final year project report cse

Upload: rajat7169451734

Post on 06-Apr-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/3/2019 Final Year Project Report CSE

    1/5

    TITLE OF THE PROJECT

    BY

    STUDENT NAME 1(UNIVERSITY ROLL NO. )

    STUDENT NAME 2(UNIVERSITY ROLL NO. )

    STUDENT NAME 3(UNIVERSITY ROLL NO. )

    STUDENT NAME 4(UNIVERSITY ROLL NO. )

    UNDER THE GUIDANCE OF

    GUIDE NAME

    PROGRESS REPORT ON PROJECT WORK

    SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENTS

    FOR THE DEGREE OF

    BACHELOR OF TECHNOLOGY (COMPUTER SCIENCE & ENGINEERING)

    AT THEDEPARTMENT OF COMPUTER SCIENCE & ENGINEERING

    ADAMAS INSTITUTE OF TECHNOLOGY

    BARASAT, KOLKATA -700126

    NOVEMBER - 2011

  • 8/3/2019 Final Year Project Report CSE

    2/5

    DEPARTMENT OF COMPUTER SCIENCE & ENGINEERING

    ADAMAS INSTITUTE OF TECHNOLOGYBARASAT, KOLKATA - 700126

    FORWARD

    I hereby forward the progress report of the project entitled TITLE OF THE PROJECT submitted by

    STUDENT NAME1, STUDENT NAME 2, STUDENT NAME 3, STUDENT NAME 4 , 7th Semester

    B.Tech(C.S.E.), session 2008 09, under my guidance in partial fulfillment of the requirements for the

    Degree of Bachelor of Technology (COMPUTER SCIENCE & ENGINEERING) of this Institute.

    (Name of the project guide)

    Department of Computer science & EngineerinAdamas Institute of Technology, Barasat

    Kolkata- 700 126

    Mr. Bibhas Das

    Teacher-In-Charge,

    Department of Computer science & Engineering

    Adamas Institute of Technology, BarasatKolkata- 700 126

  • 8/3/2019 Final Year Project Report CSE

    3/5

    DEPARTMENT OF COMPUTER SCIENCE & ENGINEERING

    ADAMAS INSTITUTE OF TECHNOLOGYBARASAT, KOLKATA - 700126

    CERTIFICATE OF APPROVAL

    The progress report is hereby approved as a creditable study in the area of Computer science & Engineeringand presented satisfactorily by NAME OF STUDENT1, NAME OF STUDENT2, NAME OF STUDENT 3,

    NAME OF STUDENT4 to warrant its acceptance as a prerequisite for the award of the Degree of Bachelor

    of Technology from Adamas Institute of Technology under West Bengal University of Technology. It isunderstood that by this approval the undersigned do not necessarily endorse or approve any statement made,

    opinion expressed or conclusion drawn therein, but approve the progress report only for the purpose for

    which it is submitted.

    Board of Examiners

    _______________________ ______________

    _______________________ ______________

    _______________________ ______________

    _______________________ ______________

    Signature Date

  • 8/3/2019 Final Year Project Report CSE

    4/5

    Acknowledgement

    SIGNATURE OF THE STUDENT WITH DATE

    SIGNATURE OF THE STUDENT WITH DATE

  • 8/3/2019 Final Year Project Report CSE

    5/5

    Table of Contents (table format)

    1. Introduction

    1.0 Background

    1.1 Purpose, Scope, and Applicability

    2. Planning Phase.

    3. Requirements Analysis Phase.

    4. Design Phase.

    5. Limitations

    6. Future Scope

    7. Bibliography/References.

    Page numbers:All text pages should be numbered at the bottom

    center of the pages.

    All figures, charts, tables, graphs and diagram should be

    numbered according to Table of Content number (i.e. 1.1, 1.2,

    1.3., 2.1, 2.2 .).The Cover Page, Acknowledgement, Table of Content, Cover

    Page before the Topic, Snapshots of output should NOT be

    numbered and NO header and Footer should be specified.

    The student will submit his/her project progress report in theprescribed format. The Project Progress Report should include:

    One hard copy of the Project Progress Report

    (Spiral binding) per project group to be submitted.

    The Project Progress Report must be at least 20 pages.