G N S

ReceptionCounter

Typical OfficeWorkstation - 1

NOTE:

H. Allow to cut 60 dia holes on tops for computer cables as Instructed by thedesigner provide cable entry cap,colour to be selected by the Designer.

All splash back to have mitre joint at corners

G.

F. All chairs to be supplied by client

E. Allow to fix all partition board to floor with required fixing

D. All door handles to be selected by the Designer

C.

B. All board colours to be Off White, allsteel frames spray painted black

A. Confirm all dimensions on site prior to construction

J. All joinery hardware to be commercialgrade and to be used from thefollowing recommended Brands:HAFELE, HETTICH & BLUM orapproved equivalent

LEGEND: NAME: SHEET:

1

3

2

J1

All exposed edges to have polish finish or matching p.v.c edge tape

4

J2/J3

5 J4Typical OfficeWorkstation 3

6 J4

7 J9

Filing Unit - 1

J1

Typical OfficeWorkstation - 2

J2/J3

Printer Unit

Filing Unit - 2

J6 J7

J5

8

9

Typical OfficeWorkstation 4

Typical OfficeWorkstation 5

J4Table10

M . L

PH.- 3316 101 , M. - 923 8860

DESIGN CONSULTANTS, INTERIORDESIGNERS & PROJECT MANAGERS,

Email : [email protected]

14 LADY NARAIN DRIVE ,P.O.BOX 522 ,SUVA , FIJI ISLANDS

Page 3: Final Tender Drawings 24.10 - Coffey...F Fabric to be selected by Designer IMAGE REFERENCE: Fabric Image - natural Potatoes Sack Texture 7 16 CPU Holder PH.- 3316 101 , M. - 923 8860

3D VIEWSCALE : NTS

RECEPTION DESK PLANSCALE 1:30

900

1675

300 600

5

2

31

5

1

A

1100

ELEVATION - ASCALE 1:30

38

1100

B

1220

1820

TYPICAL WORKSTATION 1 PLANSCALE 1:30

1

2

11

1

TYPICAL WORKSTATION 1 ELEVATION - ASCALE 1:30

150

1050

1011

7

750

1J01

2J01

15

14

4

1

2

100

750

1

8

10

9

4

714 5

8

1050

300

700750

25

600

280

14

25

150

25 25

SECTIONScale: 1:15

1J01

600

1075

300

1100

900

25

675

25

750

725

25

50 50

5050250 250 50

SECTIONScale: 1:15

2J01

166

116

166

116

460

100

1011

25 55

OFFICE FURNITURE/JOINERY FOR DEPARTMENT OF EDUCATION, MINISTRY OF EDUCATION YOUTH AND SPORT FUNAFUTI , TUVALU

Copyright reserved in all drawings and thework excuted from them. Figured dimensionsshall be read in preferance. Largest scaleddrawings shall take precedence. Check alldimensions on site. All discrepancies shallbe reported to the DESIGN CONSULTANT immediately. :

:

:

:SHEET TITLE DESIGN

DRAWN

DATE

SCALE

M . L PROJECT NO.

SHEET NO.

REV.

PROJECT

AS SHOWN

J0118-152

15.10.19

OFFICE FURNITURE/JOINERY FOR DEPARTMENT OF EDUCATION, MINISTRY OF EDUCATION YOUTH AND SPORT FUNAFUTI , TUVALU

RECEPTION COUNTER & TYPICAL WORKSTATION 1 PLAN, ELEVATION & SECTION

POLAD E S I G N S

NOTE:

KEY NUMBER REFERENCE:

E All joinery hardware to be commercialgrade and to be used from thefollowing recommended Brands:HAFELE, HETTICH & BLUM or approvedequivalent

B All exposed edges to have polish finish

A Check all dimensions on site prior to fabricate joinery

C All carcass to be off White colour board

1

6

3

2 Allow to cut 60 dia holes on tops for computer cables as directed by Design Consultant provide cable entry cap, colour to be selected

10

9

5

7

8

All exposed edges of boards to be neatly machine cut and rub down with fine sand paper/PVC edge tape

D

Selected 25mm board fixed to steel framing

25mm thick board top

100 x 16 mm thick boardsplash back

25x25 tubing framing

50x25x1.6 steel framing

16mm thick selected boardon steel framing

4

12mm Pin board screw fixed to 25x25 SHS tubing. Fabric to be selected and approved by Design Consultant,allow 15x15 aluminum capping all around,mitre joints

80dia pipe welded to 200x100x5mm thksteel plate, allow heavy duty rubber on floor

11 25mm board capping12 powerpoint13

7

duct formed with 16 mm board14

13 12

7

8

wall formed with 25mm board

15 door formed with 25mm board with heavy duty 1 pair hinge and tower bolt

25x25 tubing framing

M . L

F Fabric to be selected by Designer

IMAGE REFERENCE:

Fabric Image - natural Potatoes SackTexture

7

16 CPU Holder

PH.- 3316 101 , M. - 923 8860

DESIGN CONSULTANTS, INTERIORDESIGNERS & PROJECT MANAGERS,

Email : [email protected]

14 LADY NARAIN DRIVE ,P.O.BOX 522 ,SUVA , FIJI ISLANDS

Page 4: Final Tender Drawings 24.10 - Coffey...F Fabric to be selected by Designer IMAGE REFERENCE: Fabric Image - natural Potatoes Sack Texture 7 16 CPU Holder PH.- 3316 101 , M. - 923 8860

TYPICAL WORKSTATION 3 & FILLING UNIT 1 PLANSCALE 1:30

over

head

shelv

es o

ver

ELEVATION - ASCALE 1:30

4750

2200

350

ELEVATION - BSCALE 1:30

650

800

2200

750

6004840

EQ.

3370

400

EQ.

14

14

1

8

1

5

77

2

1

F

21

E

10 13

B

A

4J03

3J03

25 EQ. 25 EQ. 25 EQ. 25

8

over

head

shelv

es o

ver

600

150

750

2536

625

368

2562

5

EQ.EQ.EQ.

100

EQEQ

EQ

EQ. EQ. EQ.

15

12

16

7

2

7 15

16

OFFICE FURNITURE/JOINERY FOR DEPARTMENT OF EDUCATION, MINISTRY OF EDUCATION YOUTH AND SPORT FUNAFUTI , TUVALU

Copyright reserved in all drawings and thework excuted from them. Figured dimensionsshall be read in preferance. Largest scaleddrawings shall take precedence. Check alldimensions on site. All discrepancies shallbe reported to the DESIGN CONSULTANT immediately. :

:

:

:SHEET TITLE DESIGN

DRAWN

DATE

SCALE

M . L PROJECT NO.

SHEET NO.

REV.

PROJECT

AS SHOWN

J0218-152

15.10.19

OFFICE FURNITURE/JOINERY FOR DEPARTMENT OF EDUCATION, MINISTRY OF EDUCATION YOUTH AND SPORT FUNAFUTI , TUVALU

WORKSTATION 3 PLAN & FILLING UNIT DETAILSPOLA

D E S I G N S

NOTE:

KEY NUMBER REFERENCE:

E All joinery hardware to be commercialgrade and to be used from thefollowing recommended Brands:HAFELE, HETTICH & BLUM or approvedequivalent

B All exposed edges to have polish finish

A Check all dimensions on site prior to fabricate joinery

C All carcass to be White Hydrolite board

All exposed edges of Hydrolite to be neatly machine cut and rub down with fine sand paper

D

All horizontal boards to have Alphine White Finish & all vertical boards to have Ebony finish as per Design Consultants instructions

F

M . L

1

6

3

2 Allow to cut 60 dia holes on tops for computer cables as directed by Design Consultant provide cable entry cap, colour to be selected

10

9

5

7

8

Selected 25mm board fixed to steel framing

25mm thick board top

100 x 16 mm thick boardsplash back

25x25 tubing framing

50x25x1.6 steel framing

16mm thick selected boardon steel framing

4

12mm Pin board screw fixed to 25x25 SHS tubing. Fabric to be selected and approved by Design Consultant,allow 15x15 aluminum capping all around,mitre joints

80dia pipe welded to 200x100x5mm thksteel plate, allow heavy duty rubber on floor

11 25mm board capping12 powerpoint

13 duct formed with 16 mm board

25x25 tubing framing

14 16mm board backing

15 25x25 tubing mid support

15

7

16 CPU Holder

PH.- 3316 101 , M. - 923 8860

DESIGN CONSULTANTS, INTERIORDESIGNERS & PROJECT MANAGERS,

Email : [email protected]

14 LADY NARAIN DRIVE ,P.O.BOX 522 ,SUVA , FIJI ISLANDS

Page 5: Final Tender Drawings 24.10 - Coffey...F Fabric to be selected by Designer IMAGE REFERENCE: Fabric Image - natural Potatoes Sack Texture 7 16 CPU Holder PH.- 3316 101 , M. - 923 8860

625

825

2200

2557

515

0

750

SECTIONScale: 1:15

3J02

SECTIONScale: 1:15

4J02

400

8

14

10 1

3

166

116

625

2525

2537

537

5

2200

100

400

14

7A/S

50350

8

F/S

17

SECTIONScale: 1:15

5J04

A/S

F/S

A/S

F/S

1050

300

700 750

25

600

10

25

25

166

116

460

11

255

2200

150

750

SECTIONScale: 1:15

6J02

400

8

14

7A/S

10 1

15

2531

725

327

2532

525

320

2533

725

307

2536

625

368

2565

025

550

6

7

7

13

12

F/S

F/S

7

15

15

17 17 17

7

7

15

7

7

14

8

8

8

15

12

7

13

8

7

8

TYPICAL STEEL LEG SUPPORT - PROPRIETARY TYPESCALE 1 : 5

adjustable steel rod

5mm heavy duty rubber

steel leg welded to 50x25 steel frame

steel base

OFFICE FURNITURE/JOINERY FOR DEPARTMENT OF EDUCATION, MINISTRY OF EDUCATION YOUTH AND SPORT FUNAFUTI , TUVALU

Copyright reserved in all drawings and thework excuted from them. Figured dimensionsshall be read in preferance. Largest scaleddrawings shall take precedence. Check alldimensions on site. All discrepancies shallbe reported to the DESIGN CONSULTANT immediately. :

:

:

:SHEET TITLE DESIGN

DRAWN

DATE

SCALE

M . L PROJECT NO.

SHEET NO.

REV.

PROJECT

AS SHOWN

J0318-152

15.10.19

OFFICE FURNITURE/JOINERY FOR DEPARTMENT OF EDUCATION, MINISTRY OF EDUCATION YOUTH AND SPORT FUNAFUTI , TUVALU

JOINERY DETAILSPOLAD E S I G N S PH.- 3316 101 , M. - 923 8860

DESIGN CONSULTANTS, INTERIORDESIGNERS & PROJECT MANAGERS,

Email : [email protected]

14 LADY NARAIN DRIVE ,P.O.BOX 522 ,SUVA , FIJI ISLANDS

KEY NUMBER REFERENCE

M . L

1 6

3

2 Allow to cut 60 dia holes on tops for computer cables as directed by Design Consultant provide cable entry cap, colour to be selected

10

9

5

7

8

Selected 25mm board fixed to steel framing

25mm thick board top

100 x 16 mm thick boardsplash back

25x25 tubing framing

50x25x1.6 steel framing

16mm thick selected boardon steel framing

4

12mm Pin board screw fixed to 25x25 SHS tubing. Fabric to be selected and approved by Design Consultant,allow 15x15 aluminum capping all around,mitre joints

80dia pipe welded to 200x100x5mm thksteel plate, allow heavy duty rubber on floor

11 25mm board capping12 powerpoint13 duct formed with 16 mm board

25x25 tubing framing

14 16mm board backing

15 25x25 tubing mid support

16 CPU Holder

Typical Steel Leg Support - Proprietary Type

17

Page 6: Final Tender Drawings 24.10 - Coffey...F Fabric to be selected by Designer IMAGE REFERENCE: Fabric Image - natural Potatoes Sack Texture 7 16 CPU Holder PH.- 3316 101 , M. - 923 8860

1

7

ELEVATION - BSCALE 1:30

ELEVATION - ASCALE 1:30

2 3

1000 EQ. EQ.

2420

750

40922

00

750

2200

ENLARGED EXAMINATION & ASSESMENT OFFICE LAYOUT PLANSCALE 1:30

EXAMINATION &ASSESSMENT OFFICE

A

B

2

3

D

1000 600

260 825 2715

380024

20

1000

EQ.

EQ.

1420

2420

4J03

6J03

5J04

1200 400

400

1200

12

Printer Unit

10

15

15

15 7

8

8

18

7

15

1000

650

1079

EQ.

EXAMNINATION ROOM TABLE PLANSCALE 1:25

175 175

75EQ

.

C-

Selected lockable castors

25mm thick selected board top with p.v.c edge tape

750

725

ELEVATION - CSCALE 1:25

25

19

17

18 16mm thick selected board top with p.v.c edge tape

7510

0

19

17

1817

OFFICE FURNITURE/JOINERY FOR DEPARTMENT OF EDUCATION, MINISTRY OF EDUCATION YOUTH AND SPORT FUNAFUTI , TUVALU

Copyright reserved in all drawings and thework excuted from them. Figured dimensionsshall be read in preferance. Largest scaleddrawings shall take precedence. Check alldimensions on site. All discrepancies shallbe reported to the DESIGN CONSULTANT immediately.

:

:

:SHEET TITLE DESIGN

DRAWN

DATE

M . L PROJECT NO.

SHEET NO.

PROJECT

J0418-152

15.10.19

OFFICE FURNITURE/JOINERY FOR DEPARTMENT OF EDUCATION, MINISTRY OF EDUCATION YOUTH AND SPORT FUNAFUTI , TUVALU

POLAD E S I G N S

ENLARGED EXAMINATION & ASSESMENT OFFICE LAYOUT PLAN & DETAILS

NOTE:

KEY NUMBER REFERENCE:

E All joinery hardware to be commercialgrade and to be used from thefollowing recommended Brands:HAFELE, HETTICH & BLUM or approvedequivalent

B All exposed edges to have polish finish

A Check all dimensions on site prior to fabricate joinery

C All carcass to be White Hydrolite board

All exposed edges of Hydrolite to be neatly machine cut and rub down with fine sand paper

D

LEGEND:

- ADJUSTABLE SHELFA/S

All horizontal boards to have Alphine White Finish & all vertical boards to have Ebony finish as per Design Consultants instructions

F

SCALE REV.AS SHOWN

M . L

1

6

3

2 Allow to cut 60 dia holes on tops for computer cables as directed by Design Consultant provide cable entry cap, colour to be selected

10

9

5

7

8

Selected 25mm board fixed to steel framing

25mm thick board top

100 x 16 mm thick boardsplash back

25x25 tubing framing

50x25x1.6 steel framing

16mm thick selected boardon steel framing

4

12mm Pin board screw fixed to 25x25 SHS tubing. Fabric to be selected and approved by Design Consultant,allow 15x15 aluminum capping all around,mitre joints

80dia pipe welded to 200x100x5mm thksteel plate, allow heavy duty rubber on floor

11 25mm board capping12 powerpoint

13 duct formed with 16 mm board

25x25 tubing framing

14 16mm board backing

15 25x25 tubing mid support

16 CPU Holder

17

18

19

16

1

2

6

PH.- 3316 101 , M. - 923 8860

DESIGN CONSULTANTS, INTERIORDESIGNERS & PROJECT MANAGERS,

Email : [email protected]

14 LADY NARAIN DRIVE ,P.O.BOX 522 ,SUVA , FIJI ISLANDS

Page 7: Final Tender Drawings 24.10 - Coffey...F Fabric to be selected by Designer IMAGE REFERENCE: Fabric Image - natural Potatoes Sack Texture 7 16 CPU Holder PH.- 3316 101 , M. - 923 8860

ENLARGED JOINERY LAYOUT PLAN - DIRECTORS OFFICESCALE 1:30

DIRECTORSOFFICE

B

A

2

2420

3

E

2900

4001000600

ELEVATION - BSCALE 1:30

WINDOW OPENING

2900E

400 1000 600

750

650

2200

800

ELEVATION - ASCALE 1:30

2 3

EQ.

2420

750

650

2200

800

6J03

eq.

eq.

2420

400

900

EQ.EQ.

1

162 15 7

7

15

15

7

1

1

10

1

8

7

8

7

11678 15

230

25

750

750

150

25

OFFICE FURNITURE/JOINERY FOR DEPARTMENT OF EDUCATION, MINISTRY OF EDUCATION YOUTH AND SPORT FUNAFUTI , TUVALU

Copyright reserved in all drawings and thework excuted from them. Figured dimensionsshall be read in preferance. Largest scaleddrawings shall take precedence. Check alldimensions on site. All discrepancies shallbe reported to the DESIGN CONSULTANT immediately. :

:

:

:SHEET TITLE DESIGN

DRAWN

DATE

SCALE

M . L PROJECT NO.

SHEET NO.

REV.

PROJECT

AS SHOWN

J0518-152

15.10.19

OFFICE FURNITURE/JOINERY FOR DEPARTMENT OF EDUCATION, MINISTRY OF EDUCATION YOUTH AND SPORT FUNAFUTI , TUVALU

POLAD E S I G N S

NOTE:

KEY NUMBER REFERENCE:

E All joinery hardware to be commercialgrade and to be used from thefollowing recommended Brands:HAFELE, HETTICH & BLUM or approvedequivalent

B All exposed edges to have polish finish

A Check all dimensions on site prior to fabricate joinery

C All carcass to be White Hydrolite board

All exposed edges of Hydrolite to be neatly machine cut and rub down with fine sand paper

D

IMAGE REFERENCE:

LEGEND:

- ADJUSTABLE SHELFA/S

ENLARGED DIRECTORS OFFICE LAYOUT PLAN & DETAILS

STEEL LEG SUPPORT

M . L

1

6

3

2 Allow to cut 60 dia holes on tops for computer cables as directed by Design Consultant provide cable entry cap, colour to be selected

10

9

5

7

8

Selected 25mm board fixed to steel framing

25mm thick board top

100 x 16 mm thick boardsplash back

25x25 tubing framing

50x25x1.6 steel framing

16mm thick selected boardon steel framing

4

12mm Pin board screw fixed to 25x25 SHS tubing. Fabric to be selected and approved by Design Consultant,allow 15x15 aluminum capping all around,mitre joints

80dia pipe welded to 200x100x5mm thksteel plate, allow heavy duty rubber on floor

11 25mm board capping12 powerpoint

13 duct formed with 16 mm board

25x25 tubing framing

14 16mm board backing

15 25x25 tubing mid support

16 CPU Holder

16

7

1

8

PH.- 3316 101 , M. - 923 8860

DESIGN CONSULTANTS, INTERIORDESIGNERS & PROJECT MANAGERS,

Email : [email protected]

14 LADY NARAIN DRIVE ,P.O.BOX 522 ,SUVA , FIJI ISLANDS

Page 8: Final Tender Drawings 24.10 - Coffey...F Fabric to be selected by Designer IMAGE REFERENCE: Fabric Image - natural Potatoes Sack Texture 7 16 CPU Holder PH.- 3316 101 , M. - 923 8860

4550400 900 1050 900 900 400

ENLARGED JOINERY LAYOUT PLAN - IT & PROGRAME OFFICESCALE 1:30

850

5955

400

6405

1

2

4

3

D E

AJ07

BJ07

CJ08

1200

1200

430

1200

1575

400

1223

1217

1580

1220

1165

Printer Unit

127

78

2

16 10

10

127 10127 10

16 10

161

board joint line

board joint line

OFFICE FURNITURE/JOINERY FOR DEPARTMENT OF EDUCATION, MINISTRY OF EDUCATION YOUTH AND SPORT FUNAFUTI , TUVALU

Copyright reserved in all drawings and thework excuted from them. Figured dimensionsshall be read in preferance. Largest scaleddrawings shall take precedence. Check alldimensions on site. All discrepancies shallbe reported to the DESIGN CONSULTANT immediately. :

:

:

:SHEET TITLE DESIGN

DRAWN

DATE

SCALE

M . L PROJECT NO.

SHEET NO.

REV.

PROJECT

AS SHOWN

J0618-152

15.10.19

OFFICE FURNITURE/JOINERY FOR DEPARTMENT OF EDUCATION, MINISTRY OF EDUCATION YOUTH AND SPORT FUNAFUTI , TUVALU

POLAD E S I G N S

IT & PROGRAME OFFICE INTERNAL ELEVATIONS & DETAILS

NOTE:

KEY NUMBER REFERENCE:

E All joinery hardware to be commercialgrade and to be used from thefollowing recommended Brands:HAFELE, HETTICH & BLUM or approvedequivalent

B All exposed edges to have polish finish

A Check all dimensions on site prior to fabricate joinery

C All carcass to be White Hydrolite board

All exposed edges of Hydrolite to be neatly machine cut and rub down with fine sand paper

D

IMAGE REFERENCE:

LEGEND:

- ADJUSTABLE SHELFA/S

CPU HOLDER

M . L

1

6

3

2 Allow to cut 60 dia holes on tops for computer cables as directed by Design Consultant provide cable entry cap, colour to be selected

10

9

5

7

8

Selected 25mm board fixed to steel framing

25mm thick board top

100 x 16 mm thick boardsplash back

25x25 tubing framing

50x25x1.6 steel framing

16mm thick selected boardon steel framing

4

12mm Pin board screw fixed to 25x25 SHS tubing. Fabric to be selected and approved by Design Consultant,allow 15x15 aluminum capping all around,mitre joints

80dia pipe welded to 200x100x5mm thksteel plate, allow heavy duty rubber on floor

11 25mm board capping12 powerpoint13 duct formed with 16 mm board

25x25 tubing framing

14 16mm board backing

15 25x25 tubing mid support

16 CPU Holder

PH.- 3316 101 , M. - 923 8860

DESIGN CONSULTANTS, INTERIORDESIGNERS & PROJECT MANAGERS,

Email : [email protected]

14 LADY NARAIN DRIVE ,P.O.BOX 522 ,SUVA , FIJI ISLANDS

Page 9: Final Tender Drawings 24.10 - Coffey...F Fabric to be selected by Designer IMAGE REFERENCE: Fabric Image - natural Potatoes Sack Texture 7 16 CPU Holder PH.- 3316 101 , M. - 923 8860

ELEVATION - BSCALE 1:30

finished floor line

WINDOW OPENING

WINDOW OPENING

750

2200

50

6805

EQ.

43

ELEVATION - ASCALE 1:30

DOOR

OPE

NING

1450

5605

2200

finished floor line

4 3

Printer /Photocopier

Area

4001200160012001240 1165

EQ. EQ. EQ.

6J03

750 10

50

1050

1 10 10

13167678 1613

10 10 10101 1 1

7 7 7 7 6

OFFICE FURNITURE/JOINERY FOR DEPARTMENT OF EDUCATION, MINISTRY OF EDUCATION YOUTH AND SPORT FUNAFUTI , TUVALU

Copyright reserved in all drawings and thework excuted from them. Figured dimensionsshall be read in preferance. Largest scaleddrawings shall take precedence. Check alldimensions on site. All discrepancies shallbe reported to the DESIGN CONSULTANT immediately. :

:

:

:SHEET TITLE DESIGN

DRAWN

DATE

SCALE

M . L PROJECT NO.

SHEET NO.

REV.

PROJECT

AS SHOWN

J0718-152

15.10.19

OFFICE FURNITURE/JOINERY FOR DEPARTMENT OF EDUCATION, MINISTRY OF EDUCATION YOUTH AND SPORT FUNAFUTI , TUVALU

POLAD E S I G N S

M . LIT & PROGRAME OFFICE INTERNAL ELEVATIONS

NOTE:

KEY NUMBER REFERENCE:

E All joinery hardware to be commercialgrade and to be used from thefollowing recommended Brands:HAFELE, HETTICH & BLUM or approvedequivalent

B All exposed edges to have polish finish

A Check all dimensions on site prior to fabricate joinery

C All carcass to be White Hydrolite board

All exposed edges of Hydrolite to be neatly machine cut and rub down with fine sand paper

D

IMAGE REFERENCE:

1

6

3

2 Allow to cut 60 dia holes on tops for computer cables as directed by Design Consultant provide cable entry cap, colour to be selected

10

9

5

7

8

Selected 25mm board fixed to steel framing

25mm thick board top

100 x 16 mm thick boardsplash back

25x25 tubing framing

50x25x1.6 steel framing

16mm thick selected boardon steel framing

4

12mm Pin board screw fixed to 25x25 SHS tubing. Fabric to be selected and approved by Design Consultant,allow 15x15 aluminum capping all around,mitre joints

80dia pipe welded to 200x100x5mm thksteel plate, allow heavy duty rubber on floor

11 25mm board capping12 powerpoint

13 duct formed with 16 mm board

25x25 tubing framing

14 16mm board backing

15 25x25 tubing mid support

16 CPU Holder

PH.- 3316 101 , M. - 923 8860

DESIGN CONSULTANTS, INTERIORDESIGNERS & PROJECT MANAGERS,

Email : [email protected]

14 LADY NARAIN DRIVE ,P.O.BOX 522 ,SUVA , FIJI ISLANDS

Page 10: Final Tender Drawings 24.10 - Coffey...F Fabric to be selected by Designer IMAGE REFERENCE: Fabric Image - natural Potatoes Sack Texture 7 16 CPU Holder PH.- 3316 101 , M. - 923 8860

DE

ELEVATION - CSCALE 1:30

4J03

750

2200

EQ EQ EQ EQ4545

750

TYPICAL PRINTER STATION SECTIONSCALE 1:15

600

750

2524

625

254

2515

0

25

14

1

7

158

171

7

15 8

7

78

15

15

OFFICE FURNITURE/JOINERY FOR DEPARTMENT OF EDUCATION, MINISTRY OF EDUCATION YOUTH AND SPORT FUNAFUTI , TUVALU

Copyright reserved in all drawings and thework excuted from them. Figured dimensionsshall be read in preferance. Largest scaleddrawings shall take precedence. Check alldimensions on site. All discrepancies shallbe reported to the DESIGN CONSULTANT immediately. :

:

:

:SHEET TITLE DESIGN

DRAWN

DATE

SCALE

M . L PROJECT NO.

SHEET NO.

REV.

PROJECT

AS SHOWN

J0818-152

15.10.19

OFFICE FURNITURE/JOINERY FOR DEPARTMENT OF EDUCATION, MINISTRY OF EDUCATION YOUTH AND SPORT FUNAFUTI , TUVALU

POLAD E S I G N S

M . LIT & PROGRAME OFFICE INTERNAL ELEVATION

KEY NUMBER REFERENCE

1 6

3

2 Allow to cut 60 dia holes on tops for computer cables as directed by Design Consultant provide cable entry cap, colour to be selected

10

9

5

7

8

Selected 25mm board fixed to steel framing

25mm thick board top

100 x 16 mm thick boardsplash back

25x25 tubing framing

50x25x1.6 steel framing

16mm thick selected boardon steel framing

4

12mm Pin board screw fixed to 25x25 SHS tubing. Fabric to be selected and approved by Design Consultant,allow 15x15 aluminum capping all around,mitre joints

80dia pipe welded to 200x100x5mm thksteel plate, allow heavy duty rubber on floor

11 25mm board capping12 powerpoint13 duct formed with 16 mm board

25x25 tubing framing

14 16mm board backing

15 25x25 tubing mid support

16 CPU Holder

Typical Steel Leg Support - Proprietary Type

17

PH.- 3316 101 , M. - 923 8860

DESIGN CONSULTANTS, INTERIORDESIGNERS & PROJECT MANAGERS,

Email : [email protected]

14 LADY NARAIN DRIVE ,P.O.BOX 522 ,SUVA , FIJI ISLANDS

Page 11: Final Tender Drawings 24.10 - Coffey...F Fabric to be selected by Designer IMAGE REFERENCE: Fabric Image - natural Potatoes Sack Texture 7 16 CPU Holder PH.- 3316 101 , M. - 923 8860

ENLARGED JOINERY LAYOUT PLAN - SSUSCALE 1:30

SSU

A

B

4130

765

EQ.

EQ.

4

B C DA

1820

600

EQ.

3365

1245

4130

1220

1265

400

ELEVATION - BSCALE 1:30

2710

EQ.

4130

750

650

2200

800

BCD A

EQ.EQ.

390600 430

10J08

ELEVATION - ASCALE 1:30

EQ. EQ. EQ.

400

3365

750

650

2200

800

44130

765

2713

EQ. EQ. EQ.

1 716 2

11 10

16

1

2

16

1

7

7

7

7 1578

14

11 12

10

16

1

7

12

7

15

8

710

15

8

7

1

13

7

7

12

15x15 aluminum angle

12mm pin board

Selected Fabricover

OFFICE FURNITURE/JOINERY FOR DEPARTMENT OF EDUCATION, MINISTRY OF EDUCATION YOUTH AND SPORT FUNAFUTI , TUVALU

Copyright reserved in all drawings and thework excuted from them. Figured dimensionsshall be read in preferance. Largest scaleddrawings shall take precedence. Check alldimensions on site. All discrepancies shallbe reported to the DESIGN CONSULTANT immediately. :

:

:

:SHEET TITLE DESIGN

DRAWN

DATE

SCALE

M . L PROJECT NO.

SHEET NO.

REV.

PROJECT

AS SHOWN

J0918-152

15.10.19

OFFICE FURNITURE/JOINERY FOR DEPARTMENT OF EDUCATION, MINISTRY OF EDUCATION YOUTH AND SPORT FUNAFUTI , TUVALU

POLAD E S I G N S

NOTE:

KEY NUMBER REFERENCE:

E All joinery hardware to be commercialgrade and to be used from thefollowing recommended Brands:HAFELE, HETTICH & BLUM or approvedequivalent

B All exposed edges to have polish finish

A Check all dimensions on site prior to fabricate joinery

C All carcass to be White Hydrolite board

All exposed edges of Hydrolite to be neatly machine cut and rub down with fine sand paper

D

IMAGE REFERENCE:

LEGEND:

- ADJUSTABLE SHELFA/S

ENLARGED JOINERY LAYOUT PLAN & ELEVATIONS - SSU

M . L

1

6

3

2 Allow to cut 60 dia holes on tops for computer cables as directed by Design Consultant provide cable entry cap, colour to be selected

10

9

5

7

8

Selected 25mm board fixed to steel framing

25mm thick board top

100 x 16 mm thick boardsplash back

25x25 tubing framing

50x25x1.6 steel framing

16mm thick selected boardon steel framing

4

12mm Pin board screw fixed to 25x25 SHS tubing. Fabric to be selected and approved by Design Consultant,allow 15x15 aluminum capping all around,mitre joints

80dia pipe welded to 200x100x5mm thksteel plate, allow heavy duty rubber on floor

11 25mm board capping12 powerpoint13 duct formed with 16 mm board

25x25 tubing framing

14 16mm board backing

15 25x25 tubing mid support

16 CPU Holder

PH.- 3316 101 , M. - 923 8860

DESIGN CONSULTANTS, INTERIORDESIGNERS & PROJECT MANAGERS,

Email : [email protected]

14 LADY NARAIN DRIVE ,P.O.BOX 522 ,SUVA , FIJI ISLANDS

Page 12: Final Tender Drawings 24.10 - Coffey...F Fabric to be selected by Designer IMAGE REFERENCE: Fabric Image - natural Potatoes Sack Texture 7 16 CPU Holder PH.- 3316 101 , M. - 923 8860

PROPOSED POWER LAYOUT PLAN SCALE 1:75

3570

2

2420

3

7005

4

1

260 825 3155 825 5490

3370

875

1800

460

825

900

900

1220

350

910

B

1930

C

1000

D

4752

E

6003

FA

4550

800

6005

905

1995

1005

1995

905

240 825 10745 825 850

2710

4130

390 1030

4705

2420

3030 825

LONG ROOM

RECEPTION

EXAMINATION &ASSESSMENT OFFICE

DIRECTORSOFFICE

IT & PROGRAMEOFFICE

SSU

900

630

4130

3800 100 2900 3755

1565 55

6800100

60004750

2600

2600

2600

2600

2600

2600

2600

2600

2600

2600

2600

2600

600

2

2600

2600

600600

2

600600

2

600600

2

600600

2

600600

2

600600

2

600600

2

600600

2

600600

2

600600

2

600600

2

600

2

600

2

600

2

2600

600600

2

600600

2

600600

2

600600

2

2600

2600

2600

2600

2600

600

22 2

222

222

22

2600

2600

2

2

2

2

2600

2600

600

2

2600

2600

2600

2600

2

600

2600

2600

2600

2600

2600

2600

2600

2600

2600

2600

OFFICE FURNITURE/JOINERY FOR DEPARTMENT OF EDUCATION, MINISTRY OF EDUCATION YOUTH AND SPORT FUNAFUTI , TUVALU

Copyright reserved in all drawings and thework excuted from them. Figured dimensionsshall be read in preferance. Largest scaleddrawings shall take precedence. Check alldimensions on site. All discrepancies shallbe reported to the DESIGN CONSULTANT immediately. :

:

:

:SHEET TITLE DESIGN

DRAWN

DATE

SCALE

M . L PROJECT NO.

SHEET NO.

REV.

PROJECT

AS SHOWN

E0118-152

15.10.19

OFFICE FURNITURE/JOINERY FOR DEPARTMENT OF EDUCATION, MINISTRY OF EDUCATION YOUTH AND SPORT FUNAFUTI , TUVALU

POWER LAYOUT PLANPOLAD E S I G N S

ELECTRICAL NOTES:

1.

2.

3.

All cables to be mechanically secured & protected.Use pvc / pvc orange circular V75 0.6 / 1KV cables or TPS for internal wiring secure to steel catenary wires inside ceiling space. Use only equipment specified hereinrefer alternatives with samples and specifications to Design Consultants forapproval.

4. Use circuit breakers with thermal, magnetic & fault ratings to suit supply & load conditions.

6.

5. Contractor to liase with EFL regardingpermits & inspections.Use PDL 600 series fitting for all light switches,switch toggles, normal & round- pin G.P.O power outlets.

7. A complete set of all drawings ( latest revision )and specification shall be kept on site at all times & available for inspection

8. Mount switch toggles on pre fabricated switch plate with label insert slots.

All circuits shall be provided with rcdprotection to AS3000-2000 and EFL regulations.

300 Height of fitting above finished floor level unless stated otherwise

2 Double 10 amps general purpose outlet PDL 600 series or approved equivalent

ELECTRICAL LEGEND:

NOTE:- Contractor to test electrical outlets and clarify with client representative prior to hand over

M . L

- Contractor to allow 5m long grey flex wirewith each joinery

PH.- 3316 101 , M. - 923 8860

DESIGN CONSULTANTS, INTERIORDESIGNERS & PROJECT MANAGERS,

Email : [email protected]

14 LADY NARAIN DRIVE ,P.O.BOX 522 ,SUVA , FIJI ISLANDS

Page 13: Final Tender Drawings 24.10 - Coffey...F Fabric to be selected by Designer IMAGE REFERENCE: Fabric Image - natural Potatoes Sack Texture 7 16 CPU Holder PH.- 3316 101 , M. - 923 8860

OFFICE FURNITURE/JOINERY FOR DEPARTMENT OF EDUCATION, MINISTRY OF EDUCATION YOUTH AND SPORT FUNAFUTI , TUVALU

Long Room main office DOE looking down

Long Room main office DOE looking up

Reception Area

IT & Program Room looking to windows

iT & Program Room looking at corner

Same room looking at door