first floor plan - overall

1
T T T T T UP UP DW UP 140 42 154 231 567 2,587 21 35 31 85 26 270 51 UP 1. ALL DIMENSIONS ARE TO FACE OF WALL (UNLESS NOTED OTHERWISE). 2. SEE STRUCTURAL DRAWINGS FOR LOCATIONS OF ALL STEEL REINFORCING IN WALL & FLOOR CONSTRUCTION. 3. SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION OF LOCATIONS AND TYPES OF FINISH MATERIALS. 4. SEE ELEVATIONS AND STRUCTURAL DRAWINGS FOR LOCATIONS OF EXPANSION & CONTROL JOINTS. CONTRACTOR SHALL PROVIDE ADDITIONAL INTERIOR CONTROL JOINTS AS REQUIRED TO COMPLY WITH MAXIMUM SPACING REQUIREMENTS IN SPECIFICATIONS AND NATIONAL MASONRY INSTITUTE. 5. MECHANICAL & ELECTRICAL EQUIPMENT SHALL BE ON HOUSEKEEPING PADS. PADS ARE TO BE PROVIDED BY THE TRADE SUPPLYING THE EQUIPMENT. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION. WORK TO BE COORDINATED THROUGH THE GENERAL TRADES CONTRACTOR. PADS 4" MIN. 4" THICK W/ W.W.F., UNLESS NOTED OTHERWISE). 6. PROVIDE IN WALL BLOCKING FOR FITNESS EQUIPMENT AND WALL MOUNTED DEVICES 7. FURNITURE LAYOUTS ARE FOR REFERENCE ONLY. 8. SEE SHEET A800 FOR FIXTURE MOUNTING HEIGHTS. 9. SEE SHEET G002 FOR WALL TYPE CONSTRUCTION. 10. ALL RESTROOMS AND LOCKERS TO HAVE MOISTURE RESISTANT DRYWALL 11. SHOWERS TO HAVE POSITIVE DRAINAGE TO THE FLOOR DRAINS WITHIN ENTIRE SHOWER AND DRYING AREA. MINIMUM SLOPE 1/8", MAXIMUM SLOPE 3/8". ADJUST THE HEIGHT OF DRAINS AND THE FLOOR ELEVATION AT THE WALL AS NECESSARY TO PROVIDE CONSISTENT DRAINAGE. FLOOR AREA WITHIN THE SHOWER ENCLOSURE TO SLOPE TO DRAIN WITHIN THE SHOWER. 12. SLOPE FLOOR TO DRAIN, TYPICAL. 13. SEE STRUCT. DWGS FOR FLOOR SLAB CONTROL AND EXP. JOINTS. 14. REFER TO STRUCT. DWGS FOR BEARING WALL LOCATIONS. 15. REFER TO G100 FOR CODE INFORMATION. FLOOR PLAN GENERAL NOTES CODED NOTE LEGEND 1 GWB TO BE ABUSE RESISTANT AT ALL WALLS, INCLUDING SOFFITS. CARDIO CURB, SEE SHEET A822 FOR DETAILS FLOOR SLEEVE COVER, SEE DETAILS A808. TRENCH DRAIN AND GRATE. COORD. WITH LAUNDRY EQUIP. SEE PLUMBING DWGS. GYP WRAPPED BRACING ENCLOSURE AUTOMATIC DOOR OPERATOR, SEE HARDWARE AND ELEC. DWGS. PROVIDE CONTINUOUS VAPOR BARRIER. 2 3 4 5 KEYNOTE LEGEND 6 7 A C G A310 1 2 3 4 6 7 8 9 11 Q P K J H 11.5 15 16 17 19 20 21 22 23 5 24 24 B.8 A310 2 13 13 AA A 310 4 12 12 10 D.5 L M N A310 3 KENNAMER HALL P R O P E R TY L I N E PROPERTY LINE PROPERTY LINE S E TB A C K L I N E SETBACK LINE BB D E 18 E.8 B F 1 3.5 WESLEY FOUNDATION 19.9 19.1 18.1 17.2 16.2 15.4 13.8 13.4 14.5 HH 17.1 518 SF OUTDOOR ADVENTURE CENTER 130 854 SF OUTDOOR ADVENTURE CENTER EQUIPMENT 130A 244 SF STAIR 1ST03 417 SF MAIN. ELEC. 127 1196 SF GYM & BUILDING STORAGE 125 83 SF WATER ENTRANCE ROOM 126 578 SF SERVICE CORRIDOR C125 20045 SF GYM 124 4567 SF CORRIDOR C110 260 SF STAIR 1ST02 529 SF FITNESS ALCOVE 123A 391 SF VESTIBULE 110A 4227 SF FITNESS 123 1917 SF MULTIPURPOSE ROOM 122 127 SF PANTRY/LOUNGE 102G 124 SF OFFICE 102F 116 SF OFFICE 102E 128 SF OFFICE 102D 124 SF OFFICE 102C 121 SF OFFICE 102B 169 SF DIRECTOR OFFICE 102A 464 SF CONFERENCE ROOM 102K 184 SF WORK AREA 102I 216 SF ADMIN AREA MAIL ROOM 102H 163 SF STORAGE 122A 217 SF WOMEN'S RESTROOM 120 73 SF ELEC. CLOSET 117 45 SF CUSTODIAL 116 291 SF LOBBY 102 86 SF CONSULT AREA 101E 63 SF STORAGE 101D 467 SF FITNESS ASSESSMENT & TESTING LAB 101B 114 SF MASSAGE ROOM 101C 321 SF MEETING ROOM 101A 461 SF RESOURCE ROOM 101 257 SF ADMISSIONS CONTROL 115 360 SF EQUIPMENT CHECKOUT 115A 618 SF ENTRY LOBBY 100 120 SF VESTIBULE 100A 1472 SF CLIMBING 141 65 SF RESTROOM 104 61 SF RESTROOM 103 159 SF CORRIDOR C100 58 SF CORRIDOR C101 62 SF STORAGE 102J 217 SF MEN'S RESTROOM 121 1124 SF STUDIO 135 4567 SF CORRIDOR C110 170 SF CORRIDOR C140 221 SF JUICE BAR 134 235 SF JUICE BAR SUPPORT 134A 40 SF VENDING 134B 494 SF GAMING LOUNGE 133 553 SF GAMING LOUNGE 131 454 SF STORAGE 135A 388 SF WET MEETING ROOM 147 136 SF COORDINATOR OF AQUATICS 149 64 SF WOMEN'S SHOWER ROOM 153C 107 SF STEAM ROOM 153D 107 SF STEAM ROOM 154D 63 SF MEN'S SHOWER ROOM 154C 40 SF UTILITY CLOSET 150 58 SF CUSTODIAL 151 644 SF POOL STORAGE 148C 564 SF POOL MECHANICAL 152 49 SF CHEMICAL ROOM 152B 30 SF PH BUFFER ROOM 152A 64 SF WET RESTROOM 146 120 SF INDIVIDUAL CHANGING 145 120 SF INDIVIDUAL CHANGING 144 81 SF NURSING LOUNGE 143 325 SF CORRIDOR C142 1469 SF CORRIDOR C155 338 SF WOMEN'S SHOWERS 153B 359 SF WOMEN'S TOILETS 153A 1101 SF WOMEN'S LOCKERS 153 355 SF MEN'S TOILETS 154A 1081 SF MEN'S LOCKERS 154 341 SF MEN'S SHOWERS 154B 84 SF ELEC. CLOSET 158 71 SF IT CLOSET 159 36 SF CLOSET 161D S160A 288 SF MAC STORAGE 161C 5759 SF MAC COURT 161 4406 SF POOL BODY OF WATER 148A 3151 SF POOL DECK 148B 1015 SF MAC STAGING AREA 161B A101B A101A A101B A101C A101D A101A A101C A101D 30 SF POOL ELEC. 148D UTILITY YARD DUMPSTER ENCLOSURE Redundant Room MAC SURROUND 161A 187 SF MAIN IT & AV 119 310 SF BUILDING STORAGE & MAINTENANCE OFFICE 118 493 SF LAUNDRY 156 9.1 4.6 5.3 150 SF MAC SURROUND 161E 201 SF SPA 134C 148C 730 SF SOCIAL LOUNGE 132 68 SF STOR. 137 58 SF ELEVATOR 1E01 113 SF STAIR 1ST01 111 SF MAC PREFUNCTION LOBBY C160 64 SF MAC PREFUNCTION LOUNGE C160A N E W A C C E S S D R I V E YY ZZ © 2016 Moody/Nolan Inc. PRINT DATE: FILE INFO: DRAWING TITLE: for 300 Spruce Steet Suite 300 Columbus, Ohio 43215 Phone: (614) 461-4664 Fax: (614) 280-8881 www.moodynolan.com DRAWN BY: CHECKED BY: KEY PLAN C D B A N B.C. No.: 2017209 9/28/2017 8:53:02 AM C:\$$Local Revit Projects\2017 Projects\16604 JSU Fitness and [email protected] Proj. 16604 10/02/2017 ISSUE FOR CONSTRUCTION A101 Author Checker FIRST FLOOR PLAN - OVERALL JACKSONVILLE STATE UNIVERSITY FITNESS AND WELLNESS CENTER Jacksonville State University Foundation, Inc. 119 Beck Circle Jacksonville, AL 36265 10/02/2017 PLAN 1/16" = 1'-0" OVERALL FIRST FLOOR PLAN 1 # DATE CHANGE DESCRIPTION

Upload: others

Post on 25-May-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FIRST FLOOR PLAN - OVERALL

T T

T

T

T

UP UP

DW

UP

140

42

154

231

567

2,587

21

35

31

85

26

270

51

IN

OUT

IN

OUT

IN

OUT

IN

OUT

UP

1. ALL DIMENSIONS ARE TO FACE OF WALL (UNLESS NOTED OTHERWISE).

2. SEE STRUCTURAL DRAWINGS FOR LOCATIONS OF ALL STEEL REINFORCING IN WALL & FLOOR CONSTRUCTION.

3. SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION OF LOCATIONS AND TYPES OF FINISH MATERIALS.

4. SEE ELEVATIONS AND STRUCTURAL DRAWINGS FOR LOCATIONS OF EXPANSION & CONTROL JOINTS. CONTRACTOR SHALL PROVIDE ADDITIONAL INTERIOR CONTROL JOINTS AS REQUIRED TO COMPLY WITH MAXIMUM SPACING REQUIREMENTS IN SPECIFICATIONS AND NATIONAL MASONRY INSTITUTE.

5. MECHANICAL & ELECTRICAL EQUIPMENT SHALL BE ON HOUSEKEEPING PADS. PADS ARE TO BE PROVIDED BY THE TRADE SUPPLYING THE EQUIPMENT. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION. WORK TO BE COORDINATED THROUGH THE GENERAL TRADES CONTRACTOR. PADS 4" MIN. 4" THICK W/ W.W.F., UNLESS NOTED OTHERWISE).

6. PROVIDE IN WALL BLOCKING FOR FITNESS EQUIPMENT AND WALL MOUNTED DEVICES

7. FURNITURE LAYOUTS ARE FOR REFERENCE ONLY.

8. SEE SHEET A800 FOR FIXTURE MOUNTING HEIGHTS.

9. SEE SHEET G002 FOR WALL TYPE CONSTRUCTION.

10. ALL RESTROOMS AND LOCKERS TO HAVE MOISTURE RESISTANT DRYWALL

11. SHOWERS TO HAVE POSITIVE DRAINAGE TO THE FLOOR DRAINS WITHIN ENTIRE SHOWER AND DRYING AREA. MINIMUM SLOPE 1/8", MAXIMUM SLOPE 3/8". ADJUST THE HEIGHT OF DRAINS AND THE FLOOR ELEVATION AT THE WALL AS NECESSARY TO PROVIDE CONSISTENT DRAINAGE. FLOOR AREA WITHIN THE SHOWER ENCLOSURE TO SLOPE TO DRAIN WITHIN THE SHOWER.

12. SLOPE FLOOR TO DRAIN, TYPICAL.

13. SEE STRUCT. DWGS FOR FLOOR SLAB CONTROL AND EXP. JOINTS.

14. REFER TO STRUCT. DWGS FOR BEARING WALL LOCATIONS.

15. REFER TO G100 FOR CODE INFORMATION.

FLOOR PLAN GENERAL NOTES

CODED NOTE LEGEND1 GWB TO BE ABUSE RESISTANT AT ALL WALLS, INCLUDING SOFFITS.

CARDIO CURB, SEE SHEET A822 FOR DETAILS

FLOOR SLEEVE COVER, SEE DETAILS A808.

TRENCH DRAIN AND GRATE. COORD. WITH LAUNDRY EQUIP. SEE PLUMBING DWGS.

GYP WRAPPED BRACING ENCLOSURE

AUTOMATIC DOOR OPERATOR, SEE HARDWARE AND ELEC. DWGS.

PROVIDE CONTINUOUS VAPOR BARRIER.

2

3

4

5

KEYNOTE LEGEND

6

7

A

C

G

A3101

2

3

4

6

7

8

9

11

Q

P

K

J

H

11.5

15 16 17 19 20 21 22 23

5

24

24

B.8

A3102

13

13

AA

A3104

12

12

10

D.5

L

M

N

A3103

KENNAMER HALL

PROPERTY LINE

PRO

PERT

Y LI

NE

PROPERTY LINE

SETBACK LINE

SETBACK LINE

BB

D

E

18

E.8

B

F

1

3.5

WESLEY FOUNDATION

19.9

19.1

18.1

17.2

16.2

15.4

13.8

13.4

14.5

HH

17.1518 SF

OUTDOOR ADVENTURECENTER

130854 SF

OUTDOOR ADVENTURECENTER EQUIPMENT

130A

244 SF

STAIR1ST03

417 SF

MAIN. ELEC.127

1196 SF

GYM & BUILDINGSTORAGE

125

83 SF

WATER ENTRANCEROOM

126

578 SF

SERVICE CORRIDORC125

20045 SF

GYM124

4567 SF

CORRIDORC110

260 SF

STAIR1ST02

529 SF

FITNESS ALCOVE123A

391 SF

VESTIBULE110A

4227 SF

FITNESS123

1917 SF

MULTIPURPOSE ROOM122

127 SF

PANTRY/LOUNGE102G

124 SF

OFFICE102F

116 SF

OFFICE102E

128 SF

OFFICE102D

124 SF

OFFICE102C

121 SF

OFFICE102B

169 SF

DIRECTOR OFFICE102A

464 SF

CONFERENCE ROOM102K

184 SF

WORK AREA102I 216 SF

ADMIN AREA MAILROOM102H

163 SF

STORAGE122A

217 SF

WOMEN'S RESTROOM12073 SF

ELEC. CLOSET117

45 SF

CUSTODIAL116

291 SF

LOBBY102

86 SF

CONSULT AREA101E

63 SF

STORAGE101D

467 SF

FITNESS ASSESSMENT& TESTING LAB

101B

114 SF

MASSAGE ROOM101C

321 SF

MEETING ROOM101A

461 SF

RESOURCE ROOM101

257 SF

ADMISSIONS CONTROL115

360 SF

EQUIPMENT CHECKOUT115A

618 SF

ENTRY LOBBY100

120 SF

VESTIBULE100A

1472 SF

CLIMBING141

65 SF

RESTROOM104

61 SF

RESTROOM103

159 SF

CORRIDORC100

58 SF

CORRIDORC101

62 SF

STORAGE102J

217 SF

MEN'S RESTROOM121

1124 SF

STUDIO135

4567 SF

CORRIDORC110

170 SF

CORRIDORC140

221 SF

JUICE BAR134

235 SF

JUICE BAR SUPPORT134A

40 SF

VENDING134B

494 SF

GAMING LOUNGE133

553 SF

GAMING LOUNGE131

454 SF

STORAGE135A

388 SF

WET MEETING ROOM147

136 SF

COORDINATOR OFAQUATICS

149

64 SF

WOMEN'S SHOWERROOM153C

107 SF

STEAM ROOM153D

107 SF

STEAM ROOM154D

63 SF

MEN'S SHOWER ROOM154C

40 SF

UTILITY CLOSET150

58 SF

CUSTODIAL151

644 SF

POOL STORAGE148C

564 SF

POOL MECHANICAL152

49 SF

CHEMICAL ROOM152B

30 SF

PH BUFFER ROOM152A

64 SF

WET RESTROOM146

120 SF

INDIVIDUAL CHANGING145

120 SF

INDIVIDUAL CHANGING144

81 SF

NURSING LOUNGE143

325 SF

CORRIDORC142

1469 SF

CORRIDORC155

338 SF

WOMEN'S SHOWERS153B

359 SF

WOMEN'S TOILETS153A

1101 SF

WOMEN'S LOCKERS153

355 SF

MEN'S TOILETS154A

1081 SF

MEN'S LOCKERS154

341 SF

MEN'S SHOWERS154B

84 SF

ELEC. CLOSET158

71 SF

IT CLOSET159

36 SF

CLOSET161D

S160A

288 SF

MAC STORAGE161C

5759 SF

MAC COURT161

4406 SF

POOL BODY OF WATER148A

3151 SF

POOL DECK148B

1015 SF

MAC STAGING AREA161B

A101BA101A

A101BA101C

A101D

A101A

A101C

A101D

30 SF

POOL ELEC.148D

UTILITY YARD

DUMPSTER ENCLOSURE

Redundant Room

MAC SURROUND161A

187 SF

MAIN IT & AV119

310 SF

BUILDING STORAGE &MAINTENANCE OFFICE

118

493 SF

LAUNDRY156

9.1

4.6

5.3

150 SF

MAC SURROUND161E

201 SF

SPA134C148C

730 SF

SOCIAL LOUNGE132

68 SF

STOR.137

58 SF

ELEVATOR1E01

113 SF

STAIR1ST01

111 SF

MAC PREFUNCTIONLOBBYC160

64 SF

MAC PREFUNCTIONLOUNGE

C160A NEW ACCESS DRIVE

YY

ZZ

© 2

016

Moo

dy/N

olan

Inc.

PRIN

T D

ATE:

FILE

INFO

:

DRAWING TITLE:

for

300 Spruce SteetSuite 300Columbus, Ohio 43215

Phone: (614) 461-4664Fax: (614) 280-8881www.moodynolan.com

DRAWN BY: CHECKED BY:

KEY PLAN

C

D

B

A

N

B.C. No.: 2017209

9/28

/201

7 8:

53:0

2 AM

C:\$

$Loc

al R

evit

Pro j

ects

\201

7 Pr

ojec

ts\1

660 4

JSU

Fitn

ess

and

Wel

lnes

s-AR

CH

_ifc

_mjo

hnso

n @m

ood y

nola

n.c o

m.rv

t

Proj. 16604

10/02/2017

ISSUE FOR CONSTRUCTION

A101

Author Checker

FIRST FLOOR PLAN - OVERALL

JACKSONVILLE STATE UNIVERSITYFITNESS AND WELLNESS CENTER

Jacksonville State UniversityFoundation, Inc.

119 Beck CircleJacksonville, AL 36265

10/02/2017PLAN 1/16" = 1'-0"

OVERALL FIRST FLOOR PLAN1

# DATE CHANGE DESCRIPTION