final wake sw tool v22

Upload: tpqnhat

Post on 29-May-2018

228 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/8/2019 Final Wake Sw Tool v22

    1/18Wake County Stormwater ToolVersion 2.2

    09/09/2010 05:10:27

    Stormwater Management Plan S/D No.: 0

    0 Date: 12/30/1899

    0 Designer: 0

    SUMMARY INFORMATION

    Site DataTotal Area: 0 acres

    Zoning: 0

    Number of Lots: 0

    Percent Impervious: #DIV/0! %

    Volume Management Calculations

    Target Curve Number: 0

    Proposed Curve Number: 0

    Total Volume Required: #DIV/0!

    Total Volume Provided: 0

    Nitrogen Calculations

    TN Loading from Site: #DIV/0! lbs/ac/yr

    Buy-down (if in NRB): #DIV/0!

    Peak Flow Management Calculations:

    Pre-Development Peak Flow: #DIV/0! cfs

    Post-Development Peak Flow: #DIV/0! cfs

    ft3

    ft3

  • 8/8/2019 Final Wake Sw Tool v22

    2/18Wake County Stormwater ToolVersion 2.2

    09/09/2010 05:10:27

    Stormwater Management Plan S/D No.:

    Date:

    Designer:

    TARGET CURVE NUMBER CALCULATION

    Wake County Target Curve Numbers

    Zoning District A B C D

    R-80W and R-80 37 60 73 79

    R-40W and R-40 41 62 75 80

    R-30, R-20, R-15, R-5 43 63 76 81

    Site Data:Total Site Area: acres **Excludes Area of Exisitng Lakes or Ponds on site

    Existing Lake/Pond Area: acres

    Area used for Overall Density Calcs: 0 acres

    Zoning District:

    Soil Composition:Hydrologic Soil Group Site Area % Target CN

    A #DIV/0! 43

    B #DIV/0! 63

    C #DIV/0! 76

    D #DIV/0! 81

    100%

    Target Curve Number: 0

    Runoff (inches) = Q* = 0.00 inches

  • 8/8/2019 Final Wake Sw Tool v22

    3/18Wake County Stormwater ToolVersion 2.2

    09/09/2010 05:10:27

    Stormwater Management Plan S/D No.: 00 Date: 12/30/1899

    0 Designer: 0

    PRELIMINARY PLAN SUBMITTAL

    Site Data:0 acres

    Zoning District: 0

    Number of Lots:

    Total Area in R/W: acres

    Impervious Area in R/W: acres

    acres

    acres

    acres

    %

    Lot Data:

    Total Lot Acreage: 0 acres

    Impervious Area per Lot: sf

    0 %

    acresAverage Lot Size: #DIV/0! sf

    Average Percent Impervious per Lot: #DIV/0! %

    #DIV/0! %

    Stormwater Calculations:

    Woods #DIV/0! #DIV/0!

    Grass/Lawn #DIV/0! #DIV/0! A

    Impervious #DIV/0! #DIV/0! B

    #DIV/0! D

    Target Curve Number: 0

    Results:

    #DIV/0!cf

    Preliminary Total Nitrogen

    #DIV/0! lbs/ac/yr

    R=

    Total Site Area:(Excluding Area in Existing Water Bodies)

    reserve oo e rea:(Common Open Space to remain woods

    or be reforested; Stream Buffers not onlots.)

    Managed Open Space:(Grassed Common Open Space)

    Other Impervious Surface:(Impervious not on lots or in R/W)

    Percent of Total Imperviousthat is Disconnected:

    (50% is default. See Table 3.3.)

    Assumed Wooded Area:(Design Manual Table 3.1)

    Additional Wooded Area:(Stream Buffer or Additional wooded area on lots.

    Must be recorded on Plat.)

    Percent Impervious for site*:*Using total site area plus existing lakes/ponds

    Weighted CN1

    Proposed Curve Number:1

    1 Weighted CN method represents the CN when the landuse is evenly distributed among all on-site soils (w/exemption of R/W which is D soils); It is an approximatecurve number for Post-development and should be treated as such.

    Storage Volume Required:(Approximate locations shown on Preliminary Plan)

    Loading from Site:2 CNp=

    2 Preliminary nitrogen loading does not include any reductions by BMPs. If loading is above3.6 lbs/ac/yr - BMPs or a buydown will be required.

  • 8/8/2019 Final Wake Sw Tool v22

    4/18Wake County Stormwater ToolVersion 2.2

    09/09/2010 05:10:28

    Stormwater Management Plan S/D No.:

    0 Date:

    0 Designer:

    POST-DEVELOPMENT CALCULATIONS

    CURVE NUMBER:

    Is Data from Preliminary Plan Still Valid?Total Area of Lots: acres

    Number of Lots:

    Impervious Area per Lot: sf % Impervious on Lots: #DIV/0! %

    % Woods on Lots: %

    % Impervious in R/W: %

    #DIV/0! %

    Percent of Total Disconnected Impervious: 50

    HSG Land-use CN Area (acres) %0 #DIV/0!

    0 #DIV/0!

    0 #DIV/0!

    0 #DIV/0!

    0 #DIV/0!

    0 #DIV/0!

    0 #DIV/0!

    0 #DIV/0!

    0 #DIV/0!

    0 #DIV/0!

    0 #DIV/0!

    0 #DIV/0!

    0 #DIV/0!

    0 #DIV/0!

    0 #DIV/0!

    0 #DIV/0!

    Totals: 0 #DIV/0!

    Post-Development CN = 0

    Runoff (inches) = Q* = 0.00 inches

    Warnings/Notes:

    #DIV/0!

    Percent Impervious for Site*:*Using total site area plus existing lakes/ponds

    % (50% is Default. See Table 3.3)

  • 8/8/2019 Final Wake Sw Tool v22

    5/18

    Wake County Stormwater Tool 09/09/2010 05:10:28

  • 8/8/2019 Final Wake Sw Tool v22

    6/18Wake County Stormwater ToolVersion 2.2

    09/09/2010 05:10:28

    0

    12/30/1899

    0

    Y

    N

    Totals

    % R/W Dis?

    A

  • 8/8/2019 Final Wake Sw Tool v22

    7/18Wake County Stormwater ToolVersion 2 2

    09/09/2010 05:10:28

  • 8/8/2019 Final Wake Sw Tool v22

    8/18Wake County Stormwater ToolVersion 2.2

    09/09/2010 05:10:28

    Stormwater Management Plan S/D No.: 0

    0 Date: 12/30/1899

    0 Designer: 0

    PRE-DEVELOPMENT CALCULATIONS

    CURVE NUMBER:

    HSG Land-use CN Area (acres) %

    98 #DIV/0!

    98 #DIV/0!

    98 #DIV/0!

    98 #DIV/0!

    98 #DIV/0!

    98 #DIV/0!

    98 #DIV/0!

    98 #DIV/0!

    98 #DIV/0!

    98 #DIV/0!98 #DIV/0!

    98 #DIV/0!

    User Defined #DIV/0!

    User Defined #DIV/0!

    User Defined #DIV/0!

    User Defined #DIV/0!

    Totals: 0 #DIV/0!

    Pre-development CN = #DIV/0!

    Runoff (inches) = Q* = #DIV/0! inches

    TIME OF CONCENTRATION:

    Length (ft) Slope (ft/ft) Surface Cover

    Sheet Flow:

    Sheet Flow:

    Shallow Flow:

    Shallow Flow:

    Length (ft) Slope (ft/ft) n-value Wetted Perimeter (ft)

    Channel Flow:

    Channel Flow:

    0.08 hrs (Minimum 5 minutes)

    Tt(hrs)

    FlowArea (ft2) Tt (hrs)

    Pre-development Tc

    =

  • 8/8/2019 Final Wake Sw Tool v22

    9/18Wake County Stormwater ToolVersion 2.2

    09/09/2010 05:10:28

    Stormwater Management Plan S/D No.: 0

    0 Date: 12/30/1899

    0 Designer: 0

    TIME OF CONCENTRATION:

    Length (ft) Slope (ft/ft) Surface Cover

    Sheet Flow:

    Sheet Flow:

    Shallow Flow:

    Shallow Flow:

    Length (ft) Slope (ft/ft) n-value Wetted Perimeter (ft)

    Channel Flow:

    Channel Flow:

    0.08 hrs (Minimum 5 minutes)

    POST-DEVELOPMENT CALCULATIONS

    Tt(hrs)

    FlowArea (ft2) Tt (hrs)

    Post-development Tc

    =

  • 8/8/2019 Final Wake Sw Tool v22

    10/18Wake County Stormwater ToolVersion 2.2

    09/09/2010 05:10:28

    Stormwater Management Plan S/D No.: 0

    0 Date: 12/30/1899

    0 Designer: 0

    PEAK FLOW CALCULATIONS

    CURVE NUMBER:

    Pre-development CN = #DIV/0!

    #DIV/0!

    TIME OF CONCENTRATION:

    0.08 hrs

    0.08 hrs

    PEAK FLOW:

    Method: TR-55 Graphical Peak Discharge Method for Type II Distribution

    Where:

    Q* = runoff (inches)

    Pre-development

    #DIV/0! csm/in

    0.00

    Q* = #DIV/0! inches

    #DIV/0!cfs

    Post-development

    #DIV/0! csm/in

    0.00

    Q* = #DIV/0! inches

    #DIV/0!cfs

    #DIV/0!

    Post-Development CNadj

    =

    Pre-development Tc

    =

    Post-development Tc

    =

    Qp

    = quA

    mQ*

    Qp

    = Peak Discharge (cfs)

    qu

    = Unit peak discharge (csm/in) TR-55 Appendix F

    Am

    = Drainage Area (mi2)

    qu

    =

    Am

    = mi2

    Q1-year

    =

    qu

    =

    Am

    = mi2

    Q1-year

    =

  • 8/8/2019 Final Wake Sw Tool v22

    11/18Wake County Stormwater ToolVersion 2.2

    09/09/2010 05:10:28

    Stormwater Management Plan S/D No.:

    0 Date:

    0 Designer:

    PROPOSED STORAGE DEVICES

    Name/Location Type of Device Additional Comment

    1

    2

    3

    4

    5

    6

    7

    8

    910

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    Total Volume Provided: 0#DIV/0! #DIV/0! #DIV/0!

    0

    #DIV/0!

    Total Volume Required: #DIV/0!

    Post-Development Curve Number Adjustment based on Volume Provided

    Source: "Modeling Infiltration Practices Using TR-20", October, 1983, Maryland Department of the Environment

    200

    Where:

    P = Rainfall (inches) = 3 inches

    Q = Runoff Depth for Proposed CN (Q*) - Volume Provided (inches)

    Volume Provided (Inches) = #DIV/0! inches

    Q* = 0.00 inches

    Q = #DIV/0! inches

    #DIV/0!

    Enter only runoff volume below that will be infiltrated or drawn down over 2 to 5 days. Avolume provided in devices should not be entered in this worksheet.

    Storage VolumeProvided (ft3)

    ft3

    Volume Required by WakeCounty Ordinance: ft3

    Minimum Volume Required to Meet PeakFlows for Neuse Rules: ft3

    ft3

    CNadj

    =(P+2Q+2) - (5PQ+4Q2)1/2

    Post-Development CNadj =

  • 8/8/2019 Final Wake Sw Tool v22

    12/18

    Wake County Stormwater Tool 09/09/2010 05:10:28

  • 8/8/2019 Final Wake Sw Tool v22

    13/18Wake County Stormwater ToolVersion 2.2

    09/09/2010 05:10:28

    0

    12/30/1899

    0

    #DIV/0!

    ditional

  • 8/8/2019 Final Wake Sw Tool v22

    14/18

    Wake County Stormwater Tool 09/09/2010 05:10:28

  • 8/8/2019 Final Wake Sw Tool v22

    15/18Wake County Stormwater ToolVersion 2.2

    09/09/2010 05:10:29

    Stormwater Management Plan S/D No.:

    0 Date:

    0 Designer:

    NITROGEN CALCULATIONS

    Type of Land Cover Area (acres)

    0.00 0.60 0.00

    #DIV/0! 1.20 #DIV/0!

    #DIV/0! 21.20 #DIV/0!

    TOTAL 0.00 #DIV/0!

    Nitrogen Loading w/out BMP Reductions: #DIV/0! lbs/ac/yr

    Neuse Buy-down w/out BMP Reductions: #DIV/0!

    Nitrogen Loading with BMP Reductions

    See Wake County Stormwater Design Manual Chapter 4 for Details

    Drainage Area 1:

    Type of Land Cover Area (acres)

    Permanently protected open space 0.60 0.00

    Managed open space 1.20 0.00

    Impervious surfaces 21.20 0.00

    TOTAL 0.00 0.00

    Nitrogen Removal Efficiency of BMP(s) %

    Nitrogen Loading for DA 1: 0.00 lbs/ac/yr

    Drainage Area 2:

    Type of Land Cover Area (acres)

    Permanently protected open space 0.60 0.00

    Managed open space 1.20 0.00

    Impervious surfaces 21.20 0.00

    TOTAL 0.00 0.00

    Nitrogen Removal Efficiency of BMP(s) %

    Nitrogen Loading for DA 2: 0.00 lbs/ac/yr

    Drainage Area 3:

    Type of Land Cover Area (acres)

    Permanently protected open space 0.60 0.00

    Managed open space 1.20 0.00

    Impervious surfaces 21.20 0.00

    TOTAL 0.00 0.00

    Nitrogen Removal Efficiency of BMP(s) %Nitrogen Loading for DA 3: 0.00 lbs/ac/yr

    Final Nitrogen Loading from Site: #DIV/0! lbs/ac/yr

    TN exportcoefficient

    (lbs/ac/yr)

    TN exportfrom use

    (lbs/yr)

    Permanently protected undisturbed openspace (forest, unmown meadow)

    Permanently protected managed openspace (grass, landscaping, etc.)

    Impervious surfaces (roads, parking lots,driveways, roofs, etc.)

    TN coeff.(lbs/ac/yr)

    TN export(lbs/yr)

    TN coeff.(lbs/ac/yr)

    TN export(lbs/yr)

    TN coeff.(lbs/ac/yr)

    TN export(lbs/yr)

  • 8/8/2019 Final Wake Sw Tool v22

    16/18Wake County Stormwater ToolVersion 2.2

    09/09/2010 05:10:29

    Buy-down (Neuse Only):#DIV/0!

  • 8/8/2019 Final Wake Sw Tool v22

    17/18Wake County Stormwater ToolVersion 2.2

    09/09/2010 05:10:29

    0

    12/30/1899

    0

  • 8/8/2019 Final Wake Sw Tool v22

    18/18