    The BEI shall check the contents of the PCOS box based onthe checklist found inside the PCOS:

    Checklist of contents of the box

    PCOS machine and its power adaptor

    10 test ballots

    13 rolls of official thermal paper

    1 envelope containing the back-up memory

    3 labeled PINS of the BEI

    1 labeled PIN for Re-Zeroing

    Modem/bridge or BGAN, if any.

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    4/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    5/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    6/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    7/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    8/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    9/53

    REPUBLICOF THE PHILIPPINES

    AUTOMATED ELECTIONS

    BEI AUTHENTICATION

    Please insert security keyfor authentication

    LCD SW ver 103,15

    The Chairman shall place the iButtonsecurity key on top of the security keyreceptacle.

    PCOS will beep to indicatethat it is ready to acceptinstructions from the BEI

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    10/53

    ******

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    11/53

    REPUBLICOF THE PHILIPPINES

    AUTOMATED ELECTIONS

    BEI Security Key verified

    LCD SW ver 103,15

    ERROR VALIDATING SECURITYKEY

    Please try again andremember to press firmly

    against the reader

    LCD SW ver 103,15

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    12/53

    IS THIS THECORRECT TIME?

    2013:02:1910:00:00

    YES NO

    Select YES if the date andtime is correct, and entersuch fact in the minutes.

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    13/53

    SET YEAR

    2013:02:1910:00:00

    +++

    Select NO if the date and time is incorrect. Thenscreen will ask the BEI to set the correct date andtime, and ask for the correct:

    A. YEAR. If year is correct, press DONE. If not,

    +++ / ---- button until the year displayed thecurrent year.

    B. MONTH. If month is correct, press DONE. Ifnot,

    +++ / ---- button until the month displayed the

    current month.

    C. DAY. If day is correct, press DONE. If not,

    +++ / ---- button until the day displayed thecurrent day.

    DONE---

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    14/53

    Select NO if the date and time is incorrect. Thenscreen will ask the BEI to set the correct date and time,and ask for the correct:

    D. HOUR. If hour is correct, press DONE. If not,

    +++ / ---- button until the hour displayed thecurrent hour

    E. MINUTE. If minute is correct, press DONE. If not,

    +++ / ---- button until the minute displayed thecurrent minute.

    SET HOUR

    2013:02:1910:00:00

    +++ DONE---

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    15/53

    Wait until the MAIN MENU is displayed

    SET HOUR

    2013:02:1910:00:00

    +++ DONE---

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    16/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    17/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    18/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    19/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    20/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    21/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    22/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    23/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    24/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    25/53

    TESTING MODEM

    DEVICE

    PLEASE WAIT

    PCOS shall automatically testthe modem device anddisplayed the message.

    MODEM FAILED(1015)

    Ignore this message duringthe FTS since the modem isnot connected to the PCOS

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    26/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    27/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    28/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    29/53

    When DISPLAY is selected,PCOS shall display theDiagnostics Report

    When this message appearsduring FTS, ignore this sincethe modem is not connected tothe PCOS.

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    30/53

    After printing the Diagnostic Report, the PCOS willdisplay a message, press the NO option.

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    31/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    32/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    33/53

    INITIALIZING VOTECOUNTERS

    (Ensuring thatvote counters areset to zero)

    PLEASE WAIT

    RESULTS HAVE BEENZEROED

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    34/53

    WOULD YOU LIKETO PRINT MORE

    COPIES OF THEZERO TAPE?

    PRINTINGINITIALIZATION

    REPORT

    PLEASE WAIT

    YES NO

    Press NO if you do notwant to print more copies of

    Zero Tape.

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    35/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    36/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    37/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    38/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    39/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    40/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    41/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    42/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    43/53

    READY TO TRANSMIT

    PLEASE PLUG INTRANSMISSION CABLETO ELECTRONICALLY

    TRANSMIT THEELECTION RESULTS ANDPRESS OK TO CONTINUE

    Do not plug transmissioncable. Press SKIP option.

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    44/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    45/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    46/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    47/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    48/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    49/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    50/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    51/53

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    52/53

    a. Disconnect the battery cable - from the PCOS machine;b. - from the battery;c. Disconnect the power adaptor - from the electrical outlet;d. - from the PCOS machine;

    e. Insert the Back-up memory card in theAdministratorslot and seal with plastic security seal;f. Place iButton inside the printer compartment of the PCOS,g. Cover the printer and seal with plastic security seal;

  • 7/30/2019 Final Testing and Sealing Activities Ver.1.1

    53/53

    h. Record in the Minutes the serial numbers of the plasticsecurity seals used;

    i. Place the battery and its peripherals inside the battery

    box;j. Place inside the PCOS box the following: The PCOS and its power adaptor PINs for re-zeroing and

    2 copies of the Minutes in their envelopes

    k. Seal the PCOS box with the paper seal provided forthe purpose, and

    l. Allow the watchers of the PPCRV to place their ownseal.