Fitting Simulation to
DOT Business Processes
![Page 2: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/2.jpg)
Organizational Process Issues
• Simulation
• Work Zone Mobility
• Project Management – P/PMS Tasks / Flows
![Page 3: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/3.jpg)
Organizational Process Issues
• P/PMS Tasks / Flows• New federal requirements for mega projects• Unique process requirements for I-94 and I-75• Construction Staging; Constructability; Work Zone Mob.
• Work Zone Mobility and Project Selection• Programs (R&R, CE, CPT)• Decentralized program – coordination challenge• New federal rules• Network effects / requirements
• Simulation• Radically new technology• Old “Model” paradigms don’t apply• Organizational alignment challenge
![Page 4: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/4.jpg)
Requires Re-alignment:
• Organizational Structure
• Culture
• Processes
• Paradigms
Simulation - a New Technology
![Page 5: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/5.jpg)
Project Traffic
![Page 6: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/6.jpg)
Organizational Structure Shift
Old Days:
• Traffic modeling was a planning task• Operational analysis was performed by traffic engineers• Design was performed by design engineers
» Disconnect between Planning and Engineering» Disconnect between Traffic and Design» Disconnect between Traffic and Operations» Decision Quality suffered!
![Page 7: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/7.jpg)
Project Traffic
![Page 8: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/8.jpg)
Now:
• Traffic modeling will be done by traffic engineers
• The Planning Model may perceive a loss relative stature
• The middle step--“project level traffic”-- will be integrated with traffic modeling.
• Traffic analysis & modeling will be integrated with the Operational analysis
• Traffic and Design will need to be more integrated
• Design engineers will need to know a lot more about traffic operations.
• The Organization must become more traffic engineering literate
Organizational Structure Shift
![Page 9: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/9.jpg)
New Generation Simulation -- Alignment Issues
Organizational Structure: WhereWho Control
May need to be incubated outside of existing structures
Culture:Traffic engineering vs. planning Traffic engineering vs. design Top-down vs. bottom-upA simulation model cannot be “owned”
Processes:Data, GIS, Graphic
Paradigms:FlexibilityModel vs. Open Platform
![Page 10: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/10.jpg)
Making MDOT Simulation Friendly
Data Processes:
• All data from all sources must be put on one platform
• All data must be formatted and stored electronically
• The Michigan Framework
• Traffic data tools developed by the METSIM will have independent utility—e.g., the “BALT”
![Page 11: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/11.jpg)
Challenge
• Build a system model, incrementally, from the bottom up
• Maintain flexibility
• Minimize Model development costs
• Minimize maintenance costs
![Page 12: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/12.jpg)
Incremental ApproachAs each baby model is broken off, it is:
• Developed to be uniform with all the other models• Brought up to the new base year
As two or more baby models are combined for the next project:
• Their traffic is updated to the new base year• They are joined and new matrices developed
![Page 13: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/13.jpg)
Approach
Ambassador Bridge GatewayMOTSIM I-94 MOTSIM
![Page 14: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/14.jpg)
50%Simulation
And Calibration
25%Traffic
Development
25%Network
Development
New Model DevelopmentCombining Existing Models
Salvage / New% of Original Effort
25%Network
Development
20% / 5%Network
Development
15% / 10%Traffic
Development
10% / 40%Simulation
And Calibration
Total Effort 100%Salvage / New Effort
45% / 55%
![Page 15: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/15.jpg)
Work Zone Mobility• Decentralized Organization
• MDOT• Region• Transportation Service Centers
• Many chimneys: • Capacity Expand, • Preventative Maintenance• Rehab and Reconstruct • Safety
Fragmented programFragmented decision making
![Page 16: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/16.jpg)
Work Zone Mobility—New Rules
Effects of new rules for work zone mobility :
• WZ will need to go upstream in the process, » e.g., the early environmental process
• Require more functional integration in the Department» e.g., among design, planning, operations
• Earlier consideration of staging and constructability• On projects involving systemic (interstate) impacts, WZ
mobility will» require a network approach» consider the interactive effects between closures» probably require network simulation
» Organization Process Challenge
![Page 17: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/17.jpg)
Work Zone MobilityNeeded:
• A focus on Operations
• An integrated approach
• Technological assist
• Organizational alignment
![Page 18: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/18.jpg)
Metro Region’s ResponseA multi-pronged approach:
• Process Improvement
• Staff
• Data
• Network Simulation
![Page 19: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/19.jpg)
Metro Region’s ResponseProcess Improvement:
Intervention by MDOT’s Performance Excellence Division (PED) – concept stage
Top to bottom, Department-wide process improvement – concept stage
Rationalize project selection and scheduling
Reconcile bottom-up decision making with the need for a systematic approach
Integrate Processes: Planning, Operations, and Design
![Page 20: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/20.jpg)
Metro Region’s ResponseProcess Improvement
• Requires support from other Stakeholders.
• For example, from Planning
• A shared understanding is needed.
• Dialogue among Stakeholders is the first step
![Page 21: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/21.jpg)
Staff:• Reorganization of existing resources• A centralized team to oversee traffic modeling and work
zone mobility across the region
Data: • Processes• Collection• GIS based – the Michigan Framework
Metro Region’s Response
![Page 22: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/22.jpg)
Metro Region’s Response
Network Simulation:• The various projects need to be tested on one platform—
model—since their impact areas overlap• How to build a large network, and re-use it for other projects• How to do this without creating a new bureaucracy parallel to
the Travel Demand bureaucracy• In-house or by consultants?• The goal is to have uniformity of the model across the system• If multiple consultants, will there be too many cooks working
on ‘the model’?
![Page 23: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/23.jpg)
Metro Region’s Approach
• Two years ago, Planning initiated the development of a network-wide freeway simulation, the “METSIM”
• METSIM consisted of the Central Detroit Freeway Network and the I-75 corridor, extending out to Pontiac Michigan.
• The METSIM is now being used to develop work zone mobility plans for three other projects (MOTSIM’s):
• Ambassador Bridge Gateway – Construction• I-94 Rehabilitation – the Engineering Report• I-75 Trade Corridor – the Engineering Report
![Page 24: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/24.jpg)
METSIMCentral Detroit Freeway Network-CDFN
![Page 25: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/25.jpg)
METSIMI-75 Trade Corridor (I-75 TC)
![Page 26: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/26.jpg)
The Ambassador Bridge Gateway Motsim
![Page 27: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/27.jpg)
I-75 TC MOTSIM
![Page 28: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/28.jpg)
I-94 Motsim
![Page 29: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/29.jpg)
Project Management– P/PMS Tasks / Flows
• New federal requirements for mega projects
• Construction Staging; Constructability; Work Zone Mobility.
• Unique process requirements for I-94 and I-75
![Page 30: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/30.jpg)
Project Management Plans (PMP’s)
• New federal requirements: Mega projects will require PMP’s, starting at the Engineering Report Stage, or shortly after the ROD.
• We will need to develop a year by year plan of how the project is to be constructed.
• This presupposes that the Financial Plan is in place at this early stage of Design.
• This will require earlier and better construction staging, constructability, and work zone mobility analysis.
![Page 31: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/31.jpg)
MDOT’s Process---P/PMS
Acrobat Document
![Page 32: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/32.jpg)
MDOT’s Process---P/PMS
Problem:
•We need to start earlier doing Constructability , Construction Staging (CS), and Work Zone Mobility (WZ)
•On large “system” projects, we will need network simulation to perform these tasks
•We need to capture the dynamic relationships between these processes
•Conceived this way—these are essentially new processes
•MDOT doesn’t have an institutional memory
•Neither do most of the Consultant Teams
![Page 33: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/33.jpg)
Project Management • Project Management Plan Guidance for Mega Projects (and
over $100 million)
• Effort to build predictability into projects
• Effort to move federal oversight further upstream—before construction
• AASHTO found that the cost variances in large projects is larger in the pre-construction phase than at any other time.
• Improving pre-construction processes and building in predictability can have a huge potential pay-off.
• traffic simulation—construction staging– constructability –work zone mobility processes – can play a key role
![Page 34: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/34.jpg)
The Challenge
![Page 35: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/35.jpg)
• The right information• At the right time• To the right process
»Shorter feedback loops»Shorter production runs»Higher Turnover
Challenge: A Toyota Production System
![Page 36: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/36.jpg)
The Challenge
EPE ROD DESIGN CONSTRUCTIONLETTING CONSTRUCTION
TRAFFIC MODEL
WORK ZONEMOBILITY
CONSTRUCTIONSTAGING
CONSTRUCTABILITY
![Page 37: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/37.jpg)
Metro Region’s Response
Goals:
• Develop an institutional memory
• Capture the Consultant’s processes
• Rationalize and Develop the new process
![Page 38: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/38.jpg)
Metro RegionActions:
• Scopes of work for I-94 and I-75—provide a basis for the new process
• Laying the groundwork for internal consensus (Planning, Operations)
• Initiated contact with MDOT’s Performance Excellence Division
• Pursuing funding to hire a supply chain expert
• The supply chain expert will be “fly on the wall” on these projects.
• This will give MDOT a tool to rationalize the process.
![Page 39: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/39.jpg)
I-94 and I-75 Tasks
The network simulation models shall support:
• Base Plans• Constructability• Construction Staging• Structures• Maintenance of Traffic• Cost Estimates• Financial Plan• Horizontal and Vertical Alignments• ROW Plans
![Page 40: Fitting Simulation DOT Business Processes€¦ · network-wide freeway simulation, the “METSIM ... •We need to capture the dynamic relationships between these processes •Conceived](https://reader031.vdocuments.net/reader031/viewer/2022030607/5ad657607f8b9a6d708e074a/html5/thumbnails/40.jpg)
InterdependenceWork Zone Mobility, Simulation, and Project
Management pose similar challenges
They are tied to inter-connected processes
A holistic, systematic approach to process improvement is needed.
To reap the full potential of Simulation