fll welcome sign and broward county logo sign › purchasing › documents... · 2018-05-04 · st,...

9
820 N 4 th St, Lantana, FL 33461 / 561-588-2027 / CGC 1516626 / CBC 05038 / AA 26001503 Presentation prepared for: Broward County Evaluation Committee Wednesday, May 2th , 2018 / 2:00PM – 3:00PM / Governmental Center Building, 115 S. Andrews Avenue, Fort Lauderdale, Fl West Construction, Inc. Solicitation: PNC2115316P1 FLL Welcome Sign and Broward County Logo Sign

Upload: others

Post on 25-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FLL Welcome Sign and Broward County Logo Sign › Purchasing › Documents... · 2018-05-04 · St, Lantana, FL 33461 / 561 -588-2027 / CGC 1516626 / CBC 05038 / AA 26001503. Ease

820 N 4th St, Lantana, FL 33461 / 561-588-2027 / CGC 1516626 / CBC 05038 / AA 26001503

Presentation prepared for:

Broward County Evaluation Committee Wednesday, May 2th , 2018 / 2:00PM – 3:00PM / Governmental Center Building, 115 S. Andrews Avenue, Fort Lauderdale, Fl

West Construction, Inc.So

licita

tion:

PN

C21

1531

6P1

FL

L W

elco

me

Sign

and

Bro

war

d C

ount

y Lo

go S

ign

Page 2: FLL Welcome Sign and Broward County Logo Sign › Purchasing › Documents... · 2018-05-04 · St, Lantana, FL 33461 / 561 -588-2027 / CGC 1516626 / CBC 05038 / AA 26001503. Ease

820 N 4th St, Lantana, FL 33461 / 561-588-2027 / CGC 1516626 / CBC 05038 / AA 26001503

Project Team

West Construction, Inc. & West Architecture + Design, LLC.Design-Builder

Broward CountyOwner/Client

Don Bell Signs, LLC.Sign Manufacture

Solic

itatio

n: P

NC

2115

316P

1

FLL

Wel

com

e Si

gn a

nd B

row

ard

Cou

nty

Logo

Sig

n

Page 3: FLL Welcome Sign and Broward County Logo Sign › Purchasing › Documents... · 2018-05-04 · St, Lantana, FL 33461 / 561 -588-2027 / CGC 1516626 / CBC 05038 / AA 26001503. Ease

820 N 4th St, Lantana, FL 33461 / 561-588-2027 / CGC 1516626 / CBC 05038 / AA 26001503

Maintenance of Traffic• MOT will be required to condense garage

entrance traffic to one lane using the easternmost lane entering the garage during working hours.

• Additional MOT may be required along the northeast side of the garage where the flatbed truck will be staged for unloading.

• MOT will be broken down on a daily basis, if required.

Solic

itatio

n: P

NC

2115

316P

1

FLL

Wel

com

e Si

gn a

nd B

row

ard

Cou

nty

Logo

Sig

n

Page 4: FLL Welcome Sign and Broward County Logo Sign › Purchasing › Documents... · 2018-05-04 · St, Lantana, FL 33461 / 561 -588-2027 / CGC 1516626 / CBC 05038 / AA 26001503. Ease

820 N 4th St, Lantana, FL 33461 / 561-588-2027 / CGC 1516626 / CBC 05038 / AA 26001503

StagingSo

licita

tion:

PN

C21

1531

6P1

FL

L W

elco

me

Sign

and

Bro

war

d C

ount

y Lo

go S

ign

• We are committed to minimal disruptions of airport operations . In order to do this, we plan to utilize the elevated deck near the garage entrance for all staging/installation.

• The crane truck and 125’ boom lift will be unloaded and staged in the “lift and work area”. Approximately 40’ on the northeast side of the building will be used for flatbed delivery and unloading, while the east side near the entrance will be where the 125’ boom lift ,crane truck and light tower will be staged.

Page 5: FLL Welcome Sign and Broward County Logo Sign › Purchasing › Documents... · 2018-05-04 · St, Lantana, FL 33461 / 561 -588-2027 / CGC 1516626 / CBC 05038 / AA 26001503. Ease

820 N 4th St, Lantana, FL 33461 / 561-588-2027 / CGC 1516626 / CBC 05038 / AA 26001503

Proposed MaterialsPrincipal LED lighting are high quality LED sign components that with stand the harsh conditions of Florida and has held up very well the 8 years we have been using the product.

We only use 5052 strength structural aluminum or steel framing that will not rust since we prep, prime and paint the steel with marine grade primer. We use non corrosive hardware that will not rust in the tough Florida environment.

The plastic we use is Plaskolite, a leading brand of plastics in the sign industry.

Vinyls – we use 3M film products.

Paints – Matthews automotive paint with a 5 step paint process, 1 primer, 2 coats of paint, 2 coats of clear coating protection.

Solic

itatio

n: P

NC

2115

316P

1

FLL

Wel

com

e Si

gn a

nd B

row

ard

Cou

nty

Logo

Sig

n

Page 6: FLL Welcome Sign and Broward County Logo Sign › Purchasing › Documents... · 2018-05-04 · St, Lantana, FL 33461 / 561 -588-2027 / CGC 1516626 / CBC 05038 / AA 26001503. Ease

820 N 4th St, Lantana, FL 33461 / 561-588-2027 / CGC 1516626 / CBC 05038 / AA 26001503

Ease of MaintenanceServiceability: Our team designer will have pre design meetings with Don Bell Sign’sproduction team to make sure we are placing the lighting components in a waterproof area that can be easily accessible to service in the future. Power supplies that power the LED’s are usually the first to go out years down the road and we make sure they are accessible by roof or bucket truck. We build access doors that are flush to the back or return (side) of the sign cabinet with counter sunk screws that won’t be visible from the ground.

Cleaning: we suggest an annual cleaning of the sign by the sign vendor or airport maintenance crew. This consists of light pressure washing with water hose and ivory soap. The idea is similar to washing a car. A light wax is not necessary but it would be good to do if not annually, then at least every two years. This will protect your investment for many more years, similar to a car’s finish.

Solic

itatio

n: P

NC

2115

316P

1

FLL

Wel

com

e Si

gn a

nd B

row

ard

Cou

nty

Logo

Sig

n

Page 7: FLL Welcome Sign and Broward County Logo Sign › Purchasing › Documents... · 2018-05-04 · St, Lantana, FL 33461 / 561 -588-2027 / CGC 1516626 / CBC 05038 / AA 26001503. Ease

820 N 4th St, Lantana, FL 33461 / 561-588-2027 / CGC 1516626 / CBC 05038 / AA 26001503

• Our teams focus on accurate scheduling enables our projects to run efficiently.

• We have a detailed and experienced scheduling staff, with the ability to successfully plan the work of all parties involved and coordinate the many activities that simultaneously take place.

• During the setting of the final schedule the superintendent and key sub-contractors are consulted to insure that lead time for specified equipment is adequate and that the interaction of trades is adequately coordinated.

• Our schedule is as follows:Design 2 weeks Engineering 1 weekPermitting process 2 weeksOrdering materials 1 weekFabrication 11 weeksInstallation 1.5 weeksCompletion checklist 2 days

Total estimated time (+/-) 19 weeks

ScheduleSo

licita

tion:

PN

C21

1531

6P1

FL

L W

elco

me

Sign

and

Bro

war

d C

ount

y Lo

go S

ign

Page 8: FLL Welcome Sign and Broward County Logo Sign › Purchasing › Documents... · 2018-05-04 · St, Lantana, FL 33461 / 561 -588-2027 / CGC 1516626 / CBC 05038 / AA 26001503. Ease

820 N 4th St, Lantana, FL 33461 / 561-588-2027 / CGC 1516626 / CBC 05038 / AA 26001503

Why the WEST Team? Team Approach No Learning Curve Personal Involvement by Principals Understanding of Project and Logistics Understanding of the Importance of

Schedules Award Winning Team Long History of Performance on Projects Team with Proven Experience Local Office

Solic

itatio

n: P

NC

2115

316P

1

FLL

Wel

com

e Si

gn a

nd B

row

ard

Cou

nty

Logo

Sig

n

Page 9: FLL Welcome Sign and Broward County Logo Sign › Purchasing › Documents... · 2018-05-04 · St, Lantana, FL 33461 / 561 -588-2027 / CGC 1516626 / CBC 05038 / AA 26001503. Ease

820 N 4th St, Lantana, FL 33461 / 561-588-2027 / CGC 1516626 / CBC 05038 / AA 26001503

Thank you for your time!

Questions and answers?

Solic

itatio

n: P

NC

2115

316P

1

FLL

Wel

com

e Si

gn a

nd B

row

ard

Cou

nty

Logo

Sig

n