flexi configurations

94
Creating FCOA Configurations DN70128475 Issue 3-0 en 17/06/2008 # Nokia Siemens Networks 1 (158) 471841A.101 Nokia Flexi EDGE Base Station, Rel. EP2, Product Documentation, v.1

Upload: eduardo-riquelme-villalobos

Post on 28-Nov-2014

758 views

Category:

Documents


16 download

TRANSCRIPT

Page 1: Flexi Configurations

Creating FCOA Configurations

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 1 (158)

471841A.101Nokia Flexi EDGE Base Station, Rel. EP2,Product Documentation, v.1

Page 2: Flexi Configurations

66 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 3: Flexi Configurations

Appendix A Installation tools and torque values

A.1 Installation tools for Flexi EDGE BTS

This list covers all Flexi EDGE BTS installation options: stack, wall, pole,Flexi Cabinet for Indoor (FCIA), Flexi Cabinet for Outdoor (FCOA), Citytalkcabinet, feederless sites.

Table 7. Installation tools

Installation tools Usage

ESD wrist strap and cable Module/sub-module installation

TORX screwdriver set: T10, T20, T25, T45 . Installing modules (T25). Installing casing kits (T25). Module grounding (T25). FCIA/FCOA/FCFA/FCSA/FMFA mechanics

(T25). Installing sub-modules (T20). Fan plate assembly (T20). Anchoring EMIA standoff casing (T45). FCIA site grounding (T45). Isolating cable clamps (T10). EMIA door alarm kit (T10)

Socket or open-ended spanner (wrench) set:

8 mm (5/16 in.), 13 mm (1/2 in.), 17 mm (11/16) in.), 19 mm(13/16 in.)

Torque wrench is recommended for fastening the DC input lug.

. DC power terminal nuts (17 mm)

. Plinth site grounding (13 mm)

. FCOA site grounding (13 mm, 8 mm)

. Anchoring cabinets/plinths (19 mm)

Folding knife . Unpacking. Routing cables through cable entries. Preparing power and ground cables

Adjustable wrench General installation tool

Side cutters Cutting tie wraps, general installation tool

Crimping tool for 16 mm2 (6 AWG), 25 mm2 (4 AWG), 35 mm2

(2 AWG), or 50 mm2 (1/0 AWG) cable lugsGrounding and DC power input cables

Torque wrench for antenna cables (size depends on antennajumper/feeder cable size and manufacturer)

Connecting antenna cables to ERxA or ECxA

Cable ties Routing cables

Tape measure General installation tool

Flashlight, pocket lamp or torch General installation tool

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 67 (158)

Installation tools and torque values

Page 4: Flexi Configurations

Table 7. Installation tools (cont.)

Installation tools Usage

Drill with bit set: 10 mm (3/8 in.), 12 mm (15/32 in.) . Anchoring cabinets/plinths (12 mm). EMIA installation (10 mm)

Marker, pen, or comparable tool General installation tool

Pliers General installation tool

Level General installation tool

Flathead screwdriver FPMA AC power terminals

Allen (Hexagon) keys: 4 mm (5/32 in.), 5 mm (3/16 in.), 6 mm(7/32 in.), 8 mm (5/16 in.)

. VMPB/FPKA pole mounting kit (8 mm)

. EMIA installation (4 mm, 5 mm, 6 mm)

. Feederless sites (grounding kit) (5 mm)

Thread locking compound (medium strength, non-permanent),for example Loctite 242 or equivalent

. Installation on a pole or wall

. FMSA

Vacuum cleaner or broom with dust pan EMIA installation

Saw Feederless sites

Heat gun for cable shrinking sleeves Feederless sites

A.2 Torque values

Nokia Siemens Networks strongly recommends that you tighten to thefollowing torque values. These values assume the use of a lubricated boltor fastener. Use these values unless stated otherwise.

Figure 33. Torque wrench

DN70234447

68 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 5: Flexi Configurations

Table 8. Torque values for the BTS

Size Type Usage Torque

M3 Screw, TORX pan head EMIA 1.5-2.0 Nm (1.11-1.47 ft-lb)

M4 Screw, TORX cylinderhead

FCSA and FCFA fans 1.2 - 1.6 Nm (0.9 - 1.2 ft-lb)

M4 Screw, TORX pan heador thumb (knurled head)

. EWxx and FIxA installation

. ESMA, EXxA, ECxA, ESEA, andFPDA fan plate assembly

. FMAA

2.7-3.3 Nm (1.99-2.43 ft-lb)

M5 Screw, TORX thumb(knurled head) or panhead

EMxA front and rear covers 2.0 - 2.5 Nm (1.5-1.8 ft-lb)

M5 Screw, TORX pan heador thumb (knurled head)

. EMxA casings and cable entries

. Mounting modules

. Auxiliary boxes

. EMIA

. Module grounding

. FCIA site grounding (NEBS)

. FMAA

3.5-4.2 Nm (2.58-3.10 ft-lb)

M5 Nut, Hex FCOA site grounding 3 Nm

M5 Screw, slotted flathead . EMIA. Module grounding

3.5-4.2 Nm (2.58-3.10 ft-lb)

M6 Screw, Allen or TORXhead

. EMIA

. FMAA

4.2-5.8 Nm (3.1-4.28 ft-lb)

M6 Nut, Hex EMIA 4.2-5.5 Nm (3.1-4.05 ft-lb)

M8 Screw, TORX or hexhead

FCIA/EMIA/plinth site grounding 8.0-10.0 Nm (5.9-7.37 ft-lb)

M8 Nut, Hex FCOA site grounding 5 Nm

M8 Screw, hex head Plinth adapter mechanics 10.0 Nm (7.37 ft-lb)

M10 Nut, Hex ESMA, ESEA, FPDA and EOCA DCpower terminals

10.0 - 14.0 Nm (7.0 - 9.8ft -lb)

M10 Bolt, Allen head VMPB/FPKA pole mounting kits 29 Nm (21.4 ft-lb)

M12 (15/32in.)

Anchoring bolts Anchoring FCIA/FCOA/FMFA to floor(not included in Flexi EDGE delivery)

49.0 Nm (36.1 ft-lb)

7/16 DIN Antenna connector Antenna jumper cables (not includedin Flexi EDGE delivery)

25 Nm (18.5 ft-lb

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 69 (158)

Installation tools and torque values

Page 6: Flexi Configurations

Appendix B Bending diameter for cables

B.1 Bending diameter for cables

The table below shows the minimum bending diameter of Nokia FlexiEDGE BTS cables.

Static bending diameter refers to the allowed bend while the cable is fixed(for example, when the cable is tied to the side of the cabinet). Dynamicbending diameter refers to the allowed bend while the cable is in motion(for example while routing the cable through the cable entry).

For the bending diameter of antenna jumper cables, refer to the cablemanufacturer.

Table 9. Bending diameter of Nokia Flexi EDGE BTS cables

Cable Static bendingdiameter

Dynamic bendingdiameter

Cable name Cable code

RF cable 172 mm (6.8 in.)

RF cable 275 mm (10.8 in.)

RF cable 1300 mm (51.2 in.)

994931

994933

994936

30 mm (1.2 in.) 35 mm (1.4 in.)

RF cable 71 mm (2.8 in.) 994980 18 mm (0.7 in.) 18 mm (0.7 in.)

Bus cable 1054 mm (41.5 in.)

Bus cable 1554 mm (61.2 in.)

994938

994939

40 mm (1.6 in.) 45 mm (1.8 in.)

Power cable 1188 mm (46.8 in.) 994940 45 mm (1.8 in.) 50 mm (2.0 in.)

Optical cables 1) 140 mm (5.6 in.) 140 mm (5.6 in.)

DP cable

EMCA LMP cable

Sync cable for Flexi

Sync cable for UltraSite

Sync LMU cable

Q1 cable

MIBBU EPA alarm cable

Clock test cable

994969

471370

471371

471372

471377

471384

471464

471521

40 mm (1.6 in.) 45 mm (1.8 in.)

70 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 7: Flexi Configurations

1) See the product codes for optical cables in Contents of the transmissioncable deliveries (FIQA FIYA) in Nokia Flexi EDGE BTS System Module(ESMA) Description and Contents of the optical cable deliveries inOptional Items Description.

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 71 (158)

Bending diameter for cables

Page 8: Flexi Configurations

Appendix C Configuration features

C.1 Flexi EDGE BTS configuration features

C.1.1 RF Cable Auto-detection

The Flexi EDGE Base Station supports automatic RF Cable Auto-detection during commissioning for common configurations. RF CableAuto-detection reduces integration time because RF cabling does notneed to be manually defined.

For a description of RF Cable Auto-detection, see Auto-detection of SiteConfiguration and RF Cable Auto-detection in the Nokia Flexi EDGE BTSFeature Descriptions document.

For information on supported configurations, see RF auto-detectionsupported configurations in the Nokia Flexi EDGE BTS Commissioningdocument.

C.1.2 Optimised configurations

Upgrade-optimised configurations

In upgrade-optimised configurations, odd-number sectors (such as 1+1, 3+3+3, 5+5) are built like the next even-numbered configurations. Forexample, a 1+1 configuration is built like a 2+2 configuration, although thesite is operational as a 1+1. This allows easy future expansion withreduced downtime. A site visit may not be needed for expansion.

RF Cable Auto-detection is supported with upgrade-optimisedconfigurations.

For examples of RF cabling in upgrade-optimised configurations, seefigures Example of a 1+1 upgrade-optimised configuration with Rxdiversity below and RF cables in 1+1+1/2+2+2 bypass 2UD configurationin section Connecting RF cables.

72 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 9: Flexi Configurations

The dotted line indicates that the cable is installed but it is not in use.

Figure 34. Example of a 1+1 upgrade-optimised configuration with Rx diversity

Cost-optimised configurations

In cost-optimised configurations, the Dual TRX Module (EXxA) carriers (Aand B) are split into separate cell areas. Only pairs of odd-numberedconfigurations can be cost-optimised (such as 1+1, 3+3). Cost-optimisedconfigurations minimise the number of modules and are not recommendedif future expansion is possible at the site.

RF Cable Auto-detection supports cost-optimised configurations.

TxA-TxA RxA1-RxA RxB1-RxBRxAO-RxAI* TxB-TxB

*RxAO-RxAI is pre-installed DN70475304

TxA-TxA RxAO-RxAI* RxA1-RxA RxB1-RxB TxB-TxB

TRX3 TRX4

TRX1 TRX2

Sector2

Sector1

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 73 (158)

Configuration features

Page 10: Flexi Configurations

For an example of RF cabling in cost-optimised configurations, see figuresRX cables in a cost-optimised 3+3 configuration and TX cables in a cost-optimised 3+3 configuration in section 3+3 2-way 2UD cost-optimisedconfiguration.

Antenna-optimised configurations

Antenna-optimised configurations allow the Dual Duplexer Module (ERxA)sides A and B to be split into separate cell areas. This minimises thenumber of antennas.

A sector must have two or more antennas to support Rx diversity, as Rxdiversity is not supported across BTS cells.

RF Cable Auto-detection supports antenna-optimised configurations withone exception: a BCF reset is needed instead of a sector reset, if anychanges to RF cabling are made during runtime.

RxAO-RxAI is pre-installed.

DN

DN

TxA-TxA

RxA-RxA1

RxB1-RxB TxB-TxB

RxA0-RxAI*

RxA-RxB1

RxB-RxB2 TxB-TxB

OUT-TxB

OUT-TxA

TxA-TxA

Sector1

Sector2

DN70475316

74 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 11: Flexi Configurations

Figure 35. Example of a 2 +2 antenna-optimised configuration, without diversity

RxAO-RxAI is pre-installed.

Figure 36. Example of a 3 +3 antenna-optimised configuration with Rx Diversity

DN

TxB-TxB

RxA0-RxAI

TxA-TxA RxB-RxB2

TxA-TxA RxB-RxB1 TxB-TxB

TxA-TxA

RxA0-RxAI RxA-RxA1 RxA-RxA2

RxB-RxB1

TRX5

TRX7

TRX3

TRX1 TRX2

Sector2

Sector1

DN70475328

TRX6

RxA-RxA1

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 75 (158)

Configuration features

Page 12: Flexi Configurations

C.1.3 Antenna sharing (co-siting)

The Dual Duplexer Module (ERxA) can be configured to share the Rxdiversity signal between Flexi EDGE BTS and an external BTS (or otherreceiver).

For details, see Dual Duplexer Module (ERxA) Description.

C.1.4 Internal switching to 4-way uplink diversity (4UD)

Flexi EDGE BTS uses an internal switch to designate configurations as 2-way uplink diversity (2UD) or 4-way uplink diversity (4UD). The switch isbased on the Site Configuration File (SCF):

. If RxDivA/B connectors are not defined as in use in the SCF, theswitch is set to 2UD.

. If RxDivA/B connectors are defined as in use in the SCF, the switchis set to 4UD.

The Site Configuration Files are used for commissioning the Flexi EDGEBTS. For details, see Nokia Flexi EDGE BTS Commissioning.

The RxDivA/B connectors on the Dual TRX (EXxA) Module are also usedfor configurations which require splitting a Dual TRX Module into separatecell areas (such as cost-optimised configurations, 1+3).

For details about the Dual TRX Module connectors, see Dual TRX Module(EXxA) Description.

C.2 Mixed Remote Tune Combiner (ECxA) and Dual Duplexer Module(ERxA) configurations

Configurations with a mix of Remote Tune Combiner (ECxA) and DualDuplexer Module (ERxA) sectors are allowed. In these configurations,BUS and PWR cabling should follow table Bus and internal power cablingin mixed Remote Tune Combiner and Dual Duplexer Moduleconfigurations. The table shows to which ESMA and ESEA BUS and PWRconnectors the cables from each EXxA and ECxA must be connected.

A maximum of two Remote Tune Combiner Modules and nine DualDuplexer Modules are allowed per site in mixed Remote Tune Combinerand Dual Duplexer Module configurations. For RF cabling instructions,follow the appropriate instructions for each sector.

76 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 13: Flexi Configurations

Table 10. Bus and internal power cabling in mixed Remote Tune Combinerand Dual Duplexer Module configurations

Module ESMA BUS ESMA PWR ESEA BUS ESEA PWR

ECxA 1 1 1/7

ECxA 2 2 2/8

EXxA 1 1 1/7

EXxA 2 2 2/8

EXxA 3 3

EXxA 4 4

EXxA 5 5

EXxA 6 6

EXxA 7 4/10 7

EXxA 8 5/11 8

EXxA 9 6/12 9

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 77 (158)

Configuration features

Page 14: Flexi Configurations

Appendix D Common configurations

D.1 Common cabinet configurations

The following table gives details about common, symmetrical hardwareconfigurations for FCIA and FCOA installations. For details aboutasymmetric configurations, see Common sector configurations.

For details about RF cable autodetection and SCF template files, seeNokia Flexi EDGE BTS Commissioning.

Table 11. Common FCOA and FCIA configurations

Config. TXcombining

RXdiv.

# ofEXxA

# ofERxA

# ofEWxx

# ofECxA

# ofESMA

# ofESEA

# ofFPDA1)

# ofFPAA/(FPMA)1)

# ofantennas

1+1 Bypass No/1UD

1 1 0 0 1 0 1 1 2

1 to 2Omni

Bypass 2UD 1 1 0 0 1 0 1 1 2

2 2-way 1UD 1 1 1 0 1 0 1 1 1

3-4 4-way 1UD 2 1 3 0 1 0 1 1 1

3 Omni 2-way 2UD 2 1 2 0 1 0 1 1 2

4 Omni 2-way 2UD 2 1 2 0 1 0 1 1 2

5 Omni 4-way 2UD 3 1 5 0 1 0 1 1 2

6 Omni 4-way 2UD 3 1 5 0 1 0 1 2 2

7 Omni 4-way 2UD 4 1 6 0 1 0 1 2 2

8 Omni 4-way 2UD 4 1 6 0 1 0 1 2 2

3 to 4Omni

RTC 2UD 2 0 0 1 1 1 1 1 2

5 to 6Omni

RTC 2UD 3 0 0 1 1 1 1 1 to 2 2

7 to 8Omni

RTC 2UD 4 0 0 2 1 1 1 2 2

9 to 10Omni

RTC 2UD 5 0 0 2 1 1 2 2 2

11 to 12Omni

RTC 2UD 6 0 0 2 1 1 2 3 2

1+1 Bypass 2UD 2 2 0 0 1 0 1 1 4

78 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 15: Flexi Configurations

Table 11. Common FCOA and FCIA configurations (cont.)

Config. TXcombining

RXdiv.

# ofEXxA

# ofERxA

# ofEWxx

# ofECxA

# ofESMA

# ofESEA

# ofFPDA1)

# ofFPAA/(FPMA)1)

# ofantennas

2+2 Bypass 2UD 2 2 0 0 1 0 1 1 4

3+3(upgradeopt.)

Bypass 2UD 4 4 0 0 1 0 1 2 6

3+3 (costopt.)

Bypass 2UD 3 4 0 0 1 0 1 2 6

4+4 Bypass 2UD 4 4 0 0 1 0 1 2 8

4+4 RTC 2UD 4 0 0 2 1 1 1 2

6+12 RTC 2UD 9 0 0 3 1 1 3 4 6

1+1+1/

2+2+2

Bypass 2UD 3 3 0 0 1 0 1 1/2 6

3 DP 2UDor4UD

3 2 3 0 1 0 1 2 3 or 4

4 DP 2UDor4UD

4 2 4 0 1 0 1 2 4

1+1+1 DP 2UD 3 3 3 0 1 0 1 2 6

2+2+2 DP 2UD 6 3 6 0 1 0 2 3 6

1+1+1 IDD/DP 4UD 6 6 0 or 3 0 1 0 1 2 12

2+2+2 IDD/DP 4UD 6 6 0 or 6 0 1 0 2 3 12

3+3+3(upgradeopt.)

2-way 2UD 6 3 6 0 1 0 2 2 6

4+4+4 2-way 2UD 6 3 6 0 1 0 2 3 6

4+4+4 RTC 2UD 6 0 0 3 1 1 2 3

5+5+5 4-way 2UD 9 3 15 0 1 1 2 3 6

6+6+6 4-way 2UD 9 3 15 0 1 1 3 4 6

7+7+7 4-way 2UD 12 3 18 0 1 1 3 5 6

6+6+6 RTC 2UD 9 0 0 3 1 1 3 4 6

8+8+8 4-way 2UD 12 3 18 0 1 1 3 5 6

2+2+2 & 2+2+2

Bypass 2UD 6 6 0 0 1 0 2 3 12

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 79 (158)

Common configurations

Page 16: Flexi Configurations

1) Optional depending on the external power source.

Table 12. Cost-optimised and antenna-optimised configurations

Config. TXcombining

RX div. # ofEXxA

# ofERxA

# ofEWxx

# ofESMA

# ofESEA

# ofFPDA1) 2)

# of FPAA/(FPMA) 1)3)

# ofantennas

3+3 cost-opt.

2-way 2UD 3 2 4 1 0 1 2 4

5+5 cost-opt.

4-way 2UD 5 2 10 1 0 2 2 4

3+3+3cost-opt.

2-way 2UD 5 3 6 1 0 2 3 6

6 ant-opt. 2-way 2UD 3 2 3 1 0 1 2 3

6+6 ant-opt.

2-way 2UD 6 3 6 1 0 2 3 6

6+6+6 ant-opt.

2-way 2UD 9 5 9 1 1 3 4 9

12 ant-opt. 4-way 2UD 6 2 9 1 0 2 3 3

12+12 ant-opt.

4-way 2UD 12 3 18 1 1 3 5 6

3 ant-opt. Bypass 2UD 2 2 0 1 0 1 2 3

3+3 ant-opt.

Bypass 2UD 3 3 0 1 0 1 2 6

1) Optional depending on the external power source.

2) Three FPDAs are needed for a full 24-carrier configuration.

3) One FPAA supports five normal carriers and one FPMA provides amaximum of four FPAAs slots.

80 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 17: Flexi Configurations

D.2 Common sector configurations

Table 13. Common sector configurations

# ofcarriers

TXcombining

RX div. # ofEXxA

# ofERxA

# ofEWxx

# ofECxA

# ofESMA

# ofESEA

# ofantennas

1 Bypass 1UD 1 1 0 0 1 0 1

1 Bypass 2UD 1 1 0 0 1 0 2

2 Bypass 2UD 1 1 0 0 1 0 2

3 Bypass 2UD 2 2 0 0 1 0 3

4 Bypass 2UD 2 2 0 0 1 0 4

1 DP 2UD 1 1 1 0 1 0 2

2 DP 2UD 2 1 2 0 1 0 2

3 DP 2UD or4UD

3 2 3 0 1 0 2UD=3,4UD=4

4 DP 2UD or4UD

4 2 4 0 1 0 4

1 IDD or DP 4UD 2 2 IDD=0,DP=1

0 1 0 4

1 IDD 2UD 1 1 0 0 1 0 2

2 IDD or DP 4UD 2 2 IDD=0,DP=2

0 1 0 4

2 IDD 2UD 2 2 0 0 1 0 4

2 2-way 1UD 1 1 1 0 1 0 1

3 2-way 2UD 2 1 2 0 1 0 2

4 2-way 2UD 2 1 2 0 1 0 2

3-4 4-way 1UD 2 1 3 0 1 0 1

5 to 8 4-way 2UD 3 to 4 1 5 to 6 0 1 0 2

Up to 6 RTC

(6-way)

2UD Up to3

0 0 1 1 1 2

7 to 12 RTC

(6-way)

2UD 4 to 6 0 0 2 1 1 2

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 81 (158)

Common configurations

Page 18: Flexi Configurations

Appendix E Creating common configurations

E.1 4+4+4 2-way 2UD configuration in FCOA

For creating this configuration, you need:

. 6 Dual TRX Modules (EXxA)

. 3 Dual Duplexer Modules (ERxA)

. 1 System Module (ESMA)

. 6 Wideband Combiner Submodules (EWxx)

. 1 Flexi Cabinet for Outdoor (FCOA)

. If 24V DC or AC power is used, see module installation order inOptional power modules (FPDA and FPMA) in Flexi EDGE BTSconfigurations in document Installing Nokia Flexi EDGE BTSOptional Items.

The following figures show the module installation order and cabling forthis configuration. For detailed instructions on how to install the cabinetand install and cable the modules, see document Installing Flexi Cabinetfor Outdoor (FCOA) and sections Installing the modules for a 2+2+2configuration and Connecting cabling for a 2+2+2 configuration in thisdocument.

Note that the air guide plate is required if the System Module or SystemExtension Module are installed in the vertical left rack. Otherwise, usedummy panels in the empty slots.

The System Module can be installed horizontally or vertically as shown inthe figures below. Vertical installation is recommended if you are going toexpand to an 8+8+8 configuration later.

82 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 19: Flexi Configurations

Figure 37. Modules in a 3+3+3/4+4+4 FCOA configuration, ESMA horizontal

If you are using the optional power modules or other optional items, seeinstructions in Installing Nokia Flexi EDGE BTS Optional Items.

Modules

DN

DN

DN

EXxAEWxx

ERxA

ESMA

EXxAEWxx

EXxAEWxx

ERxA

EXxAEWxx

EXxAEWxx

ERxA

EXxAEWxx

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 83 (158)

Creating common configurations

Page 20: Flexi Configurations

Figure 38. Modules in a 3+3+3/4+4+4 FCOA configuration, ESMA vertical

Modules

DN

DN

DN

DN70239442

EXxAEWxx

ERxA

EXxAEWxx

EXxAEWxx

ERxA

EXxAEWxx

EXxAEWxx

ERxA

EXxAEWxx

ESMA

Air guideplate

Space foroptionalMIBBU

84 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 21: Flexi Configurations

Figure 39. External power cables in a 3+3+3/4+4+4 FCOA configuration

Externalpowercabling

DN

DN

DN70218981

DN

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 85 (158)

Creating common configurations

Page 22: Flexi Configurations

Figure 40. Dual Duplexer Module cable

DN70184091

DN

ER_A

Pre installed

86 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 23: Flexi Configurations

Figure 41. Bus cables in a 3+3+3/4+4+4 FCOA configuration

BUS-BUS6

BUS-BUS2

BUS-BUS3

BUS-BUS4

BUS-BUS1

BUS-BUS5

DN70219002

DN

DN

DN

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 87 (158)

Creating common configurations

Page 24: Flexi Configurations

Figure 42. Internal power cables in a 3+3+3/4+4+4 FCOA configuration

DN70218942

PWR-PWR6

PWR-PWR5

PWR-PWR2

PWR-PWR3

PWR-PWR4

PWR-PWR1

DN

DN

DN

88 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 25: Flexi Configurations

Figure 43. RF cables in a 3+3+3/4+4+4 2-way 2UD configuration

TX Cables

DN

TxA-TxA

TxA-OUT

TxB-TxB

OUT-TxB

TxA-TxA

TxB-TxB

RxAO-RxAI*

*pre-installed

RX Cables

DN

RxB-RxB2

RxA-RxA1

RxA-RxA2

RxB-RxB1

*pre-installed

RxAO-RxAI*

DN70154222

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 89 (158)

Creating common configurations

Page 26: Flexi Configurations

Figure 44. Antenna jumper cables in a 3+3+3/4+4+4 FCOA configuration

DN

DN

DN

AntennaJumpercabling

DN70218966

90 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 27: Flexi Configurations

Figure 45. Transmission cables in a 3+3+3/4+4+4 FCOA configuration

DN

DN

DN

Transmissioncables

DN70224839

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 91 (158)

Creating common configurations

Page 28: Flexi Configurations

E.2 4+4+4 4-way 1UD configuration

The figure below shows the RF cabling for a 4+4+4 4-way 1UDconfiguration. For module installation order, follow the instructions for a 4+4+4 2-way 2UD configuration.

Figure 46. RF cabling for a 4-way 1UD configuration

TX Cables

DN

TxA-TxA TxB-TxB

TxA-TxA

TxB-TxB

RxAO-RxAI*

*pre-installed

RX Cables

DN

RxB-RxA4

RxA1-RxA

RxA-RxA3

RxA2-RxB

*pre-installed

RxAO-RxAI*

DN70518909

TxB-OUT

TxA- OUT

OUT- TxA

92 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 29: Flexi Configurations

E.3 4+4+4 bypass 2UD configuration

The figure below shows the RF cabling for a 4+4+4 bypass 2UDconfiguration. For module installation order, see the instructions for a 2+2+2 and 2+2+2 dual band configuration.

*) RxAO-RxAI is pre-installed.

Figure 47. RF cabling for a 4+4+4 bypass 2UD configuration

DN70519647

RxAO-RxAI*

RX Cables

RxB1-RxBRxA1-RxA

RxA1-RxA RxB1-RxB

RxAO-RxAI*

TX Cables

TXA-TxA

TXA-TxA

TXB-TxB

TXB-TxB

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 93 (158)

Creating common configurations

Page 30: Flexi Configurations

E.4 6 Omni 4-Way 2UD configuration in cabinets

To create a 6 Omni 4-Way 2UD configuration, you will need the followingmodules:

. 3 Dual TRX Modules (EXxA)

. 1 Dual Duplexer Module (ERxA)

. 5 Wideband Combiner Sub-modules (EWxx)

. 1 System Module (ESMA)

. 1 transmission sub-module (FIxA)

If 24V DC or AC power is used, see Common cabinet configurations forpower module requirements.

Modules are installed in the same order as in a stack installation. Seefigure Module installation order in 6 Omni configuration in a stack indocument Creating Stack, Wall and Pole Configurations.

The following figure shows the RF cabling. For all other cables, follow theinstructions for creating a 4+4+4 2-way 2UD configuration.

94 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 31: Flexi Configurations

*) RxAO-RxAI is pre-installed.

Figure 48. RF cabling for a 6 Omni 4-way 2UD configuration

DN70472131

RxB - RxB3

RxB - RxB2

RxB - RxB1

RxA - RxA3

RxA - RxA1

RxAO - RxAI*

TxB - TxB

OUT - TxB

TxB - TxB

TxB - OUT

TxB - TxB

TxA - OUT

TxA - TxA

TxA - TxA

TxA - TxA

TxB - OUT

TxA - OUT

RxA - RxA2

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 95 (158)

Creating common configurations

Page 32: Flexi Configurations

E.5 6+6+6 4-Way 2UD configuration in FCOA

To create a 6+6+6 4-Way 2UD configuration, you need the followingmodules:

. 9 Dual TRX Modules (EXxA)

. 3 Dual Duplexer Modules (ERxA)

. 15 Wideband Combiner Sub-modules (EWxx)

. 1 System Module (ESMA)

. 1 System Extension Module (ESEA)

. 1 transmission sub-module (FIxA)

If 24 V or AC power is used, see tables in Common cabinet configurationsfor 24 V DC or AC power module requirements.

The following figure shows the module installation order. The 2U and 5Ugaps are recommended for future expansion.

96 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 33: Flexi Configurations

Figure 49. Module installation order for a 6+6+6 4-Way 2UD configuration inFCOA

The following figure shows RF cabling for one sector. For all other cables,follow the instructions for a 4+4+4 2-Way 2UD configuration in FCOA.

See also bus and power cabling rules in Appendix Bus and internal powercabling principles for System Extension Module (ESEA).

ESMA

ESEA

DN70472167

Air Guide plate

Air Guide plate

Dummy panels(5U)

ERxA

EXxAEWxx

EXxAEWxx

EXxAEWxx

EXxAEWxx

ERxA

EXxAEWxx

EXxAEWxx

ERxA

EXxAEWxx

EXxAEWxx

EXxAEWxx

DN

DN

DN

DN

DN

DN

DN

DN

DN

Dummy panels(2U)

Dummy panels(2U)

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 97 (158)

Creating common configurations

Page 34: Flexi Configurations

*) RxAO-RxAI is pre-installed.

Figure 50. RF cabling for a 6+6+6 4-Way 2UD configuration

DN70472131

RxB - RxB3

RxB - RxB2

RxB - RxB1

RxA - RxA3

RxA - RxA1

RxAO - RxAI*

TxB - TxB

OUT - TxB

TxB - TxB

TxB - OUT

TxB - TxB

TxA - OUT

TxA - TxA

TxA - TxA

TxA - TxA

TxB - OUT

TxA - OUT

RxA - RxA2

98 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 35: Flexi Configurations

E.6 8 Omni 4-Way 2UD configuration in cabinets

To create an 8 Omni 4-Way 2UD configuration, you need the followingmodules:

. 4 Dual TRX Modules (EXxA)

. 1 Dual Duplexer Module (ERxA)

. 6 Wideband Combiner Sub-modules (EWxx)

. 1 System Module (ESMA)

. 1 transmission sub-module (FIxA)

If 24V DC or AC power is used, see Common cabinet configurations forpower module requirements.

Modules are installed in the same order as in a stack installation. Seefigure Module installation order in 8 Omni configuration in a stack indocument Creating Stack, Wall and Pole Configurations.

The following figures show the RF cabling. For all other cables, follow theinstructions for a 4+4+4 2-Way 2UD configuration.

Figure 51. RF Rx cabling for an 8 Omni 4-Way 2UD configuration

DN70466567

RxB - RxB3

RxB - RxB2

RxB - RxB1

RxA - RxA3

RxA - RxA1

RxAO - RxAI*

RxA - RxA2

DNRxB - RxB4

RxA - RxA4

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 99 (158)

Creating common configurations

Page 36: Flexi Configurations

Figure 52. RF Tx cabling for an 8 Omni 4-Way 2UD configuration

E.7 8+8+8 4-Way 2UD configuration in FCOA

To create an 8+8+8 4-Way 2UD configuration, you will need the followingmodules:

. 12 Dual TRX Modules (EXxA)

. 3 Dual Duplexer Modules (ERxA)

. 18 Wideband Combiner Sub-modules (EWxx)

. 1 System Module (ESMA)

. 1 System Extension Module (ESEA)

DN70466601

TxB - TxB

OUT - TxA

TxB - TxB

OUT - TxB

TxB - TxB

TxB - OUT

TxB - TxB

TxA - OUT

TxA - TxA

TxA - TxA

TxA - TxA

TxA - TxA

TxB - OUT

TxA - OUT

100 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 37: Flexi Configurations

The 24 V DC and AC power options are not supported in Flexi Cabinet forOutdoor (FCOA) with 8+8+8 4-Way 2UD configurations because of lack ofcabinet space. If a 3rd party cabinet, which has sufficient space, is used,see the tables in Common cabinet configurations for 24V DC or AC powermodule requirements.

Figure 53. Module installation order for an 8+8+8 configuration in FCOA

EXxAEWxx

ESMA

ESEA

DN70466504

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

Air Guide plate

Air Guide plate

Dummy plates(3U)

ERxA

EXxAEWxx

EXxAEWxx

ERxA

EXxAEWxx

EXxAEWxx

EXxAEWxx

EXxAEWxx

ERxA

EXxAEWxx

EXxAEWxx

EXxAEWxx

EXxAEWxx

EXxAEWxx

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 101 (158)

Creating common configurations

Page 38: Flexi Configurations

For installation instructions for the System Extension Module, seeInstalling a System Extension Module (ESEA) in document Installing NokiaFlexi EDGE BTS Optional Items.

The figures below show how to connect the RF, bus and internal powercables. For other cables, see Connecting cabling for a 2+2+2configuration.

For detailed bus and power cabling rules for configurations having aSystem Extension Module, see Appendix Bus and internal power cablingprinciples for System Extension Module (ESEA).

Use an extension bus cable 994939 to connect the top (or farthest) DualTRX Module to the System Extension Module. For all other Dual TRXModule connections, use the standard bus cable 994938.

Two 994939 cables are provided in the System Extension Module delivery.Keep the other cable as a spare. It can be used to connect the SystemExtension Module to the System Module, or to connect another Dual TRXModule to the System Extension Module if required by 3rd party cabinetinstallations or if there are other special cable routing requirements.

Figure 54. RF Rx cabling for an 8+8+8 4-Way 2UD configuration

DN70466567

RxB - RxB3

RxB - RxB2

RxB - RxB1

RxA - RxA3

RxA - RxA1

RxAO - RxAI*

RxA - RxA2

DNRxB - RxB4

RxA - RxA4

102 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 39: Flexi Configurations

Figure 55. RF Tx cabling for an 8+8+8 4-Way 2UD configuration

DN70466601

TxB - TxB

OUT - TxA

TxB - TxB

OUT - TxB

TxB - TxB

TxB - OUT

TxB - TxB

TxA - OUT

TxA - TxA

TxA - TxA

TxA - TxA

TxA - TxA

TxB - OUT

TxA - OUT

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 103 (158)

Creating common configurations

Page 40: Flexi Configurations

Figure 56. Bus cabling for an 8+8+8 configuration in FCOA

DN70472061

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

BUS 12

BUS 11

BUS 10

BUS 9

BUS 8

BUS 7

BUS 6

BUS 5

BUS 4

BUS 3

BUS 2

BUS 1

104 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 41: Flexi Configurations

Figure 57. Internal power cabling for an 8+8+8 configuration in FCOA

DN70472085

ESMA PWR 3/9

ESMA PWR 2/8

ESMA PWR 1/7

ESMA PWR 6/12

ESMA PWR 5/11

ESMA PWR 4/10

ESEA PWR 6/12

ESEA PWR 5/11

ESEA PWR 4/10

ESEA PWR 3/9

ESEA PWR 2/8

ESEA PWR 1/7

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 105 (158)

Creating common configurations

Page 42: Flexi Configurations

E.8 DP and IDD configurations

E.8.1 1+1+1 DP 2UD configuration in FCOA

To create this configuration, you need the same modules as for a 2+2+2bypass 2UD configuration. In addition, DP Wideband Combiner Sub-Modules (EWxA) must be installed.

Double Power TRX (DP TRX) is a licence-based application softwareproduct. The licence file must be installed in the BSC before activating thesite.

If you use 24 V DC or AC power, see section Common cabinetconfigurations for power module requirements.

The optional power modules and auxiliary boxes are not shown in thefigures. For more information, see Optional power modules (FPDA andFPMA) in Flexi EDGE BTS configurations in document Installing NokiaFlexi EDGE BTS Optional Items and Installing Flexi Cabinet for Outdoor(FCOA).

106 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 43: Flexi Configurations

Figure 58. Modules in a 1+1+1 DP 2UD configuration in FCOA (ESMAhorizontal)

DN70513223

2U

2U

2U

ESMA

DN

EXxA

ERxA

EWxA

DN

DN

EXxA

ERxA

EWxA

EXxA

ERxA

EWxA

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 107 (158)

Creating common configurations

Page 44: Flexi Configurations

Figure 59. Modules in a 1+1+1 DP 2UD configuration in FCOA (ESMA vertical)

DN70513235

Air guideplate

ESMA

DN

DN

EXxA

ERxA

EWxA

EXxA

ERxA

EWxA

DN

EXxA

ERxA

EWxA

2U

2U

2U

108 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 45: Flexi Configurations

Figure 60. RF and DP cables in a 1+1+1 DP 2UD configuration

E.8.2 2+2+2 DP 2UD configuration

The figure below shows the RF cabling for a 2+2+2 DP 2UD configuration.

The module installation order is otherwise the same as in a 4+4+4 2-way2UD configuration, except Double Power TRX Wideband Combiner Sub-modules (EWxA) must be used.

In wall and pole installation, you will also need 1 Pole and Wall Cable(EPCA) Kit.

Double Power TRX (DP TRX) is a licence-based application softwareproduct. The licence file must be installed in the BSC before activating thesite.

DN70513259

DN

*RxAO-RxAI is pre-installed TxA-TxA

RxA1-RxA RxB1-RxBRxAO-RxAI*

TxB-TxBDP-DP

TxA-OUT

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 109 (158)

Creating common configurations

Page 46: Flexi Configurations

Figure 61. RF and DP cabling for a 2+2+2 DP 2UD configuration

E.8.3 1+1+1 or 2+2+2 DP 4UD configuration in FCOA

To create this configuration, you need the following modules:

. 1 System Module (ESMA)

. 1 transmission sub-module (FIxA)

TX Cables

DN

TxA-TxA TxB-TxB

TxA-TxA

RxAO-RxAI*

*pre-installed

RX Cables

DN

RxB-RxB2

RxA1-RxA

RxA-RxA2

RxB1-RxB

*pre-installed

RxAO-RxAI*

DN70518909

OUT-TxB

TxB-TxB

OUT- TxA

DP-DP

DP-DP

110 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 47: Flexi Configurations

. 6 Dual TRX Modules (EXxA)

. 6 Dual Duplexer Modules (ERxA)

. 6 DP Wideband Combiner Sub-modules (EWxA)

You will also need 4 Upgrade Cable (EUCA) Kits (12 cables).

Note that the effect of using the EUCA Kit for Tx cabling is 0.7 dB with highband, and 0.45 dB with low band. Nokia Siemens Networks recommendsonly using the EUCA cables for Rx cabling in DP configurations.

Double Power TRX (DP TRX) is a licence-based application softwareproduct. The licence file must be installed in the BSC before activating thesite.

If you use 24 V DC or AC power, see section Common cabinetconfigurations for power module requirements.

In 1+1+1 DP 4UD configurations, the second Dual TRX Module per sectoris required to provide power and control for the second Dual DuplexerModule. The second Wideband Combiner Sub-module is requiredbecause full RF cabling is needed to enable RF Cabling Auto-detection.

The optional power modules and auxiliary boxes are not shown in thefigures. For more information, see Optional power modules (FPDA andFPMA) in Flexi EDGE BTS configurations in document Installing NokiaFlexi EDGE BTS Optional Items and Installing Flexi Cabinet for Outdoor(FCOA).

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 111 (158)

Creating common configurations

Page 48: Flexi Configurations

Figure 62. Modules in a 1+1+1/2+2+2 DP 4UD configuration in FCOA (ESMAhorizontal)

DN70513332

ESMA

DN

DN

DN

DN

DN

DN

EXxA

ERxA

EWxA

EXxA

ERxA

EWxA

EXxA

ERxA

EWxA

EXxA

ERxA

EWxA

EXxA

ERxA

EWxA

EXxA

ERxA

EWxA

112 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 49: Flexi Configurations

Figure 63. Modules in a 1+1+1/2+2+2 DP 4UD configuration in FCOA (ESMAvertical)

The following figures show the DP/RF cabling. For all other cables, followthe instructions for a 4+4+4 2-way 2UD configuration in FCOA.

DN70513344

ESMA

Air guideplate

DN

DN

DN

DN

DN

DN

EXxA

ERxA

EWxA

EXxA

ERxA

EWxA

EXxA

ERxA

EWxA

EXxA

ERxA

EWxA

EXxA

ERxA

EWxA

EXxA

ERxA

EWxA

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 113 (158)

Creating common configurations

Page 50: Flexi Configurations

Figure 64. RF and DP cables in a 1+1+1/2+2+2 DP 4UD configuration

*pre-installed

DN70513356

TX Cables

OUT-TxA

DP-DP TXB-TXB

TXA-TxA

TXA-TxA

DP-DP TXB-TXB

RxAO-RxAI*

RX Cables

RxA1-RxADiv

RxB1-RxB

Rx2-RxB1 RxB2-RxB Div

RxB Div-RxB2

RxA2-RxA

RxA1-RxA

RxA Div-RxA2

OUT-TXB

114 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 51: Flexi Configurations

E.8.4 3 DP 2UD or 4UD configuration in FCOA

A 3 DP 2UD configuration uses 3 antennas and a 3 DP 4UD uses 4antennas.

To create a 3 DP configuration, you will need the following modules:

. 1 System Module (ESMA)

. 1 transmission sub-module (FIxA)

. 3 Dual TRX Modules (EXxA)

. 2 Dual Duplexer Modules (ERxA)

. 3 DP Wideband Combiner Sub-modules (EWxA)

For a 3 DP 4UD configuration, you will also need 2 Upgrade Cable (EUCA)Kits (6 cables).

Note that the effect of using the EUCA Kit for Tx cabling is 0.7 dB with highband, and 0.45 dB with low band. Nokia Siemens Networks recommendsonly using the EUCA cables for Rx cabling in DP configurations.

Double Power TRX (DP TRX) is a licence-based application softwareproduct. The licence file must be installed in the BSC before activating thesite.

If you use 24 V DC or AC power, see section Common cabinetconfigurations for power module requirements.

The figures below show the module installation order and DP and RFcabling. For all other cabling instructions, see the instructions for creating a4+4+4 2-way 2UD configuration in FCOA.

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 115 (158)

Creating common configurations

Page 52: Flexi Configurations

Figure 65. Module installation order for a 3 DP 2UD or 4UD configuration inFCOA, ESMA horizontal

DN

DN

DN

DN70525395

2U(reserved for expansion)

ESMA

ERxA

EXxA

EXxA

ERxA

EXxAEWxA

EWxA

EWxA

116 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 53: Flexi Configurations

Figure 66. Module installation order for a 3 DP 2UD or 4UD configuration inFCOA, ESMA vertical

2U(reserved for expansion)

DN

DN

DN

DN70525402

ERxA

EXxA

EXxA

ERxA

EXxA

EWxA

Air guideplate

EWxA

ESMA

EWxA

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 117 (158)

Creating common configurations

Page 54: Flexi Configurations

Figure 67. RF and DP cabling for a 3 DP 2UD configuration

TX Cables

RX Cables

RxB-RxB2

RxA1-RxA

RxB-RxB1

RxB1-RxB

*pre-installed

DN70513371

DP-DP

DN

RxAO-RxAI*

RxAO-RxAI*

RxA-RxA2

TxA-TxA

TxA-OUT

DP-DP

DN

TxB-TxB

TxB-TxB

OUT-TxB

OUT-TxB

TxB-TxB

RxAO-RxAI*

RxAO-RxAI*

TxA-TxA

RxA-RxA1

TxA-TxA

118 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 55: Flexi Configurations

Figure 68. RF and DP cabling for a 3 DP 4UD configuration

TX Cables

RX Cables RxA1-RxA RxB1-RxB

*pre-installed

DN70513383

DP-DP

DN

RxAO-RxAI*

RxAO-RxAI*

RxA1-RxA Div

TxA-TxA

TxA-OUT

DP-DP

DN

TxB-TxB

TxB-TxB

OUT-TxB

OUT-TxB

TxB-TxB

RxAO-RxAI*

RxAO-RxAI*

TxA-TxA

RxA-RxA3

TxA-TxA

RxA Div-RxA3

RxB-RxB3

RxB Div-RxB3

RxA2-RxA Div

RxB1-RxB Div

RxB2-RxB DivRxA-RxA2

RxB-RxB2

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 119 (158)

Creating common configurations

Page 56: Flexi Configurations

E.8.5 4 DP 2UD or 4UD configuration in FCOA

A 4 DP 2UD configuration uses 3 antennas and a 4DP 4UD uses 4antennas.

To create a 4 DP configuration, you will need the following modules:

. 1 System Module (ESMA)

. 1 transmission sub-module (FIxA)

. 4 Dual TRX Modules (EXxA)

. 2 Dual Duplexer Modules (ERxA)

. 4 DP Wideband Combiner Sub-modules (EWxA)

For a 4 DP 4UD configuration, you will also need 3 Upgrade Cable (EUCA)Kits (8 cables).

Note that the effect of using the EUCA Kit for Tx cabling is 0.7 dB with highband, and 0.45 dB with low band. Nokia Siemens Networks recommendsonly using the EUCA cables for Rx cabling in DP configurations.

Double Power TRX (DP TRX) is a licence-based application softwareproduct. The licence file must be installed in the BSC before activating thesite.

If you use 24 V DC or AC power, see section Common cabinetconfigurations for power module requirements.

The figures below show the module installation order and DP and RFcabling. For all other cabling instructions, see the instructions for creating a4+4+4 2-way 2UD configuration in FCOA.

120 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 57: Flexi Configurations

Figure 69. Module installation order for a 4 DP 2UD or 4UD in FCOA, ESMAhorizontal

DN

DN

DN

DN70525465

EWxA

EWxA

DNEWxA

EWxA

ESMA

ERxA

EXxA

EXxA

ERxA

EXxA

EXxA

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 121 (158)

Creating common configurations

Page 58: Flexi Configurations

Figure 70. Module installation order for a 4 DP 2UD or 4UD in FCOA, ESMAvertical

DN

DN

DN

DN70525489

ERxA

EXxA

EXxA

ERxA

EXxA

EXxADN

Air guideplate

EWxA

ESMA

EWxA

EWxA

EWxA

122 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 59: Flexi Configurations

Figure 71. RF and DP cabling for a 4 DP 2UD configuration

DP-DP

DN

RxAO-RxAI*

RxAO-RxAI*

OUT-TxA

DN

TxB-TxB

TxB-TxB

OUT-TxB

OUT-TxB

TxB-TxB

TxB-TxBTxA-TxA

TxA-TxA

TxA-OUT

TxA-TxA

TxA-TxA

*pre-installed

DN70513402

RxA1-RxA RxB-RxB1DP-DP

DN

RxAO-RxAI*

RxAO-RxAI*

RxA-RxA3

RxB-RxB1

RxA-RxA2

RxB-RxB2

DN

RxB-RxB2RxA-RxA2

RxA-RxA2

TX Cables

RX Cables

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 123 (158)

Creating common configurations

Page 60: Flexi Configurations

Figure 72. RF and DP cabling for a 4 DP 4UD configuration

DP-DP

DN

RxAO-RxAI*

RxAO-RxAI*

OUT-TxA

DN

TxB-TxB

TxB-TxB

OUT-TxB

OUT-TxB

TxB-TxB

TxB-TxBTxA-TxA

TxA-TxA

TxA-OUT

TxA-TxA

TxA-TxA

RxA1-RxA RxB-RxB1

*pre-installed

DN70513414

DN

RxAO-RxAI*

RxA Div-RxA3

RxB-RxB3

DN

RxB Div-RxB4

RxA-RxA4

RxA Div-RxA4

RxB-RxB4

RxA-RxA3

RxB Div-RxB3

RxA2-RxA Div

RxA-RxA2

RxA1-RxA Div

RxB Div-RxB2

RxB-RxB2

RxB Div-RxB1

TX Cables

RX Cables

124 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 61: Flexi Configurations

E.8.6 1+1+1 or 2+2+2 IDD 4UD configuration in FCOA

To create a 1+1+1/2+2+2 DP 4UD configuration, you need the followingmodules:

. 1 System Module (ESMA)

. 1 transmission sub-module (FIxA)

. 6 Dual TRX Modules (EXxA)

. 6 Dual Duplexer Modules (ERxA)

You will also need 4 Upgrade Cable (EUCA) Kits (12 cables).

Note that the effect of using the EUCA Kit for Tx cabling is 0.7 dB with highband, and 0.45 dB with low band. Nokia Siemens Networks recommendsonly using the EUCA cables for Rx cabling in IDD configurations.

If you use 24 V DC or AC power, see section Common cabinetconfigurations for power module requirements.

The following figures show the module installation order and RF cabling.For all other cabling instructions, follow the instructions for a 4+4+4 2-way2UD configuration in FCOA.

In 1+1+1 IDD 4UD configurations, full RF cabling for 2+2+2 IDD 4UD isneeded to enable RF Cabling Auto-detection. It is also recommended forfuture expansion.

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 125 (158)

Creating common configurations

Page 62: Flexi Configurations

Figure 73. Module installation order for a 1+1+1 or 2+2+2 IDD 4UD in FCOA,ESMA horizontal

DN70525535

ESMA

DN

DN

DN

DN

DN

DN

EXxA

ERxA

EXxA

ERxA

EXxA

ERxA

EXxA

ERxA

EXxA

ERxA

EXxA

ERxA

126 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 63: Flexi Configurations

Figure 74. Module installation order for a 1+1+1 or 2+2+2 IDD 4UD in FCOA,ESMA vertical

DN70525559

ESMA

Air guideplate

DN

DN

DN

DN

DN

DN

EXxA

ERxA

EXxA

ERxA

EXxA

ERxA

EXxA

ERxA

EXxA

ERxA

EXxA

ERxA

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 127 (158)

Creating common configurations

Page 64: Flexi Configurations

Figure 75. RF cabling in a 1+1+1/2+2+2 IDD 4UD configuration

*pre-installed

DN70513368

TX Cables

TxA-TxA

TxB-TxB

RxAO-RxAI*

RX Cables

RxA1-RxA Div

RxB1-RxB

RxB-RxB1 RxB2-RxB Div

RxB Div-RxB2

RxA2-RxA

RxA1-RxA

RxA Div-RxA2

TxA-TxA

128 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 65: Flexi Configurations

E.9 RTC configurations

E.9.1 4+4 RTC 1UD or 2UD configuration in FCOA

To create a 4+4 RTC 1UD or 2UD configuration, you need:

. 4 Dual TRX Modules (EXxA)

. 1 System Module (ESMA)

. 1 transmission sub-module (FIxA)

. 2 Remote Tune Combiner Modules (ECxA)

. 1 System Extension Module (ESEA)

If 24 V or AC power is used, see tables in Common cabinet configurationsfor 24 V DC or AC power module requirements.

The module installation order is the same as in Flexi Cabinet for Indoor(FCIA), except that the System Module and System Extension Modulesare in the vertical (left) rack. See figure Module installation order for an 4+4RTC configuration in Flexi Cabinet for Indoor (FCIA), optimised forexpansion in document Creating FCIA Configurations.

The following figure shows the RF cabling for a 4+4 RTC 2UDconfiguration. For a 4+4 RTC 1UD configuration, the RF cables areotherwise connected as shown in the figure, except RxA or RxB cables areabsent from the Dual TRX Modules to the Remote Tune CombinerModules.

For all the other cables, follow the instructions in 4+4+4 RTC 1UD or 2UDconfiguration in FCOA (excluding the cables for the third sector).

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 129 (158)

Creating common configurations

Page 66: Flexi Configurations

Figure 76. 4 sector RTC RF cabling

E.9.2 4+4+4 RTC 1UD or 2UD configuration in FCOA

To create a 4+4+4 RTC 1UD or 2UD configuration, you need:

. 6 Dual TRX Modules (EXxA)

. 1 System Module (ESMA

. 1 transmission sub-module (FIxA)

. 3 Remote Tune Combiner Modules (ECxA)

. 1 System Extension Module (ESEA)

If 24 V or AC power is used, see tables in Common cabinet configurationsfor 24 V DC or AC power module requirements. Note that if this site willeventually expand to a 6+6+6 RTC configuration, 24 V or AC power is notsupported in the Flexi Cabinet for Outdoor (FCOA) because of lack ofspace.

DN

DN

DN

DN

Tx4 - TxB

Tx5 - TxB

Tx1 - TxA

Tx2 - TxA

Rx6 - RxB

Rx4 - RxB

Rx3 - RxA

Rx1 - RxA

DN70472225

130 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 67: Flexi Configurations

The module installation order is the same as in Flexi Cabinet for Indoor(FCIA), except that the System Module and the System ExtensionModules are in the vertical (left) rack. See figure Module installation orderfor an 4+4+4 RTC configuration in FCIA (optimised for expansion) indocument Creating FCIA Configurations.

Table Bus and power cabling on the ESMA and ESEA for 4+4+4 RTC 2UDconfiguration shows to which ESMA and ESEA BUS and PWR connectorsthe cables from each EXxA and ECxA must be connected. Gaps are left inthe ports for Dual TRX Module 3, 6, and 9 for future expansion to a 6+6+6RTC configuration.

Review also the bus and power cabling rules for configurations having aRemote Tune Combiner Module. See section Bus and internal powercabling principles for System Extension Module (ESEA).

Table 14. Bus and power cabling on the ESMA and ESEA for 4+4+4 RTC 2UDconfiguration

Module ESMA BUS ESMA PWR ESEA BUS ESEA PWR

EXxA 1 1 1/7

EXxA 2 2 2/8

EXxA 3(unused)

3 (unused) 3/9 (unused)

EXxA 4 4 4/10

EXxA 5 5 5/11

EXxA 6 (leftopen)

6 (unused) 6/12 (unused)

EXxA 7 4/10 7

EXxA 8 5/11 8

EXxA 9 (leftopen)

6/12 (unused) 9 (unused)

ECxA 1 1 1/7

ECxA 2 2 2/8

ECxA 3 3 3/9

The following figure shows RF cabling for a 4+4+4 RTC 2UD configuration.For a 4+4+4 RTC 1UD configuration, the RF cables are otherwiseconnected as shown in the figure, except RxA or RxB cables are absentfrom the Dual TRX Modules to the Remote Tune Combiner Modules.

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 131 (158)

Creating common configurations

Page 68: Flexi Configurations

For all other cables, follow the instructions for a 4+4+4 2-way 2UDconfiguration in FCOA.

Figure 77. RF cabling for 4 sector RTC 2UD configuration

E.9.3 6+6 RTC 1UD or 2UD configuration in FCOA

To create a 6+6 RTC 1UD or 2UD configuration, you need:

. 6 Dual TRX Modules (EXxA)

. 1 System Module (ESMA)

. 1 transmission sub-module (FIxA)

. 2 Remote Tune Combiner Modules (ECxA)

. 1 System Extension Module (ESEA)

. If 24V DC or AC power is used, see module installation order inOptional power modules (FPDA and FPMA) in Flexi EDGE BTSconfigurations in document Installing Nokia Flexi EDGE BTSOptional Items.

DN

DN

DN

DN

Tx4 - TxB

Tx5 - TxB

Tx1 - TxA

Tx2 - TxA

Rx6 - RxB

Rx4 - RxB

Rx3 - RxA

Rx1 - RxA

DN70472225

132 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 69: Flexi Configurations

Figure 78. Module installation order in a 6+6 RTC configuration in FCOA

The following figure shows the RF cabling for a 6+6 RTC 2UDconfiguration.

For a 6+6 RTC 1UD configuration, the RF cables are otherwise connectedas shown in the figure, except RxA or RxB cables are absent from the DualTRX Modules to the Remote Tune Combiner Modules.

DN

DN

DN

DN

DN

DN

EXxA

ECxA

EXxA

EXxA

EXxA

ECxA

EXxA

EXxA

ESEA

ESMA

Air guideplate

DN70330471

Air guideplate

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 133 (158)

Creating common configurations

Page 70: Flexi Configurations

For bus and power cabling, see section Bus and internal power cablingprinciples for System Extension Module (ESEA).

All Remote Tune Combiner Module power and bus cables must beconnected to the System Module. All Dual TRX Module bus cables mustbe connected to the System Extension Module.

For all other cables, follow the instructions for a 4+4+4 2-Way 2UDconfiguration in FCOA.

Figure 79. RF cabling for a 6+6 RTC configuration

E.9.4 6+6+6 RTC 1UD or 2UD configuration in FCOA

To create this configuration, you need:

DN

DN

Rx6 - RxB

Rx4 - RxB

Rx3 - RxA

Rx1 - RxA

DN

DN

DN

DN

DN70330483

Tx4 - TxB

Tx5 - TxB

Tx1 - TxA

Tx2 - TxA

Tx3 - TxA Tx6 - TxB

Rx5 - RxBRx2 - RxA

134 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 71: Flexi Configurations

. 9 Dual TRX Modules (EXxA)

. 1 System Module (ESMA)

. 1 transmission sub-module (FIxA)

. 3 Remote Tune Combiner Modules (ECxA)

. 1 System Extension Module (ESEA)

24 V DC and AC power options are not supported in Flexi Cabinet forOutdoor (FCOA) with 6+6+6 RTC 1UD or 2UD configurations because oflack of cabinet space. If a 3rd party cabinet, which has sufficient space, isused, see the tables in Common cabinet configurations for 24V DC or ACpower module requirements.

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 135 (158)

Creating common configurations

Page 72: Flexi Configurations

Figure 80. Module installation order in a 6+6+6 RTC configuration in FCOA

The following figure shows the RF cabling for a 6+6+6 RTC 2UDconfiguration.

For a 6+6+6 RTC 1UD configuration, the RF cables are otherwiseconnected as shown in the figure, except RxA or RxB cables are absentfrom the Dual TRX Modules to the Remote Tune Combiner Modules.

DN

DN

DN

DN

DN

DN

EXxA

ECxA

EXxA

EXxA

EXxA

ECxA

EXxA

EXxA

ESEA

ESMA

Air guideplate

DN70472116

Air guideplate

EXxA

EXxA

ECxA

DN

DN

DN

EXxA

136 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 73: Flexi Configurations

For all other cables, follow the instructions for a 4+4+4 2-Way 2UDconfiguration in FCOA.

Review also the bus and power cabling rules for configurations having aRemote Tune Combiner Module. See section Bus and internal powercabling principles for System Extension Module (ESEA).

Use an extension bus cable 994939 to connect the top (or farthest) DualTRX Module to the System Extension Module. For all other Dual TRXModule connections, use the standard bus cable 994938.

Two 994939 cables are provided in the System Extension Module delivery.Keep the other cable as a spare. It can be used to connect the SystemExtension Module to the System Module, or to connect another Dual TRXModule to the System Extension Module if required by 3rd party cabinetinstallations or if there are other special cable routing requirements.

Figure 81. RF cabling for a 6+6+6 RTC 2UD configuration

DN

DN

Rx6 - RxB

Rx4 - RxB

Rx3 - RxA

Rx1 - RxA

DN

DN

DN

DN

DN70330483

Tx4 - TxB

Tx5 - TxB

Tx1 - TxA

Tx2 - TxA

Tx3 - TxA Tx6 - TxB

Rx5 - RxBRx2 - RxA

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 137 (158)

Creating common configurations

Page 74: Flexi Configurations

E.9.5 12 Omni RTC 2UD configuration

To create this configuration, you need:

. 6 Dual TRX Modules (EXxA)

. 1 System Module (ESMA)

. 1 transmission sub-module (FIxA)

. 2 Remote Tune Combiner Modules (ECxA)

. 1 System Extension Module (ESEA)

. 1 Upgrade Cable Kit (EUCA)

. If 24V DC or AC power is used, see module installation order inOptional power modules (FPDA and FPMA) in Flexi EDGE BTSconfigurations in document Installing Nokia Flexi EDGE BTSOptional Items.

Review the bus and power cabling rules for configurations having aRemote Tune Combiner Module in section Bus and internal power cablingprinciples for System Extension Module (ESEA).

All Remote Tune Combiner Module power and bus cables must beconnected to the System Module. All Dual TRX Module bus cables mustbe connected to the System Extension Module.

For module installation order and cabling, see the instructions for a 6+6RTC 1UD or 2UD configuration. In addition, connect the EUCA RF cables:

. Connect RX_ext_In of the top RTC to RX_ext_Out of the lower RTC.

. Connect RX_ext_Out of the top RTC to RX_ext_In of the lower RTC.

Tip

Route the EUCA RF cables along the sides of the cabinet so that thecables do not block installation or removal of the Dual TRX Module.

E.9.6 12+12+12 RTC 2UD configuration in FCOA

To create this configuration, you need the following modules:

138 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 75: Flexi Configurations

. 18 Dual TRX Modules (EXxA)

. 1 System Module (ESMA)

. 1 transmission sub-module (FIxA)

. 6 Remote Tune Combiner Modules (ECxA)

. 1 System Extension Module (ESEA)

The following figures show the module installation and RF diversitycabling. For instructions on other cables, see 6+6+6 RTC 1UD or 2UDconfiguration in FCOA.

Figure 82. Module installation order for a 12+12+12 RTC configuration in FCOA

DN70521266

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

ESEA

ESMA

EXxA

ECxA

EXxA

EXxA

EXxA

ECxA

EXxA

EXxA

EXxA

EXxA

ECxA

EXxASector 1

Sector 2 Sector 2

Sector 3

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 139 (158)

Creating common configurations

Page 76: Flexi Configurations

Figure 83. RF diversity cabling for a 12+12+12 RTC configuration

E.10 Dual band configurations

E.10.1 2+2+2 and 2+2+2 by-pass 2UD configuration in FCOA

For creating a 2+2+2 and 2+2+2 dual band configuration, you need:

. 6 Dual TRX Modules (EXxA)

. 6 Dual Duplexer Modules (ERxA)

. 1 System Module (ESMA)

. 1 transmission sub-module (FIxA)

. If 24V DC or AC power is used, see module installation order inOptional power modules (FPDA and FPMA) in Flexi EDGE BTSconfigurations in document Installing Nokia Flexi EDGE BTSOptional Items.

DN70521281

DN

DN

DN

Rx ext Out - Rx ext In

140 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 77: Flexi Configurations

The following figure shows the module installation order. For instructionson cabling, see the following:

. RF cabling: follow the instructions for a 2+2+2 bypass 2UDconfiguration.

. All other cabling: follow the instructions for a 4+4+4 2-way 2UDconfiguration in FCOA.

If you are using the optional power modules or other optional items, seeinstructions in Installing Nokia Flexi EDGE BTS Optional Items.

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 141 (158)

Creating common configurations

Page 78: Flexi Configurations

Figure 84. Module installation order in a 2+2+2 and 2+2+2 dual bandconfiguration in FCOA

DN70238291

ERxA

EXxA

ERxA

EXxA

ERxA

EXxA

ERxA

EXxA

ERxA

EXxA

ERxA

EXxA

ESMA

Air guideplate

142 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 79: Flexi Configurations

E.10.2 4+4+4 and 4+4+4 4-way 2UD configuration in FCOA

The following figure shows the module installation order for a 4+4+4 and 4+4+4 dual band configuration in FCOA. The blue and red frames indicatethe different frequency bands.

For bus and internal power cabling, follow the instructions for an 8+8+8 4-Way 2UD configuration in FCOA.

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 143 (158)

Creating common configurations

Page 80: Flexi Configurations

Figure 85. Module installation order for a 4+4+4 and 4+4+4 dual bandconfiguration in FCOA

DN70519659

Air guideplate

ESMADN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

EWxx

EWxx

EWxx

ESEA

EWxx ERxA

EXxA

ERxA

EXxA

EXxA

ERxA

EXxA

EXxA

ERxA

EXxA

EXxA

ERxA

EXxA

EXxA

EXxA

ERxA

EXxA

EXxA

EWxx

EWxx

EWxx

EWxx

EWxx

EWxx

EWxx

EWxx

144 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 81: Flexi Configurations

E.11 Antenna-optimised configurations

E.11.1 6 TRX 2-Way 2UD (antenna-optimised) configuration

A 6 TRX 2-Way 2UD antenna-optimised configuration can be installed in astack, in Flexi Cabinet for Indoor (FCIA) and Flexi Cabinet for Outdoor(FCOA).

To create this configuration, you will need the following modules:

. 3 Dual TRX Modules (EXxA)

. 2 Dual Duplexer Module (ERxA)

. 3 Wideband Combiner Sub-modules (EWxx)

. 1 System Module (ESMA)

. 1 transmission sub-module (FIxA)

If you use 24V DC or AC power, see table Antenna-optimised and cost-optimised configurations in Common stack, wall and pole configurations orCommon cabinet configurations for power module requirements.

Figure 86. RF Rx cabling in a 6 TRX 2-way 2UD antenna-optimisedconfiguration

RX Cables

RxB3-RxB

*pre-installedDN70544952

DN

RxAO-RxAI*

RxAO-RxAI*

RxA-RxA2 RxB-RxA2

RxA1-RxA

RxB1-RxB

RxA1-RxA

EXxA1

ERxA1

EXxA2

ERxA2

EXxA3

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 145 (158)

Creating common configurations

Page 82: Flexi Configurations

Figure 87. RF Tx cabling in a 6 TRX 2-way 2UD antenna-optimisedconfiguration

E.11.2 6+6 2-Way 2UD (antenna-optimised) configuration

A 6+6 2-Way 2UD antenna-optimised configuration can be installed in astack, in Flexi Cabinet for Indoor (FCIA) and Flexi Cabinet for Outdoor(FCOA).

To create this configuration, you will need the following modules:

. 6 Dual TRX Modules (EXxA)

. 3 Dual Duplexer Module (ERxA)

. 6 Wideband Combiner Sub-modules (EWxx)

. 1 System Module (ESMA)

. 1 transmission sub-module (FIxA)

. 1 Extension Bus Cable Kit (EECA)

. 1 Upgrade RF Cable Kit (EUCA)

TX Cables*pre-installed

DN70544976

TxA-TxA

TxA-OUT

DN

TxB-TxB

TxB-TxB

OUT-TxB

TxB-TxB

RxAO-RxAI*

RxAO-RxAI*

TxA-TxA

TxA-TxA

TxA-OUT

EXxA1

ERxA1

EXxA2

ERxA2

EXxA3

146 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 83: Flexi Configurations

Note that the effect of using the Upgrade RF Cable Kit (EUCA) for Txcabling is 0.7 dB with high band, and 0.45 dB with low band. NokiaSiemens Networks recommends not to use these cables for Tx cabling inconfigurations when RF performance is critical.

If you use 24V DC or AC power, see table Antenna-optimised and cost-optimised configurations in Common stack, wall and pole configurations orCommon cabinet configurations for power module requirements.

The following figures show the RF cabling. The System Module should beinstalled on top.

Figure 88. RF Rx cabling in a 6+6 TRX 2-way 2UD antenna-optimisedconfiguration

DN

RxAO-RxAI*

RxAO-RxAI*

*pre-installed

DN70544988

RX Cables

DN

DN

EXxA1

ERxA1

EXxA2

ERxA2

EXxA3

EXxA4

EXxA5

ERxA3

EXxA6

RxAO-RxAI*

RxA-RxA2RxB-RxA2

RxA1-RxA

RxB1-RxB

RxB3-RxB

RxA1-RxA

RxA1-RxA

RxB2-RxA

RxB4-RxB

RxB-RxB2

RxB1-RxB

RxA4-RxA

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 147 (158)

Creating common configurations

Page 84: Flexi Configurations

Figure 89. RF Tx cabling in a 6+6 TRX 2-way 2UD antenna-optimisedconfiguration

E.11.3 6+6+6 2-Way 2UD (antenna-optimised) configuration in FCOA

A 6+6+6 2-Way 2UD antenna-optimised configuration can be installed inFlexi Cabinet for Indoor (FCIA) and Flexi Cabinet for Outdoor (FCOA).

To create this configuration, you will need the following modules:

. 9 Dual TRX Modules (EXxA)

. 5 Dual Duplexer Module (ERxA)

. 9 Wideband Combiner Sub-modules (EWxx)

DN

RxAO-RxAI*

RxAO-RxAI*

TxB-TxB

TxB-TxB

OUT-TxB

TxB-TxB

TxA-TxA

TxA-OUT

TxA-OUT

TxA-TxA

*pre-installed

DN70544991

TX Cables

DN

DN

TxA-TxA

TxB-TxB

OUT-TxB

TxA-TxA

TxB-TxBTxA-TxA

TxA-OUT

TxA-TxATxB-TxB

TxB-OUT

EXxA1

ERxA1

EXxA2

ERxA2

EXxA3

EXxA4

EXxA5

ERxA3

EXxA6

RxAO-RxAI*

148 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 85: Flexi Configurations

. 1 System Module (ESMA)

. 1 transmission sub-module (FIxA)

. 1 System Extension Module (ESEA)

. 1 Upgrade RF Cable Kit (EUCA)

Note that the effect of using the Upgrade RF Cable Kit (EUCA) for Txcabling is 0.7 dB with high band, and 0.45 dB with low band. NokiaSiemens Networks recommends not to use these cables for Tx cabling inconfigurations when RF performance is critical.

If you use 24V DC or AC power, see table Antenna-optimised and cost-optimised configurations in Common cabinet configurations for powermodule requirements.

Note that one of the extension bus cables 9949939 included in the SystemExtension Module (ESEA) delivery is used to connect BUS on EXxA 9 toBUS 9 on the ESEA. The other extension bus cable can be used toconnect BUS OUT on the ESEA to BUS IN on the ESMA.

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 149 (158)

Creating common configurations

Page 86: Flexi Configurations

Figure 90. Module order for a 6+6+6 2-way 2UD (antenna-optimised)configuration in FCOA, ESMA vertical

If you are installing the System Module and System Extension Module onthe horizontal rack, the module installation order is the same as in FCIA.See figure Module order for a 6+6+6 2-way 2UD (antenna-optimised)configuration in FCIA in Creating FCIA Configurations, section 6+6+6 2-Way 2UD (antenna-optimised) configuration in FCIA.

DN70545048

EXxA6EWxx

EXxA9EWxx

EXxA7EWxx

EXxA8EWxx

EXxA4EWxx

EXxA5EWxx

EXxA1EWxx

EXxA2EWxx

ESEA

ESMA

Air guideplate

Air guideplate

DN

DN

DN

DN

DN

DN

DN

DN

DN

EXxA3EWxx

ERxA1

ERxA2

ERxA3

ERxA4

ERxA5

150 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 87: Flexi Configurations

For RF cabling, see 6 TRX 2-Way 2UD (antenna-optimised) configurationand 6+6 2-Way 2UD (antenna-optimised) configuration.

E.11.4 12 TRX 4-Way 2UD (antenna-optimised) configuration

A 12 TRX 4-Way 2UD antenna-optimised configuration can be installed ina stack, Flexi Cabinet for Indoor (FCIA) and Flexi Cabinet for Outdoor(FCOA).

To create this configuration, you will need the following modules:

. 6 Dual TRX Modules (EXxA)

. 2 Dual Duplexer Module (ERxA)

. 9 Wideband Combiner Sub-modules (EWxx)

. 1 System Module (ESMA)

. 1 transmission sub-module (FIxA)

. 1 Upgrade RF Cable Kit (EUCA)

If you use 24V DC or AC power, see table Antenna-optimised and cost-optimised configurations in Common stack, wall and pole configurations orCommon cabinet configurations for power module requirements.

Note that one of the extension bus cables 9949939 included in the SystemExtension Module (ESEA) delivery is used to connect BUS on EXxA 9 toBUS 9 on the ESEA. The other extension bus cable can be used toconnect BUS OUT on the ESEA to BUS IN on the ESMA.

The following figures show the RF cabling. The System Module should beinstalled on top.

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 151 (158)

Creating common configurations

Page 88: Flexi Configurations

Figure 91. RF Rx cabling in a 12 TRX 4-way 2UD antenna-optimisedconfiguration

DN

RxAO-RxAI*

*pre-installed

DN70545009

RX Cables

DN

DN

EXxA1

ERxA1

EXxA2

EXxA3

EXxA6

DN

EXxA4

EXxA5

ERxA2

RxA2-RxA

RxA2-RxA

RxA1-RxA

RxA1-RxA

RxA3-RxA

RxA4-RxA

RxB-RxA4

RxB-RxA3

RxB-RxB4

RxB1-RxB

RxB-RxB2

RxB-RxB3

152 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 89: Flexi Configurations

Figure 92. RF Tx cabling in a 12 TRX 4-way 2UD antenna-optimisedconfiguration

E.11.5 12+12 TRX 4-Way 2UD (antenna-optimised) configuration

A 12+12 TRX 4-Way 2UD antenna-optimised configuration can beinstalled in Flexi Cabinet for Indoor (FCIA) and Flexi Cabinet for Outdoor(FCOA).

To create this configuration, you will need the following modules:

. 12 Dual TRX Modules (EXxA)

. 3 Dual Duplexer Module (ERxA)

. 18 Wideband Combiner Sub-modules (EWxx)

DN

RxAO-RxAI*

TxA-OUT

*pre-installed

DN70545012

TX Cables

DN

DN

TxB-TxB

EXxA1

ERxA1

EXxA2

EXxA3

EXxA6

DN

TxB-TxB

TxB-OUT

TxA-TxA

TxA-OUT

EXxA4

EXxA5

ERxA2

TxB-TxB

TxB-TxB

TxB-TxB

TxB-TxB

TxA-TxA

TxA-TxA

TxA-TxA

TxA-TxA

TxA-TxA

OUT-TxA

TxB-OUT

TxB-OUT

TxA-OUT

TxA-OUT

OUT-TxB

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 153 (158)

Creating common configurations

Page 90: Flexi Configurations

. 1 System Module (ESMA)

. 1 System Extension Module (ESEA)

. 1 transmission sub-module (FIxA)

. 2 Upgrade RF Cable Kits (EUCA)

. 4 Extension Bus Cable Kits (EECA)

If you use 24V DC or AC power, see table Antenna-optimised and cost-optimised configurations in Common cabinet configurations for powermodule requirements.

Note that in addition to the extension bus cables 9949939 included in theEECA kits, the extension bus cables included in the System ExtensionModule delivery are also required in this configuration (6 in total).

For sector RF cabling, see figure RF cabling in a 12 TRX 4-Way 2UDantenna-optimised configuration in 12 TRX 4-Way 2UD (antenna-optimised) configuration. Note that the top Dual Duplexer Module is splitbetween both sectors. The System Module should be installed above thetwo, and the System Extension Module should be installed below the twosectors.

E.12 Cost-optimised configurations

E.12.1 3+3 2-way 2UD (cost-optimised) configuration

A cost-optimised 3+3 Flexi EDGE configuration can be installed in a stack,in Flexi Cabinet for Indoor (FCIA) and Flexi Cabinet for Outdoor (FCOA).

For creating this configuration, you need:

. 1 System Module (ESMA)

. 3 Dual TRX Modules (EXxA)

. 2 Dual Duplexer Modules (ERxA)

. 1 transmission sub-module (FIxA)

. 4 Wideband Combiner Sub-modules (EWxx)

The following figures show the RF cabling.

154 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 91: Flexi Configurations

*) RxAO-RxAI is pre-installed

Note that all four Rx cables are needed for the split Dual TRX Module

Figure 93. RX cables in a cost-optimised 3+3 configuration

DN

DN

DN

RxAO-RxAI* RxB1-RxBRxA1-RxARxA2-RxA

RxAO-RxAI* RxA1-RxA

RxB2-RxA Div

RxB1-RxB RxB Div-RxB2

DN70238201

RxB-RxA2

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 155 (158)

Creating common configurations

Page 92: Flexi Configurations

*) RxAO-RxAI is pre-installed

Figure 94. TX cables in a cost-optimised 3+3 configuration

E.13 Multimode configurations

E.13.1 2+2+2 EDGE and 1+1+1 WCDMA configuration in FCOA

The following figure shows how to install Flexi EDGE and Flexi WCDMAmodules in Flexi Cabinet for Outdoor (FCOA) in a /2+2+2 EDGE and 1+1+1 WCDMA configuration.

DN

DN

DN

DN70238213

RxAO-RxAI* TxB-TxB

TxB-TxB

TxA-TxA

TxA-TxA

TxB-OUT

TxB-TxBOUT-TxB

TxA-OUTTxA-TxA

RxAO-RxAI* TxA-OUT

156 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations

Page 93: Flexi Configurations

Flexi WCDMA modules are installed on the bottom of the cabinet, andFlexi EDGE modules on top. The stickers on the cabinets show theinstallation location for Flexi EDGE and Flexi WCDMA modules.

For detailed instructions on installing and cabling Flexi WCDMA modules,see Nokia Flexi WCDMA Base Station, Product Documentation.

For detailed instructions on installing and cabling Flexi EDGE modules,see the configuration-specific instructions.

DN70128475Issue 3-0 en17/06/2008

# Nokia Siemens Networks 157 (158)

Creating common configurations

Page 94: Flexi Configurations

Figure 95. 2+2+2 EDGE and 1+1+1 WCDMA configuration in Flexi Cabinet forOutdoor (FCOA)

DN70237717

FRxx

FRxx

FRxx

FSMx

ERxA

EXxA

ERxA

EXxA

ERxA

EXxA

ESMA

Air guideplate

158 (158) # Nokia Siemens Networks DN70128475Issue 3-0 en17/06/2008

Creating FCOA Configurations