Floodwater Management in Dallas, TX Stephen Swan CE 394K 2 April 22, 2010 1

Upload: lise

Post on 26-Feb-2016

37 views

Category:

Documents


0 download

DESCRIPTION

Stephen Swan CE 394K 2 April 22, 2010. Floodwater Management in Dallas, TX. OUTLINE. Project Background Dallas and the Trinity River Flood of 1908 Current Flood Control Measures Initial Modeling Future Work. CITY OF DALLAS. Population: 1.2 million 8 th largest city in the nation - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Floodwater Management in Dallas, TX

1

Floodwater Management in Dallas, TX

Stephen SwanCE 394K 2April 22, 2010

Page 2: Floodwater Management in Dallas, TX

2

OUTLINE

Project BackgroundDallas and the Trinity RiverFlood of 1908Current Flood Control MeasuresInitial ModelingFuture Work

Page 3: Floodwater Management in Dallas, TX

3

CITY OF DALLAS

Population: 1.2 million 8th largest city in the nation Average annual precipitation

Rainfall: 33.7 in Snow: 2.5 in

Located along the Trinity River in the Upper Trinity River Basin

http://www.dallascityhall.com/info/about.html

Page 4: Floodwater Management in Dallas, TX

4

TRINITY RIVER AT DALLAS

Three forks meet before Dallas Clear, West, and Elm Forks East Fork meets southeast of Dallas

River course 710 mile length Empties into the Gulf of Mexico

Average annual flow Last ten years: 800 - 4000 cfs

http://en.wikipedia.org/wiki/File:Trinity_Watershed.png

Page 5: Floodwater Management in Dallas, TX

5

FLOOD OF 1908 Worst recorded flood in Dallas’ history Trinity River

52.6 feet deep 1.5 miles wide

Estimated damage : $2.5 million 4,000 people left homeless Five were killed Began the design and implementation of flood control

systems in Dallas

http://www.dallashistory.org/history/dallas/dallas_history.htm

Page 6: Floodwater Management in Dallas, TX

6

DALLAS FLOOD CONTROL Levees

East Levee: 11.5 mi West Levee: 13.4 mi Rochester Levee: 5.1 mi Average height: 28 ft

Pumping Stations Stations: 16 Pumps: 63 Flow rate: 4,399 cfs

Pressure Sewers Sewers: 6 Flow rate: 19,868 cfs

http://www.ci.dallas.tx.us/sts/html/fc.html

Page 7: Floodwater Management in Dallas, TX

7

LEVEE SYSTEM

Appendix A, Periodic Inspection Report, Dallas Floodway Project, USACE

Page 8: Floodwater Management in Dallas, TX

8

USACE PERIODIC INPECTION 2007

USACE 5 year inspection Dallas levee system Unacceptable East levee

47% below Standard Project Flood West levee

42% below Standard Project Flood Issues with other flood protection

Periodic Inspection Report, Dallas Floodway Project, USACE

Page 9: Floodwater Management in Dallas, TX

9

HEC-HMS MODELING

water.usgs.gov

USGS Streamflow Gauge 08057000 at Downtown Dallas

Page 10: Floodwater Management in Dallas, TX

10

HEC-HMS MODELING

Jessica Baker, Halff Associates

Cedar Springs Branch at Turtle Creek

Page 11: Floodwater Management in Dallas, TX

11

HEC-HMS MODELING

Appendix A, Periodic Inspection Report, Dallas Floodway Project, USACE

100-year conditions outflow at Cedar Springs Branch, Junction 8

Page 12: Floodwater Management in Dallas, TX

12

HEC-SSP MODELING

Annual peak flows for USGS 08057000 at Dallas, TX

Page 13: Floodwater Management in Dallas, TX

13

HEC-SSP MODELING

Annual peak flows distribution

Page 14: Floodwater Management in Dallas, TX

14

FUTURE WORK

HEC-RAS Modeling Model the current levee system against 100-year

flood conditions Determine levee failures from the 100-year flood Compare 100-year flood failures to Standard

Project Flood failures

Page 15: Floodwater Management in Dallas, TX

15

QUESTIONS?