first line diagnosis fld update
DESCRIPTION
First Line Diagnosis FLD Update. Julian Brower CEng FIET Section Leader ISIS Accelerator Performance Improvement. Update since Melbourne ARW2103. FLD being used Robust workflow systems More staff Equipment owners input SharePoint integration Population growing Feedback received - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: First Line Diagnosis FLD Update](https://reader036.vdocuments.net/reader036/viewer/2022062309/56815a34550346895dc773f2/html5/thumbnails/1.jpg)
First Line DiagnosisFLD Update
Julian Brower CEng FIET
Section LeaderISIS Accelerator Performance Improvement
![Page 2: First Line Diagnosis FLD Update](https://reader036.vdocuments.net/reader036/viewer/2022062309/56815a34550346895dc773f2/html5/thumbnails/2.jpg)
Update since Melbourne ARW2103
• FLD being used
• Robust workflow systems
• More staff
• Equipment owners input
• SharePoint integration
• Population growing
• Feedback received
• Wi-Fi imminent
• Applications developer
![Page 3: First Line Diagnosis FLD Update](https://reader036.vdocuments.net/reader036/viewer/2022062309/56815a34550346895dc773f2/html5/thumbnails/3.jpg)
FLDRutherford Appleton Laboratory, Oxfordshire
![Page 4: First Line Diagnosis FLD Update](https://reader036.vdocuments.net/reader036/viewer/2022062309/56815a34550346895dc773f2/html5/thumbnails/4.jpg)
![Page 5: First Line Diagnosis FLD Update](https://reader036.vdocuments.net/reader036/viewer/2022062309/56815a34550346895dc773f2/html5/thumbnails/5.jpg)
![Page 6: First Line Diagnosis FLD Update](https://reader036.vdocuments.net/reader036/viewer/2022062309/56815a34550346895dc773f2/html5/thumbnails/6.jpg)
Ion Source: 35 keV H–
RFQ: 665 keV H–
LINAC: 70 MeV H–, 4 tank, 202.5 MHz
Synchrotron: 800 MeV protons,
10 accelerating cavities, 50 Hz
Targets: 200-215uA, Tantalum coated Tungsten,
TS1/160kW TS2/40kW
![Page 7: First Line Diagnosis FLD Update](https://reader036.vdocuments.net/reader036/viewer/2022062309/56815a34550346895dc773f2/html5/thumbnails/7.jpg)
User Cycles• 120 days/yr, 4 x 30 day cycles
• Experiment 1/2day – 2 weeks
• 1 day maintenance day mid cycle
• Overall availability 85% + Reasons for non availability
•Running an accelerator
•Machine age
•Running harder
•Speed to faults (FLD)
![Page 8: First Line Diagnosis FLD Update](https://reader036.vdocuments.net/reader036/viewer/2022062309/56815a34550346895dc773f2/html5/thumbnails/8.jpg)
FLD FLD
FLDFLD
FLD
FLD
![Page 9: First Line Diagnosis FLD Update](https://reader036.vdocuments.net/reader036/viewer/2022062309/56815a34550346895dc773f2/html5/thumbnails/9.jpg)
Operating ISIS
• 4 man crew, 8 hour shifts
• Duty Officer, 3 others,
engineering backgrounds
• First line faults
• First line faults existing skills and knowledge
• On call specialists 24/7
![Page 10: First Line Diagnosis FLD Update](https://reader036.vdocuments.net/reader036/viewer/2022062309/56815a34550346895dc773f2/html5/thumbnails/10.jpg)
FLD, improving availabilityby effective fault resolution
• FLD, First Line Diagnosis
• Interactive fault analysis tool
• Technical knowledge base
• Provides centralised resources
• Reduce beam downtime
![Page 11: First Line Diagnosis FLD Update](https://reader036.vdocuments.net/reader036/viewer/2022062309/56815a34550346895dc773f2/html5/thumbnails/11.jpg)
FLD, a network of interconnected flow diagrams,
with links to technical resources
FLD, a network of interconnected flow diagrams,
with links to technical resources
![Page 12: First Line Diagnosis FLD Update](https://reader036.vdocuments.net/reader036/viewer/2022062309/56815a34550346895dc773f2/html5/thumbnails/12.jpg)
PC accessible
Wi-Fi accessible
FLD •Presents information in a Web Page Format •Available On line and Off Line
![Page 13: First Line Diagnosis FLD Update](https://reader036.vdocuments.net/reader036/viewer/2022062309/56815a34550346895dc773f2/html5/thumbnails/13.jpg)
Interactive tabs
Numbered versioned
Standardised format
![Page 14: First Line Diagnosis FLD Update](https://reader036.vdocuments.net/reader036/viewer/2022062309/56815a34550346895dc773f2/html5/thumbnails/14.jpg)
Appendices
Word search
Live scopes
Equipment
Risk assessments
![Page 15: First Line Diagnosis FLD Update](https://reader036.vdocuments.net/reader036/viewer/2022062309/56815a34550346895dc773f2/html5/thumbnails/15.jpg)
Procedures
SparesMovements
![Page 16: First Line Diagnosis FLD Update](https://reader036.vdocuments.net/reader036/viewer/2022062309/56815a34550346895dc773f2/html5/thumbnails/16.jpg)
Ski Slope Competency/callout matrix
Competency matrix
Competency colours
![Page 17: First Line Diagnosis FLD Update](https://reader036.vdocuments.net/reader036/viewer/2022062309/56815a34550346895dc773f2/html5/thumbnails/17.jpg)
Workflow
• Meeting with EO’s
• Crew fault scenarios
• LTR’s and MCR Log (operational issue
• EO’s self develop
Identify population verification
Stage 1 Stage 2 Stage 3 Stage 4delivery
FeedbackUpdates
Tracking andrevisions
![Page 18: First Line Diagnosis FLD Update](https://reader036.vdocuments.net/reader036/viewer/2022062309/56815a34550346895dc773f2/html5/thumbnails/18.jpg)
Catacombs
FLD Wi-Fi upgrade
Specifications•20 AP’s•IEEE 802-11n •Principle areas
JUNIPER WLA532E-WW 2.4Ghz, 23dBm
2.4Ghz aerial
HP J9778A POE
• Windows tablet• IPAD• Mobile
![Page 19: First Line Diagnosis FLD Update](https://reader036.vdocuments.net/reader036/viewer/2022062309/56815a34550346895dc773f2/html5/thumbnails/19.jpg)
Project deliverables/timescales
• Roll out 6 high consequence pathways (within 3 months) √ √
• Roll out much of FLD to ISIS (2 years) On target
• Implement SSC/Spares/Document/Word search (1year) On target
• Employ 2 additional staff to facilitate growth (2 years) √
• Metrics and feedback √
• 12 ½ % lost time/yr, return on investment (within 5 years)
![Page 20: First Line Diagnosis FLD Update](https://reader036.vdocuments.net/reader036/viewer/2022062309/56815a34550346895dc773f2/html5/thumbnails/20.jpg)
Demonstration