  • 8/11/2019 FLAME- Final Layout

    1/8

    BOILERINDIA

    VIII.APRIL 2014|INFO BOARD

    FLAME

    IndexSudhanshus Message :The Path AheadThe Second Sex?Cover StoryKaleidoscopeMix Bag Pragati Project UpdatesThrough The LookingGlass RefelctionsZenith

    Key Achievments andtrainingsOur VoiceShowcasing the talents ofour employees

    Dear Colleagues,

    At the outset, I would like to greet you all as this is my first personal message to the teamsince I have joined. Past 7-8 months have been pretty eventful and hectic. Meetingpeople, understanding how we work and taking over the responsibility from SteveSchmidt

    The Last couple of months have also brought some good news for all of us We havebeen recently awarded four projects. Neyveli, Angul LOI, Darlipalli and North Karanpura.So the good thing here is that we have our hands full but it is not going to be an easy journey. We are bound to face challenges while executing these projects.

    I am however confident that we can meet these challenges and very positively respondto the changes in the market. Our success will come from our expertise, innovationcapabilities, engineering competencies but more than anything from our commitment tothe values and vision of Alstom. We have already achieved a lot together, and I dobelieve that Boilers India has a very promising and exciting future.

    India is one of the most dynamic, challenging and rewarding places to work in thepresent Global scenario. We are very lucky to witness this deep evolution of the countryand with it the business we are working in.

    The entry of new players in the market and the changing political dynamics has made itvery crucial that we excel in every single thing we do. We must ensure that we are allcommitted to the d2e approach while keeping in mind the DISHA vision envisaged for thebusiness because that is how growth happens, one gesture, one person, and one momentat a time. We must not forget,

    The strength of the team is each ind ividual member. The strength of eachmember is the team

    We have strong ambitions requiring us to develop continuously; this automaticallycreates the need for a more vibrant and stronger internal communication system.FLAME fulfils that crucial need, simulating a network which makes us know each otherbetter. It is YOUR magazine, YOUR ideas, YOUR achievements, experiences anddiscoveries which makes it a real pleasure to release another edition of it. Hope youenjoy reading it !!

    Sudhanshu

  • 8/11/2019 FLAME- Final Layout

    2/8

    ALSTOM 2012. ALSTOM, the ALSTOM logo and any alternative version thereof are trademarks and service marks of ALSTOM. Theother names mentioned, registered or not, are the property o f their respective companies. The technical and other data contained in thisdocument is provided for information only. ALSTOM reserves the right to revise or change this data at any time without further notice.

    Flame| Noida Apr 2014

    WELCOME to a 3.0 material world 3 D Printing also known as additive manufacturing is a processof generating a 3-D model by thin slicing.

    GhumakkarhLooking for a delightful vacation to a nearby place?

    DEORIA TAL: Uttarakhand (Altitude: 2438)Distance from Delhi: 420 Km+ 2km TrekBest Season: March-May, October-November

    Did I hear Merger? Kaleidoscope

    Insanity is doing the same thing, over and over again, but expecting different results

    Sherman

    Antitrust

    Act

    triggers awave of

    mergers,

    1800

    firms

    disappea

    r

    Wall

    street

    Crash

    ends asecond

    wave of

    US

    mergers

    Trend of

    creation of

    conglome

    rates and

    holding

    companies

    e.g. GE

    Wave

    collapsed

    in 70s oil

    crisis

    Deregulation

    and creation

    of new

    instrumentsand markets Stock

    MarketCollapse

    Endsfourthphase

    BIGGEST OF THEM ALL

    Why Mergers and Acquisitions

    Mergers & Acquisitions - The Timeline

    Acquisitions to gainaccess to

    knowledge-basedassets,

    Formationof trade

    zones suchas

    EU,NAFTAe.g.

    BP,GSK

    Operating Synergies

    Financial Synergies

    Managerial Synergies

    .COMCRASH

    5th waveends

    Sixthphase

    kickstarte

    d withthecontinuat

    ion oftrends in

    90s

    Lowinterest

    ratecoupled

    withendlesscreditfuelled

    the M&A

    R

    E

    C

    E

    S

    S

    I

    O

    N

  • 8/11/2019 FLAME- Final Layout

    3/8

    ALSTOM 2012. ALSTOM, the ALSTOM logo and any alternative version thereof are trademarks and service marks of ALSTOM. Theother names mentioned, registered or not, are the property o f their respective companies. The technical and other data contained in thisdocument is provided for information only. ALSTOM reserves the right to revise or change this data at any time without further notice.

    Flame| Noida Apr 2014

    USES

    3D object modelled by a CAD Design sent to printer

    The printer makes passes,releasing a small amountof material, layer by layer

    Addition of layers-The final product

    ADVANTAGES

    Used for printing of human body partse.g. human jaws

    Used by defence departments formanufacturing highly specialised aerospace

    Designers and architects use 3 D printingto make a prototype

    Used for manufacturing auto parts

  • 8/11/2019 FLAME- Final Layout

    4/8

    ALSTOM 2012. ALSTOM, the ALSTOM logo and any alternative version thereof are trademarks and service marks of ALSTOM. Theother names mentioned, registered or not, are the property o f their respective companies. The technical and other data contained in thisdocument is provided for information only. ALSTOM reserves the right to revise or change this data at any time without further notice.

    Flame| Noida Apr 2014

    BARH II (2660) was the first contract signed by BHEL

    with NTPC under Collaboration Agreement withALSTOM for Supercritical Boilers. It is now fullyerected, Hydro test completed and trial synchronizationdone. Soon, it will be the first live & performingsupercritical Boiler under Alstom Technology In India.KHRISHNAPATNAM (2800) was the second project, itshydro Test and Steam Blowing have been donesuccessfully and it will be commissioned soon. In otherprojects where Alstom has already completed thesupplies like BARA (3660), YERMARAS (2800),BELLARY (1700) , the construction is in full swing.

    So, a normal day in thelife of a constructionengineer remains intensive

    throughout the day but isalso rewarding. It throwsto you enough challengeswhich will teach you waybetter than any book CHANDAN MISHRAConstruction Engineer

    MOUDA (2660) Congratulations to Mouda Project Team for Project Key Achievements as below

    Replicating Barh-II design with value additions in Mouda project. Thereby, setting a model for executing projects using aplatform design.Engineering completed in 50% of the as Sold hours.First time supplier List established with BHEL/NTPC for raw materials and Bought-outs.All the main pressure parts materials dispatched 7 months in advance of contractual schedule.All PO for Bought outs were placed within 21 months and supplies started within 19 month of NTP.Establishing MQPs with NTPC which are also replicated in Nabinagar and Gadarwara projects.Design standards for elbows established.Significant improvements achieved in cash flows by advancing deliveries.

    SURATGARH (2660)

    Congratulations to Suratgarh Project Team to achieve first important milestone with start of shipment for first pressure partconsignment to Project Site, 6 months prior to contractual shipment start date.

  • 8/11/2019 FLAME- Final Layout

    5/8

    ALSTOM 2012. ALSTOM, the ALSTOM logo and any alternative version thereof are trademarks and service marks of ALSTOM. Theother names mentioned, registered or not, are the property o f their respective companies. The technical and other data contained in thisdocument is provided for information only. ALSTOM reserves the right to revise or change this data at any time without further notice.

    Flame| Noida Apr 2014

    `

  • 8/11/2019 FLAME- Final Layout

    6/8

    ALSTOM 2012. ALSTOM, the ALSTOM logo and any alternative version thereof are trademarks and service marks of ALSTOM. Theother names mentioned, registered or not, are the property o f their respective companies. The technical and other data contained in thisdocument is provided for information only. ALSTOM reserves the right to revise or change this data at any time without further notice.

    Flame| Noida Apr 2014

    Through the looking glassThough the roads been rocky it sure feels good to me

    Xuanzang Xu-An-Zang? What a strange name? Who is he and whyare we talking about him?He was a Chinese Buddhist Monk who made a 17 year journey (covering more than 20000 miles on foot andwithout the aid of any maps or modern gadgets) in 629 C.Eto reach India.

    17 Years? Really??Why was he so desperate to reach India?He believed that true knowledge and wisdom could only be

    obtained by coming to India The Land of Buddha. Hewanted to answer questions that were troubling ChineseBuddhists in those days.

    Hard to believe? Are you sure that he had no secret Missionin Mind??Absolutely.Unlike travellers like Vasco Da Gama, Columbusand Bartolomeu Dias who did it for Money, Glory, Religiouscampaigning XZ was motivated only by the thirst forknowledge.

    Was he successful? What did he do in India?He not only studied Buddhism in detail by staying inVarious Indian cities but also learned Yoga Shastras inNalanda University.

    How did he convince the Chinese Monks back home abouthis insights after he returned?He took back with him 657 copies of books on Buddhismon 20 horses. The entire collection was translated intoChinese from Sanskrit under his supervision and placed in aknowledge temple which still exists in China.

    I never read anything about Buddhism? Is it thatinteresting?Strange, how little we know about our past. Specially intimes sought with so much strife, when Buddhas messageof tolerance and peace hold more relevance than everbefore.

    I never thought Chinese people had any respect for theIndian way of life.This not only shows how little we know about our ownpast, but about our neighbours as well. There is an entire

    world beyond Europe and America waiting to be explored.

    Penned By: G Gopinath

    ts a miracle to be alive

    When 11 Alstom employees got stuck at a landslide inHimachal Pradesh. Th eir miracul ous adventure

  • 8/11/2019 FLAME- Final Layout

    7/8

    ALSTOM 2012. ALSTOM, the ALSTOM logo and any alternative version thereof are trademarks and service marks of ALSTOM. Theother names mentioned, registered or not, are the property o f their respective companies. The technical and other data contained in thisdocument is provided for information only. ALSTOM reserves the right to revise or change this data at any time without further notice.

    Flame| Noida Apr 2014

    Boiler standardization for coal based 660 MW Thermal power plants -

    India Boiler team has recently developed a product/platform concept and evaluates the wide range of Coal -which covers morethan 60% of Indian market and can yield guarantee values to mee ts different customers specification. The Coal range hasbeen classified as medium grade coal and thus named this development project as RP660MGI. This decision was made keepingin mind the tough competitive environment and the standardized product which is required to suit different customer acrossthe country.

    The journey involved multiple discussions between various partners, mainly Alstom plants group which resulted on thedevelopment of the product. It has successfully passed the design gate review for its commercialization and Alstom is bidding

    majority of the proposals based on the platform concept.Following are the salient features of standardized boiler as a product which shall be considered as unique selling point.

    Suitable for vide variety of Coal. Suitable for different location across Indian terrain. Ease of Construction. Better operational efficiency at site. Safe design. Enhanced product quality Proven technology across globe. Reduced execution cycle time. Optimized structure.

    Anshul Verma

    Project Engineering

    CONGRATULATIONS

    NIKHIL KHURANAfor acquiring Project Management Professional (PMP) Certification, a global credential forProject Managers from Project Management Institute, USA in Nov2013.

    ZenithKnowledge is Power? No. Knowledge on its own is nothing, but the application of useful knowledge, now that is powerful

    Till date we have received 12 Nos. Supercritical Boiler orders from BHEL @ total Alstom value of around 1.4 BUSD. Thisvalue includes recently received projects namely Darlipalli (2x800 MW) & North Karanpura (3x660 MW).

    We have now entered the market with BHEL for a new design of Tower Type Boilers and have received a prestigious orderfor design, manufacture, supply, erection & commissioning of Neyveli (2x500 MW) @ value approx. 168 MUSD.

  • 8/11/2019 FLAME- Final Layout

    8/8