No. Description P I C
-12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 Week-1 Week-2 Week-3 Week-4 Week-5 Week-6 Week-7 Week-8 Week-9 Week-10 Week-11 Week-12 Week-13 Week-14 Week-15 Week-16 Week-17 Week-18 Week-19 Week-20 Week-21 Week-22 Week-23 Week-24 Week-25 Week-26 Week-27 Week-28 Week-29 Week-30 Week-31 Week-32 Week-33 Week-34 Week-35 Week-36 Week-37 Week-38 Week-39 Week-40 Week-41 Week-42 Week-43 Week-44 Week-45 Week-46 Week-47 Week-48 Week-49 Week-50 Week-51 Week-52 Week-53 Week-54 Week-55 Week-56 Week-57 Week-58 Week-59 Week-60
I PRELIMINARIES
1 PERSONNIL RECRUIT PROGRAM
a Recruitment Advertizing HRD
b Test Invitation & Interview HRD
c Employment Contract Period HRD
2 KEET & UTILIZATION
a Furniture CM
c Hardware & Software IT
d Utility (PDAM & PLN) CM
3 GOVERNMENT PERMIT & SOCIAL RESPONSIBILITY
a IMB HO
b AMDAL HO
c Amdalalin HO
d Depnaker HO
e Kecamatan & Kelurahan HO + CM
II SUB STRUCTURES
- Tender Kontraktor Pile Owner invitation aanwijzing bidding & submit klarifikasi klarifikasi nego award Mobilization & preparation
- Tender Kontraktor SAP (Struktur, Arsitektur & Plambing) Owner invitation aanwijzing bidding & submit klarifikasi klarifikasi nego award Mobilization & preparation
- Ground Breaking MK preparation
- Cleaning, Cut & Fill MK cleaning, cut and fill
- Loading Test MK mob loading test demob
- Pilling STR mob pilling
- Pile Cap STR Pile Cap
III BASEMENT FLOOR
A STRUCTURE
- Tender & Prelim Kontraktor STP MK + Perencana invitation aanwijzing bidding submission klarifikasi submission nego awarded mob
- Tender & Prelim Kontraktor Plumbing MK + Perencana invitation aanwijzing bidding submission klarifikasi submission nego awarded mob
- Pembesian Plat Lantai STR pembesian lantai
- Bekisting Basement 2 (GWT & STP) STR bekisting
- Sparing, Sleeve & Opening PL sleeve
- Cor Plat Lantai Basement 2 STR concreette
- Pembesian Kolom & Shearwall STR pembesian
- Sparing, Sleeve & Opening PL sleeve
- Bekisting Kolom & Shearwall STR bekisting
- Cor Kolom & Shearwall STR concreette
- Pembesian Dinding Perimeter Gedung STR pembesian
- Sparing, Sleeve & Opening PL sleeve
- Cor Dinding Perimeter gedung STR bekisting Cor
- Pasang buffer structure lift Buffer Lift
- Perbaikan struktur Perbaikan
B CIVIL, ARCHITECT & FINISHING
- Pekerjaan dinding
a Pemasangan Dinding bata Dinding Bata
b Plaster + Aci Buffer Lift Buffer Lift
c Pekerjaan Pengecatan
d Pasang marmer / Granite dinding
e Pekerjaan signage
- Pekerjaan lantai
a Levelling screed Levelling Screed
b Trowell Finish Trowell Finish
c Pemasangan keramik + step nose tangga Pasang Keramik
d Pekerjaan Railing Tangga Railing
d Pekerjaan car stopper Car stopper
- Pekerjaan Besi / Metal work
a Pemasangan railing tangga
b Pemasangan bordes
c Pemasangan streel grille
d Pemasangan streel grating
C MECHANICAL - ELECTRICAL
- Pekerjaan Plumbing
a Pasang instalasi air kotor
b Pasang instalasi air bersih - Riser
c Pasang instalasi air bersih - Toilet
d Pasang Riser air hujan
e Pasang instalasi Sumppit, Sewage & Grease Trap
f Test Partial
g Pemasangan pompa dan eqpt. Utama lain
- Pekerjaan Fire Fighting
a Pasang instalasi Fire Hydrant
b Pasang instalasi Fire Sprinkler
c Pasang instalasi Riser Hydrant dan Sprinler
d Test Partial
e Pemasangan pompa dan eqpt. Utama lain
f Pemasangan pipa dropper
g Testing Commissioning
- Pekerjaan Ventilasi Mekanis
a Fabrikasi Ductwork
b Fabrikasi Hanger & Alat bantu
c Pemasangan Instalasi
d Pemasangan Equipment Utama
e Pemasangan Asesoris
f Test Partial
g Testing Commissioning
- Pekerjaan AC
a Fabrikasi Ductwork
b Fabrikasi Hanger & Alat bantu
c Pemasangan Instalasi Air Supply
d Pemasangan Instalasi Reffrigerant Pipe
e Pemasangan Equipment Utama
f Pemasangan Asesoris
g Test Partial
Testing Commissioning
Percentage %
contractor PQ
revise bid + submit
contractor PQ
revise bid + submit
ground breaking
contractor PQ
contractor PQ
buka bekisting
IV GROUND FLOOR
- Pembesian Plat Lantai, kolom & shear wall STR pembesian
- Bekisting lantai, kolom & shear wall STR
- Cor Plat Lantai ground floor STR cor
V FIRST FLOOR
- Pembesian Plat Lantai, kolom & shear wall STR pembesian
- Bekisting lantai, kolom & shear wall STR
- Cor Plat Lantai 1 STR cor
VI SECOND FLOOR
- Pembesian Plat Lantai, kolom & shear wall STR pembesian
- Bekisting lantai, kolom & shear wall STR
- Cor Plat Lantai 2 STR cor
VII THIRD FLOOR
- Pembesian Plat Lantai, kolom & shear wall STR pembesian
- Bekisting lantai, kolom & shear wall STR
- Cor Plat Lantai 3 STR cor
VIII 4th FLOOR
- Pembesian Plat Lantai, kolom & shear wall STR pembesian
- Bekisting lantai, kolom & shear wall STR
- Cor Plat Lantai 4 STR cor
IX 5th FLOOR
- Pembesian Plat Lantai, kolom & shear wall STR pembesian
- Bekisting lantai, kolom & shear wall STR
- Cor Plat Lantai 5 STR cor
X 6th FLOOR
- Pembesian Plat Lantai, kolom & shear wall STR pembesian
- Bekisting lantai, kolom & shear wall STR
- Cor Plat Lantai 6 STR cor
XI 7th FLOOR
- Pembesian Plat Lantai, kolom & shear wall STR pembesian
- Bekisting lantai, kolom & shear wall STR
- Cor Plat Lantai 7 STR cor
XII 8th FLOOR
- Pembesian Plat Lantai, kolom & shear wall STR pembesian
- Bekisting lantai, kolom & shear wall STR
- Cor Plat Lantai 8 STR cor
XIII 9th FLOOR
- Pembesian Plat Lantai, kolom & shear wall STR pembesian
- Bekisting lantai, kolom & shear wall STR
- Cor Plat Lantai 9 STR cor
XIV 10th FLOOR
- Pembesian Plat Lantai, kolom & shear wall STR pembesian
- Bekisting lantai, kolom & shear wall STR
- Cor Plat Lantai 10 STR cor
XV 11th FLOOR
- Pembesian Plat Lantai, kolom & shear wall STR pembesian
- Bekisting lantai, kolom & shear wall STR
- Cor Plat Lantai 11 STR cor
bekisting + sleeve
buka bekisting
bekisting + sleeve
buka bekisting
bekisting + sleeve
buka bekisting
bekisting + sleeve
buka bekisting
bekisting + sleeve
buka bekisting
bekisting + sleeve
buka bekisting
bekisting + sleeve
buka bekisting
bekisting + sleeve
buka bekisting
bekisting + sleeve
buka bekisting
bekisting + sleeve
buka bekisting
bekisting + sleeve
buka bekisting
bekisting + sleeve
buka bekisting
TOTAL 100.000%
Monthly Progress(%) 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
Progress Cummulative (%) 0.000% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SARASWANTI GRAHA INDAHSTRUKTUR ORGANISASI CONSTRUCTION MANAGEMENT
1
8
2
3
14
1 Civil Engineer 6 - 7 jt/Bulan S-1 / D-3 Teknik Sipil1 Laki-laki
Pengalaman minimal 5 tahunMampu mengoperasikan AutoCADMampu bekerja dengan Spreadsheet, Word processor dan EmailMampu menganalisa dan menghitung kekuatan Struktural GedungPengalaman kerja di gedung bertingkatPekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktuBahasa Inggris minimal pasifAnalitis dan Komunikatif
2 Civil Supervisor 3.5 - 4.5 jt/Bulan STM Teknik Sipil2 Laki-laki
(Add 1 person - 07 Mei 2013) Pengalaman kerja di gedung bertingkat, minimal 8 tahunPekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktu
PROJECT DIRECTOR
PROJECT MANAGER
CONSTRUCTION MANAGER
Drafter + Civil Spv (1)+(1) Structure Engineer (1)
PROJECT ARCHITECT
Structure Supervisor (1)
Bahasa Inggris minimal pasifAnalitis dan Komunikatif
3 Arsitek Deleted (07 Mei 2013)1
4 Architecture Spv 3.5 - 4.5 jt/Bulan STM Teknik Sipil1 Laki-laki
Pengalaman kerja di gedung bertingkatPekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktuBahasa Inggris minimal pasifAnalitis dan Komunikatif
5 ME Supervisor 3.5 - 4.5 jt/Bulan STM Elektro2 laki-laki
(Add 1 person - 07 Mei 2013) Pengalaman kerja di gedung bertingkat, minimal 7 tahunPekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktuBahasa Inggris minimal pasifAnalitis dan Komunikatif
6 Project Purchasing 3 - 4 jt/Bulan S-1 Ekonomi1 laki-laki / Wanita
Pengalaman bekerja sebagai Purchasing minimal 3 tahunPekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktuBahasa Inggris minimal pasifAnalitis dan Komunikatif
7 Project Secretary 2 - 2.5 jt/Bulan SMEA1 Wanita
Pengalaman bekerja sebagai administrasi, min 3 tahunMengerti tentang penyimpanan dokumenPekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktuBahasa Inggris aktifAnalitis dan Komunikatif
8 Admin + W'housing 1.5 - 2.25 jt/Bulan SMEA1 Laki-laki
Pengalaman bekerja sebagai warehouse officer, min 1 tahunMengerti tentang penyimpanan barang dan dokumenPekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktuKomunikatif
9 Office Boy 750rb - 1.2 Jt/Bulan SMP1 Laki-laki
Sanggup bekerja kerasPekerja teliti, ulet, sanggup bekerja di bawah tekananKomunikatif
11
SARASWANTI GRAHA INDAHSTRUKTUR ORGANISASI CONSTRUCTION MANAGEMENT
2
Mampu bekerja dengan Spreadsheet, Word processor dan EmailMampu menganalisa dan menghitung kekuatan Struktural Gedung
Pekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktu
Pengalaman kerja di gedung bertingkat, minimal 8 tahunPekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktu
PROJECT DIRECTOR
PROJECT MANAGER
CONSTRUCTION MANAGER
Structure Engineer (1) ME Supervisor (2) Project Adm, Finance & Purchasing (2)
Structure Supervisor (1) Adm & Warehousing (1)
OB (2) + Driver (1)
CONSULTANT
Pekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktu
Pengalaman kerja di gedung bertingkat, minimal 7 tahunPekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktu
Pengalaman bekerja sebagai Purchasing minimal 3 tahunPekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktu
Pengalaman bekerja sebagai administrasi, min 3 tahun
Pekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktu
Pengalaman bekerja sebagai warehouse officer, min 1 tahunMengerti tentang penyimpanan barang dan dokumenPekerja teliti, ulet, sanggup bekerja di bawah tekanan dan target waktu
Pekerja teliti, ulet, sanggup bekerja di bawah tekanan
SARASWANTI GRAHA INDAHSTRUKTUR ORGANISASI CONSTRUCTION MANAGEMENT
KEBUTUHAN HARDWARE & SOFTWAREI. KEBUTUHAN FURNITUREa. Meja dan kursi direksi 1 unit 1 Bekas Alana
1 Meja 1 biro 6 Unit 1 Bekas Alana2 Meja setengah biro 7 Unit 5 Bekas Alana3 Kursi Putar 11 Unit 7 Bekas Alana4 Meja Rapat triplek (panjang) 3 Unit5 Meja printer + Rak 2 Unit 2 Bekas Alana6 Lemari File + kunci 2 Unit 1 Bekas Alana7 Rak File 2 Unit 1 Bekas Alana8 Rak Material Contoh 2 Unit9 Kursi Lipat 16 Unit
10 White board besar 4 UnitWhite board sedang 2 UnitWhite board kecil 5 Unit
11 AC, Kap : 1 Unit12 Lampu Emergency 2 Unit13 Stempel : Approval Material 1 Unit14 Stempel : Received 1 Unit15 Stempel : Proyek 1 Unit16 Stempel : FORCON 1 Unit17 Stempel : For Tender 1 Unit18 Tempat sampah 10 Unit 3 Bekas Alana19 Peralatan kebersihan (Sapu, Kain pel, Ember) 1 Set2021
II. KEBUTUHAN HARDWARE KOMPUTER + PRINTER1 Modem speedy 1 Unit
Omni / Repeater 2 UnitWifi device 6 Unit 4 Bekas Alana
2 Komputer desktop + monitor 19" 6 Unit 4 Bekas Alana3 Printer A3 1 Unit 1 Bekas Alana4 Printer A4 + copy machine 2 Unit 2 Bekas Alana5 UPS 500 Watt 4 Unit 4 Bekas Alana6 Switch hub 1 Unit Tidak perlu7 Jaringan LAN 1 Set Tidak perlu
III. KEBUTUHAN SOFTWARE1 Operating System - Linux2 Program Open Office3 Program BricksCAD
IV. SAFETY APPAREL1 Safety helmet Team MK Unit
2 Safety helmet Tamu Unit3 Safety Shoes Team MK Unit4 Safety Shoes Tamu Unit5 Police Line 3 Roll6 Senter untuk Lapangan 8 Unit7 Meteran + Water Pass 8 Unit8 Meja dada (tripleks) 8 Unit
V. COMMUNICATION's1 Handset telephone + lock 2 Unit2 Fax 1 Unit3 Handy Talkie + Permit 9 Unit4 Unit
VI. MOBILITAS1 Mobil Pick up 1 Unit2 Motor 1 Unit3 s4
Bekas AlanaBekas AlanaBekas AlanaBekas Alana
Bekas AlanaBekas AlanaBekas Alana
Bekas Alana
Bekas AlanaBekas AlanaBekas AlanaBekas AlanaBekas Alana
- Adequate communication& Coordination between
- Adequate communication and coordination within
Financial Aspect - Appointing a PM with
- On time interim payment to- Making fast decision within each Project Team
(C2)- Providing incentives to Contractors
if project are completed on time(C1)
- Social activities rejections has to be
- Obtaining Government Permits
-
External Factors
Organization & Coordination beetwen All Project Team
Contractors & Subcon (H1)
Project Team (H2)
suitable leadership style (C1)
Contractors (H2)
anticipated (C1)
earlier (C1)
Government Strategy (C1)
Progress Schedulling & Control Construction Technologies
- Identifying critical (H1) - Adequate ContractorsActivities & setting milestone experience in building blocks
(H2) - Adopting a time saving &(H2) - Sequencing construction activities Standardized floor cycle
in appropriate chronological order
- Comparing & controllingprogress against original
Making fast decision within each Project Team - Forseeing possible contingencies
- Increasing the plant utilization level
- Approving material approval as early- Obtaining adequate equipment
(C1)- Reliability of materials supliers - Increasing the plan utiization level
(H2)- Delivering materials on site
(H1) - Obtaining adequate equipment
Material Management Equipment Management
dates for them (H1)
schedule regularly (C1)
which may affect the progress (C2)
on site (C2)
as possible (C2)
on site (H2)
on time (H1)
Design Aspect Project Characteristics
(H1) - Minimizing design changes (H1) - Minimum variaties from Clientafter construction commented
(H2) - Clear Client brief(H2) - Providing accurate & complete
design drawings to Construction (C1) - Favourable Site ConditionsTeam
(C2) - Adequatic pre-construction(C1) - Standardizing the building components planning
(C2) - Design with high constructubility
- Reserving the right to downgrade or withdrawcontractors from PQ list, to avoid serious
Increasing the plant utilization level- Adequate coordination among subcon
(C1)- Adequate coordination among
Increasing the plan utiization level(H2) - Appropriate labour deployment - Close monitoring of subcon
work by foreman from (H1) - Adequate supply of workforce
Labour Management
delay (H1)
subcontractors (H2)
main contractors (H1)Main Contractors Control on
Subcontractor
Project Characteristics
Minimum variaties from Client
Clear Client brief
Favourable Site Conditions
Adequatic pre-construction
Reserving the right to downgrade or withdrawcontractors from PQ list, to avoid serious
Adequate coordination among subcon
Adequate coordination among
Close monitoring of subconwork by foreman from
subcontractors (H2)
main contractors (H1)Main Contractors Control on
Subcontractor
"3 RIGHT"
"3 RIGHT"