final work plan sdg&e chula vista no track changes 091014 · 2017. 8. 30. · microsoft word -...
TRANSCRIPT
Photo 1 – Construction activities during installation of subsurface high voltage line.
Photo 2 – Construction activities during installation of subsurface high voltage line.
OU 1 004411
Photo 3 – Construction activities during installation of subsurface high voltage line.
Photo 4 – Construction activities during installation of subsurface high voltage line.
OU 1 004412
Photo 5 – Aerial photograph showing location of the subsurface high voltage line excavation.
Photo 6 – View of Area of interest #1, looking north.
OU 1 004413
Photo 7 – View of grid A19 and railroad right of way looking south.
Photo 8 – View of suspect undocumented fill (Grid A10) with potential debris from kiln, looking northeast.
OU 1 004414
Photo 9 – Railroad right of way.
OU 1 004415