    ANDHRA PRADESH POWER GENERATION CORPORATION LIMITEDKOTHAGUDEM THERMAL POWER STATION, STAGE-V&VI

    From:- To:

    The Chief Engineer The Chief Engineer,

    Operation & Maintenance, Generation-I,

    K.T.P.S., V&VI-Stage, APGENCO, Vidyut Soudha

    Paloncha 507 115. Hyderabad.

    Lr.No.CE/O&M/KTPS/V&VI-Stg/Safety/F.No.21/D.No. 226 /2012,Dt: 28.06.2012.

    Sir,

    Sub:- KTPS/VI-Stage Safety-Fire Mock Drill conducted on 27.06.2012 at 10:52 Hrs. near PA&FD

    Fans area at Unit-XI- Detailed Report Reg.

    It is to inform that the class A Fire Mock Drill is conducted near PA&FD Fans area of -XI Unit at 10.52

    hrs, KTPS VI-Stage on 27.06.2012 . The following Engineers and staff have been participated in the Fire Mock Drill.

    Sarva Sri

    1. S.Veereddy : SE/E&M-II /KTPS-VI

    2. CH.Appaji : DE/safety/KTPS-V&VI

    3. K.Vara prasad : DE/shift/UCB/KTPS-VI

    4. Md. Anwar Pasha : ADE/Safety/V Stage

    5. S.Nagaiah : ADE/Safety/VI Stage

    6. B.Adinarayana : ADE/Shift/Boiler/ VI Stage

    7. M.Veerabhdra rao : ADE/Shift/UCB/ VI Stage:

    8. S.Vidyasagar : ADE/Shift/UCB/ VI Stage9. B.Nagesh : ADE/SILOI/ VI Stage

    10 A.Rangaiah : ADE/BOP-III/ VI Stage

    11 P.Seshasai : AAE/Safety/V Stage

    12.T.Visweswara rao : AAE/Safety/VI Stage

    13.A.Madhu : AE/SILO/VI Stage

    14.Ch.Ramesh ; Sub Engineer /Shift/ESP/ VI Stage

    15.T.Ramesh : Sub Engineer /General/ VI Stage

    16.G.S.Nagendra kumar ; PA/Shift/UCB/VI Stage

    17.V.Saravan kumar : Safety officer/ M/s BGR Energy Systems Ltd.

    18.G.Balu : Contract worker/Civil

    19.A.Rajendra Prasad : Contract worker/Indwel Company

    20.G.Tata rao : Contract worker/Civil

    21.S.Ashok kumar : Contract worker/ P.E.S

    22.P.Dastagiri : Contract worker/P.E.S

    23.S.Muthaiah : Contract worker /J.S.Contractor

    24.J.Suresh Kumar : Contract worker /J.S.Contractor

    25.B.Veera kiran : Contract worker /J.S.Contractor

    Fire tender Staff:-

    1. B.Ramakrishnareddy : Station Fire Officer

    2. M.Penchalaiah : Driver Operator

    3. Sk.Meera saheeb : F.M(L.F Incharge)

    4. B.Narendar : Home Guard

    5. D.Rajendar : Home Guard

    The Fire Mock Drill is conducted on 27.06.2012 near PA&FD Fans area at KTPS VI-Stage. Fire is started

    at 10:52 Hrs and Fire Quenching operations are carried out from 10:58 Hrs. onwards. The Fire is completely Quenched

    off at 11-22 Hrs. The DE/Safety, ADE/Safety/KTPS V and ADE/safety/KTPS VI and Fire Staff had given training to the

    participants regarding operation and fixing of Fire Hose Nozzles, Hoses to Hydrants and Fire quenching Techniques to

    Staff present to Fire Mock Drill.

    Sd/-(M.Sidhaiah)

    Encl:- 1 sheet operations and Chief Engineer/O&M

    carried out. K.T.P.S. V& VI -Stage.

    CS : to P.A to the Director/Thermal/APGENCO/V.S/Hyderabad.

    Cc : to Chief of Vigilance & Security /APGENCO./V.S/Hyderabad

    Cc : to All Superintending Engineers /KTPS/V&VI-Stage // FORWARDED BY ORDER //

    Cc : to All HODS /KTPS/VI-Stage.

    Cc : to Security Officer/KTPS/V&VI-Stage.

    Cc : to Deputy. Chief Inspector of Factories/Warangal . DIVISIONAL ENGINEER

    Cc: to Inspector of Factories/Khammam. SAFETY, KTPS V&VI-Stage

    .

  • 7/30/2019 Fire Mock Drillon 27-06-12

    2/3

    OPERATIONS CARRIED OUT DURING FIRE MOCK DRILL ON 27.06.2012 AT 10:52 HRS.

    Near PA&FD Fans area -XI Unit KTPS VI STAGE

    Time Operations Carried out

    1. 10:52 Hrs.: Fire is observed by Sri Ch.Ramesh ,Sub Engineer

    /Shift/ESP/VI Stage while carrying Out ESP -XI Unitworks at area .2. 10:52 Hrs. : Sri . Ch.Ramesh ,Sub Engineer /Shift/ESP immediately

    intimated to Sri B.Adinarayana / ADE/Shift/Boiler/ VI Stage byshouting FIRE-FIRE- FIRE

    3. 10:54 Hrs. : Sri B.Adinarayana / ADE/Boiler/AHP/ VI Stage immediatelyinformed over phone to Fire Station and requested to sendthe Fire Tender immediately for fire quenching operations.

    4. 10:55 Hrs. : Sri B.Adinarayana / ADE/Shift/Boiler/ VI Stage and their staff.are attended the spot along with Fire hoses and

    Nozzles from ESP -XI Unit connected to Hydrant point

    and started fire quenching operations5. 10:56 Hrs : Sri B.Adinarayana / ADE/Shift/Boiler/ VI Stage, immediatelytelephoned to DE/Shift/UCB, CE/O&M / KTPS/V&VI-Stage &SE / E&M-I, Factory Manager, Safety officer, SecurityOfficer, DE/General and requested to arrange assistance andto witness the fire .

    6. 10:57 Hrs.: The Fire Tender Staff along with Fire Tender attended to thespot.

    7. 10:59 Hrs. : The Fire Staff connected the Fire Hoses to Hydrant pointand started Fire quenching operations. .

    8. 11.00 Hrs. : The DE/safety, ADE/Safety/VI, and other senior officials andother staff attended to the spot for assisting and witnessing

    the fire quenching operations.9. 11:02 Hrs. : The Fire Staff and other existing staff completely quenched off

    the fire near PA&FD Fans area .10. 11:12 Hrs. : The Fire Tender staff Trained the following Staff gathered at

    near PA&FD area in Fire quenching operations.11. 11:22 Hrs.: After ensuring as no more fire in that area and after giving

    training to the staff all the staff members including FireTender Staff left the spot.

    Sarva Sri1. B.Adinarayana : ADE/Shift/Boiler/ VI Stage

    2. M.Veerabhdra rao : ADE/Shift/UCB/ VI Stage:3. S.Vidyasagar : ADE/Shift/UCB/ VI Stage4. B.Nagesh : ADE/SILOI/ VI Stage5. A.Rangaiah : ADE/BOP-III/ VI Stage6. A.Madhu : AE/SILO/VI Stage7. Ch.Ramesh : Sub Engineer /Shift/ESP/ VI Stage8. T.Ramesh : Sub Engineer /General/ VI Stage9. G.S.Nagendra kumar : PA/Shift/UCB/VI Stage10.V.Saravan kumar : Sfety officer/BGR11.G.Balu : Contract worker/Civil12.A.Rajendra Prasad : Contract worker/Indwel13.G.Tata rao : Contract worker/Civil

    14.S.Ashok kumar : Contract worker/ P.E.S

    Sd/-(M.Sidhaiah)Chief Engineer/O&MK.T.P.S., V & VI-Stage.