No. Description P I C -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 Week-1 Week-2 Week-3 Week-4 Week-5 Week-6 Week-7 Week-8 Week-9 Week-10 Week-11 Week-12 Week-13 Week-14 Week-15 Week-16 Week-17 Week-18 Week-19 Week-20 Week-21 Week-22 Week-23 Week-24 Week-25 Week-26 Week-27 Week-28 Week-29 Week-30 Week-31 Week-32 Week-33 Week-34 Week-35 Week-36 Week-37 Week-38 Week-39 Week-40 Week-41 Week-42 Week-43 Week-44 Week-45 Week-46 Week-47 Week-48 Week-49 Week-50 Week-51 Week-52 I PRELIMINARIES 1 PERSONNIL RECRUIT PROGRAM a Recruitment Advertizing HRD b Test Invitation & Interview HRD c Employment Contract Period HRD 2 KEET & UTILIZATION a Furniture CM c Hardware & Software IT d Utility (PDAM & PLN) CM 3 GOVERNMENT PERMIT & SOCIAL RESPONSIBILITY a IMB HO b AMDAL HO c Amdalalin HO d Depnaker HO e Kecamatan & Kelurahan HO + CM II SUB STRUCTURES - Tender Kontraktor Pile Owner invitation aanwijzing bidding & submit klarifikasi klarifikasi nego award - Tender Kontraktor SAP (Struktur, Arsitektur & Plambing) Owner invitation aanwijzing bidding & submit klarifikasi klarifikasi nego award - Ground Breaking MK preparation - Cleaning, Cut & Fill MK cleaning, cut and fill - Loading Test MK mob loading test demob - Pilling STR mob pilling - Pile Cap STR Pile Cap III BASEMENT FLOOR A STRUCTURE - Tender & Prelim Kontraktor STP MK + Perencana invitation aanwijzing bidding submission klarifikasi submission nego awarded mob - Tender & Prelim Kontraktor Plumbing MK + Perencana invitation aanwijzing bidding submission klarifikasi submission nego awarded mob - Pembesian Plat Lantai STR pembesian lantai - Bekisting Basement 2 (GWT & STP) STR bekisting - Sparing, Sleeve & Opening PL sleeve - Cor Plat Lantai Basement 2 STR concreette - Pembesian Kolom & Shearwall STR pembesian - Sparing, Sleeve & Opening PL sleeve - Bekisting Kolom & Shearwall STR bekisting - Cor Kolom & Shearwall STR concreette - Pembesian Dinding Perimeter Gedung STR pembesian - Sparing, Sleeve & Opening PL sleeve - Cor Dinding Perimeter gedung STR bekisting Cor - Pasang buffer structure lift Buffer Lift - Perbaikan struktur Perbaikan B CIVIL, ARCHITECT & FINISHING - Pekerjaan dinding a Pemasangan Dinding bata Dinding Bata b Plaster + Aci Buffer Lift Buffer Lift c Pekerjaan Pengecatan d Pasang marmer / Granite dinding e Pekerjaan signage - Pekerjaan lantai a Levelling screed Levelling Screed b Trowell Finish Trowell Finish c Pemasangan keramik + step nose tangga Pasang Keramik d Pekerjaan Railing Tangga Railing d Pekerjaan car stopper Car stopper - Pekerjaan Besi / Metal work a Pemasangan railing tangga b Pemasangan bordes c Pemasangan streel grille d Pemasangan streel grating C MECHANICAL - ELECTRICAL - Pekerjaan Plumbing a Pasang instalasi air kotor b Pasang instalasi air bersih - Riser c Pasang instalasi air bersih - Toilet d Pasang Riser air hujan e Pasang instalasi Sumppit, Sewage & Grease Trap f Test Partial g Pemasangan pompa dan eqpt. Utama lain - Pekerjaan Fire Fighting a Pasang instalasi Fire Hydrant b Pasang instalasi Fire Sprinkler c Pasang instalasi Riser Hydrant dan Sprinler d Test Partial e Pemasangan pompa dan eqpt. Utama lain f Pemasangan pipa dropper g Testing Commissioning - Pekerjaan Ventilasi Mekanis a Fabrikasi Ductwork b Fabrikasi Hanger & Alat bantu c Pemasangan Instalasi d Pemasangan Equipment Utama e Pemasangan Asesoris f Test Partial g Testing Commissioning - Pekerjaan AC a Fabrikasi Ductwork b Fabrikasi Hanger & Alat bantu c Pemasangan Instalasi Air Supply d Pemasangan Instalasi Reffrigerant Pipe e Pemasangan Equipment Utama f Pemasangan Asesoris g Test Partial Testing Commissioning Percentage % contractor PQ revise bid + submit Mobilization & preparation contractor PQ revise bid + submit Mobilization & preparation ground breaking contractor PQ contractor PQ buka bekisting

Upload: white-feather

Post on 30-Jan-2016

36 views

Category:

Documents


1 download

DESCRIPTION

understanding project management

TRANSCRIPT

Page 1: Fishbone Diagram

No. Description P I C

-12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 Week-1 Week-2 Week-3 Week-4 Week-5 Week-6 Week-7 Week-8 Week-9 Week-10 Week-11 Week-12 Week-13 Week-14 Week-15 Week-16 Week-17 Week-18 Week-19 Week-20 Week-21 Week-22 Week-23 Week-24 Week-25 Week-26 Week-27 Week-28 Week-29 Week-30 Week-31 Week-32 Week-33 Week-34 Week-35 Week-36 Week-37 Week-38 Week-39 Week-40 Week-41 Week-42 Week-43 Week-44 Week-45 Week-46 Week-47 Week-48 Week-49 Week-50 Week-51 Week-52 Week-53 Week-54 Week-55 Week-56 Week-57 Week-58 Week-59 Week-60

I PRELIMINARIES

1 PERSONNIL RECRUIT PROGRAM

a Recruitment Advertizing HRD

b Test Invitation & Interview HRD

c Employment Contract Period HRD

2 KEET & UTILIZATION

a Furniture CM

c Hardware & Software IT

d Utility (PDAM & PLN) CM

3 GOVERNMENT PERMIT & SOCIAL RESPONSIBILITY

a IMB HO

b AMDAL HO

c Amdalalin HO

d Depnaker HO

e Kecamatan & Kelurahan HO + CM

II SUB STRUCTURES

- Tender Kontraktor Pile Owner invitation aanwijzing bidding & submit klarifikasi klarifikasi nego award Mobilization & preparation

- Tender Kontraktor SAP (Struktur, Arsitektur & Plambing) Owner invitation aanwijzing bidding & submit klarifikasi klarifikasi nego award Mobilization & preparation

- Ground Breaking MK preparation

- Cleaning, Cut & Fill MK cleaning, cut and fill

- Loading Test MK mob loading test demob

- Pilling STR mob pilling

- Pile Cap STR Pile Cap

III BASEMENT FLOOR

A STRUCTURE

- Tender & Prelim Kontraktor STP MK + Perencana invitation aanwijzing bidding submission klarifikasi submission nego awarded mob

- Tender & Prelim Kontraktor Plumbing MK + Perencana invitation aanwijzing bidding submission klarifikasi submission nego awarded mob

- Pembesian Plat Lantai STR pembesian lantai

- Bekisting Basement 2 (GWT & STP) STR bekisting

- Sparing, Sleeve & Opening PL sleeve

- Cor Plat Lantai Basement 2 STR concreette

- Pembesian Kolom & Shearwall STR pembesian

- Sparing, Sleeve & Opening PL sleeve

- Bekisting Kolom & Shearwall STR bekisting

- Cor Kolom & Shearwall STR concreette

- Pembesian Dinding Perimeter Gedung STR pembesian

- Sparing, Sleeve & Opening PL sleeve

- Cor Dinding Perimeter gedung STR bekisting Cor

- Pasang buffer structure lift Buffer Lift

- Perbaikan struktur Perbaikan

B CIVIL, ARCHITECT & FINISHING

- Pekerjaan dinding

a Pemasangan Dinding bata Dinding Bata

b Plaster + Aci Buffer Lift Buffer Lift

c Pekerjaan Pengecatan

d Pasang marmer / Granite dinding

e Pekerjaan signage

- Pekerjaan lantai

a Levelling screed Levelling Screed

b Trowell Finish Trowell Finish

c Pemasangan keramik + step nose tangga Pasang Keramik

d Pekerjaan Railing Tangga Railing

d Pekerjaan car stopper Car stopper

- Pekerjaan Besi / Metal work

a Pemasangan railing tangga

b Pemasangan bordes

c Pemasangan streel grille

d Pemasangan streel grating

C MECHANICAL - ELECTRICAL

- Pekerjaan Plumbing

a Pasang instalasi air kotor

b Pasang instalasi air bersih - Riser

c Pasang instalasi air bersih - Toilet

d Pasang Riser air hujan

e Pasang instalasi Sumppit, Sewage & Grease Trap

f Test Partial

g Pemasangan pompa dan eqpt. Utama lain

- Pekerjaan Fire Fighting

a Pasang instalasi Fire Hydrant

b Pasang instalasi Fire Sprinkler

c Pasang instalasi Riser Hydrant dan Sprinler

d Test Partial

e Pemasangan pompa dan eqpt. Utama lain

f Pemasangan pipa dropper

g Testing Commissioning

- Pekerjaan Ventilasi Mekanis

a Fabrikasi Ductwork

b Fabrikasi Hanger & Alat bantu

c Pemasangan Instalasi

d Pemasangan Equipment Utama

e Pemasangan Asesoris

f Test Partial

g Testing Commissioning

- Pekerjaan AC

a Fabrikasi Ductwork

b Fabrikasi Hanger & Alat bantu

c Pemasangan Instalasi Air Supply

d Pemasangan Instalasi Reffrigerant Pipe

e Pemasangan Equipment Utama

f Pemasangan Asesoris

g Test Partial

Testing Commissioning

Percentage %

contractor PQ

revise bid + submit

contractor PQ

revise bid + submit

ground breaking

contractor PQ

contractor PQ

buka bekisting

Page 2: Fishbone Diagram

IV GROUND FLOOR

- Pembesian Plat Lantai, kolom & shear wall STR pembesian

Page 3: Fishbone Diagram

- Bekisting lantai, kolom & shear wall STR

- Cor Plat Lantai ground floor STR cor

V FIRST FLOOR

- Pembesian Plat Lantai, kolom & shear wall STR pembesian

- Bekisting lantai, kolom & shear wall STR

- Cor Plat Lantai 1 STR cor

VI SECOND FLOOR

- Pembesian Plat Lantai, kolom & shear wall STR pembesian

- Bekisting lantai, kolom & shear wall STR

- Cor Plat Lantai 2 STR cor

VII THIRD FLOOR

- Pembesian Plat Lantai, kolom & shear wall STR pembesian

- Bekisting lantai, kolom & shear wall STR

- Cor Plat Lantai 3 STR cor

VIII 4th FLOOR

- Pembesian Plat Lantai, kolom & shear wall STR pembesian

- Bekisting lantai, kolom & shear wall STR

- Cor Plat Lantai 4 STR cor

IX 5th FLOOR

- Pembesian Plat Lantai, kolom & shear wall STR pembesian

- Bekisting lantai, kolom & shear wall STR

- Cor Plat Lantai 5 STR cor

X 6th FLOOR

- Pembesian Plat Lantai, kolom & shear wall STR pembesian

- Bekisting lantai, kolom & shear wall STR

- Cor Plat Lantai 6 STR cor

XI 7th FLOOR

- Pembesian Plat Lantai, kolom & shear wall STR pembesian

- Bekisting lantai, kolom & shear wall STR

- Cor Plat Lantai 7 STR cor

XII 8th FLOOR

- Pembesian Plat Lantai, kolom & shear wall STR pembesian

- Bekisting lantai, kolom & shear wall STR

- Cor Plat Lantai 8 STR cor

XIII 9th FLOOR

- Pembesian Plat Lantai, kolom & shear wall STR pembesian

- Bekisting lantai, kolom & shear wall STR

- Cor Plat Lantai 9 STR cor

XIV 10th FLOOR

- Pembesian Plat Lantai, kolom & shear wall STR pembesian

- Bekisting lantai, kolom & shear wall STR

- Cor Plat Lantai 10 STR cor

XV 11th FLOOR

- Pembesian Plat Lantai, kolom & shear wall STR pembesian

- Bekisting lantai, kolom & shear wall STR

- Cor Plat Lantai 11 STR cor

bekisting + sleeve

buka bekisting

bekisting + sleeve

buka bekisting

bekisting + sleeve

buka bekisting

bekisting + sleeve

buka bekisting

bekisting + sleeve

buka bekisting

bekisting + sleeve

buka bekisting

bekisting + sleeve

buka bekisting

bekisting + sleeve

buka bekisting

bekisting + sleeve

buka bekisting

bekisting + sleeve

buka bekisting

bekisting + sleeve

buka bekisting

bekisting + sleeve

buka bekisting

Page 4: Fishbone Diagram
Page 5: Fishbone Diagram
Page 6: Fishbone Diagram
Page 7: Fishbone Diagram

TOTAL 100.000%

Monthly Progress(%) 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

Progress Cummulative (%) 0.000% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Page 8: Fishbone Diagram

SARASWANTI GRAHA INDAHSTRUKTUR ORGANISASI CONSTRUCTION MANAGEMENT

1

8

2

3

14

1 Civil Engineer 6 - 7 jt/Bulan S-1 / D-3 Teknik Sipil1 Laki-laki

Pengalaman minimal 5 tahunMampu mengoperasikan AutoCADMampu bekerja dengan Spreadsheet, Word processor dan EmailMampu menganalisa dan menghitung kekuatan Struktural GedungPengalaman kerja di gedung bertingkatPekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktuBahasa Inggris minimal pasifAnalitis dan Komunikatif

2 Civil Supervisor 3.5 - 4.5 jt/Bulan STM Teknik Sipil2 Laki-laki

(Add 1 person - 07 Mei 2013) Pengalaman kerja di gedung bertingkat, minimal 8 tahunPekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktu

PROJECT DIRECTOR

PROJECT MANAGER

CONSTRUCTION MANAGER

Drafter + Civil Spv (1)+(1) Structure Engineer (1)

PROJECT ARCHITECT

Structure Supervisor (1)

Page 9: Fishbone Diagram

Bahasa Inggris minimal pasifAnalitis dan Komunikatif

3 Arsitek Deleted (07 Mei 2013)1

4 Architecture Spv 3.5 - 4.5 jt/Bulan STM Teknik Sipil1 Laki-laki

Pengalaman kerja di gedung bertingkatPekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktuBahasa Inggris minimal pasifAnalitis dan Komunikatif

5 ME Supervisor 3.5 - 4.5 jt/Bulan STM Elektro2 laki-laki

(Add 1 person - 07 Mei 2013) Pengalaman kerja di gedung bertingkat, minimal 7 tahunPekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktuBahasa Inggris minimal pasifAnalitis dan Komunikatif

6 Project Purchasing 3 - 4 jt/Bulan S-1 Ekonomi1 laki-laki / Wanita

Pengalaman bekerja sebagai Purchasing minimal 3 tahunPekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktuBahasa Inggris minimal pasifAnalitis dan Komunikatif

7 Project Secretary 2 - 2.5 jt/Bulan SMEA1 Wanita

Pengalaman bekerja sebagai administrasi, min 3 tahunMengerti tentang penyimpanan dokumenPekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktuBahasa Inggris aktifAnalitis dan Komunikatif

8 Admin + W'housing 1.5 - 2.25 jt/Bulan SMEA1 Laki-laki

Pengalaman bekerja sebagai warehouse officer, min 1 tahunMengerti tentang penyimpanan barang dan dokumenPekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktuKomunikatif

9 Office Boy 750rb - 1.2 Jt/Bulan SMP1 Laki-laki

Page 10: Fishbone Diagram

Sanggup bekerja kerasPekerja teliti, ulet, sanggup bekerja di bawah tekananKomunikatif

11

Page 11: Fishbone Diagram

SARASWANTI GRAHA INDAHSTRUKTUR ORGANISASI CONSTRUCTION MANAGEMENT

2

Mampu bekerja dengan Spreadsheet, Word processor dan EmailMampu menganalisa dan menghitung kekuatan Struktural Gedung

Pekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktu

Pengalaman kerja di gedung bertingkat, minimal 8 tahunPekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktu

PROJECT DIRECTOR

PROJECT MANAGER

CONSTRUCTION MANAGER

Structure Engineer (1) ME Supervisor (2) Project Adm, Finance & Purchasing (2)

Structure Supervisor (1) Adm & Warehousing (1)

OB (2) + Driver (1)

CONSULTANT

Page 12: Fishbone Diagram

Pekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktu

Pengalaman kerja di gedung bertingkat, minimal 7 tahunPekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktu

Pengalaman bekerja sebagai Purchasing minimal 3 tahunPekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktu

Pengalaman bekerja sebagai administrasi, min 3 tahun

Pekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktu

Pengalaman bekerja sebagai warehouse officer, min 1 tahunMengerti tentang penyimpanan barang dan dokumenPekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktu

Page 13: Fishbone Diagram

Pekerja teliti, ulet, sanggup bekerja di bawah tekanan

Page 14: Fishbone Diagram

SARASWANTI GRAHA INDAHSTRUKTUR ORGANISASI CONSTRUCTION MANAGEMENT

Page 15: Fishbone Diagram

KEBUTUHAN HARDWARE & SOFTWAREI. KEBUTUHAN FURNITUREa. Meja dan kursi direksi 1 unit 1 Bekas Alana

1 Meja 1 biro 6 Unit 1 Bekas Alana2 Meja setengah biro 7 Unit 5 Bekas Alana3 Kursi Putar 11 Unit 7 Bekas Alana4 Meja Rapat triplek (panjang) 3 Unit5 Meja printer + Rak 2 Unit 2 Bekas Alana6 Lemari File + kunci 2 Unit 1 Bekas Alana7 Rak File 2 Unit 1 Bekas Alana8 Rak Material Contoh 2 Unit9 Kursi Lipat 16 Unit

10 White board besar 4 UnitWhite board sedang 2 UnitWhite board kecil 5 Unit

11 AC, Kap : 1 Unit12 Lampu Emergency 2 Unit13 Stempel : Approval Material 1 Unit14 Stempel : Received 1 Unit15 Stempel : Proyek 1 Unit16 Stempel : FORCON 1 Unit17 Stempel : For Tender 1 Unit18 Tempat sampah 10 Unit 3 Bekas Alana19 Peralatan kebersihan (Sapu, Kain pel, Ember) 1 Set2021

II. KEBUTUHAN HARDWARE KOMPUTER + PRINTER1 Modem speedy 1 Unit

Omni / Repeater 2 UnitWifi device 6 Unit 4 Bekas Alana

2 Komputer desktop + monitor 19" 6 Unit 4 Bekas Alana3 Printer A3 1 Unit 1 Bekas Alana4 Printer A4 + copy machine 2 Unit 2 Bekas Alana5 UPS 500 Watt 4 Unit 4 Bekas Alana6 Switch hub 1 Unit Tidak perlu7 Jaringan LAN 1 Set Tidak perlu

III. KEBUTUHAN SOFTWARE1 Operating System - Linux2 Program Open Office3 Program BricksCAD

IV. SAFETY APPAREL1 Safety helmet Team MK Unit

Page 16: Fishbone Diagram

2 Safety helmet Tamu Unit3 Safety Shoes Team MK Unit4 Safety Shoes Tamu Unit5 Police Line 3 Roll6 Senter untuk Lapangan 8 Unit7 Meteran + Water Pass 8 Unit8 Meja dada (tripleks) 8 Unit

V. COMMUNICATION's1 Handset telephone + lock 2 Unit2 Fax 1 Unit3 Handy Talkie + Permit 9 Unit4 Unit

VI. MOBILITAS1 Mobil Pick up 1 Unit2 Motor 1 Unit3 s4

Page 17: Fishbone Diagram

Bekas AlanaBekas AlanaBekas AlanaBekas Alana

Bekas AlanaBekas AlanaBekas Alana

Bekas Alana

Bekas AlanaBekas AlanaBekas AlanaBekas AlanaBekas Alana

Page 18: Fishbone Diagram

- Adequate communication& Coordination between

- Adequate communication and coordination within

Financial Aspect - Appointing a PM with

- On time interim payment to- Making fast decision within each Project Team

(C2)- Providing incentives to Contractors

if project are completed on time(C1)

- Social activities rejections has to be

- Obtaining Government Permits

-

External Factors

Organization & Coordination beetwen All Project Team

Contractors & Subcon (H1)

Project Team (H2)

suitable leadership style (C1)

Contractors (H2)

anticipated (C1)

earlier (C1)

Government Strategy (C1)

Page 19: Fishbone Diagram

Progress Schedulling & Control Construction Technologies

- Identifying critical (H1) - Adequate ContractorsActivities & setting milestone experience in building blocks

(H2) - Adopting a time saving &(H2) - Sequencing construction activities Standardized floor cycle

in appropriate chronological order

- Comparing & controllingprogress against original

Making fast decision within each Project Team - Forseeing possible contingencies

- Increasing the plant utilization level

- Approving material approval as early- Obtaining adequate equipment

(C1)- Reliability of materials supliers - Increasing the plan utiization level

(H2)- Delivering materials on site

(H1) - Obtaining adequate equipment

Material Management Equipment Management

dates for them (H1)

schedule regularly (C1)

which may affect the progress (C2)

on site (C2)

as possible (C2)

on site (H2)

on time (H1)

Page 20: Fishbone Diagram

Design Aspect Project Characteristics

(H1) - Minimizing design changes (H1) - Minimum variaties from Clientafter construction commented

(H2) - Clear Client brief(H2) - Providing accurate & complete

design drawings to Construction (C1) - Favourable Site ConditionsTeam

(C2) - Adequatic pre-construction(C1) - Standardizing the building components planning

(C2) - Design with high constructubility

- Reserving the right to downgrade or withdrawcontractors from PQ list, to avoid serious

Increasing the plant utilization level- Adequate coordination among subcon

(C1)- Adequate coordination among

Increasing the plan utiization level(H2) - Appropriate labour deployment - Close monitoring of subcon

work by foreman from (H1) - Adequate supply of workforce

Labour Management

delay (H1)

subcontractors (H2)

main contractors (H1)Main Contractors Control on

Subcontractor

Page 21: Fishbone Diagram

Project Characteristics

Minimum variaties from Client

Clear Client brief

Favourable Site Conditions

Adequatic pre-construction

Reserving the right to downgrade or withdrawcontractors from PQ list, to avoid serious

Adequate coordination among subcon

Adequate coordination among

Close monitoring of subconwork by foreman from

subcontractors (H2)

main contractors (H1)Main Contractors Control on

Subcontractor

"3 RIGHT"

Page 22: Fishbone Diagram

"3 RIGHT"