  • 8/13/2019 Final Variation for 134 & 146 Rob 97 - 2003

    1/14

    As per agt Final As per agt

    Annexure - A

    1 103 b EW excavation in OS 10Cum 560 300 0 1680

    2 103 c Ew excavation in Hs 10Cum 848 400 527.986 3392

    3 103 d E.W. In ordinary rock 10Cum 2034 400 479.885 8136

    4 103 e E.W. In the Hard rock 10Cum 3994 200 149.427 7988

    5 104 bSeepage excess of 15 cm no req.

    H.bailing10Cum 161 700 465.92 1127

    6 106 Filling Rly. Loose soil in foundn., 10Cum 356 700 2492

    7 109 Extra for addition lead of 30m 10Cum 72 800 643.856 576

    8 111 Extra of each all. Lift of 1.5m 10Cum 78 600 514.315 468

    9 111-2Extra for each additional lift of 1.5m (for

    it 101 t 103 105 106 d t)10Cum 156 600 150.89 936

    QtySL

    NoSch No Description of work Unit Rate

    Name of the Contractor: M/s. M.P. Construction & KRV infrastructures (JV)

    FINAL VA

    1) IRUGUR - PODANUR Section : Proposed Construction of 1 x 18.239m Square (22.00m skew) Clear span wit

    at Km 479/22-24.

    2) VANJIPALAYAM YARD: Proposed Construction of 1 x 22.07m Square (25.00m Skew) & 1 x 17.659 square (

    Name of work:

    UCC:001157 AFREEMENT No

  • 8/13/2019 Final Variation for 134 & 146 Rob 97 - 2003

    2/14

    As per agt Final As per agt

    QtySL

    NoSch No Description of work Unit Rate

    Name of the Contractor: M/s. M.P. Construction & KRV infrastructures (JV)

    1) IRUGUR - PODANUR Section : Proposed Construction of 1 x 18.239m Square (22.00m skew) Clear span wit

    at Km 479/22-24.

    2) VANJIPALAYAM YARD: Proposed Construction of 1 x 22.07m Square (25.00m Skew) & 1 x 17.659 square (

    Name of work:

    UCC:001157 AFREEMENT No

    17 506a CC with 20mm stone-bed blocks cum 1832 185 50.59 33892

    18 511 bi RCC work Using granite metal cum 4744 775 561.308 367660

    19 511 ci RCC work in curved portion. cum 5026 80 230.577 40208

    20 511 di RCC works in founds cum 3981 540 320.496 214974

    21 513Extra for the use of formwork with

    curved srfaces10Sqm 1209 90 642.011 1088

    22 514 ci Precast RCC in slabs-gr.metal cum 2460 30 11.774 7380

    23 515 d Erection of Precast articals cum 370 30 11.774 1110

    24 527 a Extra over items 506 and 507 10Sqm 945 100 0 945

    25 530Extra for lift above 5m from GL for

    conrete as specified. BSR itemscum 130 100 416.968 1300

    26 530-2Extra over items 504 to 506, 508 to 512,

    516 519 d 520 tcum 260 150 249.37 3900

  • 8/13/2019 Final Variation for 134 & 146 Rob 97 - 2003

    3/14

    As per agt Final As per agt

    QtySL

    NoSch No Description of work Unit Rate

    Name of the Contractor: M/s. M.P. Construction & KRV infrastructures (JV)

    1) IRUGUR - PODANUR Section : Proposed Construction of 1 x 18.239m Square (22.00m skew) Clear span wit

    at Km 479/22-24.

    2) VANJIPALAYAM YARD: Proposed Construction of 1 x 22.07m Square (25.00m Skew) & 1 x 17.659 square (

    Name of work:

    UCC:001157 AFREEMENT No

    Add 23.4% 171610

    Grand total 904991

    Item Code Annexure - B

    1 1400177

    Fabrication, Erection, Metalizing and

    Painting of steel girder for COMPOSITE

    structure over Track span with over

    headed Electrification under power block

    and line block.

    Tonne 90036 250 350.518 22509

    2 300310Pre-cast, post-tensioned, pre-stressed

    concrete (M45 Design Mix) PSC SLABScum 10000 130 0 1300

    3 300311

    Providing and fixing in position to exact

    profile and prestressing HIGH TENSILE

    STRANDS of specified ultimate strength

    Tonne 125000 2.4 0 300

    4 1400142Supply and fixing ELASTOMERIC BEARING

    of approved design and required sizeCubic Cm 1 600000 456000 600

    5 600240

    Providing Guard Rails over PSC sleepers

    using 52kg/90r rails under the bridge gth of Fini 600 200 0 120

  • 8/13/2019 Final Variation for 134 & 146 Rob 97 - 2003

    4/14

    As per agt Final As per agt

    QtySL

    NoSch No Description of work Unit Rate

    Name of the Contractor: M/s. M.P. Construction & KRV infrastructures (JV)

    1) IRUGUR - PODANUR Section : Proposed Construction of 1 x 18.239m Square (22.00m skew) Clear span wit

    at Km 479/22-24.

    2) VANJIPALAYAM YARD: Proposed Construction of 1 x 22.07m Square (25.00m Skew) & 1 x 17.659 square (

    Name of work:

    UCC:001157 AFREEMENT No

    11 100119Supply of JCB on hire basis as and when

    required by the Engineer-in-chargeHour 800 200 0 160

    12 431

    Providing rail barricading 1.20m heigth

    (above ground level) with rail posts at

    1.5m interval

    Each 150 400 33 60

    13 600093

    Deploying of labour with sufficient

    experience on permenant way

    maintenance

    Each 330 400 0 132

    14 600335Removing the existing lifting barrier

    along with winch and other componentsSet 18000 2 1 36

    15 78

    Fabrication, supply and fixing in position

    of retro reflective Engineering indicators

    made out of 2mm tk (CAUTION BOARD)

    Each 4000 4 0 16

    16 79

    Fabrication, supply and fixing in position

    of retro reflective Engineering indicators

    made out of 2mm tk (SPEED

    INDICATORS)

    Each 4600 4 0 18

    17 80

    Fabrication, supply and fixing in position

    of retro reflective Engineering indicatorsE h 5000 4 0 20

  • 8/13/2019 Final Variation for 134 & 146 Rob 97 - 2003

    5/14

    As per agt Final As per agt

    QtySL

    NoSch No Description of work Unit Rate

    Name of the Contractor: M/s. M.P. Construction & KRV infrastructures (JV)

    1) IRUGUR - PODANUR Section : Proposed Construction of 1 x 18.239m Square (22.00m skew) Clear span wit

    at Km 479/22-24.

    2) VANJIPALAYAM YARD: Proposed Construction of 1 x 22.07m Square (25.00m Skew) & 1 x 17.659 square (

    Name of work:

    UCC:001157 AFREEMENT No

    2 1

    Supply of Ordinary Portland Cement

    Grade 43/53 conforming to I.S.8112-

    1989/12269 at site of work

    Tonne 4500 675 570.68 3037

    3 830

    Supply of TMT --- Fe 415 Grade or above

    Grade steel rods of various diameters

    conforming to I.S. codes 1786/1985 at

    site of work

    Tonne 44000 230 150.598 10120

    Total 13757

    Grand Total of Annexure (A+B+C) 5059791

  • 8/13/2019 Final Variation for 134 & 146 Rob 97 - 2003

    6/14

    Remarks

    existing level crossing No: 1

    o: 134 at Km.450/13-15.

  • 8/13/2019 Final Variation for 134 & 146 Rob 97 - 2003

    7/14

    Remarks

    existing level crossing No: 1

    o: 134 at Km.450/13-15.

  • 8/13/2019 Final Variation for 134 & 146 Rob 97 - 2003

    8/14

    Remarks

    existing level crossing No: 1

    o: 134 at Km.450/13-15.

  • 8/13/2019 Final Variation for 134 & 146 Rob 97 - 2003

    9/14

    Remarks

    existing level crossing No: 1

    o: 134 at Km.450/13-15.

  • 8/13/2019 Final Variation for 134 & 146 Rob 97 - 2003

    10/14

    Remarks

    existing level crossing No: 1

    o: 134 at Km.450/13-15.

  • 8/13/2019 Final Variation for 134 & 146 Rob 97 - 2003

    11/14

    Annexure As per Agreement As per Final ExcessAnnexure - A 9049910.43 7069225.50Annexure - B 27790500 33721846.65 593134Annexure - C 13757500 9194372.00

    50597910.43 49985444.15 59313

    Amount as per Agreement 50597910.43

    Amount As per final variation 49985444.15

    Savings 612466.28 1.21

    Contractor Sr SO(A)

    The arthmetical accuracy and the quantity in the variation statement have been verified with those

    ABSTRACT - FINAL

    . t s cert e t at t e quant t es o tems not operate ess operate un er t s agreement w n

    other on going agreement or future teners.

  • 8/13/2019 Final Variation for 134 & 146 Rob 97 - 2003

    12/14

    2. It is certified that there are no unintended benefits accured to the contractor by operating the va

    3.There is no adult/accounts/vigilance cases pending against this contract.

  • 8/13/2019 Final Variation for 134 & 146 Rob 97 - 2003

    13/14

    Savings1980684.93

    04563128.00

    6543812.93

    Ch OS XEN/CN/PTJ

    measurement book and found correct.

    equ re an w not e operate n uture n any

  • 8/13/2019 Final Variation for 134 & 146 Rob 97 - 2003

    14/14

    under this agreement.