fix it with fixed film: the details of ifas/mbbr design and

28
OBG PRESENTS: Fix it with Fixed Film: The Details of IFAS/MBBR Design and Construction Kristin Waller, PE 2016 TriCon – August 31, 2016

Upload: vanthu

Post on 11-Feb-2017

241 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

OBG PRESENTS:

OBG PRESENTS:

Fix it with Fixed Film:The Details of IFAS/MBBR Design and Construction

Kristin Waller, PE 2016 TriCon – August 31, 2016

Page 2: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

Agenda

2

Massillon Martinsburg Olean

IFAS/MBBR Overview

Process Overview

Important Design Details

Case Studies (3)

Summary and Questions

Page 3: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

3

Overview

MMoving

BBed

BBiofilm

RReactor

Fixed Biofilm / IR / TN Removal Fixed Biofilm + SS / IR + RAS / TN + TP Removal

IIntegrated

FFixed-Film

AActivated

SSludge

Protected biomass on plastic media expands capacity

Nutrients, peak flows, cold temps

Page 4: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

Tank configuration

Minimize approach velocity (~30-35 m/hr max)

Fail safes to contain media

Physical and operational

4

Important Design Details

Variation between vendors

Pre-purchase / selection (akin to Progressive Design Build)

Page 5: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

5

CASE STUDY #1: MASSILLON, OH

Existing 15.8 MGD secondary

Expand to 17 MGD (22 MGD peak)

1 mg/L TP effluent limit - future 10 mg/L TN

Project Goals

Demo roughing filters

Meet milestone deadlines

Maintain existing footprint

Page 6: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

6

IFAS for Massillon

Benefits Obstacles

Page 7: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

7

Mid-TankScreen WallsDeep An/Ax

Mid- Tank IR Wells

SQUARE RECTANGULAR

TWO OPTIONS FOR RETROFIT

Replace screw pumps with VTSH

Deep An/Ax, no media

Hydraulic drop barrier

Page 8: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

Deadline – January 2019

Pre-purchased IFAS and VTSH pumps

Suez (formerly IDI): square zones

Kruger: rectangular

Pre-Purchase Selection

8

Kruger: lowest capital and life-cycle costs

Page 9: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

9

ADDITIONAL PHYSICAL PROTECTION

Provided walkway access

Overflows between tanks

Air scour cleaning

Page 10: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

10

Stop flows sequentially

IR

RAS

Forward Flow

Mixing

De-clogging

Increases process and air scour blower air

ADDITIONAL OPERATIONAL FAIL SAFES

High water level sensor and alarms

Guided wave radar and level switches

Page 11: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

Status: in construction

Contract 2 Construction NTP Delay

Delayed Contract 1 delivery

No-cost change order

Media stored onsite

Page 12: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

12

CASE STUDY #2: MARTINSBURG, WV

3 MGD (10 MGD peak to bio)

5 mg/L TN effluent limit

0.5 mg/L TP effluent limit

Project Goals

Demo:

Trickling filters

Nitrification tower

Add:

New headworks

Operations building

Solids handling and storage

Page 13: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

13

MBBR for Martinsburg

Benefits Obstacles

Page 14: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

14

NEW TANKS

Allow for “ideal” reactors

Square

3-4 ft freeboard

Overflows between reactors

Page 15: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

15

Pre-Anoxic

Effluent Channel

Swing

Internal Recycle

Post-Aeration

Nitrification

Post-Anoxic

Tank 1

IR

Tank 2

INTERIM TREATMENT

Keep 1 trickling filter online

Site / size restrictions

Build MBBR in 2 stages

Can also bypass Tank 1

Maintenance

Or, if media blockage

Page 16: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

Pre-Purchase Selection

16

Suez (IDI) Kruger Biowater Technology Headworks

Operational deadline – June 2016

Pre-purchased MBBR

Lowest life-cycle, capital costs

Potential change to IFAS in future

Page 17: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

17

New 5 mm screens and gritPHASE 1 (INTERIM) Headworks

Tricking FilterNit. Tower

Tank 2

Page 18: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

18

Headworks

Status: construction near completion

PHASE 2 (FINAL) HeadworksTank 1 + 2

Solids HandlingOperations

Page 19: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

19

LESSONS FROM CONSTRUCTION

IR zone flap gates

High mixing velocity

Media back into IR zone

Flat screen replacement

Still - mixing is good!

Keeps media from blocking

Square tanks, air scour facilitate roll

Warranty lengths

Tank 2 end near performance test

Page 20: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

20

CASE STUDY #3: OLEAN, NY

Existing 4 MGD ADF, 7 MGD peak

Expand peak to 12 MGD

New winter NH3-N - 10.7 mg/L

Project Goals

Respond to consent order

Add SC to meet 10 states SOR

SPDES violations, wet weather

Page 21: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

21

Initial Approach

3rd Final Clarifier

4th Aeration BasinDigester Complex

All new infrastructure

Difficult subsurface conditions

Reduces open space

Page 22: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

22

Approach 2

3rd Final Clarifier

Convert 3 Aeration Basins to IFAS / MBBRDigester Complex

MBBR + IFAS

Less excavation

MBBR < 4 MGDIFAS > 4 MGD

Page 23: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

23

Approach 3IFAS

Rebuild Existing Digester Complex

Convert 2 Aeration Basins to IFAS

Convert Aeration Basin 3 into SC

Benefits Obstacles

Page 24: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

Pre-Selection (x2)

24

IDI Kruger Biowater Technology Evoqua

First try – Bidders determine tank configuration

Two “lowest bids” – capital vs. life-cycle

Owner wanted to select on capital

Restructured evaluation and re-bid

Biowater BWT-X

Lowest capital, life-cycle costs

Described more detail of tank segmentations (1 wall) and life cycle calcs

Page 25: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

Existing eff trough and retention screen wall with air scour

FRP baffle wall 70/30 split

IFAS zone

MLSS Zone

RETROFITTING TANKAGE

Carved tanksMLSS + IFAS

No mid-tank screens required

Status: in construction. GC Inherited Pre-Selection Contract

Page 26: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

Summary and Lessons Learned

26

Expand treatment within existing tanks or small footprint

Square reactors or mid-tank IR wells

3-4 ft freeboard, overflows

Hydraulic drops, screens contain media

Air scour cleans screens, encourages mixing

Level sensors / switches add operational fail safes

Pre-purchase/selection to streamline design coordination

Akin to Design Build

Clearly state selection criteria – translate client goals into installed product

Keep vendors abreast of schedule changes

Page 28: Fix it with Fixed Film: The Details of IFAS/MBBR Design and

28

CONVERSION OF AERATION TANK TO THIRD FINAL CLARIFIER

Existing clarifiers limited by surface overflow rate for

single stage nitrification

Resolved by converting rectangular

concrete tank to final clarifier

Chain and flight collector system installed in two

channels

Includes scum and WAS removal

Increases plant capacity from 9.1

MGD to 12.7 MGD (Design Peak)