first operation of the ttf2 injector with beam jean-paul carneiro desy hamburg tesla collaboration...
TRANSCRIPT
![Page 1: First operation of the TTF2 injector with beam Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Hamburg, 16 Sept 2003](https://reader035.vdocuments.net/reader035/viewer/2022071805/56649cdb5503460f949a5b27/html5/thumbnails/1.jpg)
First operation of the TTF2 injector with beam
Jean-Paul CarneiroDESY Hamburg
TESLA COLLABORATION MEETING
DESY Hamburg, 16 Sept 2003
![Page 2: First operation of the TTF2 injector with beam Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Hamburg, 16 Sept 2003](https://reader035.vdocuments.net/reader035/viewer/2022071805/56649cdb5503460f949a5b27/html5/thumbnails/2.jpg)
TTF2 INJECTOR SCHEMATIC
Jean-Paul Carneiro FIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM
BC 2
(1) From P.Piot, EPAC 2002, p. 1798(2) From S. Schreiber, private communication
ACC 1 DOUBLET S. H. TRIPLET RF GUN+ SOLENOIDES
dump
Bunch Charge 1 nC OKLaser Diameter 3 mm (uniform) OKLaser pulse length 20 ps flat top + 3 ps rise time 20 ps flat top + 6 ps rise time Solenoid Bmax 163 mT OKPhase Gun 34 Deg OKField Cathode 40 MV/m OKACC1 (cav 1 to 4) 12.5 MV/m 15 MV/mACC1 (cav 5 to 8) 20 MV/m 15 MV/mPhase ACC1 -10.8 Deg (w.r.t max energy) on crestACC39 14 MV/m not presentPhase ACC39 183.0 Deg (w.r.t max energy) not present
Nominal Operation (1) First Operation (2)
STOP SIMULATIONS AT Z =19 M
![Page 3: First operation of the TTF2 injector with beam Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Hamburg, 16 Sept 2003](https://reader035.vdocuments.net/reader035/viewer/2022071805/56649cdb5503460f949a5b27/html5/thumbnails/3.jpg)
Jean-Paul Carneiro FIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM
TTF2 LASER (ASTRA GENERATOR OUTPUTS, 2E5 p.)
• Transverse distribution : uniform, r = 1.5 mm• Longitudinal distribution : uniform, L=20 ps with ~5 ps rise times• Thermal emittance : 55 keV
From TELSA-FEL 97-01 (K. Floettmann) : mradmm63.03
12
2 ,20
,
rmsnkin
rmsncm
Er
Longitudinal distribution Transverse distribution
-30 -20 -10 0 10 20 300
500
1000
1500
2000
2500
3000
3500
Time [ps]
Po
pu
latio
n
![Page 4: First operation of the TTF2 injector with beam Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Hamburg, 16 Sept 2003](https://reader035.vdocuments.net/reader035/viewer/2022071805/56649cdb5503460f949a5b27/html5/thumbnails/4.jpg)
Jean-Paul Carneiro FIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM
PHASE SCAN OF TESLA XFEL WITH ASTRA
• TTF2 NOMINAL : 40 MV/m, 0.163 T, L = 20 ps + 3 ps rise time, r =1.5 mm (plot presented at the S2E Workshop, DESY ZEUTHEN, AUG-2002, http://www.desy.de/s2e)
-10 -5 0 5 100
0.2
0.4
0.6
0.8
1
RF GUN LAUNCH PHASE [DEG]
CH
AR
GE
[nC
]SPACE CHARGE OFFSPACE CHARGE ON
SPACE CHARGE ON & OFFZERO-CROSSING = - 6 DEG
![Page 5: First operation of the TTF2 injector with beam Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Hamburg, 16 Sept 2003](https://reader035.vdocuments.net/reader035/viewer/2022071805/56649cdb5503460f949a5b27/html5/thumbnails/5.jpg)
ENERGY AND ENERGY SPREAD
Jean-Paul Carneiro FIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM
0 5 10 15 200
2
4
6
8
10
Z [m]E
ne
rgy
Sp
rea
d [%
]
FIRST OPERATIONNOMINAL
0 5 10 15 200
20
40
60
80
100
120
140
Z [m]
To
tal E
ne
rgy
[Me
V]
FIRST OPERATIONNOMINAL
![Page 6: First operation of the TTF2 injector with beam Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Hamburg, 16 Sept 2003](https://reader035.vdocuments.net/reader035/viewer/2022071805/56649cdb5503460f949a5b27/html5/thumbnails/6.jpg)
Jean-Paul Carneiro FIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM
LONG. PHASE SPACE AT Z=19 M (END INJECTOR)
TAILTAIL
HEAD
HEAD
TAIL
NOMINAL FIRST OPERATION
![Page 7: First operation of the TTF2 injector with beam Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Hamburg, 16 Sept 2003](https://reader035.vdocuments.net/reader035/viewer/2022071805/56649cdb5503460f949a5b27/html5/thumbnails/7.jpg)
EMITTANCE AND ENVELOPE
Jean-Paul Carneiro FIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM
0 5 10 15 200
0.5
1
1.5
2
2.5
3
3.5
Z [m]R
MS
Sp
ot S
ize
[mm
] FIRST OPERATIONNOMINAL
0 5 10 15 200
2
4
6
8
10
Z [m]
RM
S E
mitt
an
ce [m
m-m
rad
]
FIRST OPERATIONNOMINAL
![Page 8: First operation of the TTF2 injector with beam Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Hamburg, 16 Sept 2003](https://reader035.vdocuments.net/reader035/viewer/2022071805/56649cdb5503460f949a5b27/html5/thumbnails/8.jpg)
Jean-Paul Carneiro FIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM
BUNCH LENGTH
0 5 10 15 200
0.5
1
1.5
2
2.5
Z [m]
RM
S B
un
ch L
en
gh
t [m
m]
First OperationNominal
![Page 9: First operation of the TTF2 injector with beam Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Hamburg, 16 Sept 2003](https://reader035.vdocuments.net/reader035/viewer/2022071805/56649cdb5503460f949a5b27/html5/thumbnails/9.jpg)
Jean-Paul Carneiro FIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM
SPOT AND TRANSVERSE PHASE SPACE (AT Z =19 M)
![Page 10: First operation of the TTF2 injector with beam Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Hamburg, 16 Sept 2003](https://reader035.vdocuments.net/reader035/viewer/2022071805/56649cdb5503460f949a5b27/html5/thumbnails/10.jpg)
Jean-Paul Carneiro FIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM
SLICE EMITTANCE AND RMS SIZE (19 M)
-6 -4 -2 0 2 4 60
1
2
3
4
5
6
Z [mm]
RM
S E
MIT
TA
NC
E [m
m-m
rad
]
FIRST OPERATIONNOMINAL
-6 -4 -2 0 2 4 60
0.5
1
1.5
2
2.5
Z [mm]R
MS
SIZ
E [m
m]
FIRST OPERATIONNOMINAL
![Page 11: First operation of the TTF2 injector with beam Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Hamburg, 16 Sept 2003](https://reader035.vdocuments.net/reader035/viewer/2022071805/56649cdb5503460f949a5b27/html5/thumbnails/11.jpg)
Jean-Paul Carneiro FIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM
CURRENT DISTRIBUTION (AT Z =19 M)
-6 -4 -2 0 2 4 60
10
20
30
40
50
Z [mm]
Cu
rre
nt [
A]
FIRST OPERATIONNOMINAL
![Page 12: First operation of the TTF2 injector with beam Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Hamburg, 16 Sept 2003](https://reader035.vdocuments.net/reader035/viewer/2022071805/56649cdb5503460f949a5b27/html5/thumbnails/12.jpg)
Jean-Paul Carneiro FIRST OPERATION OF THE TTF2 INJECTOR WITH BEAM
CONCLUSION
• CHARGE 1 nC 1 nC• MOMEMTUN 121.7 MeV/c 134.05 MeV/c• ENERGY SPREAD 0.9 [%] 0.2 [%]• RMS EMITTANCE 1.28 [mm-mrad] 1.75 [mm-mrad] • RMS SIZE 0.41 [mm] 0.41 [mm]• BUNCH LENGTH 1.88 [mm] 2.1 [mm]• PEAK CURRENT ~ 60 [A] ~ 40 [A]• SLICE EMITTANCE ~ 1 [mm-mrad] ~ 1 [mm-mrad]
NOMINAL FIRST OPERATION