  • 7/30/2019 Fire Mock Drill on 31-10-12

    1/3

    ANDHRA PRADESH POWER GENERATION CORPORATION LIMITEDKOTHAGUDEM THERMAL POWER STATION, STAGE-V&VI

    rom:- To:he Chief Engineer The Chief Engineer,peration & Maintenance, Generation-I,.T.P.S., V&VI-Stage, APGENCO, Vidyut Soudhaaloncha 507 115. Hyderabad.r.No.CE/O&M/KTPS/V&VI-Stg/Safety/F.No.21/D.No. 377 /2012,Dt: 08.11.2012.r,

    Sub:- KTPS/VI-Stage Safety-Fire Mock Drill conducted on 31.10.2012 at 10:54 Hrs.

    Near ESP hoppers at XI Unit area of KTPS VI-Stage Detailed Report Reg.

    * * * *It is to inform that the class A Fire Mock Drill is conducted near ESP hoppers of XI Unit area at

    0.54 hrs, KTPS VI-Stage on 31.10.2012. The following Engineers and staff have been participated in the Fock Drill.

    Sarva Sri1. CH.Appaji : DE/safety/KTPS-V&VI2. M.Srinivas rao : DE/I&C/KTPS-VI3. K.Suri babu : DE/CAM/KTPS-VI4. Md. Anwar Pasha : ADE/Safety/V Stage5. S.Nagaiah : ADE/Safety/VI Stage

    6. M.Adinarayanan murthy : ADE/Shift/AHP/ VI Stage7. B.Nagesh : ADE/CAM/KTPS-VI8. CH.Krishna Prasad : ADE/LT/KTPS-VI9. V.Kanthaiah : ADE/I&C/ VI Stage10.T.Visweswara rao : AAE/Safety&Staff/VI Stage11.A.Madhu : AE/CAM/ VI Stage12.M.Chandra shekar : AE/LT/ VI Stage13.M.Venkateswarlu : AE/I&C/ VI Stage14.S.M.Sharif : AE/HT/ VI Stage15.O.Ravindra ; Sub Engineer /Shift/ AHP/ VI Stage16.V.Rami reddy , : Contract worker /Santosh Constructions17.D.Yakub : Contract worker /Santosh Constructions

    18.SK. Naimuddin : Contract worker /Santosh Constructions19.D.Yakub : Contract worker /Santosh Constructions20.P.Shiva Prasad : Contract worker /ICL21.B.Ram murthy : Contract worker/ICL22.Md.Waheed : Contract worker /ICL

    ire tender Staff:-1. B. Ramakrishnareddy : Station Fire Officer2. M. Chandrasekharreddy : L/F / Fire3. G.R.Sudhakarreddy : D/OP/Fire4. MD. Abdul samad : F.M(LF Incharge)

    The Fire Mock Drill is conducted on 31.10.2012 near ESP hoppers at XI Unit area of KTPS VI-S

    started at 10:54 Hrs and Fire Quenching operations are carried out from 11:01 Hrs. onwards. The Fiompletely Quenched off at 11-24 Hrs. The DE/Safety, ADE/Safety and Fire Tender Staff had given traininhe participants regarding operation and fixing of Nozzles, Hoses to Hydrants and Fire quenching Techniquetaff present to Fire Mock Drill. (Sd/- M.Sidhaiah )Encl:- 1 sheet operations and Chief Engineer/O&M

    Carried out. K.T.P.S. V& VI -Stage.CS : to S.E Tech to the Director/Thermal/APGENCO/V.S/Hyderabad.Cc : to Chief of Vigilance & Security /APGENCO./V.S/HyderabadCc : to All Superintending Engineers /KTPS/V&VI-Stage // FORWARDED BY ORDER //Cc : to All HODS /KTPSV&VI-Stage.Cc : to Security Officer/KTPS/V&VI-Stage.Cc : to Deputy. Chief Inspector of Factories/Warangal . DIVISIONAL ENGINEER

    Cc: to Inspector of Factories/Khammam. SAFETY, KTPS V&VI-Stage

  • 7/30/2019 Fire Mock Drill on 31-10-12

    2/3

    PERATIONS CARRIED OUT DURING FIRE MOCK DRILL ON 31.10.2012 AT 10:54 HRS.

    Near ESP hoppers ofXI Unit at KTPS VI STAGE

    Time Operations Carried out

    10:54 Hrs.: Fire is observed by Sri V. Rami reddy / CL/Santosh constructions ,

    while carrying Out ESP hoppers ofXI Unit works area .10:54 Hrs. : Sri . V. Rami reddy / Contract worker/Santosh constructions

    immediately intimated to Sri M.Adinarayanan murthy / ADE/Shift/AHP/ VI Stage by

    shouting FIRE-FIRE- FIRE

    10:56 Hrs. : Sri M. Adinarayanan murthy / ADE/Shift/AHP/ VI Stage immediately informed

    over phone to Fire Station and requested to send the Fire Tender

    immediately for fire quenching operations.

    10:57 Hrs. : Sri M. Adinarayanan murthy / ADE/Shift/AHP/ VI Stage and their staff are

    attended the spot along with Fire hoses and Nozzles from Ash

    handling plant -XI Unit connected to Hydrant point and started fire

    quenching operations10:58 Hrs : Sri M.Adinarayanan murthy / ADE/Shift/AHP/ VI Stage, immediately telephoned to

    DE/Shift/UCB, CE/O&M / KTPS/V&VI-Stage & SE / E&M-I, Factory

    Manager, Safety officer, Security Officer, DE/General and

    requested to arrange assistance and to witness the fire

    10:59 Hrs.: The Fire Tender Staff along with Fire Tender attended to the spot.

    . 11:01 Hrs. : The Fire Staff connected the Fire Hoses to Hydrant point and

    Started Fire quenching operations. .

    . 11:02 Hrs. : The ADE/Safety, and other staff attended to the spot for

    Assisting and witnessing the fire quenching operations.

    11:04 Hrs. : The Fire Staff and other existing staff completely quenched off the

    Fire at ESP hoppers -XI Unit area.10. 11:14 Hrs. : The Fire staff trained the following Staff gathered at near ESP hoppers -XI Unit area in F

    quenching operations.

    1. 11:24 Hrs.: After ensuring as no more fire in that area and after giving training

    to the staff all the staff members including Fire Staff left the spot.

    arva Sri1. M.Adinarayanan murthy : ADE/Shift/AHP/ VI Stage2. M.Srinivas rao : DE/I&C/KTPS-VI3. CH.Krishna Prasad : ADE/LT/KTPS-VI4. V.Kanthaiah : ADE/I&C/ VI Stage5. M.Chandra shekar : AE/LT/ VI Stage6. M.Venkateswarlu : AE/I&C/ VI Stage7. S.M.Sharif : AE/HT/ VI Stage8. O.Ravindra ; Sub Engineer /Shift/ AHP/ VI Stage9. V.Rami reddy , : Contract worker /Santosh Constructions10.B.Ram murthy : Contract worker/ICL

    ( Sd/- M.Sidhaiah )

    Chief Engineer/O&M

    K.T.P.S., V & VI-Stage.