Interim Bellevue Fire Chief Mark Risen is seeking a major investment in public safety from the City Council through a facilities master plan unveiled Monday, replacing a 1979 model as outdated as some of the fire stations around the city.The total program cost is estimated at $129.6 million in 2014, with cost escalation predictions as high as $151.8 million under a 12-year scheduling option and $139.5 million for six.TRANSCRIPT
BELLEVUE FIRE DEPARTMENT FACILITIES MASTER PLAN
City Council Study SessionMonday, June 30, 2014
2
MAINTAIN CURRENT SERVICE LEVELS FOR THE NEXT 30-40 YEARS
3
PREVIOUS PLANNING• Completed in 1979
• Growth was primarily East-West
• Very few “high-rise” structures
4
SCOPE & PLAN OBJECTIVES
• Analyze current response data to evaluate location of Fire Stations
• Assess current Fire Facilities to prioritize renovation, replacement, or relocation
• Assess capability of Public Safety Training Center to meet department and regional training needs
5
GOOD NEWS!
• Stations generally in good locations and currently come close to NFPA response standards
• Department has maximized use of all available space
• Facilities are generally well maintained
6
PLAN PRIORITIES
• No decrease in current level of services as City grows/changes
• Ensure response capability survives seismic event
• Meet regulations/standards and best management practices
• Protect firefighter health & safety
7
CURRENT FACILITIESStation 1 - 31 Years old
Station 2 - 12 Years old
Station 3 - 31 Years old
Station 4 - 49 Years old
Station 5 - 47 Years old
Station 6 - 31 Years old
Station 7 - 29 Years old
Station 8 - 19 Years old
Station 9 - 39 Years old
Training Cntr. - 31 Years old
8
CHANGING DEMOGRAPHICS
• Population Growth
• Housing Density
• Job Growth
9
BELLEVUE POPULATION19
53
1960
1970
1980
1990
2000
2010
2020
2030
2035
161600
12,806
61,19673,903
86,874
109,827
132,100
1953-2013 and 2035 forecast
High period of annexation
High period of annexation
Bel-Red36%
Eastgate/ Facto-ria6%
Remainder of City7%
Downtown51%
South Bellevueannexation
10
1970
1980
1990
2000
2012
2035
202020
35,700
75,537
116,611 134,766
Bellevue Jobs 1970-2012 and 2035 forecastBELLEVUE JOB GROWTH
Please note forecast figures on this slide include construction resource jobs.
Bel-Red21%
Eastgate/ Fac-toria11%
Remainder of City16%
Downtown47%
11
EMS INCIDENT DENSITY
12
FIRE INCIDENT DENSITY
13
TIMELY HIGH RISE RESPONSE
3 Min. Travel
Coverage Gap
Station #10
Hi-Rise Area
14
LADDER SUPPORT RESPONSE
15
BC SUPPORT RESPONSE
16
FIREFIGHTER HEALTH & SAFETY
• Air Quality
• Bio/Chemical Contamination
• Training & Fitness
17
STATION FACILITY ASSESSMENT
• New EMS equipment & regulations require dedicated spaces not currently provided
• Code seismic design forces are greater than current stations were designed for
• Modern apparatus require larger bays• Specialty units/response have unmet storage
needs• Limited capability for in-station training• Additional space needed to address air quality
(separation of firefighter gear from apparatus)
18
TRAINING ASSESSMENT
• Past 30 Year Useful Life
• Deficient Training Tower
• Inadequate Storage Areas
• Limited Classroom Size
• Limited Administrative & Training Facilities
• Inadequate Training Area
19
RECOMMENDATIONS: STATIONS• Replace Station 5 on adjacent site• Construct Downtown Station• Relocate/Replace Stations 4 and 6 as
taskforce stations
20
RECOMMENDATIONS: STATIONS• Remodel/Expand Stations 1,2,3,7,8 & 9 to
accommodate modern equipment and provide compliance with current NFPA standards and fire industry best-practices
21
RECOMMENDATIONS: Public Safety Training Center
• Acquire adjacent property to accommodate phased replacement of PSTC and a new Department Central Support Facility
22
TOP 3 PRIORITY NEEDS
• Construction of Clyde Hill Fire Station
• Land Acquisition & Future Construction of Downtown Fire Station
• Public Safety Training Center Expansion
23
IMPLEMENTATION – 12 Year Plan
24
The Changing Face of The City…
25
…Increasing Job Growth & Vital Neighborhoods Call For Proactive Fire Facility Planning
26
NEXT STEPS• 2015-2021 CIP Proposals:
• Replacement of Fire Station 5 ($11.6M)• Land acquisition for a downtown fire station ($14.25M)• Training Center Expansion ($16.8M)
• Additional options developed by city staff prioritized and consistent with City policies.
• City staff will work with the City Manager’s Office and City Council, to develop a cost and phasing schedule for the Plan based on Council direction.
27
Q & ABellevue Fire Department Facility Master Plan
28
Bellevue Fire Service Contract• Contract Communities
• Beaux Arts, Clyde Hill, Hunts Point, Medina, Newcastle, and Yarrow Point
• Contract Terms• Six Year Agreement (2012-2017);• Full cost recovery contract including CIP expenses for existing
facilities;• Requires parties to discuss and “agree on a fair allocation” of
capital costs for new stations built within existing service area• Allocation based on a “Weighted Community Factor” that includes
calls for service, population and Assessed Valuation• In 2014, contract fees total $3.1 million